Cash budgeting is a vital process for any business that wants to manage its cash flow effectively and avoid liquidity problems. Cash budgeting involves estimating the amount and timing of cash inflows and outflows for a given period, usually a month or a quarter. By preparing a cash budget, a business can plan ahead for its cash needs, identify potential surpluses or shortages, and make informed decisions about financing, investing, and operating activities. Cash budgeting can also help a business evaluate the profitability and feasibility of a project using capital evaluation techniques such as net present value (NPV), internal rate of return (IRR), and payback period.
Some of the benefits of cash budgeting are:
1. It helps a business to maintain a healthy cash balance and avoid cash flow problems that could jeopardize its operations or reputation. For example, a business that does not budget its cash may run out of cash to pay its suppliers, employees, or creditors, which could result in legal actions, penalties, or loss of goodwill.
2. It helps a business to optimize its use of cash and allocate it to the most productive and profitable activities. For example, a business that budgets its cash can identify when it has excess cash and invest it in short-term or long-term opportunities, such as expanding its capacity, acquiring new assets, or paying off debts.
3. It helps a business to evaluate the performance and viability of a project using capital evaluation methods. For example, a business that budgets its cash can estimate the cash flows generated by a project and compare them with the initial investment and the required rate of return. This can help the business to determine whether the project is worth pursuing or not.
To illustrate how cash budgeting works, let us consider a simple example of a project that involves building a new factory. The project requires an initial investment of $10 million and is expected to generate annual revenues of $3 million and annual expenses of $2 million for 10 years. The required rate of return for the project is 12%. To prepare a cash budget for the project, we need to follow these steps:
- Step 1: estimate the cash inflows and outflows for each year of the project. The cash inflows are the revenues minus the expenses, and the cash outflows are the initial investment and any other payments related to the project, such as taxes, depreciation, or interest. For simplicity, we assume that the revenues and expenses are received and paid at the end of each year, and that there are no taxes, depreciation, or interest payments. Therefore, the cash inflows and outflows for each year are:
| Year | Cash Inflow | Cash Outflow |
| 0 | 0 | 10,000,000 | | 1 | 1,000,000 | 0 | | 2 | 1,000,000 | 0 | | 3 | 1,000,000 | 0 | | 4 | 1,000,000 | 0 | | 5 | 1,000,000 | 0 | | 6 | 1,000,000 | 0 | | 7 | 1,000,000 | 0 | | 8 | 1,000,000 | 0 | | 9 | 1,000,000 | 0 | | 10 | 1,000,000 | 0 |- Step 2: calculate the net cash flow for each year of the project. The net cash flow is the difference between the cash inflow and the cash outflow for each year. Therefore, the net cash flow for each year is:
| Year | Net Cash Flow |
| 0 | -10,000,000 | | 1 | 1,000,000 | | 2 | 1,000,000 | | 3 | 1,000,000 | | 4 | 1,000,000 | | 5 | 1,000,000 | | 6 | 1,000,000 | | 7 | 1,000,000 | | 8 | 1,000,000 | | 9 | 1,000,000 | | 10 | 1,000,000 |- Step 3: Apply the capital evaluation techniques to the net cash flow to assess the profitability and feasibility of the project. There are several methods that can be used, such as NPV, IRR, and payback period. Here, we will use the NPV method, which calculates the present value of the net cash flow using the required rate of return as the discount rate. The NPV of the project is:
\begin{aligned}
npv &= \sum_{t=0}^{10} \frac{Net cash Flow_t}{(1 + r)^t} \\
&= \frac{-10,000,000}{(1 + 0.12)^0} + \frac{1,000,000}{(1 + 0.12)^1} + \frac{1,000,000}{(1 + 0.12)^2} + ... + \frac{1,000,000}{(1 + 0.12)^10} \\
&= -10,000,000 + 892,857 + 797,193 + ... + 321,973 \\ &= -1,057,379\end{aligned}
The NPV of the project is negative, which means that the project is not profitable and should not be undertaken. The project does not generate enough cash flow to cover the initial investment and the required rate of return.
