SlideShare a Scribd company logo
  • Upload
  • Login
  • Download free for 30 days
SlideShare a Scribd company logo
  • Upload
  • Download free for 30 days
  • Login
×
×
×
×
×
×
Matthew Combe

Matthew Combe

6 Followers
3 SlideShares 6 Followers
  • Unblock User Block User
3 SlideShares 6 Followers

Personal Information
Organization / Workplace
Seattle, WA United States
Occupation
Sustainablity Consultant
Industry
CleanTech / Environment
Website
www.linkedin.com/pub/matthew-combe/22/115/575
About
Most recently I have worked in an Architecture Practice in the role of Sustainability Champion and was heavily involved in the sustainability audits of all the current projects in the office. I also carried out environmental analysis at the initial design stages to ensure the basics of design were done correctly to maximise the buildings sustainability potential I have a very enthusiastic approach to sustainability ensuring I have gathered all the information before giving a detailed analysis. I also carried out the office Post Occupancy Evaluation (POE) process on all completed projects. This entails a study on energy consumption, material selection and client feedback. Previous to grad
  • Activity
  • About

Presentations

(3)

Weather Tool Presentation

15 years ago • 2110 Views

Ecotect Presentaion

15 years ago • 9281 Views

BREEAM Presentation

15 years ago • 8199 Views
Personal Information
Organization / Workplace
Seattle, WA United States
Occupation
Sustainablity Consultant
Industry
CleanTech / Environment
Website
www.linkedin.com/pub/matthew-combe/22/115/575
About
Most recently I have worked in an Architecture Practice in the role of Sustainability Champion and was heavily involved in the sustainability audits of all the current projects in the office. I also carried out environmental analysis at the initial design stages to ensure the basics of design were done correctly to maximise the buildings sustainability potential I have a very enthusiastic approach to sustainability ensuring I have gathered all the information before giving a detailed analysis. I also carried out the office Post Occupancy Evaluation (POE) process on all completed projects. This entails a study on energy consumption, material selection and client feedback. Previous to grad

Modal header

  • About
  • Support
  • Terms
  • Privacy
  • Copyright
  • Cookie Preferences
  • Do not sell or share my personal information
English
Current Language: English
Español
Português
Français
Deutsch

© 2025 SlideShare from Scribd