SlideShare una empresa de Scribd logo
  • Cargar
  • Iniciar sesión
  • Descarga gratis durante 30 días
SlideShare una empresa de Scribd logo
  • Cargar
  • Descarga gratis durante 30 días
  • Iniciar sesión
×
×
×
×
×
×
waqar kazmi

waqar kazmi

0 Seguidores
1 SlideShare
  • Desbloquear usuario Bloquear usuario
1 SlideShare

Personal Information
Organización/Lugar de trabajo
Pakistan Pakistan
Ocupación
Associate Engineer Neelum Jhelum Consultant.
Sector
Real Estate/ Construction / Architecture
Acerca de
Associate Engineer Neelum Jhelum Consultant. A joint venture between (MWH “USA”, Norplan “Norway” Nespak “Pakistan”, ACE “Pakistan”, NDC “Pakistan” ) The US$ 2.16 billion Neelum Jhelum hydro power project is under construction in order to meet the needs of the power. The project is located in the lower Himalayas; it envisages the diversion of Neelum river water through a tunnel out-falling into Jhelum River. Underground works comprises of the construction of near 32 kilometres long tunnels and two huge caverns. Mostly drill and blast method will be used for the underground excavation. 11 kilometres long tunnel will be excavate with TBM. The installed capacity is 969...
Datos de contacto
  • Actividad
  • Acerca de

Documentos

(1)

Syed Waqar Ali Shah

Hace 9 años • 1235 Visualizaciones

Recomendaciones

(2)

Word forms and parts of speech

mcclintic • Hace 12 años

Tenses

Shiqin Jozof • Hace 12 años
Personal Information
Organización/Lugar de trabajo
Pakistan Pakistan
Ocupación
Associate Engineer Neelum Jhelum Consultant.
Sector
Real Estate/ Construction / Architecture
Acerca de
Associate Engineer Neelum Jhelum Consultant. A joint venture between (MWH “USA”, Norplan “Norway” Nespak “Pakistan”, ACE “Pakistan”, NDC “Pakistan” ) The US$ 2.16 billion Neelum Jhelum hydro power project is under construction in order to meet the needs of the power. The project is located in the lower Himalayas; it envisages the diversion of Neelum river water through a tunnel out-falling into Jhelum River. Underground works comprises of the construction of near 32 kilometres long tunnels and two huge caverns. Mostly drill and blast method will be used for the underground excavation. 11 kilometres long tunnel will be excavate with TBM. The installed capacity is 969...

Modal header

  • Acerca de
  • Atención al cliente
  • Condiciones
  • Privacidad
  • Copyright
  • Preferencias de cookies
  • No vender ni compartir mis datos personales
Español
English
Idioma actual: Español
Português
Français
Deutsch

© 2025 SlideShare from Scribd