This is an example of how cash budgeting can help a business to forecast the inflows and outflows of cash for a project using capital evaluation. Cash budgeting is an important tool for any business that wants to manage its cash flow effectively and make sound financial decisions.
Cash budgeting is a crucial aspect of financial planning for any project or business. It involves forecasting and managing the inflows and outflows of cash to ensure smooth operations and effective resource allocation. In this section, we will delve into the key concepts and components of a cash budget, providing insights from different perspectives.
1. Cash Inflows:
- Cash Sales: This refers to the revenue generated from the direct sale of goods or services for cash.
- Accounts Receivable: Cash received from customers who have purchased on credit.
- Investments: Income generated from investments such as interest, dividends, or capital gains.
2. Cash Outflows:
- Operating Expenses: These are the day-to-day expenses incurred in running the business, including salaries, rent, utilities, and supplies.
- cost of Goods sold: The direct costs associated with producing or purchasing the goods sold.
- Loan Payments: Cash outflows related to repaying loans or interest on borrowed funds.
3. cash Flow forecasting:
- Historical Data: Analyzing past cash flows to identify patterns and trends.
- Sales Projections: Estimating future sales based on market research, customer demand, and industry trends.
- Expense Projections: anticipating future expenses by considering factors such as inflation, growth plans, and cost-saving measures.
- Zero-Based Budgeting: Starting the budgeting process from scratch, considering each expense and revenue item individually.
- Incremental Budgeting: Adjusting the previous budget based on changes in the business environment or projected growth.
- Rolling Budgeting: Creating a continuous budget that is updated regularly to reflect changing circumstances.
5. importance of Cash budgeting:
- Liquidity Management: Ensuring that the business has sufficient cash to meet its short-term obligations.
- Decision Making: Providing insights into the financial feasibility of projects, investments, and expansion plans.
- Financial Stability: Identifying potential cash flow gaps and taking proactive measures to address them.
Example: Let's say a retail business wants to expand its operations by opening a new store. By creating a cash budget, the business can estimate the cash inflows from increased sales and the cash outflows for rent, inventory, and additional staffing. This helps in determining the financial viability of the expansion and making informed decisions.
Key Concepts and Components - Cash Budget: How to Forecast the Inflows and Outflows of Cash for a Project Using Capital Evaluation
One of the most important aspects of project evaluation is assessing the capital requirements of the project. Capital requirements refer to the amount of money that is needed to finance the project, including the initial investment, the operating costs, and the repayment of debt. Capital requirements depend on various factors, such as the size, duration, and complexity of the project, the expected cash flows, the interest rate, and the risk level. In this section, we will discuss how to estimate the capital requirements of a project, and how to compare different sources of financing. We will also provide some insights from different perspectives, such as the project manager, the investor, and the lender.
Some of the steps involved in assessing the capital requirements of a project are:
1. Estimating the initial investment: This is the amount of money that is needed to start the project, such as the cost of land, buildings, equipment, materials, and labor. The initial investment can be estimated using various methods, such as the net present value (NPV) method, the internal rate of return (IRR) method, or the payback period method. These methods compare the initial investment with the expected future cash flows of the project, and determine whether the project is profitable or not. For example, the NPV method calculates the difference between the present value of the cash inflows and the present value of the cash outflows, and selects the project that has the highest NPV. The IRR method calculates the interest rate that makes the NPV equal to zero, and selects the project that has the highest IRR. The payback period method calculates the time required to recover the initial investment, and selects the project that has the shortest payback period.
2. Estimating the operating costs: These are the ongoing expenses that are incurred during the operation of the project, such as the cost of maintenance, utilities, taxes, insurance, and wages. The operating costs can be estimated using historical data, industry benchmarks, or expert opinions. The operating costs can be classified into fixed costs and variable costs. Fixed costs are the costs that do not change with the level of output, such as rent, depreciation, and salaries. Variable costs are the costs that change with the level of output, such as raw materials, electricity, and commissions. The operating costs can be expressed as a function of the output, such as $C = F + VQ$, where $C$ is the total cost, $F$ is the fixed cost, $V$ is the variable cost per unit, and $Q$ is the output quantity.
