1. Introduction to Cost Breakdown Structure
2. Importance of Cost Predictability Simulation
3. Key Components of a Cost Breakdown Structure
4. Creating a Cost Breakdown Structure
5. Organizing Cost Elements in the Structure
6. Using Cost Breakdown Structure for Cost Estimation
7. Analyzing Cost Variance with Cost Breakdown Structure
A cost breakdown structure (CBS) is a hierarchical representation of the costs associated with a project, program, or portfolio. It is a useful tool for planning, estimating, budgeting, controlling, and reporting the costs of a project. A CBS can help you to:
- Identify the major cost elements and their relationships
- Allocate resources and assign responsibilities
- track and monitor the cost performance and variance
- Analyze the sources and causes of cost deviations
- communicate and report the cost information to stakeholders
A CBS can be created and used in different ways depending on the purpose and scope of the project. Some of the common approaches are:
1. Top-down approach: This approach starts with the total project cost and breaks it down into smaller and more detailed cost categories and subcategories. This is useful for estimating the overall project cost and setting the budget at the early stages of the project. For example, a CBS for a construction project can be divided into design, materials, labor, equipment, overhead, and contingency costs.
2. Bottom-up approach: This approach starts with the lowest level of cost items and aggregates them into higher-level cost categories and subcategories. This is useful for calculating the actual project cost and measuring the cost performance at the later stages of the project. For example, a CBS for a software development project can be composed of the costs of individual tasks, activities, deliverables, and milestones.
3. Hybrid approach: This approach combines the top-down and bottom-up approaches to create a balanced and comprehensive CBS. This is useful for reconciling the estimated and actual project costs and identifying the gaps and discrepancies. For example, a CBS for a research and development project can be structured by the phases of the project life cycle, such as initiation, planning, execution, and closure.
A CBS can be customized and adapted to suit the specific needs and characteristics of the project. Some of the factors that can influence the design and format of a CBS are:
- The size and complexity of the project
- The type and nature of the project
- The level of detail and accuracy required
- The standards and guidelines followed
- The preferences and expectations of the project team and stakeholders
A CBS can be represented in various ways, such as a table, a chart, a diagram, or a matrix. A common and popular way to visualize a CBS is to use a tree diagram, which shows the hierarchical structure and the breakdown of the project costs. Here is an example of a CBS for a website development project:
 is a hierarchical representation of the costs associated with a project, program, or portfolio. It helps to identify, categorize, and allocate costs to different levels of the project structure, such as work packages, activities, resources, and deliverables. A CBS can also be used to compare actual costs with planned or estimated costs, and to identify sources of cost variance and risk. A CBS is an essential tool for cost management, control, and reporting, as it provides a clear and consistent way of tracking and communicating the cost performance of a project.
The key components of a CBS are:
1. Cost elements: These are the lowest level of the CBS, where the costs are assigned to specific items or units of work. Cost elements can be based on different criteria, such as type of cost (direct or indirect), nature of cost (fixed or variable), or source of cost (labor, material, equipment, etc.). Cost elements should be clearly defined, measurable, and verifiable, and should have a direct relationship with the project scope and deliverables. For example, a cost element for a construction project could be the cost of concrete per cubic meter, or the cost of labor per hour.
2. Cost categories: These are the intermediate level of the CBS, where the cost elements are grouped into logical and meaningful categories. Cost categories can be based on different criteria, such as function, phase, location, or responsibility. Cost categories should be mutually exclusive and collectively exhaustive, and should reflect the project objectives and requirements. For example, a cost category for a software development project could be the cost of design, development, testing, or deployment.
3. Cost accounts: These are the highest level of the CBS, where the cost categories are aggregated into cost accounts. Cost accounts are the main units of cost management, control, and reporting, and they represent the major segments or components of the project. Cost accounts should be aligned with the project scope and the work breakdown structure (WBS), and should have a unique identifier, a description, a budget, and a responsible manager. For example, a cost account for a product development project could be the cost of product A, product B, or product C.
Key Components of a Cost Breakdown Structure - Cost Breakdown Structure: How to Create and Use Cost Breakdown Structure for Cost Predictability Simulation
Creating a cost breakdown structure (CBS) is a crucial step in any project management process. A CBS is a hierarchical representation of the costs associated with each component or activity of a project. It helps to estimate, monitor, and control the project budget and resources. A CBS also enables the project manager to perform cost analysis, forecasting, and reporting at different levels of detail and granularity. A CBS can be used for cost predictability simulation, which is a technique to estimate the probability distribution of the project cost based on various assumptions and scenarios. Cost predictability simulation can help to identify and mitigate the risks and uncertainties that may affect the project outcome.
