POST TENSIONING METHOD OF STATEMENT
1. INSTALLATION
The manufacture and assembly of tendons shall be performed in accordance with the best quality of workmanship appropriate to the post-tensioning system being used.
Tendons shall be made to the required length plus an allowance (where applicable) at each end for stressing operation.
Flame cutting of wire or strand will not be permitted at any time.
Care shall be taken that tendons are not damaged, kinked, or bent. Tendons so impaired shall not be used.
Only a thin, tightly adhered film of rust will be permitted on tendons. Tendons shall be kept free from loose rust, oil, grease, tar, paint, mud, or any other deleterious substances.
In cleaning tendons, they shall not be brought to a smooth polished condition.
Material for tendons and assembled tendons shall be stored under a waterproof shelter, supported above ground level, and shall be protected from damage and deterioration from exposure or any other causes.
Sheathing and Tendons
Tendons shall be sheathed and placed in position prior to concreting.
Tendons shall be handled with care and shall be pushed or pulled through sheathing in such a manner as to avoid damage or contamination to either the tendon or the sheathing.
Sheathing shall be securely fixed at points sufficiently close together to maintain a smooth tendon profile throughout the length of the tendon within a tolerance of ±5mm (vertically) of the position shown in the design. At peaks and valleys, the position of the sheathing shall be adjusted to ensure that the tendon profile is within the specified tolerance.
If, in the opinion of the Engineer, the sheathing is liable to be damaged or deformed during the placing of the concrete, the Contractor shall take additional precautions to maintain the position and shape of the sheathing.
Unless otherwise stipulated in the design, the minimum cover of concrete to the outside surface of any sheathing shall be 40mm for beam soffit and 25mm elsewhere. The minimum cover shall be increased by 20mm for members in contact with earth or water and by 25mm for members in contact with salt water.
The ducts shall be set in a smooth line and secured at the supporting points. The maximum allowable deviation of the ducts from the theoretical line shown in the drawings is 10mm in any direction (horizontally). The distance between the supporting points shall be so small that the tolerance for the position of the ducts is not exceeded, and unintended angles shall be <0.3 degrees per meter.
At the point where the duct joins the anchorage, the direction of the duct shall be precisely parallel to the axis of the anchorage. The straight length of the duct adjacent to the anchorage shall be in accordance with the instructions from the supplier of the pre-stressing system. The joint between duct and anchorage shall be watertight.
The duct must have provision for air vents. These vents shall be located at both ends so that the distance between adjacent vents does not exceed 25mm.
Anchorages
Each anchorage device shall be set square to the line of the corresponding pre-stressing tendon and shall be positioned securely to prevent movement during concreting.
The placing and securing of the anchorage shall be subject to the approval of the Engineer.
The anchorage devices shall be cleaned to the satisfaction of the Engineer prior to the placement of the concrete.
Any mortar or concrete which adheres to bearing or wedging surfaces shall be removed immediately.
The anchorage recess shall be filled with OPC. The mix of such mortar shall be relatively hard as excessive slurry might close the vents.
2. PLACING OF CONCRETE
All concrete shall be fully compacted in the manner specified in the concrete specification. The Engineer may order the Contractor to discontinue the use of any type of vibrator if, in his opinion, it is unsuitable for use in any part of the works.
Vibrations shall not come into direct contact with sheathing in the case of post-tensioned work. If the sheathing is damaged during concreting, the whole or a portion of the concrete cast may be rejected by the Engineer. Sheathing shall be cleaned out by blowing oil-free compressed air through the length of the sheathing.
Controlled vibrations shall be done in the proximity of the bond dead anchors and live anchors.
3. STRESSING
For long cables, the initial stress (25% of the post-tensioning force) shall be applied to the concrete member once the concrete strength has reached 12 MPa or 24 hours after the concrete pour, whichever comes first.
The final post-tensioning force shall not be applied to a member until it has attained a compressive strength of 30 MPa.
Consideration will be given to the application of partial stressing at an earlier date to overcome handling or shrinkage problems, or to permit early removal of formwork. Details of proposals shall be submitted to the Engineer for approval.
Stressing Precautions
Care shall be taken during stressing to ensure the safety of all personnel engaged in the work and other persons in the vicinity.
Jacks shall be secured in such a manner that they will be restrained should they lose their grip on the tendons.
No person shall be permitted to stand behind the jacks or close to the line of the tendons while tensioning is in progress.
The operation of jacks, the measurement of elongation, and associated operations shall be carried out in such a manner and from such positions that the safety of all is ensured.