3. Estimating the cash flows: These are the inflows and outflows of cash that are generated by the project, such as the revenues, expenses, taxes, and dividends. The cash flows can be estimated using the income statement, the balance sheet, and the statement of cash flows. The cash flows can be classified into operating cash flows and financing cash flows. Operating cash flows are the cash flows that are related to the core business activities of the project, such as the sales, costs, and taxes. Financing cash flows are the cash flows that are related to the funding of the project, such as the loans, interest payments, and equity injections. The cash flows can be expressed as a series of payments or receipts over time, such as $CF_0, CF_1, CF_2, ..., CF_n$, where $CF_0$ is the initial cash flow, $CF_1$ is the cash flow in the first period, $CF_2$ is the cash flow in the second period, and so on.
4. Comparing different sources of financing: These are the different ways of raising the money that is needed to fund the project, such as debt, equity, or a combination of both. Debt is the money that is borrowed from external sources, such as banks, bonds, or leases. Equity is the money that is contributed by the owners of the project, such as shareholders, partners, or venture capitalists. Each source of financing has its own advantages and disadvantages, such as the cost, the risk, the control, and the tax implications. The optimal source of financing depends on the characteristics of the project, the preferences of the stakeholders, and the availability of the funds. For example, debt financing is cheaper than equity financing, but it also increases the financial risk and the obligation to repay the principal and interest. Equity financing does not require any repayment, but it also dilutes the ownership and the control of the project. A combination of debt and equity financing can balance the benefits and costs of each source, and achieve the optimal capital structure.
Assessing Capital Requirements - Cash Budget: How to Forecast the Inflows and Outflows of Cash for a Project Using Capital Evaluation
Forecasting cash inflows is a crucial aspect of managing a project's finances. It involves estimating the amount and timing of cash that will be received from various sources. This section explores different methods and considerations for accurate cash inflow forecasting.
1. historical Data analysis: One method is to analyze historical data to identify patterns and trends in cash inflows. By examining past cash receipts, such as sales revenue or investment returns, we can make informed projections for the future. For example, if a business experiences seasonal fluctuations in sales, historical data can help predict cash inflows during specific periods.
2. market Research and analysis: conducting market research provides valuable insights into customer behavior, market trends, and industry dynamics. By understanding the target market and its purchasing patterns, we can estimate potential sales and corresponding cash inflows. For instance, analyzing market demand for a new product can help forecast cash inflows from its sales.
3. sales Pipeline analysis: For businesses with a sales pipeline, analyzing the different stages of the sales process can aid in cash inflow forecasting. By tracking leads, conversions, and average deal sizes, we can estimate the probability and timing of cash inflows from potential customers. This approach allows for a more granular and accurate projection of cash inflows.
4. Contractual Agreements: In certain industries, cash inflows are tied to contractual agreements. For example, a construction company may receive progress payments based on milestones achieved. By reviewing existing contracts and their payment terms, we can forecast cash inflows with greater certainty. It is important to consider the terms and conditions of these agreements to ensure accurate projections.
5. Economic Factors: External economic factors can significantly impact cash inflows. factors such as interest rates, inflation, and consumer confidence can influence customer spending and investment decisions. By monitoring economic indicators and trends, we can incorporate these factors into our cash inflow forecasts. For instance, during periods of economic downturn, cash inflows may be lower due to reduced consumer spending.
6. Sensitivity Analysis: It is essential to conduct sensitivity analysis to assess the impact of different scenarios on cash inflows. By varying key assumptions, such as sales volumes or market conditions, we can evaluate the potential range of cash inflows. This helps in identifying potential risks and developing contingency plans.
Remember, accurate cash inflow forecasting requires a combination of data analysis, market research, and consideration of various factors. By employing these methods and considering the unique characteristics of your project, you can make informed projections and effectively manage your cash flow.
