create a website

Incentive contracts with demand guarantee in BOT toll road projects. (2023). Feng, Zhuo ; Zhao, Yunpeng ; Jin, Lulu ; Song, Jinbo.
In: Research in Transportation Economics.
RePEc:eee:retrec:v:98:y:2023:i:c:s0739885923000124.

Full description at Econpapers || Download paper

Cited: 1

Citations received by this document

Cites: 58

References cited by this document

Cocites: 27

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information. (2024). Chen, Yue ; Yin, Yafeng ; Zhou, Xiongwei ; Shi, Shasha ; Pan, Meixu ; Tuo, Yuhui.
    In: Transportation Research Part E: Logistics and Transportation Review.
    RePEc:eee:transe:v:183:y:2024:i:c:s1366554524000553.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Albalate, D. ; Bel, G. Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts. 2009 Transportation Research Part A: Policy and Practice. 43 219-229

  2. Alonso-Conde, A.B. ; Brown, C. ; Rojo-Suarez, J. Public private partnerships: Incentives, risk transfer and real options. 2007 Review of Financial Economics. 16 335-349

  3. Ashuri, B. ; Kashani, H. ; Molenaar, K.R. ; Lee, S. ; Lu, J. Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. 2011 Journal of Construction Engineering and Management. 138 545-557
    Paper not yet in RePEc: Add citation now
  4. Baron, D.P. ; Myerson, R.B. Regulating a monopolist with unknown costs. 1982 Econometrica: Journal of the Econometric Society. 911-930

  5. Brandão, L.E. ; Bastian-Pinto, C. ; Gomes, L.L. ; Labes, M. Government supports in public–private partnership contracts: Metro line 4 of the Sao Paulo Subway System. 2012 Journal of Infrastructure Systems. 18 218-225
    Paper not yet in RePEc: Add citation now
  6. Brandao, L.E.T. ; Saraiva, E. The option value of government guarantees in infrastructure projects. 2008 Construction Management & Economics. 26 1171-1180

  7. Chang, Z. Public–private partnerships in China: A case of the Beijing No. 4 Metro line. 2013 Transport Policy. 30 153-160

  8. Chiara, N. ; Garvin, M.J. ; Vecer, J. Valuing simple multiple-exercise real options in infrastructure projects. 2007 Journal of Infrastructure Systems. 13 97-104
    Paper not yet in RePEc: Add citation now
  9. Engel, E. ; Fischer, R. ; Galetovic, A. Least-present-value-of-revenue auctions and highway franchising. 2001 Journal of Political Economy. 109 993-1020

  10. Engel, E. ; Fischer, R. ; Galetovic, A. The basic public finance of public–private partnerships. 2013 Journal of the European Economic Association. 11 83-111

  11. Erhun, F. ; Keskinocak, P. ; Tayur, S. Dynamic procurement in a capacitated supply chain facing uncertain demand. 2008 IIE Transactions. 40 733-748
    Paper not yet in RePEc: Add citation now
  12. Feng, Z. ; Zhang, S. ; Gao, Y. Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects. 2015 Transportation Research Part A: Policy and Practice. 78 54-67

  13. Feng, Z. ; Zhang, S. ; Gao, Y. ; Zhang, S. Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach. 2016 Transportation Research Part B: Methodological. 91 466-491

  14. Feng, Z. ; Zhang, Y. ; Zhang, S. ; Song, J. Contracting and renegotiating with a loss-averse private firm in BOT road projects. 2018 Transportation Research Part B: Methodological. 112 40-72

  15. Flyvbjerg, B. ; Skamris, H.M.K. ; Buhl, S.L. How (in) accurate are demand forecasts in public works projects? The case of transportation. 2005 Journal of the American Planning Association. 71 131-146
    Paper not yet in RePEc: Add citation now
  16. Gagnepain, P. ; Ivaldi, M. ; Martimort, D. The cost of contract renegotiation: Evidence from the local public sector. 2013 The American Economic Review. 103 2352-2383

