create a website

Evaluating the inhibitors in the growth of high-speed railway in India: A multi-stakeholder perspective. (2024). Bhattacharjee, Pushparenu ; Verma, Meenakshi ; Dadsena, Krishna Kumar ; Debroy, Arindam.
In: Transport Policy.
RePEc:eee:trapol:v:155:y:2024:i:c:p:93-109.

Full description at Econpapers || Download paper

Cited: 0

Citations received by this document

Cites: 126

References cited by this document

Cocites: 28

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

    This document has not been cited yet.

References

References cited by this document

  1. Aiyara, T. The long and winding railway: domestic politics and the realization of China-initiated high-speed railway projects in Thailand. Chinese Political. 2019 Sci. Rev.. 4 327-348
    Paper not yet in RePEc: Add citation now
  2. Akram, H.W. ; Ahmad, A. ; Sanyal, S. An analysis of performance of Indian railways. 2021 Int. J. Logist. Syst. Manag.. 40 287-308
    Paper not yet in RePEc: Add citation now
  3. Albalate, D. ; Bel, G. ; Fageda, X. When supply travels far beyond demand: causes of oversupply in Spain's transport infrastructure. 2015 Transport Pol.. 41 80-89

  4. Albalate, D. ; Campos, J. ; Jimenez, J.L. Tourism and high-speed rail in Spain: does the AVE increase local visitors?. 2017 Ann. Tourism Res.. 65 71-82
    Paper not yet in RePEc: Add citation now
  5. Alqershy, M.T. ; Shi, Q. Barriers to social responsibility implementation in belt and road mega infrastructure projects: a hybrid fuzzy DEMATEL-ISM-MICMAC approach. 2023 Buildings. 13 1561-
    Paper not yet in RePEc: Add citation now
  6. Amiril, A. ; Nawawi, A.H. ; Takim, R. ; Latif, S.N.F.A. Transportation infrastructure project sustainability factors and performance. 2014 Procedia-Social and Behavioral Sciences. 153 90-98
    Paper not yet in RePEc: Add citation now
  7. Andrić, J.M. ; Wang, J. ; Zhong, R. Identifying the critical risks in railway projects based on fuzzy and sensitivity analysis: a case study of belt and road projects. 2019 Sustainability. 11 1302-

  8. Arias, J.F. ; Bachmann, C. Quantifying the relative importance of rapid transit implementation barriers: evidence from Ecuador. 2022 J. Transport Geogr.. 100 -

  9. Bai, C. ; Sarkis, J. A grey-based DEMATEL model for evaluating business process management critical success factors. 2013 Int. J. Prod. Econ.. 146 281-292

  10. Balci, G. ; Surucu-Balci, E. Blockchain adoption in the maritime supply chain: examining barriers and salient stakeholders in containerized international trade. 2021 Transport. Res. E Logist. Transport. Rev.. 156 -

  11. Biswas, B. ; Gupta, R. Analysis of barriers to implement blockchain in industry and service sectors. 2019 Comput. Ind. Eng.. 136 225-241
    Paper not yet in RePEc: Add citation now
  12. Boholm, Å. ; Löfstedt, R. Issues of risk, trust and knowledge: the Hallandsås tunnel case. 1999 Ambio. 556-561
    Paper not yet in RePEc: Add citation now
  13. Bruzzone, F. The effects of high-speed rail on accessibility and equity: evidence from the Turin-Lyon case-study. 2023 Soc. Econ. Plann. Sci.. 85 -

  14. Bugalia, N. ; Maemura, Y. ; Dasari, R. ; Patidar, M. A system dynamics model for effective management strategies of High-Speed Railway (HSR) projects involving private sector participation. 2023 Transport. Res. Pol. Pract.. 175 -

  15. Burnside‐Lawry, J. ; Ariemma, L. Global governance and communicative action: a study of democratic participation during planning for the Lyon–Turin rail link. 2015 J. Publ. Aff.. 15 129-142
    Paper not yet in RePEc: Add citation now
  16. Cai, D.L. ; Xiao, Y.B. ; Jiang, C. Competition between high-speed rail and airlines: considering both passenger and cargo. 2021 Transport Pol.. 110 379-393

  17. Campos, J. ; De Rus, G. Some stylized facts about high-speed rail: a review of HSR experiences around the world. 2009 Transport Pol.. 16 19-28

  18. Cavallaro, F. Effects of high-speed rail on regional accessibility. 2022 Transportation. -
    Paper not yet in RePEc: Add citation now
  19. Cavallaro, F. ; Eboli, L. ; Mazzulla, G. ; Nocera, S. Design of integrated passenger-freight transport: a multi-stakeholder perspective. 2023 Journal of Public Transportation. 25 -
    Paper not yet in RePEc: Add citation now
  20. Chen, Z. ; Xue, J. ; Rose, A.Z. ; Haynes, K.E. The impact of high-speed rail investment on economic and environmental change in China: a dynamic CGE analysis. 2016 Transport. Res. Pol. Pract.. 92 232-245