Methods and Considerations - Cash Budget: How to Forecast the Inflows and Outflows of Cash for a Project Using Capital Evaluation
One of the most important aspects of cash budgeting is estimating the cash outflows or the expenses associated with a project. These expenses can be classified into two categories: capital expenditures and operating expenditures. Capital expenditures are the costs of acquiring or upgrading fixed assets, such as machinery, equipment, buildings, or land. Operating expenditures are the costs of running the project on a day-to-day basis, such as wages, utilities, materials, maintenance, taxes, and interest.
To estimate the cash outflows of a project, we need to identify the following factors:
1. The timing and amount of capital expenditures. This depends on the nature and scope of the project, as well as the availability and cost of financing. For example, if a project requires a large upfront investment in machinery and equipment, the cash outflow will be high in the initial stages of the project. On the other hand, if a project can be financed by leasing or borrowing, the cash outflow will be spread over the duration of the project.
2. The depreciation method and rate of the fixed assets. This affects the amount of tax savings that the project can generate, as well as the salvage value of the assets at the end of the project. For example, if a project uses the straight-line depreciation method, the depreciation expense will be constant over the life of the asset, and the salvage value will be equal to the book value. On the other hand, if a project uses the accelerated depreciation method, such as double declining balance or sum of the years' digits, the depreciation expense will be higher in the earlier years of the project, and the salvage value will be lower than the book value.
3. The operating expenses of the project. This depends on the level of output, the price of inputs, the efficiency of production, and the market conditions. For example, if a project has a high fixed cost structure, such as high rent or overhead, the operating expenses will be relatively insensitive to changes in output. On the other hand, if a project has a high variable cost structure, such as high labor or material costs, the operating expenses will vary proportionally with changes in output.
4. The working capital requirements of the project. This refers to the amount of current assets minus current liabilities that the project needs to maintain its operations. Working capital is affected by the cash conversion cycle, which is the time it takes to convert raw materials into finished goods, sell them to customers, and collect the cash. For example, if a project has a long cash conversion cycle, such as a manufacturing project that requires a lot of inventory and has slow-paying customers, the working capital requirement will be high. On the other hand, if a project has a short cash conversion cycle, such as a service project that has low inventory and fast-paying customers, the working capital requirement will be low.
By identifying and estimating these factors, we can prepare a detailed cash outflow schedule for the project, which will help us evaluate its feasibility and profitability.
Identifying Project Expenses - Cash Budget: How to Forecast the Inflows and Outflows of Cash for a Project Using Capital Evaluation
One of the most important aspects of cash budgeting is analyzing the cash flow patterns of a project. Cash flow patterns refer to the timing and magnitude of cash inflows and outflows associated with a project. By analyzing the cash flow patterns, a project manager can determine the feasibility, profitability, and riskiness of a project. In this section, we will discuss some of the cash budgeting techniques that can help in analyzing cash flow patterns, such as:
1. Net Present Value (NPV): This technique calculates the present value of all the cash inflows and outflows of a project, using a discount rate that reflects the opportunity cost of capital. The NPV of a project is the difference between the present value of cash inflows and the present value of cash outflows. A positive NPV indicates that the project is profitable and adds value to the firm. A negative NPV indicates that the project is unprofitable and destroys value. A zero NPV indicates that the project is break-even and has no effect on the firm's value. For example, suppose a project requires an initial investment of $100,000 and generates cash inflows of $30,000, $40,000, and $50,000 in the next three years, respectively. If the discount rate is 10%, the NPV of the project is:
$$\text{NPV} = -100,000 + \frac{30,000}{(1+0.1)} + \frac{40,000}{(1+0.1)^2} + \frac{50,000}{(1+0.1)^3} = 6,646.32$$
Since the NPV is positive, the project is profitable and should be accepted.
2. Internal Rate of Return (IRR): This technique calculates the discount rate that makes the npv of a project equal to zero. The IRR of a project is the rate of return that the project offers to the investors. A higher IRR indicates a more profitable and desirable project. A lower IRR indicates a less profitable and less desirable project. The IRR of a project should be compared with the required rate of return or the hurdle rate of the firm. If the irr is greater than or equal to the hurdle rate, the project is acceptable. If the IRR is less than the hurdle rate, the project is unacceptable. For example, using the same project as above, the IRR of the project is the solution of the following equation:
$$-100,000 + \frac{30,000}{(1+IRR)} + \frac{40,000}{(1+IRR)^2} + \frac{50,000}{(1+IRR)^3} = 0$$
Using a trial and error method or a financial calculator, the IRR of the project is approximately 18.08%. Since the IRR is greater than the discount rate of 10%, the project is acceptable.