  17. Galera, A.L.L. ; Soliño, A.S. A real options approach for the valuation of highway concessions. 2010 Transportation Science. 44 416-427
    Paper not yet in RePEc: Add citation now
  18. Guo, X. ; Yang, H. Analysis of a build–operate–transfer scheme for road franchising. 2009 International Journal of Sustainable Transportation. 3 312-338
    Paper not yet in RePEc: Add citation now
  19. Irwin, T. Government guarantees: Allocating and valuing risk in privately financed infrastructure projects. 2007 The World Bank:

  20. Jun, J. Appraisal of combined agreements in BOT project finance: Focused on minimum revenue guarantee and revenue cap agreements. 2010 International Journal of Strategic Property Management. 14 139-155
    Paper not yet in RePEc: Add citation now
  21. Kokkaew, N. ; Chiara, N. A modeling government revenue guarantees in privately built transportation projects: A risk-adjusted approach. 2013 Transport. 28 186-192
    Paper not yet in RePEc: Add citation now
  22. Lariviere, M.A. Inducing forecast revelation through restricted returns. 2002 :
    Paper not yet in RePEc: Add citation now
  23. Li, B. ; Akintoye, A. ; Edwards, P.J. ; Hardcastle, C. Critical success factors for PPP/PFI projects in the UK construction industry. 2005 Construction Management & Economics. 23 459-471

  24. Li, S. ; Cai, H. Government incentive impacts on private investment behaviors under demand uncertainty. 2017 Transportation Research Part E: Logistics and Transportation Review. 101 115-129

  25. Li, S. ; Cai, J. ; Feng, Z. ; Xu, Y. ; Cai, H. Government contracting with monopoly in infrastructure provision: Regulation or deregulation?. 2019 Transportation Research Part E: Logistics and Transportation Review. 122 506-523

  26. Light, T. Optimal highway design and user welfare under value pricing. 2009 Journal of Urban Economics. 66 116-124

  27. Liu, J. ; Yu, X. ; Cheah, C.Y.J. Evaluation of restrictive competition in PPP projects using real option approach. 2014 International Journal of Project Management. 32 473-481
    Paper not yet in RePEc: Add citation now
  28. Lu, Z. ; Meng, Q. Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty. 2017 Transportation Research Part E: Logistics and Transportation Review. 100 17-37

  29. Niu, B. ; Zhang, J. Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty. 2013 Transportation Research Part E: Logistics and Transportation Review. 53 1-14

  30. Parker, G.G. ; Van Alstyne, M.W. Two-sided network effects: A theory of information product design. 2005 Management Science. 51 1494-1504

  31. Qiu, L.D. ; Wang, S. BOT projects: Incentives and efficiency. 2011 Journal of Development Economics. 94 127-138

  32. Rouhani, O.M. Beyond standard zonal congestion pricing: A detailed impact analysis. 2018 Journal of Transportation Engineering, Part A: Systems. 144 -
    Paper not yet in RePEc: Add citation now
  33. Shi, S. ; Yin, Y. ; Guo, X. Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost information. 2016 Transportation Research Part B: Methodological. 85 56-69

  34. Snow, A. ; Warren, R.S. The marginal welfare cost of public funds: Theory and estimates. 1996 Journal of Public Economics. 61 289-305

  35. Song, J. ; Zhao, Y. ; Jin, L. ; Sun, Y. Pareto optimization of public-private partnership toll road contracts with government guarantees. 2018 Transportation Research Part A: Policy and Practice. 117 158-175

  36. Subprasom, K. ; Chen, A. Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. 2007 Journal of Construction Engineering and Management. 133 64-71
    Paper not yet in RePEc: Add citation now
  37. Sun, Y. ; Zhang, L. Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. 2014 Journal of Construction Engineering and Management. 141 -
    Paper not yet in RePEc: Add citation now
  38. Tam, C.M. Build-operate-transfer model for infrastructure developments in Asia: Reasons for successes and failures. 1999 International Journal of Project Management. 17 377-382
    Paper not yet in RePEc: Add citation now
  39. Tan, Z. ; Yang, H. Flexible build-operate-transfer contracts for road franchising under demand uncertainty. 2012 Transportation Research Part B: Methodological. 46 1419-1439

  40. Tan, Z. ; Yang, H. The impact of user heterogeneity on road franchising. 2012 Transportation Research Part E: Logistics and Transportation Review. 48 958-975