  21. Cheng, S. ; Lin, J. ; Yang, D. ; Liu, J. ; Li, H. Carbon, water, land and material footprints of China's high-speed railway construction. 2020 Transport. Res. Transport Environ.. 82 -
    Paper not yet in RePEc: Add citation now
  22. Cheng, Y.H. ; Tsao, H.L. Rolling stock maintenance strategy selection, spares parts' estimation, and replacements' interval calculation. 2010 Int. J. Prod. Econ.. 128 404-412

  23. Chou, J.S. ; Tserng, H.P. ; Lin, C. ; Yeh, C.P. Critical factors and risk allocation for PPP policy: comparison between HSR and general infrastructure projects. 2012 Transport Pol.. 22 36-48

  24. Cornet, Y. ; Dudley, G. ; Banister, D. High speed rail: implications for carbon emissions and biodiversity. 2018 Case studies on transport policy. 6 376-390
    Paper not yet in RePEc: Add citation now
  25. Cui, P. ; Ge, Y. ; Li, S. ; Li, Z. ; Xu, X. ; Zhou, G.G. Scientific challenges in disaster risk reduction for the Sichuan–Tibet Railway. 2022 Eng. Geol.. 309 -
    Paper not yet in RePEc: Add citation now
  26. Currie, R.R. ; Seaton, S. ; Wesley, F. Determining stakeholders for feasibility analysis. 2009 Ann. Tourism Res.. 36 41-63
    Paper not yet in RePEc: Add citation now
  27. Dadsena, K.K. ; Pant, P. ; Paul, S.K. ; Pratap, S. Overcoming strategies for supply chain digitization barriers: implications for sustainable development goals. 2024 Bus. Strat. Environ.. -

  28. Damoah, I.S. ; Mouzughi, Y. ; Kumi, D.K. The effects of government construction projects abandonment: stakeholders' perspective. 2020 International Journal of Construction Management. 20 462-479
    Paper not yet in RePEc: Add citation now
  29. Dansoh, A. ; Frimpong, S. ; Ampratwum, G. ; Dennis Oppong, G. ; Osei-Kyei, R. Exploring the role of traditional authorities in managing the public as stakeholders on PPP projects: a case study. 2020 International Journal of Construction Management. 20 628-641
    Paper not yet in RePEc: Add citation now
  30. De Rus, G. The BCA of HSR: should the government invest in high speed rail infrastructure?. 2011 J. Benefit-Cost Anal.. 2 1-28

  31. De Rus, G. ; Nombela, G. Is investment in high speed rail socially profitable?. 2007 J. Transport Econ. Pol.. 41 3-23

  32. Desai, D. As China's High-Speed Railways Fall into Debt Trap, India Must Be Cautious. 2021 :
    Paper not yet in RePEc: Add citation now
  33. Dhingra, T. ; Sharma, S. Rail infrastructure—journey since Indian independence and beyond. 2022 En : Infrastructure Planning and Management in India. Springer: Singapore
    Paper not yet in RePEc: Add citation now
  34. Dobruszkes, F. High-speed rail and air transport competition in Western Europe: a supply-oriented perspective. 2011 Transport Pol.. 18 870-879

  35. Dobruszkes, F. ; Chen, C.L. ; Moyano, A. ; Pagliara, F. ; Endemann, P. Is high-speed rail socially exclusive? An evidence-based worldwide analysis. 2022 Travel Behaviour and Society. 26 96-107
    Paper not yet in RePEc: Add citation now
  36. European Commission Roadmap to a Single European Transport Area–Towards a Competitive and Resource Efficient Transport System: Illustrated Brochure. 2011 :
    Paper not yet in RePEc: Add citation now
  37. Fang, W. ; Ma, C. ; Lei, Z. Research on sustainable development of transport infrastructure based on corporate culture and low-carbon perspective. 2022 Journal of Environmental and Public Health. 2022 -
    Paper not yet in RePEc: Add citation now
  38. Farooque, M. ; Zhang, A. ; Liu, Y. Barriers to circular food supply chains in China. 2019 Supply Chain Manag.: Int. J.. 24 677-696
    Paper not yet in RePEc: Add citation now
  39. Frohlich, M.T. E‐integration in the supply chain: barriers and performance. 2002 Decis. Sci. J.. 33 537-556
    Paper not yet in RePEc: Add citation now
  40. Garg, A. ; Gupta, S. A descriptive analysis of risk management with specific reference to high speed rail (HSR) in India. 2021 Water Energy Int.. 64 37-44
    Paper not yet in RePEc: Add citation now
  41. Gaur, S. ; Tawalare, A. Investigating the role of BIM in stakeholder management: evidence from a metro-rail project. 2022 J. Manag. Eng.. 38 -
    Paper not yet in RePEc: Add citation now
  42. Gedam, V.V. ; Raut, R.D. ; de Sousa Jabbour, A.B.L. ; Tanksale, A.N. ; Narkhede, B.E. Circular economy practices in a developing economy: barriers to be defeated. 2021 J. Clean. Prod.. 311 -