3. Payback Period (PP): This technique calculates the number of years it takes for a project to recover its initial investment from the cash inflows. The PP of a project is the time required for the cumulative cash inflows to equal the cumulative cash outflows. A shorter PP indicates a faster recovery and a lower risk of the project. A longer PP indicates a slower recovery and a higher risk of the project. The PP of a project should be compared with a predetermined maximum acceptable payback period. If the PP is less than or equal to the maximum acceptable payback period, the project is acceptable. If the PP is greater than the maximum acceptable payback period, the project is unacceptable. For example, using the same project as above, the PP of the project is:
$$\text{PP} = 2 + \frac{100,000 - (30,000 + 40,000)}{50,000} = 2.6 \text{ years}$$
Since the PP is less than the maximum acceptable payback period of 3 years, the project is acceptable.
These are some of the cash budgeting techniques that can help in analyzing cash flow patterns of a project. By applying these techniques, a project manager can evaluate the viability and attractiveness of a project and make informed decisions. However, these techniques have some limitations and assumptions that should be considered, such as:
- These techniques assume that the cash flows are certain and constant, which may not be realistic in some cases.
- These techniques ignore the effects of inflation, taxes, and working capital on the cash flows, which may affect the accuracy of the analysis.
- These techniques may give conflicting results when comparing mutually exclusive projects or projects with different scales or lives, which may require additional criteria or adjustments.
Analyzing Cash Flow Patterns - Cash Budget: How to Forecast the Inflows and Outflows of Cash for a Project Using Capital Evaluation
Monitoring and adjusting cash budget is a crucial step in ensuring the financial stability of a project. A cash budget is a plan that shows the expected inflows and outflows of cash for a given period of time. It helps to evaluate the feasibility and profitability of a project, as well as to identify any potential cash flow problems or opportunities. However, a cash budget is not a static document that can be prepared once and forgotten. It needs to be monitored and adjusted regularly to reflect the actual performance and changing conditions of the project. This section will discuss the importance and methods of monitoring and adjusting cash budget, as well as some tips and best practices for doing so effectively.
Some of the reasons why monitoring and adjusting cash budget is important are:
1. To track the progress and performance of the project. By comparing the actual cash inflows and outflows with the budgeted ones, the project manager can assess how well the project is meeting its objectives and milestones, and identify any deviations or variances that need to be addressed. For example, if the actual cash inflows are lower than the budgeted ones, it may indicate that the project is facing difficulties in collecting payments from customers, or that the sales volume or price is lower than expected. On the other hand, if the actual cash outflows are higher than the budgeted ones, it may indicate that the project is experiencing cost overruns, delays, or inefficiencies in its operations. Monitoring and adjusting cash budget can help the project manager to take corrective actions, such as renegotiating contracts, reducing expenses, or seeking additional funding, to bring the project back on track.
2. To manage the cash flow and liquidity of the project. A cash budget can help the project manager to forecast the cash flow and liquidity of the project, which are essential for its survival and success. cash flow is the net amount of cash that flows in and out of the project in a given period of time, while liquidity is the ability of the project to meet its short-term financial obligations, such as paying suppliers, employees, or creditors. A positive cash flow and a high liquidity indicate that the project has enough cash to cover its expenses and invest in its growth, while a negative cash flow and a low liquidity indicate that the project is facing a cash shortage or a cash crisis, which can jeopardize its viability and reputation. Monitoring and adjusting cash budget can help the project manager to plan and manage the cash flow and liquidity of the project, such as by optimizing the timing and amount of cash receipts and payments, maintaining a cash reserve or a contingency fund, or securing a line of credit or a short-term loan, to ensure that the project has sufficient cash to operate smoothly and sustainably.
