Build a work breakdown structure
The best way to build a Work Breakdown Structure, or WBS, is to start at the top level of summary tasks and work your way down. Work with your team to identify the WBS. You're less likely to forget work that needs to be done, and the team is more likely to buy into the project. As a team, you identify the top few levels of summary tasks. Then you can have smaller groups break down the summary tasks into smaller chunks. At the end, everyone gets back together to review the results and correct any issues. If the full team isn't on board yet, work with your initial team to brainstorm the WBS. Then you can revise and add more detail to the WBS later as others join the project. Start by using the scope statement and deliverables to identify the top-level summary tasks. For example, the scope for the scheduling project includes redesigned scheduling processes, a new scheduling system, documentation, and training. So you add summary tasks to cover all of those. Next, break down each of the summary tasks into smaller pieces. deliverables come in handy for identifying lower-level summary tasks and work packages. For example, the scheduling project includes a deliverable for a signed contract with the system vendor. Let's add tasks to obtain proposals, select the vendor, negotiate terms, and sign the contract. You might wonder, how much breakdown is enough? Most project managers shoot for work packages that take between 8 and 80 hours to complete. Work packages are the lowest level tasks in the WBS and represent the work that needs to be done. Consider breaking down work to match the frequency of your status reports. That way, you have measurable progress and completed tasks for every status report. Here are some tests to determine whether you've broken work down to the right level. Time and cost are easy to estimate. Status is easy to measure. Task durations are shorter than your reporting periods. The detail is at the level you can and want to manage. Different parts of a project might require different levels of decomposition. One part of the project might include more work, so you break it down to 3 or 4 levels. If another part of the project is simpler, you might need only 2 levels. Don't worry about the initial organization of your WBS. You can rearrange it later as you learn more about the project. Building a WBS from the top down works well, because you can use the scope statement and deliverables to get started. For practice, try building more of the scheduling project's WBS based on the project's scope and deliverables.
Contents
-
-
-
-
-
Project planning overview1m 39s
-
What is a work breakdown structure?2m 27s
-
Build a work breakdown structure3m 16s
-
How to create work packages1m 47s
-
Estimate time and cost3m 22s
-
How to choose the best estimate3m 29s
-
Create a resource management plan3m 46s
-
Build a project schedule1m 50s
-
Develop a project budget3m 25s
-
Identify risks3m 15s
-
Create a risk management plan4m 11s
-
Set up a communication plan2m 32s
-
Develop a quality plan3m 30s
-
How to set up a change management plan4m
-
How to plan procurement2m 50s
-
How to obtain approval to proceed1m 49s
-
Challenge: Change1m 10s
-
-
-
-
-
-
-
-
-