Coordinated. Precise. Self-Performed. RP/CEC recently completed a design-build industrial SBR system in the Midwest — treating wastewater for direct discharge with a complex mix of above- and below-grade process piping. Civil Engineers & Constructors, LLC led the design (excluding electrical), including full regulatory approvals. RP self-performed every inch of the installation, including: - 30” stainless steel welded aeration pipe - 36” C900 decant - 10” WAS return This was not your average install. A narrow corridor housed all three systems with little room for error, demanding exact transitions and full team coordination. Stainless steel of this size and complexity isn’t for everyone — but it’s a space we thrive in. When design and construction are integrated, outcomes improve. Design to Dirt. CAD to Completion. One team, one result.