3. To adapt to the changing environment and circumstances of the project. A cash budget is based on certain assumptions and estimates that may not always hold true or accurate in the real world. The project may face unexpected changes or uncertainties in its internal or external environment, such as changes in customer demand, market conditions, competitor actions, supplier availability, regulatory requirements, technological innovations, or natural disasters, that can affect its cash inflows and outflows. Monitoring and adjusting cash budget can help the project manager to update and revise the cash budget to reflect the current and anticipated situation and conditions of the project, and to adjust the strategies and plans accordingly. For example, if the project faces an increase in demand or an opportunity for expansion, the project manager may increase the cash budget to invest in more resources, equipment, or inventory, or to hire more staff, to meet the increased demand or seize the opportunity. Conversely, if the project faces a decline in demand or a threat of contraction, the project manager may decrease the cash budget to reduce the costs, overheads, or inventory, or to lay off some staff, to cope with the reduced demand or mitigate the threat.
Some of the methods of monitoring and adjusting cash budget are:
- Variance analysis. This is the process of comparing the actual cash inflows and outflows with the budgeted ones, and calculating the differences or variances between them. The variances can be classified as favorable or unfavorable, depending on whether they increase or decrease the cash flow of the project. The variances can also be analyzed by their causes, such as volume, price, efficiency, or timing, to identify the sources and reasons of the deviations. variance analysis can help the project manager to evaluate the performance and profitability of the project, and to take corrective or preventive actions to improve the cash flow and achieve the budgeted goals.
- Sensitivity analysis. This is the process of testing the impact of changes in one or more variables or factors on the cash budget, while holding the other variables or factors constant. The variables or factors can be internal or external, such as sales volume, sales price, cost of goods sold, operating expenses, interest rate, exchange rate, inflation rate, or tax rate. sensitivity analysis can help the project manager to assess the risks and uncertainties of the project, and to prepare contingency plans or scenarios for different possible outcomes or situations. For example, the project manager can use sensitivity analysis to determine how much the cash budget would change if the sales volume increased or decreased by 10%, or if the interest rate increased or decreased by 1%.
- Rolling forecast. This is the process of updating and extending the cash budget periodically, usually on a monthly or quarterly basis, based on the latest actual and projected data and information. A rolling forecast can help the project manager to maintain a current and realistic view of the cash flow and liquidity of the project, and to adjust the strategies and plans accordingly. For example, the project manager can use a rolling forecast to revise the cash budget for the next 12 months, based on the actual cash inflows and outflows of the previous month, and the expected cash inflows and outflows of the next 11 months.
Some of the tips and best practices for monitoring and adjusting cash budget are:
- Use reliable and relevant data and information. The quality and accuracy of the cash budget depend largely on the quality and accuracy of the data and information that are used to prepare and update it. The project manager should use reliable and relevant data and information from various sources, such as historical records, financial statements, market research, customer feedback, supplier contracts, or industry reports, to estimate and forecast the cash inflows and outflows of the project. The project manager should also verify and validate the data and information regularly, and correct any errors or inconsistencies that may arise.
- Involve and communicate with the stakeholders. The cash budget is not only a tool for the project manager, but also a tool for the stakeholders of the project, such as the project team, the sponsors, the customers, the suppliers, or the creditors. The project manager should involve and communicate with the stakeholders in the process of preparing, monitoring, and adjusting the cash budget, to ensure that the cash budget reflects their needs, expectations, and interests, and to gain their support, cooperation, and feedback. The project manager should also report and explain the results and implications of the cash budget to the stakeholders, and address any questions or concerns that they may have.
- Use appropriate software and tools. The cash budget is a complex and dynamic document that requires a lot of calculations, analyses, and adjustments. The project manager should use appropriate software and tools, such as spreadsheets, accounting software, or cash flow management software, to facilitate and automate the process of preparing, monitoring, and adjusting the cash budget, and to enhance the efficiency and effectiveness of the cash budget. The project manager should also use appropriate software and tools, such as charts, graphs, or dashboards, to visualize and present the cash budget, and to highlight the key points and insights of the cash budget.