  41. Tan, Z. ; Yang, H. ; Guo, X. Properties of Pareto-efficient contracts and regulations for road franchising. 2010 Transportation Research Part B: Methodological. 44 415-433

  42. Tsay, A.A. The quantity flexibility contract and supplier-customer incentives. 1999 Management Science. 45 1339-1358

  43. Tsay, A.A. ; Lovejoy, W.S. Quantity flexibility contracts and supply chain performance. 1999 Manufacturing & Service Operations Management. 1 89-111

  44. Vassallo, J.M. ; Soliño, A.S. Minimum income guarantee in transportation infrastructure concessions in Chile. 2006 Transportation Research Record: Journal of the Transportation Research Board. 1960 15-22
    Paper not yet in RePEc: Add citation now
  45. Verhoef, E. ; Nijkamp, P. ; Rietveld, P. Second-best congestion pricing: The case of an untolled alternative. 1996 Journal of Urban Economics. 40 279-302

  46. Verhoef, E.T. Second-best road pricing through highway franchising. 2007 Journal of Urban Economics. 62 337-361

  47. Wang, F. ; Xiong, M. ; Niu, B. ; Zhuo, X. Impact of government subsidy on BOT contract design: Price, demand, and concession period. 2018 Transportation Research Part B: Methodological. 110 137-159

  48. Wang, Y. ; Cui, P. ; Liu, J. Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. 2018 International Journal of Project Management. 36 899-909
    Paper not yet in RePEc: Add citation now
  49. Wang, Y. ; Liu, J. Evaluation of the excess revenue sharing ratio in PPP projects using principal–agent models. 2015 International Journal of Project Management. 33 1317-1324
    Paper not yet in RePEc: Add citation now
  50. Wibowo, A. Valuing guarantees in a BOT infrastructure project. 2004 Engineering Construction and Architectural Management. 11 395-403
    Paper not yet in RePEc: Add citation now
  51. Wibowo, A. ; Kochendoerfer, B. Selecting BOT/PPP infrastructure projects for government guarantee portfolio under conditions of budget and risk in the Indonesian context. 2010 Journal of Construction Engineering and Management. 137 512-522
    Paper not yet in RePEc: Add citation now
  52. Wibowo, A. ; Permana, A. ; Kochendörfer, B. ; Tiong Lee Kiong, R. ; Jacob, D. ; Neunzehn, D. Modeling contingent liabilities arising from government guarantees in Indonesian BOT/PPP toll roads. 2012 Journal of Construction Engineering and Management. 138 1403-1410
    Paper not yet in RePEc: Add citation now
  53. World Bank World development indicators. 1998 World Bank:
    Paper not yet in RePEc: Add citation now
  54. Xiao, Y. ; Fu, X. ; Zhang, A. Airport capacity choice under airport-airline vertical arrangements. 2016 Transportation Research Part A: Policy and Practice. 92 298-309

  55. Xiong, W. ; Zhang, X. The real option value of renegotiation in public–private partnerships. 2016 Journal of Construction Engineering and Management. 142 -
    Paper not yet in RePEc: Add citation now
  56. Yang, H. ; Tang, W.H. ; Cheung, W.M. ; Meng, Q. Profitability and welfare gain of private toll roads in a network with heterogeneous users. 2002 Transportation Research Part A: Policy and Practice. 36 537-554

  57. Zhang, Y. ; Feng, Z. ; Zhang, S. The effects of concession period structures on BOT road contracts. 2018 Transportation Research Part A: Policy and Practice. 107 106-125

  58. Zhang, Y. ; Feng, Z. ; Zhang, S. ; Song, J. The effects of service level on BOT transport project contract. 2018 Transportation Research Part E: Logistics and Transportation Review. 118 184-206

Cocites

Documents in RePEc which have cited the same bibliography

  1. Essays on Modelling Public-Private-Partnerships (PPP) for Indian Emergency Medical Services. (2025). Dr, Senthilkumar Kumar ; Elitzur, Ramy ; Kapoor, Rohit ; Chaudhari, Sanjay C ; Chawan, Vinaysingh J.
    In: Thesis Commons.
    RePEc:osf:thesis:5m49e_v1.

