To truly prevent costly last-minute rush orders, companies need to embrace a more demand-driven planning approach. This means structuring your supply chain and processes so that they respond to real demand signals and buffer against variability, rather than relying on constant forecast-driven pushes and emergency adjustments.
Key recommendations for implementing a sustainable, demand-driven model include:
- Institute a Robust S&OP/IBP Process: As mentioned, a monthly (or weekly) Sales and Operations Planning cadence is the heartbeat of demand-driven supply chains. It aligns demand forecasts with production, inventory, and supply capabilities, enabling proactive decisions. Over time, a good S&OP process will reduce surprises and allow you to plan promotions, launches, or seasonal peaks without last-minute chaos. It also facilitates communication across departments – sales, manufacturing, procurement, logistics – so everyone is on the same page and working off the same plan (Metric of the Month: Mitigating Expedited Costs in Logistics | Supply & Demand Chain Executive).
- Adopt Demand-Driven Replenishment (Pull Systems): Consider transitioning from traditional push (forecast-driven MRP) to a demand-pull system for planning materials. Approaches like Demand-Driven MRP (DDMRP) use strategically placed stock buffers and dynamic adjustments based on consumption to manage variability. Instead of scheduling production strictly by a long-range forecast (which will be wrong), you maintain reasonable buffers and only replenish what was used. This drastically cuts the bullwhip effect and nervousness in the system. Companies that have implemented end-to-end pull and demand-driven methods report far fewer expedites and much more stable schedules, as noted earlier (e.g. achieving fill rates while reducing inventory ~40% and lead times in parallel) (How Expediting Destroys Factory Performance (& how to avoid it)). The switch to demand-driven doesn’t happen overnight – it requires training, possibly new software tools, and mindset shift – but it is a proven way to break the expedite cycle by design.
- Continuous Improvement and Monitoring: Even with the right processes in place, continuously monitor expediting as a metric. Track how many orders are expedited each month and why. This can be an early warning system for issues – if you see expedite incidents creeping up, investigate the root cause (was there a forecasting miss? A supplier problem? A stock accuracy error?). By treating expediting as an exception and rigorously examining each occurrence, you can fine-tune your planning parameters (lead times, safety stocks, order quantities) to prevent similar issues next time. Many leading firms set a KPI for “percent of orders expedited” and drive it toward zero through ongoing problem-solving. It creates a culture where firefighting is the exception, not the norm.
- Invest in Talent and Tools: Lastly, support the transition with the right team and technology. Planners should be trained in modern forecasting, inventory optimization, and demand planning techniques. Equipping them with advanced planning systems or business intelligence tools can greatly enhance visibility. For example, an integrated dashboard that shows current stock levels, supplier lead times, and demand forecasts helps planners spot potential gaps well in advance. Some organizations also use automation to handle routine adjustments (e.g. automatically expediting an order if a threshold is crossed) – but beware of automating expedites too much, as it can mask the problem. The focus should be on early warning and decision support, not just faster reaction.
By building these capabilities, manufacturers create a sustainable planning ecosystem that is demand-driven and resilient. The need for costly last-minute orders will dwindle because issues are resolved before they escalate. Over time, the savings from reduced expediting – in money, time, and stress – can be reinvested into further improvements, creating a positive cycle instead of a vicious one.
Frequent expediting is a symptom that something is amiss in the supply chain. It imposes real financial costs (overtime, premium freight, supplier fees) and undermines operational efficiency with constant disruptions. Perhaps most insidiously, it often feeds on itself – once a company gets in the habit of expediting, lead times lengthen and planning confidence erodes, leading to even more expediting. But this “urgent order treadmill” is not inevitable. By attacking root causes like poor forecasting, mismanaged inventory, and lack of planning coordination, companies can regain control. The experiences of industry leaders show that drastically reducing expedites is possible – and it brings tangible benefits like lower inventory, higher service reliability, and improved production efficiency.
The journey to a demand-driven supply chain requires effort and change, but the reward is a more agile, cost-effective operation. Instead of constantly reacting to yesterday’s problems, your team can anticipate and prevent them. In the long run, dialling down the dependence on expediting not only saves money – it frees your organization to focus on innovation and growth rather than firefighting. It’s time to break the cycle of expedites and let a proactive, demand-driven approach drive your manufacturing success.
Supply Chain Transformation
2mohttps://www.linkedin.com/pulse/carry-expediting-simon-eagle-bod6e/