  43. Giri, B.C. ; Molla, M.U. ; Biswas, P. Pythagorean fuzzy DEMATEL method for supplier selection in sustainable supply chain management. 2022 Expert Syst. Appl.. 193 -
    Paper not yet in RePEc: Add citation now
  44. González‐Savignat, M.A.R. Will the high‐speed train compete against the private vehicle?. 2004 Transport Rev.. 24 293-316
    Paper not yet in RePEc: Add citation now
  45. Govindan, K. ; Kannan, D. ; Shankar, K.M. Evaluating the drivers of corporate social responsibility in the mining industry with multi-criteria approach: a multi-stakeholder perspective. 2014 J. Clean. Prod.. 84 214-232
    Paper not yet in RePEc: Add citation now
  46. Govindan, Kannan ; Khodaverdi, Roohollah ; Vafadarnikjoo, Amin A grey DEMATEL approach to develop third-party logistics provider selection criteria. 2016 Ind. Manag. Data Syst.. 116 690-722
    Paper not yet in RePEc: Add citation now
  47. GOYAL, A. High Speed Rail in India: importance of National Policies. 2014 Econ. Political Wkly.. 155-164
    Paper not yet in RePEc: Add citation now
  48. Guo, D. ; He, G. ; Lian, Z. Environmental risk perception and public trust—from planning to operation for China's high-speed railway. 2017 International Journal of Sustainable Transportation. 11 696-706
    Paper not yet in RePEc: Add citation now
  49. Haas, P.J. ; Hernandez, P. ; Estrada, K. Estimating workforce development needs for high-speed rail in California. 2012 Research Report. 11-16
    Paper not yet in RePEc: Add citation now
  50. Haikola, S. ; Anshelm, J. The modern railway and the Swedish state–competing storylines about state capacity, modernisation and material dependencies in the Swedish high-speed rail discourse, 1995–2020. 2022 J. Environ. Pol. Plann.. 24 325-342
    Paper not yet in RePEc: Add citation now
  51. He, G. ; Mol, A.P. ; Lu, Y. Public protests against the Beijing–Shenyang high-speed railway in China. 2016 Transport. Res. Transport Environ.. 43 1-16
    Paper not yet in RePEc: Add citation now
  52. He, G. ; Mol, A.P. ; Zhang, L. ; Lu, Y. Environmental risks of high-speed railway in China: public participation, perception and trust. 2015 Environmental Development. 14 37-52
    Paper not yet in RePEc: Add citation now
  53. Hernandez, P.D. ; Haas, P.J. Estimating workforce needs for high-speed rail in California and the United States. 2013 Transport. Res. Rec.. 2328 25-31
    Paper not yet in RePEc: Add citation now
  54. Hong, S.J. ; Najmi, H. Impact of High-speed rail on air travel demand between Dallas and Houston applying Monte Carlo simulation. 2022 J. Air Trans. Manag.. 102 -

  55. Hosseini, S.A. ; Maleki Toulabi, H. Examining an appropriate express railway pavement system using fuzzy DEMATEL method. 2022 En : Journal of Transportation Research. Articles in Press:
    Paper not yet in RePEc: Add citation now
  56. Hu, X. ; Huang, J. ; Shi, F. Circuity in China's high-speed-rail network. 2019 J. Transport Geogr.. 80 -

  57. Inglada, V. ; Coto-Millán, P. ; Villaverde, J. Economic assessment of high-speed rail in Spain. 2016 En : Territorial Implications of High Speed Rail. Routledge:
    Paper not yet in RePEc: Add citation now
  58. Jha, S. Modi Govt Has Put 498 Crawling Rail Projects Worth Rs 6.75 Lakh Crore on Temporary Freeze. 2020 :
    Paper not yet in RePEc: Add citation now
  59. Jiang, C. ; Zhang, A. Airline network choice and market coverage under high-speed rail competition. 2016 Transport. Res. Pol. Pract.. 92 248-260

  60. Jin, M. ; Lin, K.C. ; Shi, W. ; Lee, P.T. ; Li, K.X. Impacts of high-speed railways on economic growth and disparity in China. 2020 Transport. Res. Pol. Pract.. 138 158-171

  61. Kaewunruen, S. ; Sresakoolchai, J. ; Peng, J. Life cycle cost, energy and carbon assessments of Beijing-Shanghai high-speed railway. 2019 Sustainability. 12 206-

