IS 456:2000 Cube Sampling Frequency for Concrete

View profile for Shahid Ullah

HSE Engineer at Velosi |Civil Engineer (PEC Registered) |AutoCAD,Revit,Sap2000,ETABs Enthusiast| Structure Designer| Material Inspector| Geotechnical Inverstigor| Foundation Designer| Transportation Designer|

CONCRETE CUBE SAMPLING FREQUENCY – IS 456:2000 In accordance with Indian Standard IS 456:2000, the frequency of cube sampling directly correlates with the volume of concrete utilized, guaranteeing quality, adherence to standards, and structural integrity. 🔹 Key Highlights: - The quantity of concrete placed determines the number of cubes for testing. - IS 456:2000 outlines the minimum sampling frequency for each concrete grade. - Effective sampling aids in promptly identifying deviations in quality. - Ensures longevity of structures and adherence to regulations. 🔹 My Contribution: I have designed an Excel-based tool to streamline and automate the calculation process. (Available upon request) - Facilitates swift determination of necessary cube samples. - Enhances efficiency in quality oversight and documentation throughout construction. 🔹 Practical Example: For 110 m³ of concrete → Total samples required: 6 Total cubes (3 per sample): 18

  • table

To view or add a comment, sign in

Explore content categories