To create a CBS, the following steps are usually followed:
1. Define the project scope and objectives. This involves identifying the project deliverables, requirements, constraints, and assumptions. The project scope should be clear, specific, and measurable.
2. Identify the project work breakdown structure (WBS). A WBS is a hierarchical decomposition of the project scope into manageable and deliverable work packages. A WBS defines the scope of each work package and the relationships among them. A WBS can be created using various methods, such as top-down, bottom-up, or hybrid approaches.
3. Assign cost elements to each work package. Cost elements are the categories or types of costs that are incurred in a project, such as labor, materials, equipment, subcontractors, overhead, etc. Cost elements can be further divided into sub-elements or cost accounts, which are the smallest units of cost measurement. Cost elements and sub-elements should be consistent and aligned with the project accounting system and the project objectives.
4. Estimate the cost of each cost element or sub-element. This involves using various techniques, such as expert judgment, analogous estimation, parametric estimation, bottom-up estimation, or three-point estimation, to calculate the expected cost of each cost element or sub-element based on the available data and information. The cost estimates should be realistic, accurate, and reliable, and should include appropriate contingencies and reserves.
5. Aggregate the cost estimates to obtain the total project cost. This involves adding up the cost estimates of all the cost elements or sub-elements at each level of the CBS hierarchy, from the lowest to the highest. The total project cost should be consistent with the project scope and objectives, and should reflect the project risks and uncertainties.
6. Validate and update the CBS. This involves reviewing and verifying the CBS for completeness, correctness, and consistency. The CBS should be validated by the project stakeholders, such as the project sponsor, the project team, the project customer, and the project suppliers. The CBS should also be updated regularly throughout the project life cycle to reflect any changes in the project scope, schedule, quality, or risks. The CBS should be used as a baseline for cost management and control, and as an input for cost predictability simulation.
Creating a Cost Breakdown Structure - Cost Breakdown Structure: How to Create and Use Cost Breakdown Structure for Cost Predictability Simulation
One of the most important steps in creating a cost breakdown structure (CBS) is to organize the cost elements in a logical and consistent way. The cost elements are the smallest units of cost that can be identified and measured in a project. They can be grouped into different categories, such as labor, materials, equipment, subcontractors, overhead, and contingency. The way you organize the cost elements in the structure depends on the type, size, and complexity of your project, as well as the level of detail and accuracy you need for your cost estimation and control. There are different methods and best practices for organizing cost elements in the structure, such as:
1. Using a standard classification system: A standard classification system is a predefined set of cost elements and categories that are widely used and accepted in the industry or domain of your project. For example, you can use the Uniformat II system for building projects, which classifies the cost elements according to the functional elements of a building, such as foundations, walls, roofs, finishes, services, and equipment. Using a standard classification system can help you to ensure consistency, completeness, and comparability of your cost data with other projects and benchmarks.
2. Using a work breakdown structure (WBS): A work breakdown structure (WBS) is a hierarchical decomposition of the project scope into manageable work packages. You can use the WBS as a basis for organizing the cost elements in the structure, by assigning each work package a corresponding cost element or category. For example, if your project is to design and build a bridge, you can use the WBS to divide the project into phases, such as planning, design, construction, and testing. Then, you can assign each phase a cost element or category, such as labor, materials, equipment, subcontractors, etc. Using the WBS can help you to align the cost structure with the project scope and schedule, and to facilitate the cost allocation and tracking.
3. Using a resource breakdown structure (RBS): A resource breakdown structure (RBS) is a hierarchical representation of the resources that are required and consumed by the project. You can use the RBS as a basis for organizing the cost elements in the structure, by identifying the types and quantities of resources that are needed for each work package or activity. For example, if your project is to develop a software application, you can use the RBS to list the resources that are involved in each phase, such as programmers, testers, analysts, hardware, software, licenses, etc. Using the RBS can help you to estimate the resource requirements and costs, and to optimize the resource utilization and allocation.
These are some of the common methods and best practices for organizing cost elements in the structure. However, you should always tailor the cost structure to the specific needs and characteristics of your project, and to the expectations and requirements of your stakeholders. You should also review and update the cost structure periodically, as the project progresses and changes occur. By organizing the cost elements in the structure in a logical and consistent way, you can create a reliable and effective tool for cost predictability simulation and control.