When, in the opinion of the Supervisor, there is danger to the general public or to property, special precautions in the form of substantial barriers will be required.
Equipment
Each set of equipment—comprising pump, jack, and pressure gauge—shall be calibrated to the satisfaction of the Engineer, and the true force determined from the calibration. All equipment shall be recalibrated at intervals not exceeding 12 months. Calibration shall be submitted to the Engineer at least one week prior to jacking. Pressure gauges shall permit force and elongation to be determined within an accuracy of 2%.
Pressure gauges shall be concentric scale gauges and accurate to within 1% of their full capacity. They shall be selected so as to be used between 50-90% of their full capacity, and the maximum load shall not be less than 200mm in diameter. Where pressure gauges are used, a suitable device shall be fitted to protect the gauge against sudden release of pressure.
Measurement of the Post-Tensioning Forces
The tensioning forces applied to any tendon shall be determined by direct measurement of the force and checked by measurement of the elongation of the tendon.
The secant modulus determined from test samples or shown on test certificates shall be used when interpreting the measurement of elongation. The design shall specify the required values for the elongation and for the force in the tendon at the jack. Allowance shall be made for anticipated draw-in at the anchorage devices on release of the jack, for elastic shortening of the member, and for anticipated losses due to stressing of subsequent tendons.
The tensioning forces required are to be shown on the drawings. Maximum tension in one strand shall not exceed 75% of its ultimate strength.
Allowances should be made for any slippage or draw-in at the anchorage devices on release of the jacks. The final forces in each tendon shall be within an accuracy of ±5% of the values stipulated.
If, on completion of tensioning each tendon to the required force, the check measurement of elongation differs from its required value by more than 7%, the Engineer may direct that some or all of the following steps be taken:
1- Recalibration of equipment
2- Testing of tendon material to check secant modulus
3- Lubrication of tendons to reduce friction losses. Only water-soluble oils shall be used in ducted systems, and these shall be washed out before grouting.
4- Other methods as directed by the Supervisor.
All stressing operations shall take place in the presence of the Engineer or his representative. No member shall be stressed until the concrete has attained the specified strength.
The stressing operation shall be supervised by personnel trained and experienced in this type of work. Special care shall be taken to apply the tensioning force smoothly and evenly.
The stressing operation shall be performed in accordance with the best practice applicable to the particular system approved.
If ducts are not to be grouted within 7 days of the commencement of stressing, the ducts shall be sealed to protect tendons from corrosion, and an approved corrosion inhibitor placed in the ducts. Single-stage stressed tendons are to be grouted within 7 days.
Tendons shall be cleaned by blowing oil-free compressed air through them, and anchorages shall be thoroughly cleaned prior to the commencement of tensioning. The protruding ends of tendons shall be cleaned of any coating such as rust, mortar, oil, grease, or mud, which would loosen the grip of the wedges of anchorage devices. Tendons shall be checked before tensioning to ensure that they are free to move inside the duct.
The jacks shall be set accurately in the line of the tendons.
Strand Stressing Records
Complete stressing records shall be kept of pressure gauge readings and strand extensions for each strand of every cable. A daily return shall be submitted to the Engineer for record.
The following data, where applicable, shall be recorded:
Identification number of each gauge, pump, and jack.
Identification particulars of tendons.
Elongations after release of jacks.
Final (full) tensioning shall only be carried out when the concrete has reached the minimum specified characteristic strength. The Contractor shall declare the minimum characteristic strength in his design by taking creep and shrinkage into consideration.
The strength development shall be based on results from pre-testing of concrete and thereafter updated on the basis of actual strengths achieved. The date of final stressing shall be based on the maturity of the concrete, determined from temperature monitoring of the structure and the relation to strength established during the pre-testing of concrete.
The Contractor’s detailed work procedure shall, at a minimum, contain safety precautions, tensioning operations (stating equipment, tensioning loads, steps in tensioning), expected elongation and wedge draw in each step, and sequence for tensioning the tendons. The Contractor shall ensure that nobody, at any time during the tensioning of the tendons, is behind any of the ends of a tendon or a bar, and shall ensure that no one can accidentally come into these zones.
4. GROUTING
General
The grouting procedures shall comply with BS EN 446, with the following additions and amendments:
Tendons shall be pressure-grouted as soon as practicable after stressing the member unless otherwise approved by the Engineer.
No cutting of strands shall take place without the approval of the Engineer.
Before grouting, post-tensioning anchorages shall be sealed to prevent loss of grout.
Grout holes shall be left at the end of each duct. The Contractor shall grout both ends if instructed by the Engineer.