    Full description at Econpapers || Download paper

  2. Clearing in financial networks and dynamic investment under uncertainty. (2024). Ketelaars, Martijn.
    In: Other publications TiSEM.
    RePEc:tiu:tiutis:94768fb9-fd72-405d-a330-6b704cd05b41.

    Full description at Econpapers || Download paper

  3. Incentive contracts with demand guarantee in BOT toll road projects. (2023). Feng, Zhuo ; Zhao, Yunpeng ; Jin, Lulu ; Song, Jinbo.
    In: Research in Transportation Economics.
    RePEc:eee:retrec:v:98:y:2023:i:c:s0739885923000124.

    Full description at Econpapers || Download paper

  4. Evidence on optimal risk allocation models for Indonesian geothermal projects under PPP contracts. (2023). Burton, Bruce ; Nur, Suardi ; Bergmann, Ariel.
    In: Utilities Policy.
    RePEc:eee:juipol:v:81:y:2023:i:c:s0957178723000231.

    Full description at Econpapers || Download paper

  5. Risk and benefit sharing schemes in oil exploration and production. (2022). Hagspiel, Verena ; Lerdahl, Thomas ; Fedorov, Semyon ; Lavrutich, Maria.
    In: Energy Economics.
    RePEc:eee:eneeco:v:116:y:2022:i:c:s0140988322005308.

    Full description at Econpapers || Download paper

  6. Do firms manipulate earnings after winning public-private partnership bids? Evidence from China. (2022). Majeed, Muhammad Ansar ; Zhong, Huijie ; Yan, Chao.
    In: Emerging Markets Review.
    RePEc:eee:ememar:v:51:y:2022:i:pb:s1566014121000881.

    Full description at Econpapers || Download paper

  7. Persistence and dynamics in the efficiency of toll motorways: The Spanish case. (2022). Baos-Pino, Jose F ; Zapico, Emma ; Boto-Garcia, David.
    In: Economics of Transportation.
    RePEc:eee:ecotra:v:31:y:2022:i:c:s2212012222000211.

    Full description at Econpapers || Download paper

  8. Essays on Modelling Public-Private-Partnerships (PPP) for Indian Emergency Medical Services. (2021). Anantharaman, Senthil Kumar.
    In: EconStor Theses.
    RePEc:zbw:esthes:319602.

    Full description at Econpapers || Download paper

  9. Essays on Modelling Public-Private-Partnerships (PPP) for Indian Emergency Medical Services. (2021). Chaudhari, Sanjay ; Chawan, Vinay Singh ; Elitzur, Ramy ; Kapoor, Rohit ; Anantharaman, Senthil Kumar.
    In: MPRA Paper.
    RePEc:pra:mprapa:125056.

    Full description at Econpapers || Download paper

  10. Persistence and dynamics in the efficiency of toll motorways: The Spanish case. (2021). Baos-Pino, Jose F ; Zapico, Emma ; Boto-Garcia, David.
    In: Efficiency Series Papers.
    RePEc:oeg:wpaper:2021/03.

    Full description at Econpapers || Download paper

  11. Renegotiations and Renewals of Public Contracts. (2021). Saussier, Stephane ; Beuve, Jean.
    In: Review of Industrial Organization.
    RePEc:kap:revind:v:59:y:2021:i:3:d:10.1007_s11151-021-09819-w.

    Full description at Econpapers || Download paper

  12. Renegotiation Strategy of Public-Private Partnership Projects with Asymmetric Information—An Evolutionary Game Approach. (2020). Li, Yue Lin ; Xing, Huige.
    In: Sustainability.
    RePEc:gam:jsusta:v:12:y:2020:i:7:p:2646-:d:337523.

    Full description at Econpapers || Download paper

  13. Simulation-based dynamic adjustments of prices and subsidies for transportation PPP projects based on stakeholders’ satisfaction. (2019). Ji, Wenying ; Skibniewski, Mirosaw J ; Guo, Jiyue ; Yuan, Jingfeng.
    In: Transportation.
    RePEc:kap:transp:v:46:y:2019:i:6:d:10.1007_s11116-018-9940-1.