Organizing Cost Elements in the Structure - Cost Breakdown Structure: How to Create and Use Cost Breakdown Structure for Cost Predictability Simulation
One of the main benefits of using a cost breakdown structure (CBS) is that it can help with cost estimation and budgeting for a project. cost estimation is the process of predicting the total cost of a project based on various factors such as scope, resources, risks, and quality. cost estimation is crucial for project planning, control, and evaluation. A CBS can facilitate cost estimation by providing a detailed and hierarchical representation of the project's components and their associated costs. In this section, we will discuss how to use a CBS for cost estimation and some of the challenges and best practices involved. We will also show how a CBS can be used for cost predictability simulation, which is a technique to assess the impact of uncertainties and variations on the project's cost.
To use a CBS for cost estimation, the following steps are typically followed:
1. Identify the project's components and their relationships. This involves defining the scope and deliverables of the project and breaking them down into smaller and manageable units. The units can be based on work packages, activities, tasks, or resources. The relationships between the units can be shown using a tree diagram or a matrix. The CBS should be aligned with the work breakdown structure (WBS) and the organizational breakdown structure (OBS) of the project.
2. Assign costs to each component. This involves estimating the direct and indirect costs of each component based on historical data, expert judgment, parametric models, or other methods. The direct costs are the costs that can be directly attributed to a specific component, such as labor, materials, equipment, or subcontractors. The indirect costs are the costs that are shared among multiple components, such as overhead, administration, or contingency. The costs can be expressed in terms of fixed, variable, or mixed costs. The CBS should include all the relevant costs that affect the project's performance and objectives.
3. Aggregate the costs to obtain the total project cost. This involves adding up the costs of the components at each level of the CBS hierarchy to obtain the costs of the higher-level components and ultimately the total project cost. The CBS can also show the percentage of each component's cost relative to the total project cost or the parent component's cost. This can help to identify the cost drivers and the areas where cost savings or optimization can be achieved.
4. Review and validate the cost estimates. This involves checking the accuracy, completeness, and consistency of the cost estimates and the CBS. The cost estimates should be verified by comparing them with similar projects, benchmarks, or standards. The cost estimates should also be validated by involving the stakeholders, experts, or independent reviewers. The CBS should be updated and refined as the project progresses and more information becomes available.
One of the challenges of using a CBS for cost estimation is that it can be difficult to account for the uncertainties and variations that may affect the project's cost. Uncertainties are the unknown factors that may influence the project's cost, such as changes in scope, requirements, quality, or risks. Variations are the fluctuations that may occur in the project's cost, such as changes in prices, rates, or productivity. Uncertainties and variations can cause the actual project cost to deviate from the estimated project cost, resulting in cost overruns or underruns.
To address this challenge, a CBS can be used for cost predictability simulation, which is a technique to assess the impact of uncertainties and variations on the project's cost. Cost predictability simulation involves using a probabilistic or stochastic model to generate a range of possible project costs based on different scenarios, assumptions, or inputs. The model can incorporate the probability distributions, correlations, or dependencies of the cost components and their influencing factors. The output of the model can be presented as a histogram, a cumulative frequency curve, or a confidence interval of the project cost. The output can also show the sensitivity or importance of each cost component or factor to the project cost.
Cost predictability simulation can help to improve the reliability and realism of the cost estimates and the CBS. It can also help to identify the sources and levels of uncertainty and variation and their impact on the project cost. It can also help to evaluate the trade-offs and alternatives and to support decision making and risk management.
An example of using a CBS for cost estimation and cost predictability simulation is shown below. The example is based on a hypothetical project to build a new bridge. The CBS shows the breakdown of the project's components and their costs. The cost predictability simulation shows the range of possible project costs based on different scenarios of the cost components and their influencing factors.
 is that it allows you to analyze the cost variance of your project. cost variance is the difference between the actual cost and the planned cost of a project. It indicates whether the project is over budget or under budget, and by how much. A positive cost variance means that the project is under budget, while a negative cost variance means that the project is over budget.
analyzing cost variance with CBS can help you identify the sources of cost deviations, evaluate the performance of your project, and take corrective actions if needed. Here are some steps to follow when analyzing cost variance with CBS:
1. Compare the actual cost and the planned cost of each cost element in the CBS. This will give you the cost variance of each element, as well as the total cost variance of the project. You can use a formula such as `CV = AC - PC`, where `CV` is the cost variance, `AC` is the actual cost, and `PC` is the planned cost. For example, if the actual cost of a cost element is $120,000 and the planned cost is $100,000, the cost variance is -$20,000, which means that the element is over budget by $20,000.