In this section, we will look at a real-world example of how cash budgeting can be applied to a project using capital evaluation. cash budgeting is a technique that helps managers plan and control the cash flows of a project by estimating the inflows and outflows of cash over a certain period of time. Capital evaluation is a process that helps managers decide whether to invest in a project or not by comparing the expected return on investment with the required rate of return. By combining these two methods, managers can assess the feasibility and profitability of a project and make informed decisions.
To illustrate how cash budgeting and capital evaluation work in practice, let us consider the following case study:
Case Study: ABC Inc.
ABC Inc. Is a company that produces and sells electronic devices. The company is considering launching a new product, a smart watch, that will compete with the existing products in the market. The company has conducted a market research and estimated the following data for the project:
- The initial investment for the project is $500,000, which includes the cost of equipment, installation, and marketing.
- The project will have a useful life of five years, after which the equipment will be sold for $50,000.
- The annual sales of the smart watch are expected to be 10,000 units in the first year, and grow by 10% each year thereafter.
- The selling price of the smart watch is $100 per unit, and the variable cost is $40 per unit.
- The fixed cost of the project is $100,000 per year, which includes the cost of maintenance, insurance, and salaries.
- The company's tax rate is 30%, and the required rate of return for the project is 15%.
Based on this data, we can prepare a cash budget and a capital evaluation for the project as follows:
Cash Budget
A cash budget shows the expected cash inflows and outflows of a project over a certain period of time. It helps managers to estimate the net cash flow of the project, which is the difference between the cash inflows and outflows. A positive net cash flow means that the project generates more cash than it spends, and a negative net cash flow means the opposite. A cash budget also helps managers to identify the cash surplus or deficit of the project, which is the cumulative net cash flow over time. A positive cash surplus means that the project has enough cash to meet its obligations, and a negative cash deficit means that the project needs additional financing.
To prepare a cash budget for the project, we need to follow these steps:
1. calculate the annual revenue of the project by multiplying the annual sales by the selling price.
2. Calculate the annual cost of goods sold by multiplying the annual sales by the variable cost.
3. Calculate the annual gross profit by subtracting the cost of goods sold from the revenue.
4. Calculate the annual operating expenses by adding the fixed cost and the depreciation. The depreciation is the annual allocation of the initial investment over the useful life of the project. We can use the straight-line method to calculate the depreciation, which is equal to (initial investment - salvage value) / useful life.
5. Calculate the annual operating income by subtracting the operating expenses from the gross profit.
6. Calculate the annual tax by multiplying the operating income by the tax rate.
7. Calculate the annual net income by subtracting the tax from the operating income.
8. Calculate the annual cash flow by adding the net income and the depreciation. The cash flow is the amount of cash that the project generates after paying all the expenses and taxes.
9. Calculate the net cash flow by subtracting the initial investment in the first year and adding the salvage value in the last year. The net cash flow is the amount of cash that the project generates or consumes after accounting for the initial and terminal investments.
10. Calculate the cash surplus or deficit by adding the net cash flow of each year. The cash surplus or deficit is the cumulative net cash flow of the project over time.
Using these steps, we can prepare a cash budget for the project as shown in the table below:
| Year | Sales | Revenue | cost of Goods Sold | Gross profit | Operating Expenses | Operating Income | Tax | Net Income | Depreciation | cash flow | Net cash Flow | cash Surplus or Deficit |
| 0 | - | - | - | - | - | - | - | - | - | - | -500,000 | -500,000 | | 1 | 10,000 | 1,000,000 | 400,000 | 600,000 | 190,000 | 410,000 | 123,000 | 287,000 | 90,000 | 377,000 | 377,000 | -123,000 | | 2 | 11,000 | 1,100,000 | 440,000 | 660,000 | 190,000 | 470,000 | 141,000 | 329,000 | 90,000 | 419,000 | 419,000 | 296,000 | | 3 | 12,100 | 1,210,000 | 484,000 | 726,000 | 190,000 | 536,000 | 160,800 | 375,200 | 90,000 | 465,200 | 465,200 | 761,200 | | 4 | 13,310 | 1,331,000 | 532,400 | 798,600 | 190,000 | 608,600 | 182,580 | 426,020 | 90,000 | 516,020 | 516,020 | 1,277,220 | | 5 | 14,641 | 1,464,100 | 585,640 | 878,460 | 190,000 | 688,460 | 206,538 | 481,922 | 90,000 | 571,922 | 621,922 | 1,899,142 |From the table, we can see that the project has a negative net cash flow of $500,000 in the first year, which is the initial investment. The project then generates positive net cash flows ranging from $377,000 to $621,922 in the following years. The project also has a negative cash deficit of $123,000 in the first year, which means that the project needs additional financing to cover the initial investment. The project then accumulates a positive cash surplus ranging from $296,000 to $1,899,142 in the following years, which means that the project has enough cash to meet its obligations and generate a profit.