Grout vent pipes must also be placed at high points on the duct, spaced to a maximum of 15 m between vents.
Materials
Grout for filling pre-stressing ducts shall be composed of cement, water, and grout material like Interplast Z to reduce shrinkage and bleeding. The water-cement ratio should be as low as possible, consistent with adequate workability, but shall not exceed 0.45 unless approved by the Engineer. The materials and the proportions of the grout mixture shall be to the approval of the Engineer.
Ambient temperature for grouting shall not exceed 32 degrees Celsius. In hot weather, water shall be chilled, and if the required temperature is not reached, the Contractor shall provide cooling rooms for the cement.
Properties and Tests
Composition and properties of grout shall comply with BS EN 447 and be documented through the manufacturer’s documentation and through pre-trials to check the following in accordance with BS EN 447:
Fluidity.
Bleeding and absorption.
Compressive strength.
Mixing ratio.
Expansion.
Mixing and Pumping Equipment
Grout shall be mixed in a high-speed mechanical mixer for at least 2 minutes until a uniform colloidal consistency is produced. Mixing by hand will not be permitted.
Water shall be added to the mixer first, then the cement shall be added gradually and the grout stirred continuously until pumped into the duct. Grout shall not be used later than 90 minutes after the addition of cement to the mix.
All equipment, especially piping, shall be thoroughly washed with clean water after each series of operations and more frequently if necessary.
Grouting Procedure
The ducts shall be checked for blockages before injecting grout by pumping oil-free air or other approved means.
Grout shall then be injected into each duct in a continuous steady flow until the duct is completely filled and pure grout issues from all vents and from the far end, and all entrapped air has been expelled. The vents shall be progressively closed as required to ensure the complete filling of the duct.
If a blockage occurs, pumping may be transferred quickly to the far end of the duct if there are sufficient vents to ensure that the ducts will be filled with grout. Alternatively, ducts may be flushed with clean water to clear the blockage. The Contractor shall be responsible for the complete filling of the ducts with grout. If several blockages occur, the grouting mix may be rejected and a new mix designed.
On completion of grouting and after the grout has hardened sufficiently, any vents or grouting tubes which extend to the surfaces of the concrete shall be cut off to the concrete surface.
5. REMOVAL OF FORMWORK FOR POST-TENSIONED MEMBERS
Props removal shall be in accordance with concrete specifications except:
Sides and soffit of slabs -after stressing (props shall be left until after grouting).
Props to soffit of beams - 14 days.
Back Propping
Back propping to the slab supporting the wet floor shall be located in accordance with the Engineer’s requirements such that the weight of the wet concrete and a nominal construction loading of 2.0 kN/sqm can be shared between two similar floor slabs below the wet floor. Back propping shall be carried out through at least two levels below the current construction level and must only be removed at the lowest level when more than two levels are back propped.
For the slab directly above the slab/raft on grade, the propping shall be capable of taking the full weight of the wet floor in addition to the nominated construction loading of 2.0 kN/sqm.
The Contractor shall submit his proposal for back propping to the Engineer for review, including the type of back props to be used.
Special back propping areas in the proximity of the pouring strip shall be provided as per the Engineer’s requirements.
6. QUALITY CONTROL IN EXECUTION
The Contractor shall prepare work procedures for the preparation of the pre-stressing units on site with clearly identified interfaces to work procedures from suppliers, for casting, and for tensioning and grouting of tendons. A detailed Inspection Plan covering all requirements and hold points shall be prepared for production inspection and testing. Quality Records shall be on standard inspection forms.
The Contractor’s quality control shall include, but not be limited to, checking, testing, and keeping records of the following:
Check on correct positioning, fastening, and water-tight sealing of ducts, anchorages, and couplers.
Records from tensioning stating equipment, force, and elongation for each tendon.
Calibration results for tensioning equipment.
Records from grouting of tendons, including mix recipe and test results for fluidity, bleeding, re-absorption, expansion, and strength, in accordance with BS EN 446, clause 8.
The Contractor shall keep these records in a log with times and dates stated for each operation.
Engineering Geology, Underground Excavations, Slope stabilizations, Grouting Rock Mechanics, and QA/QC
4mostressing procedures in detail
Civil Engineer, Technical Office Engineer ,M.Eng, PMP , PRMG
1yجميل بس ممكن الاقي method of statement لهدم بلاطات pt ?
"Skilled civil engineer | Prestressing & site engineering expertise | Bangalore Metro rail"
1yVery useful
Projects Execution Manager at Misr Dywidag - Osman Group
1yGreat 👍