  62. Kamranfar, S. ; Azimi, Y. ; Gheibi, M. ; Fathollahi-Fard, A.M. ; Hajiaghaei-Keshteli, M. Analyzing green construction development barriers by a hybrid decision-making method based on DEMATEL and the ANP. 2022 Buildings. 12 1641-
    Paper not yet in RePEc: Add citation now
  63. Karmarkar, O.D. ; Jana, A. ; Velaga, N.R. Willingness to Pay for Proposed High Speed Railway in India: Are Conventional Train Travellers Ready to Pay Higher for Saved Travel Times and How Much?. 2021 :
    Paper not yet in RePEc: Add citation now
  64. Khuman, A.S. The similarities and divergences between grey and fuzzy theory. 2021 Expert Syst. Appl.. 186 -
    Paper not yet in RePEc: Add citation now
  65. Kim, S.Y. ; Nguyen, V.T. Supply chain management in construction: critical study of barriers to implementation. 2022 International Journal of Construction Management. 22 3148-3157
    Paper not yet in RePEc: Add citation now
  66. Kumar, A. ; Anbanandam, R. Evaluating the interrelationships among inhibitors to intermodal railroad freight transport in emerging economies: a multi-stakeholder perspective. 2020 Transport. Res. Pol. Pract.. 132 559-581

  67. Kumar, A. ; Dixit, G. Evaluating critical barriers to implementation of WEEE management using DEMATEL approach. 2018 Resour. Conserv. Recycl.. 131 101-121
    Paper not yet in RePEc: Add citation now
  68. Kumar, S. ; Raut, R.D. ; Narwane, V.S. ; Narkhede, B.E. ; Muduli, K. Implementation barriers of smart technology in Indian sustainable warehouse by using a Delphi-ISM-ANP approach. 2022 Int. J. Prod. Perform. Manag.. 71 696-721
    Paper not yet in RePEc: Add citation now
  69. Kuo, C.W. ; Tang, M.L. Relationships among service quality, corporate image, customer satisfaction, and behavioral intention for the elderly in high speed rail services. 2013 J. Adv. Transport.. 47 512-525
    Paper not yet in RePEc: Add citation now
  70. Li, H. Are conventional train passengers underserved after entry of high-speed rail? -Evidence from Chinese intercity markets. 2020 Transport Pol.. 95 1-9

  71. Li, H. Policy analysis for high-speed rail in China: evolution, evaluation, and expectation. 2021 Transport Pol.. 106 37-53

  72. Lin, B. ; Wu, J. ; Lin, R. ; Wang, J. ; Wang, H. ; Zhang, X. Optimization of high-level preventive maintenance scheduling for high-speed trains. 2019 Reliab. Eng. Syst. Saf.. 183 261-275

  73. Liu, Z. ; Ming, X. ; Qiu, S. ; Qu, Y. ; Zhang, X. A framework with hybrid approach to analyse system requirements of smart PSS toward customer needs and co-creative value propositions. 2020 Comput. Ind. Eng.. 139 -
    Paper not yet in RePEc: Add citation now
  74. Marincioni, F. ; Appiotti, F. The lyon-turin high-speed rail: the public debate and perception of environmental risk in susa valley, Italy. 2009 Environ. Manag.. 43 863-875
    Paper not yet in RePEc: Add citation now
  75. Mathivathanan, D. ; Kannan, D. ; Haq, A.N. Sustainable supply chain management practices in Indian automotive industry: a multi-stakeholder view. 2018 Resour. Conserv. Recycl.. 128 284-305
    Paper not yet in RePEc: Add citation now
  76. Mattsson, L.G. ; Jenelius, E. Vulnerability and resilience of transport systems–A discussion of recent research. 2015 Transport. Res. Pol. Pract.. 81 16-34
    Paper not yet in RePEc: Add citation now
  77. Merkisz-Guranowska, A. ; Merkisz, J. ; Kozak, M. ; Jacyna, M. Development of a sustainable road transport system. 2013 WIT Trans. Built Environ.. 130 507-517
    Paper not yet in RePEc: Add citation now
  78. Mitra, S. Mumbai-ahmedabad Bullet Train: the Reason behind the Delays in the Project. 2022 :
    Paper not yet in RePEc: Add citation now
  79. Mok, K.Y. ; Shen, G.Q. ; Yang, J. Stakeholder management studies in mega construction projects: a review and future directions. 2015 Int. J. Proj. Manag.. 33 446-457
    Paper not yet in RePEc: Add citation now
  80. Mumbai News Maharashtra: Shiv Sena Joins Opposition Parties at Rally against Bullet Train. 2018 :
    Paper not yet in RePEc: Add citation now
  81. Narayanan, V.G. ; Chaturvedi, S. Delhi Metro Rail Corporation. 2012 Harvard Business School Accounting & Management Unit Case:
    Paper not yet in RePEc: Add citation now
  82. Nash, C. When to invest in high speed rail. 2015 Journal of Rail Transport Planning & Management. 5 12-22
    Paper not yet in RePEc: Add citation now
  83. Nguyen, T. ; Tran, Q.P. ; Chileshe, N. ; Thao Huynh, T.Y. ; Hallo, L. Risk prioritization using analytic process network for metro rail implementation projects in developing countries: a typical case study of Vietnam. 2022 International Journal of Construction Management. 1-13
    Paper not yet in RePEc: Add citation now
  84. Nimawat, D. ; Gidwani, B.D. Prioritization of barriers for Industry 4.0 adoption in the context of Indian manufacturing industries using AHP and ANP analysis. 2021 Int. J. Comput. Integrated Manuf.. 34 1139-1161
    Paper not yet in RePEc: Add citation now
  85. Odeck, J. Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway. 2014 Transport. Res. Pol. Pract.. 65 68-79

