Top Mistakes That Increase Construction Costs (And How to Avoid Them)

Top Mistakes That Increase Construction Costs (And How to Avoid Them)

When planning a new factory, warehouse, or industrial building, every rupee matters. Yet many projects go over budget due to common but avoidable mistakes. At Panjetani Buildwell, we have seen these issues first-hand and helped clients prevent them.

In this blog, we highlight the top mistakes that inflate construction costs and share expert tips to keep your project efficient and affordable.

 

1. Poor Initial Planning

 

Lack of detailed planning is one of the main reasons costs spiral out of control. Many companies jump straight into construction without a proper design, site survey, or feasibility study.

How to avoid it:

  • Hire experienced designers and engineers to create accurate plans.

  • Allocate time for site analysis and soil testing.

  • Define all project requirements before starting.

Learn more about our PEB design and engineering services.

 

2. Choosing Low-Quality Materials

 

Going for cheaper materials may seem like a cost-saving move, but it leads to frequent repairs, safety risks, and higher maintenance expenses in the long run.

How to avoid it:

  • Choose trusted suppliers and certified materials.

  • Consider life-cycle costs, not just initial price.

  • Use quality PUF panels and pre-engineered steel structures to ensure durability.

Read our guide on PUF panels and their advantages.

 

3. Ignoring Local Regulations

 

Non-compliance with government regulations or local building codes can result in heavy fines and expensive rework.

How to avoid it:

  • Work with a company familiar with local compliance and environmental norms.

  • Obtain all necessary permits and approvals before starting.

Check India’s National Building Code (NBC) for detailed guidelines.

 

4.Frequent Design Changes

 

Frequent changes during construction lead to rework, material wastage, and additional labor costs.

How to avoid it:

  • Finalize the design early and involve all stakeholders.

  • Use 3D visualization and digital models to confirm designs before execution.

 

5. Underestimating Site Conditions

 

Unexpected site issues like poor soil, water logging, or difficult access can cause costly delays.

How to avoid it:

  • Conduct thorough geotechnical and environmental studies.

  • Plan for possible contingencies in your budget.

 

Final Thoughts

 

By avoiding these common mistakes, you can save significantly on your project and achieve faster completion. At Panjetani Buildwell, we specialize in pre-engineered buildings (PEB) and PUF panel solutions, helping you reduce costs without compromising on quality.

If you’re planning a new project, connect with us for expert guidance and customized solutions.

 

KIJO MISHAK

#Estimation Engineer #PEB-Steel Structure #Costing || Ex-LTIMindtree - Power Bi developer.

2mo

Helpful information

Brij Pal Singh Chauhan

Executive Director - Simar Infrastructures Ltd. Panipat

2mo

Useful information shared...thx.