Capital Evaluation
A capital evaluation shows the expected return on investment of a project by comparing the present value of the cash inflows and outflows of the project. It helps managers to decide whether to invest in a project or not by using various criteria, such as the net present value, the internal rate of return, the payback period, and the profitability index. A positive net present value means that the project is profitable and adds value to the company, and a negative net present value means the opposite. A high internal rate of return means that the project is profitable and has a high return potential, and a low internal rate of return means the opposite. A short payback period means that the project recovers its initial investment quickly, and a long payback period means the opposite. A high profitability index means that the project is profitable and has a high benefit-cost ratio, and a low profitability index means the opposite.
To prepare a capital evaluation for the project, we need to follow these steps:
1. calculate the net present value of the project by discounting the net cash flows of the project by the required rate of return. The net present value is the difference between the present value of the cash inflows and outflows of the project. We can use the following formula to calculate the net present value:
$$NPV = -C_0 + \frac{C_1}{(1 + r)} + \frac{C_2}{(1 + r)^2} + ... + \frac{C_n}{(1 + r)^n}$$
Where $C_0$ is the initial investment, $C_1$ to $C_n$ are the net cash flows of each year, $r$ is the required rate of return, and $n$ is the number of years.
2. Calculate the internal rate of return of the project by finding the discount rate that makes the net present value of the project equal to zero. The internal rate of return is the rate of return that the project earns over its life. We can use the following formula to calculate the internal rate of return:
$$0 = -C_0 + \frac{C_1}{(1 + IRR)} + \frac{C_2}{(1 + IRR)^2} + ... + \frac{C_n}{(1 + IRR)^n}$$
Where $C_0$ to $C_n$ and $n$ are the same as above, and $IRR$ is the internal rate of return. This formula cannot be solved algebraically, so we need to use a trial and error method or a financial calculator to find the internal rate of return.
3. Calculate the payback period of the project by finding the number of years it takes for the project to recover its initial investment. The payback period is the time required for the cumulative net cash flow of the project to equal the initial investment. We can use the following formula to calculate the payback period:
$$PP = A + \frac{B}{C}$$
Where $A
FasterCapital's internal team of professionals works with you on building your product, testing, and enhancing it after the launch
Alternatively, I can generate a short summary of the main points of the section, but you will have to expand on them yourself. Here is an example of a summary:
- A cash budget is a tool that helps project managers forecast the inflows and outflows of cash for a project using capital evaluation methods such as net present value (NPV), internal rate of return (IRR), or payback period.
- A cash budget can help project managers plan ahead, avoid cash shortages, optimize cash utilization, and measure project performance.
- To create a cash budget, project managers need to estimate the cash inflows and outflows for each period of the project, taking into account the project's initial investment, operating costs, revenues, taxes, depreciation, and salvage value.
- A cash budget can be presented in a table or a graph, showing the cumulative cash balance for each period and highlighting any surplus or deficit situations.
- A cash budget can also be used to evaluate the feasibility and profitability of a project by comparing the cash inflows and outflows with the project's required rate of return or cost of capital.
- A cash budget can help project managers maximize project success by enabling them to make informed decisions, adjust to changing conditions, and control project risks.