  86. Olander, S. ; Landin, A. A comparative study of factors affecting the external stakeholder management process. 2008 Construct. Manag. Econ.. 26 553-561

  87. Opricovic, S. ; Tzeng, G.H. Defuzzification within a multicriteria decision model. 2003 Int. J. Uncertain. Fuzziness Knowledge-Based Syst.. 11 635-652
    Paper not yet in RePEc: Add citation now
  88. Pinkhasik, P. ; Herrmann, P. Learning from external stakeholders: evidence from two railway projects in Germany. 2021 Project Leadership and Society. 2 -
    Paper not yet in RePEc: Add citation now
  89. Pu, H. ; Xie, J. ; Schonfeld, P. ; Song, T. ; Li, W. ; Wang, J. ; Hu, J. Railway alignment optimization in mountainous regions considering spatial geological hazards: a sustainable safety perspective. 2021 Sustainability. 13 1661-

  90. Qin, J. ; Qu, W. ; Wu, X. ; Zeng, Y. Differential pricing strategies of high speed railway based on prospect theory: an empirical study from China. 2019 Sustainability. 11 3804-

  91. Raghuram, G. ; Udayakumar, P.D. Dedicated High Speed Rail Network in india: Issues in Development. 2016 :

  92. Ravesteijn, W. ; He, J. ; Chen, C. Responsible innovation and stakeholder management in infrastructures: the nansha port railway project. 2014 Ocean Coast Manag.. 100 1-9
    Paper not yet in RePEc: Add citation now
  93. Redding, S.J. ; Turner, M.A. Transportation costs and the spatial organization of economic activity. 2015 Handb. Reg. Urban Econ.. 5 1339-1398

  94. Reddy, V. ; Chattopadhyay, G. ; Larsson-Kråik, P.O. ; Hargreaves, D.J. Modelling and analysis of rail maintenance cost. 2007 Int. J. Prod. Econ.. 105 475-482

  95. Román, C. ; Martín, J.C. ; Espino, R. ; Cherchi, E. ; de Dios Ortuzar, J. ; Rizzi, L.I. Valuation of travel time savings for intercity travel: the Madrid-Barcelona corridor. 2014 Transport Pol.. 36 105-117

  96. Rostamnezhad, M. ; Nasirzadeh, F. ; Khanzadi, M. ; Jarban, M.J. ; Ghayoumian, M. Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project. 2020 Eng. Construct. Architect. Manag.. 27 1595-1618
    Paper not yet in RePEc: Add citation now
  97. Sarkar, D. ; Singh, M. Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India. 2020 International Journal of Construction Management. 1-12
    Paper not yet in RePEc: Add citation now
  98. Saroha, M. ; Garg, D. ; Luthra, S. Identification and analysis of circular supply chain management practices for sustainability: a fuzzy-DEMATEL approach. 2021 Int. J. Prod. Perform. Manag.. -

  99. Sharma, S.K. ; Routroy, S. ; Singh, R.K. ; Nag, U. Analysis of supply chain vulnerability factors in manufacturing enterprises: a fuzzy DEMATEL approach. 2022 Int. J. Logist. Res. Appl.. 1-28
    Paper not yet in RePEc: Add citation now
  100. Singh, R. Delays and cost overruns in infrastructure projects: extent, causes and remedies. 2010 Econ. Polit. Wkly.. 43-54
    Paper not yet in RePEc: Add citation now
  101. Sitharamaraju, K. ; Yelne, S.A. ; Kumar, B.S. ; Narayanaswami, S. . 2020 Indian Institute of Management: Ahmedabad
    Paper not yet in RePEc: Add citation now
  102. Stenström, C. ; Norrbin, P. ; Parida, A. ; Kumar, U. Preventive and corrective maintenance–cost comparison and cost–benefit analysis. 2016 Structure and Infrastructure Engineering. 12 603-617
    Paper not yet in RePEc: Add citation now
  103. Sun, H. ; Dang, Y. ; Mao, W. A decision-making method with grey multi-source heterogeneous data and its application in green supplier selection. 2018 Int. J. Environ. Res. Publ. Health. 15 446-

  104. Tan-Mullins, M. ; Urban, F. ; Mang, G. Evaluating the behaviour of Chinese stakeholders engaged in large hydropower projects in Asia and Africa. 2017 China Q.. 230 464-488
    Paper not yet in RePEc: Add citation now
  105. Thakur, R. . 2021 :
    Paper not yet in RePEc: Add citation now
  106. Verma, A. ; Sudhira, H.S. ; Rathi, S. ; King, R. ; Dash, N. Sustainable urbanization using high speed rail (HSR) in Karnataka, India. 2013 Res. Transport. Econ.. 38 67-77

