Constructability Review: Overcoming Installation Challenges

View profile for Mohd Zafran Mohd Zain

Executive (Construction) / Construction Site Representative for Facilities Management (Facilities Improvement and Construction) at PETRONAS Carigali Sdn. Bhd. (Lead Auditor QMS IRCA QCI ISO 9001:2015 | ASNT MT,PT,UT)

Installation Challenges & Importance of Constructability Review ♻️Reality vs. Drawing Installation works often deviate from original drawings as site surveys may not fully capture: ❌ Constructability aspects ❌ Actual site conditions ❌ Existing constraints 🌐Consequences 📣 Alternative (Plan B) solutions are frequently required to address unforeseen challenges. 🔆Way Forward 🌈Conducting a thorough constructability review is critical to: ✅ Proactively identify and mitigate site constraints ✅ Align design with actual site conditions ✅ Enhance efficiency, safety, and project reliability ✅ Enable effective recovery plans to minimize delays and optimize delivery

Ir. Mohd Faiz Mohd Jailani, CEng MIET, ACPE

Executive Instrument | P.Eng (BEM) | Chartered Engineer, CEng MIET | IECEx Ex 001 & 009 | ACPE

1w

Mantap sifu

Like
Reply
Muhammad Faiz Abdul Rahman

Workpack Team Leader at Dayang Enterprise Sdn. Bhd.

1w

1. To utilize 360 camera during the site visit so that the actual site condition can be reviewed during CR session. 2. To ensure all parties get involved during the CR session.

Zubairi Farihan Roffie

Reliability Specialist for EPOMS Sdn. Bhd.

1w

Kemahhh

Like
Reply
See more comments

To view or add a comment, sign in

Explore content categories