    Full description at Econpapers || Download paper

  14. Developing a Revenue Sharing Method for an Operational Transfer-Operate-Transfer Project. (2019). Ke, Yongjian ; Du, Yanhua ; Philbin, Simon P ; Fang, Jun ; Zhang, Jingxiao.
    In: Sustainability.
    RePEc:gam:jsusta:v:11:y:2019:i:22:p:6436-:d:287570.

    Full description at Econpapers || Download paper

  15. The effects of concession period structures on BOT road contracts. (2018). Feng, Zhuo ; Zhang, Yiwen.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:107:y:2018:i:c:p:106-125.

    Full description at Econpapers || Download paper

  16. Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions. (2017). Lu, Zhaoyang ; Meng, Qiang.
    In: Transportation Research Part B: Methodological.
    RePEc:eee:transb:v:102:y:2017:i:c:p:105-123.

    Full description at Econpapers || Download paper

  17. Critical renegotiation triggers of European transport concessions. (2016). Domingues, Sergio ; Sarmento, Joaquim Miranda.
    In: Transport Policy.
    RePEc:eee:trapol:v:48:y:2016:i:c:p:82-91.

    Full description at Econpapers || Download paper

  18. From fixed to state-dependent duration in public-private partnerships. (2015). Vinella, Annalisa ; Danau, Daniel.
    In: Economics Working Paper Archive (University of Rennes & University of Caen).
    RePEc:tut:cremwp:201504.

    Full description at Econpapers || Download paper

  19. The Economics of Public-Private Partnerships: A Basic Guide. (2015). Chang, Chen-Yu.
    In: Construction Management and Economics.
    RePEc:taf:conmgt:v:33:y:2015:i:3:p:233-238.

    Full description at Econpapers || Download paper

  20. Changing perceptions on PPP games: Demand risk in Irish roads. (2015). Burke, Richard ; Demirag, Istemi.
    In: CRITICAL PERSPECTIVES ON ACCOUNTING.
    RePEc:eee:crpeac:v:27:y:2015:i:c:p:189-208.

    Full description at Econpapers || Download paper

  21. Urban transport : can public-private partnerships work ?. (2014). Engel, Eduardo ; Galetovic, Alexander.
    In: Policy Research Working Paper Series.
    RePEc:wbk:wbrwps:6873.

    Full description at Econpapers || Download paper

  22. Unbundling tolls from contracts: a new road PPP model. (2014). Maria de los angeles Baeza, ; Tamayo, Julian Sierra ; Vassallo, Jose Manuel.
    In: Public Money & Management.
    RePEc:taf:pubmmg:v:34:y:2014:i:6:p:447-451.

    Full description at Econpapers || Download paper

  23. Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty. (2013). Niu, Baozhuang ; Zhang, Jie.
    In: Transportation Research Part E: Logistics and Transportation Review.
    RePEc:eee:transe:v:53:y:2013:i:c:p:1-14.

    Full description at Econpapers || Download paper

  24. Case analysis of simultaneous concessions of parking meters and underground parking facilities. (2013). Caicedo, Felix ; Diaz, Alejandra.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:49:y:2013:i:c:p:358-378.

    Full description at Econpapers || Download paper

  25. Flexible build-operate-transfer contracts for road franchising under demand uncertainty. (2012). Yang, Hai ; Tan, Zhijia.
    In: Transportation Research Part B: Methodological.
    RePEc:eee:transb:v:46:y:2012:i:10:p:1419-1439.

    Full description at Econpapers || Download paper

  26. Infrastructure and nation building: The regulation and financing of network transportation infrastructures in Spain (1720-2010). (2010). Bel, Germà.
    In: IREA Working Papers.
    RePEc:ira:wpaper:201016.

    Full description at Econpapers || Download paper

  27. Questioning the need for full amortization in PPP contracts for transport Infrastructure. (2010). Viegas, Jose M..
    In: Research in Transportation Economics.
    RePEc:eee:retrec:v:30:y:2010:i:1:p:139-144.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-10-06 00:56:57 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated August, 3 2024. Contact: Jose Manuel Barrueco.