  107. Vickerman, R. High-speed rail in Europe: experience and issues for future development. 1997 Ann. Reg. Sci.. 31 21-38

  108. Vikram, K. Railway Works Form Bulk of Delayed Big Infrastructure Projects. 2021 :
    Paper not yet in RePEc: Add citation now
  109. Wan, Z. ; Nie, A. ; Chen, J. ; Ge, J. ; Zhang, C. ; Zhang, Q. Key barriers to the commercial use of the Northern Sea Route: view from China with a fuzzy DEMATEL approach. 2021 Ocean Coast Manag.. 208 -
    Paper not yet in RePEc: Add citation now
  110. Wang, J. ; Huang, J. ; Jing, Y. Competition between high-speed trains and air travel in China: from a spatial to spatiotemporal perspective. 2020 Transport. Res. Pol. Pract.. 133 62-78

  111. Wang, N. ; Ma, M. ; Wu, G. ; Liu, Y. ; Gong, Z. ; Chen, X. Conflicts concerning construction projects under the challenge of cleaner production–case study on government funded projects. 2019 J. Clean. Prod.. 225 664-674
    Paper not yet in RePEc: Add citation now
  112. Ward, S. ; Chapman, C. Stakeholders and uncertainty management in projects. 2008 Construct. Manag. Econ.. 26 563-577

  113. Wu, S.S. ; Chong, A. Developmental railpolitics: the political economy of China's high-speed rail projects in Thailand and Indonesia. 2018 Contemp. S. Asia. 40 503-526
    Paper not yet in RePEc: Add citation now
  114. Wu, X. ; Qin, J. ; Qu, W. ; Zeng, Y. ; Yang, X. Collaborative optimization of dynamic pricing and seat allocation for high-speed railways: an empirical study from China. 2019 IEEE Access. 7 139409-139419
    Paper not yet in RePEc: Add citation now
  115. Wu, Y. ; Liao, Y. ; Xu, M. ; He, J. ; Tao, Y. ; Zhou, J. ; Chen, W. Barriers identification, analysis and solutions to rural clean energy infrastructures development in China: government perspective. 2022 Sustain. Cities Soc.. 86 -
    Paper not yet in RePEc: Add citation now
  116. Xia, Xiqiang ; Govindan, Kannan ; Zhu, Qinghua Analyzing internal barriers for automotive parts remanufacturers in China using grey-DEMATEL approach. 2015 J.Cleaner Prod.. 87 811-825
    Paper not yet in RePEc: Add citation now
  117. Xue, Y. ; Xiang, P. ; Jia, F. ; Liu, Z. Risk assessment of high-speed rail projects: a risk coupling model based on system dynamics. 2020 Int. J. Environ. Res. Publ. Health. 17 5307-

  118. Yan, Y.Q. ; Zhang, H.Q. ; Ye, B.H. Assessing the impacts of the high-speed train on tourism demand in China. 2014 Tourism Econ.. 20 157-169

  119. Yan, Z. ; Li, X. ; Zhang, Q. ; Han, B. Seat allocation model for high-speed railway passenger transportation based on flexible train composition. 2020 Comput. Ind. Eng.. 142 -
    Paper not yet in RePEc: Add citation now
  120. Yorulmaz, M. ; Karabulut, K. Analyzing the factors determining the effectiveness of the international safety management code applied on ships through the fuzzy DEMATEL method. 2022 Saf. Sci.. 155 -
    Paper not yet in RePEc: Add citation now
  121. Yuan, H. Achieving sustainability in railway projects: major stakeholder concerns. 2017 Proj. Manag. J.. 48 115-132
    Paper not yet in RePEc: Add citation now
  122. Yuan, J. ; Chen, K. ; Li, W. ; Ji, C. ; Wang, Z. ; Skibniewski, M.J. Social network analysis for social risks of construction projects in high-density urban areas in China. 2018 J. Clean. Prod.. 198 940-961
    Paper not yet in RePEc: Add citation now
  123. Yuan, J. ; Li, W. ; Guo, J. ; Zhao, X. ; Skibniewski, M.J. Social risk factors of transportation PPP projects in China: a sustainable development perspective. 2018 Int. J. Environ. Res. Publ. Health. 15 1323-

  124. Zhang, A. ; Wan, Y. ; Yang, H. Impacts of high-speed rail on airlines, airports, and regional economies: a survey of recent research. 2019 Transport Pol.. 81 A1-A19

  125. Zhang, L. ; Sun, X. ; Xue, H. Identifying critical risks in Sponge City PPP projects using DEMATEL method: a case study of China. 2019 J. Clean. Prod.. 226 949-958
    Paper not yet in RePEc: Add citation now
  126. Zhao, J. ; Zhao, Y. ; Li, Y. The variation in the value of travel-time savings and the dilemma of high-speed rail in China. 2015 Transport. Res. Pol. Pract.. 82 130-140

Cocites

Documents in RePEc which have cited the same bibliography

  1. Evaluating the inhibitors in the growth of high-speed railway in India: A multi-stakeholder perspective. (2024). Bhattacharjee, Pushparenu ; Verma, Meenakshi ; Dadsena, Krishna Kumar ; Debroy, Arindam.
    In: Transport Policy.
    RePEc:eee:trapol:v:155:y:2024:i:c:p:93-109.