2. calculate the cost variance percentage of each cost element and the project. This will give you the relative magnitude of the cost variance, as well as the overall performance of the project. You can use a formula such as `CV% = (CV / PC) x 100`, where `CV%` is the cost variance percentage, `CV` is the cost variance, and `PC` is the planned cost. For example, if the cost variance of a cost element is -$20,000 and the planned cost is $100,000, the cost variance percentage is -20%, which means that the element is 20% over budget.
3. Identify the cost elements that have the largest cost variance and cost variance percentage. These are the cost elements that have the most impact on the project budget and performance. You can use a table or a chart to rank the cost elements by their cost variance and cost variance percentage, and highlight the ones that exceed a certain threshold. For example, you can use a red color to indicate the cost elements that have a cost variance percentage of -10% or lower, which means that they are significantly over budget.
4. Analyze the root causes of the cost variance of the identified cost elements. This will help you understand why the cost deviations occurred, and whether they were due to internal or external factors. You can use a technique such as the 5 Whys to ask a series of questions that lead to the underlying cause of the problem. For example, you can ask: Why is the cost element over budget? Why did the actual cost exceed the planned cost? Why did the scope, schedule, or quality change? Why did the resources, materials, or equipment cost more than expected? Why did the risks or uncertainties materialize?
5. Recommend corrective actions to reduce or eliminate the cost variance of the identified cost elements. This will help you bring the project back on track, or adjust the budget or the scope accordingly. You can use a technique such as the SMART criteria to define specific, measurable, achievable, relevant, and time-bound actions that address the root causes of the cost variance. For example, you can recommend: To reduce the cost variance of the cost element, we will negotiate with the supplier to lower the price of the materials, or we will use alternative materials that are cheaper and of similar quality. We will implement this action by the end of the next week, and we will monitor the cost performance of the cost element on a weekly basis.
My creative side is identifying all these great entrepreneurial creative people that come up with great ideas, whether they are in fashion or technology or a new tool to improve ourselves.
Cost predictability simulation is a technique that helps project managers and stakeholders to estimate the cost of a project based on various factors and scenarios. It can help to reduce the uncertainty and risk associated with project cost management, and to improve the decision-making process. In this section, we will explore some of the benefits of cost predictability simulation, and how it can be applied using a cost breakdown structure (CBS).
Some of the benefits of cost predictability simulation are:
1. It allows for better planning and budgeting. By simulating different cost scenarios, project managers can identify the optimal allocation of resources, the contingency reserve, and the expected value of the project. They can also compare the results of different simulation methods, such as Monte Carlo, sensitivity analysis, or what-if analysis, and choose the most appropriate one for their project.
2. It enhances the communication and transparency among stakeholders. Cost predictability simulation can help to communicate the assumptions, risks, and uncertainties involved in the project cost estimation. It can also provide a visual representation of the cost distribution, the confidence intervals, and the probability of achieving the target cost. This can help to align the expectations and goals of the project team, the sponsors, and the clients.
3. It supports the monitoring and control of the project. Cost predictability simulation can help to track the actual cost performance of the project against the simulated baseline, and to identify any deviations or variances. It can also help to update the cost estimates and forecasts based on the changes in the project scope, schedule, quality, or resources. This can help to avoid cost overruns, or to take corrective actions if needed.
To apply cost predictability simulation, a project manager needs to have a detailed and accurate cost breakdown structure (CBS). A CBS is a hierarchical representation of the project costs, organized by work packages, activities, and cost elements. It can help to:
- Define the scope and deliverables of the project
- assign the responsibility and accountability for each cost element
- Estimate the cost of each work package and activity
- aggregate the cost of the project at different levels
- analyze the cost drivers and variances
- report the cost performance and status
A CBS can be created using various tools and techniques, such as work breakdown structure (WBS), resource breakdown structure (RBS), cost estimating methods, cost accounting standards, or software applications. A CBS should be consistent, comprehensive, and clear, and should reflect the project objectives and requirements.
