Fluidra Australia & New Zealand’s Post

Creating workable and sustainable solutions. #engineering #aquatics #versatility

View profile for Jeremy Smith

General Manager Fluidra Commercial Australia

Check this out... an amazing solution developed by our commercial projects and engineering team for older pools that were originally built to 33m! This length has always been difficult to manage for refurbishment and really not useful as a short course/lap pool or learn to swim space. Development for this unique static wall was led by Ole Hoskinson and allowed for the pool to have a very usable shallow section for learn to swim classes and a 25m lap pool in the one body of water. Instead of demolishing and rebuilding new pool structures, the client was able to get two fully refurbished pools in one for a fraction of the cost. An exceptional outcome for the local community for years to come! New SR Smith dividing wall key features: ✅ Corrosion proof composite and engineered polymer construction ✅ Non-slip walkway for coaches and teachers ✅ Flow through micromesh grating - allows for complete circulation through both bodies of water ✅ Shallow anchoring method prevents damage to pool floor and structure ✅ Fast Installation - within 3 days ✅ Australian made If you have a facility with a similar need, please reach out! We are keen to see this solution rolled out to more councils and operators looking to reprogram their pools and make room for additional aquatic activities.

  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image
  • No alternative text description for this image

To view or add a comment, sign in

Explore content categories