    Full description at Econpapers || Download paper

  2. Highway usage efficiency and debt burden: Evidence from China. (2024). Yan, Shengyu ; Zhong, Ninghua ; Lian, Fangzhou ; Cai, Dongmei.
    In: Journal of Asian Economics.
    RePEc:eee:asieco:v:91:y:2024:i:c:s1049007824000046.

    Full description at Econpapers || Download paper

  3. Risk assessment of several hazards along railway network using AHP incorporated into GIS. (2023). Mezhoud, Samy ; Bennani, Nerdjes.
    In: Technium Social Sciences Journal.
    RePEc:tec:journl:v:39:y:2023:i:1:p:452-464.

    Full description at Econpapers || Download paper

  4. The effect of high-speed rail connectivity and accessibility on tourism seasonality. (2023). Pérez, Levi ; Perez, Levi ; Boto-Garcia, David.
    In: Journal of Transport Geography.
    RePEc:eee:jotrge:v:107:y:2023:i:c:s0966692323000182.

    Full description at Econpapers || Download paper

  5. Theorizing nation-building through high-speed rail development: Hegemony and space in the Basque Country, Spain. (2022). Garca-Mejuto, Diego.
    In: Environment and Planning A.
    RePEc:sae:envira:v:54:y:2022:i:3:p:554-571.

    Full description at Econpapers || Download paper

  6. Risk Management Using Network Thinking Methodology on the Example of Rail Transport. (2022). Kruszyski, Micha ; Kowacka, Magdalena ; Debita, Grzegorz ; Dudziak-Gajowiak, Dominika ; Bekisz, Agnieszka.
    In: Energies.
    RePEc:gam:jeners:v:15:y:2022:i:14:p:5100-:d:861437.

    Full description at Econpapers || Download paper

  7. What drives the allocation of motorways? Evidence from Portugals fast-expanding network. (2022). Rocha, Bruno ; Melo, Patricia ; Afonso, Nuno ; de Abreu, Joo.
    In: Journal of Transport Geography.
    RePEc:eee:jotrge:v:102:y:2022:i:c:s0966692322001077.

    Full description at Econpapers || Download paper

  8. Persistence and dynamics in the efficiency of toll motorways: The Spanish case. (2022). Baos-Pino, Jose F ; Zapico, Emma ; Boto-Garcia, David.
    In: Economics of Transportation.
    RePEc:eee:ecotra:v:31:y:2022:i:c:s2212012222000211.

    Full description at Econpapers || Download paper

  9. Fuzzy-based decision analysis on Arctic transportation: A guidance for freight shipping companies. (2021). Benz, Lukas ; Hartmann, Evi ; Munch, Christopher.
    In: Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL).
    RePEc:zbw:hiclch:249657.

    Full description at Econpapers || Download paper

  10. What drives the allocation of motorways? Evidence from Portugal’s fast-expanding network. (2021). Rocha, Bruno ; Melo, Patricia ; Afonso, Nuno ; de Abreu, Joo.
    In: Working Papers REM.
    RePEc:ise:remwps:wp01842021.

    Full description at Econpapers || Download paper

  11. Method of Assessing the Risk of Implementing Railway Investments in Terms of the Cost of Their Implementation. (2021). Trach, Roman ; Pooski, Mieczysaw ; Lendo-Siwicka, Marzena ; Kowalski, Jan ; Wrzesiski, Grzegorz.
    In: Sustainability.
    RePEc:gam:jsusta:v:13:y:2021:i:23:p:13085-:d:688365.

    Full description at Econpapers || Download paper

  12. Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects. (2021). Qi, Xijing ; Chileshe, Nicholas ; Nikjow, Mohammad Ajmal ; Liang, LI.
    In: Sustainability.
    RePEc:gam:jsusta:v:13:y:2021:i:17:p:9503-:d:620557.

    Full description at Econpapers || Download paper

  13. An Ex Ante Analysis of the Planned Transportation Network in the Region of Extremadura (Spain) by Using Physical Parameters. (2021). Plasencia-Lozano, Pedro.
    In: Sustainability.
    RePEc:gam:jsusta:v:13:y:2021:i:11:p:5947-:d:561682.

    Full description at Econpapers || Download paper

  14. Country Evaluation for China’s Hydropower Investment in the Belt and Road Initiative Nations. (2020). Luo, Qian ; Yan, Min ; Ye, Jian ; Fang, Guohua.
    In: Sustainability.
    RePEc:gam:jsusta:v:12:y:2020:i:19:p:8281-:d:425024.