An example of a CBS for a software development project is shown below:
| Work Package | Activity | cost Element | cost Estimate |
| WP1: Project Management | A1.1: Initiation | PM Salary | $10,000 |
| | A1.2: Planning | PM Salary | $15,000 |
| | A1.3: Execution | PM Salary | $20,000 |
| | A1.4: Monitoring and Control | PM Salary | $25,000 |
| | A1.5: Closure | PM Salary | $10,000 |
| WP2: Software Design | A2.1: Requirement Analysis | Analyst Salary | $30,000 |
| | A2.2: System Architecture | Architect Salary | $40,000 |
| | A2.3: user Interface design | Designer Salary | $20,000 |
| WP3: Software Development | A3.1: Coding | Developer Salary | $50,000 |
| | A3.2: Testing | Tester Salary | $30,000 |
| | A3.3: Debugging | Developer Salary | $20,000 |
| WP4: Software Deployment | A4.1: Installation | Installer Salary | $10,000 |
| | A4.2: Configuration | Configurer Salary | $10,000 |
| | A4.3: User Training | Trainer Salary | $10,000 |
| WP5: Software Maintenance | A5.1: Update | Developer Salary | $10,000 |
| | A5.2: support | Support staff Salary | $10,000 |
| Total Project Cost | | | $320,000 |
Using this CBS, a project manager can perform cost predictability simulation by applying different factors and scenarios, such as:
- The probability of each cost element occurring or not occurring
- The range of possible values for each cost element
- The correlation or dependency among cost elements
- The impact of external factors, such as inflation, exchange rate, or market demand
- The sensitivity of the project cost to changes in the project scope, schedule, quality, or resources
By doing so, the project manager can obtain a more realistic and reliable estimate of the project cost, and can plan and manage the project accordingly. Cost predictability simulation can be a powerful tool for project cost management, and can help to achieve the project success.
FasterCapital provides you with full support throughout your funding journey to get the capital needed quickly and efficiently with the help of an expert team
In this blog, we have discussed the concept of cost breakdown structure (CBS), its benefits, and how to create and use it for cost predictability simulation. We have also shown some examples of CBS for different types of projects and how they can help in estimating and controlling the project costs. In this final section, we will summarize the main points of the blog and suggest some next steps for applying CBS in your own projects.
Here are some of the key takeaways from this blog:
1. CBS is a hierarchical representation of the project costs that shows the relationship between the project scope, work breakdown structure (WBS), and cost elements. It helps in identifying and allocating the project costs to the appropriate level of detail and category.
2. CBS has many advantages for project management, such as improving the accuracy and transparency of cost estimation, facilitating the tracking and reporting of cost performance, enabling the analysis and optimization of cost drivers, and supporting the risk management and contingency planning of the project.
3. CBS can be used for cost predictability simulation by using various methods and tools, such as parametric estimation, bottom-up estimation, historical data, expert judgment, monte Carlo simulation, and sensitivity analysis. These methods and tools can help in estimating the most likely, optimistic, and pessimistic scenarios of the project costs and their probability distribution.
4. CBS can be customized for different types of projects depending on the project characteristics, objectives, and requirements. Some of the factors that can influence the design and structure of CBS are the project size, complexity, duration, industry, domain, and methodology. For example, a CBS for a software development project may differ from a CBS for a construction project in terms of the cost elements, categories, and levels of detail.
5. CBS requires regular updating and revision throughout the project life cycle to reflect the changes in the project scope, schedule, resources, and risks. It is important to maintain the consistency and alignment of CBS with the other project documents, such as the project charter, WBS, and project plan. It is also essential to communicate and validate the CBS with the project stakeholders, such as the sponsor, customer, team, and suppliers.
Some of the next steps that you can take to apply CBS in your own projects are:
- Review the existing literature and best practices on CBS and cost management. You can find many useful resources online, such as books, articles, blogs, podcasts, webinars, and courses that can help you learn more about CBS and how to use it effectively.
- Create a CBS template that suits your project needs and preferences. You can use some of the examples that we have provided in this blog as a reference or inspiration, or you can create your own from scratch. You can also use some of the available software tools, such as Microsoft Excel, Microsoft Project, or Primavera, that can help you create and manage CBS.
- Apply CBS to your current or future projects and see how it can improve your cost estimation and control. You can start with a simple and high-level CBS and then refine and expand it as the project progresses. You can also compare and contrast the results of using CBS with other methods of cost management and see how it can enhance your project performance and outcomes.