    Full description at Econpapers || Download paper

  15. Assessment of risks impeding sustainable mining in Pakistan using fuzzy synthetic evaluation. (2020). Lu, Xiang ; Zhou, Wei ; Cai, Qingxiang ; Jiskani, Izhar Mithal.
    In: Resources Policy.
    RePEc:eee:jrpoli:v:69:y:2020:i:c:s0301420720308527.

    Full description at Econpapers || Download paper

  16. Numerical Simulation and Spatial Distribution of Transportation Accessibility in the Regions Involved in the Belt and Road Initiative. (2019). Feng, Zhiming ; You, Zhen ; Yang, Yanzhao ; Shi, Hui.
    In: Sustainability.
    RePEc:gam:jsusta:v:11:y:2019:i:22:p:6187-:d:283989.

    Full description at Econpapers || Download paper

  17. Politics, risk, and white elephants in infrastructure PPPs. (2019). Gragera, Albert ; Bel, Germà ; Albalate, Daniel ; Albert, Gragera ; Daniel, Albalate.
    In: Utilities Policy.
    RePEc:eee:juipol:v:58:y:2019:i:c:p:158-165.

    Full description at Econpapers || Download paper

  18. “When politics and lobbyism combine to promote white elephants by using PPPs”. (2018). Gragera, Albert ; Bel, Germà ; Albalate, Daniel.
    In: IREA Working Papers.
    RePEc:ira:wpaper:201823.

    Full description at Econpapers || Download paper

  19. Strategies of gain and strategies of waste: what determines the success of development intervention?. (2018). Rodríguez-Pose, Andrés ; Wilkie, Callum ; Rodriguez-Pose, Andres.
    In: LSE Research Online Documents on Economics.
    RePEc:ehl:lserod:89241.

    Full description at Econpapers || Download paper

  20. Strategies of gain and strategies of waste: What determines the success of development intervention?. (2018). Rodríguez-Pose, Andrés ; Wilkie, Callum ; Rodriguez-Pose, Andres.
    In: Papers in Evolutionary Economic Geography (PEEG).
    RePEc:egu:wpaper:1826.

    Full description at Econpapers || Download paper

  21. Delusions of success: Costs and demand of high-speed rail in Italy and Spain. (2018). Grimaldi, Raffaele ; Beria, Paolo ; Bel, Germà ; Albalate, Daniel.
    In: Transport Policy.
    RePEc:eee:trapol:v:68:y:2018:i:c:p:63-79.

    Full description at Econpapers || Download paper

  22. Subnational Infrastructure Investment in OECD Countries: Trends and Key Governance Levers. (2017). Vincent, Margaux ; Allain-Dupre, Dorothee ; Hulbert, Claudia.
    In: OECD Regional Development Working Papers.
    RePEc:oec:govaab:2017/05-en.

    Full description at Econpapers || Download paper

  23. Unbundling political and economic rationality: A non-parametric approach tested on transport infrastructure in Spain. (2017). Estache, Antonio ; Bertoméu Sánchez, Salvador ; Bertomeu-Sanchez, Salvador.
    In: Transport Policy.
    RePEc:eee:trapol:v:59:y:2017:i:c:p:181-195.

    Full description at Econpapers || Download paper

  24. Do all transport modes impact on industrial employment? Empirical evidence from the Spanish regions. (2017). Fageda, Xavier ; Gonzalez-Aregall, Marta.
    In: Transport Policy.
    RePEc:eee:trapol:v:55:y:2017:i:c:p:70-78.

    Full description at Econpapers || Download paper

  25. Myopic PPPs: Risk allocation and hidden liabilities for taxpayers and users. (2017). Rosell, Jordi ; Bel, Germà ; Bel-Piana, Paula.
    In: Utilities Policy.
    RePEc:eee:juipol:v:48:y:2017:i:c:p:147-156.

    Full description at Econpapers || Download paper

  26. High speed rail and tourism: Empirical evidence from Spain. (2016). Fageda, Xavier ; Albalate, Daniel.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:85:y:2016:i:c:p:174-185.

    Full description at Econpapers || Download paper

  27. An econometric evaluation of the management of large-scale transport infrastructure in Spain during the great recession: Lessons for infrastructure bubbles. (2016). Pozo-Barajas, Rafael ; Castillo-Manzano, Jose I ; Pedregal, Diego J.
    In: Economic Modelling.
    RePEc:eee:ecmode:v:53:y:2016:i:c:p:302-313.

    Full description at Econpapers || Download paper

  28. Evaluating HSR availability on Tourism: Evidence from Spanish Provinces and Cities. (2015). Albalate, Daniel ; del Sol, Daniel Albalate.
    In: ERSA conference papers.
    RePEc:wiw:wiwrsa:ersa15p288.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-10-05 01:16:11 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated August, 3 2024. Contact: Jose Manuel Barrueco.