create a website

Safety Risk Identification Method for Railway Construction in Complex and Dangerous Areas. (2022). Yin, Yang ; Wei, Qiang ; Wang, Peng ; Zhao, Guotang.
In: Sustainability.
RePEc:gam:jsusta:v:14:y:2022:i:21:p:13698-:d:950234.

Full description at Econpapers || Download paper

Cited: 2

Citations received by this document

Cites: 34

References cited by this document

Cocites: 5

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. Risk Assessment Method of Railway Engineering Technology Innovation in Complex Areas. (2025). Chen, Yongjun ; Cai, Chaoxun ; Guan, Honghao ; Li, Xiaojian ; Shi, Yuefeng ; Tian, Shiyu.
    In: Mathematics.
    RePEc:gam:jmathe:v:13:y:2025:i:12:p:1970-:d:1679281.

    Full description at Econpapers || Download paper

  2. Application of the DEMATEL method for quantitative analysis of risk factors for railway investments in Poland. (2024). Lendo-Siwicka, Marzena ; Mirosaw-Witek, Dorota ; Skutnik, Zdzisaw ; Kowalski, Jan.
    In: PLOS ONE.
    RePEc:plo:pone00:0303606.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Aliyari, M.; Ashrafi, B.; Ayele, Y.Z. Hazards identification and risk assessment for UAV-assisted bridge inspections. Struct. Infrastruct. Eng. 2022, 18, 412–428. [CrossRef]
    Paper not yet in RePEc: Add citation now
  2. An, R.; Sun, Q.X.; Wang, F.T.; Bai, W.F.; Zhu, X.Y.; Liu, R.K. Improved Railway Track Geometry Degradation Modeling for Tamping Cycle Prediction. J. Transp. Eng. Part A-Syst. 2018, 144. [CrossRef]
    Paper not yet in RePEc: Add citation now
  3. Chatziioannou, A.A.; Kanaris, I.; Doukas, C.; Moulos, P.; Kolisis, F.N.; Maglogiannis, I. GRISSOM Platform: Enabling Distributed Processing and Management of Biological Data Through Fusion of Grid and Web Technologies. IEEE Trans. Inf. Technol. Biomed. 2011, 15, 83–92. [CrossRef] [PubMed]
    Paper not yet in RePEc: Add citation now
  4. Chen, H.H.; Li, H.J.; Wang, Y.G.; Cheng, B.Q. A Comprehensive Assessment Approach for Water-Soil Environmental Risk during Railway Construction in Ecological Fragile Region Based on AHP and MEA. Sustainability 2020, 12, 7910. [CrossRef]
    Paper not yet in RePEc: Add citation now
  5. Ding, L.Y.; Yu, H.L.; Li, H.; Zhou, C.; Wu, X.G.; Yu, M.H. Safety risk identification system for metro construction on the basis of construction drawings. Autom. Constr. 2012, 27, 120–137. [CrossRef]
    Paper not yet in RePEc: Add citation now
  6. Dong, S.C.; Yang, Y.; Li, F.J.; Cheng, H.; Li, J.N.; Bilgaev, A.; Li, Z.H.; Li, Y. An evaluation of the economic, social, and ecological risks of China-Mongolia-Russia high-speed railway construction and policy suggestions. J. Geogr. Sci. 2018, 28, 900–918. [CrossRef]
    Paper not yet in RePEc: Add citation now
  7. Geng, X.; Zhang, P.R.; Cai, Y.; Liang, Y.; Wu, Q.L. Comparative Study on Simulation of Grid and Non-grid Management Process of Farmland. In Proceedings of the 4th International Conference on Management Engineering, Software Engineering and Service Sciences (ICMSS), Wuhan, China, 17–19 January 2020; pp. 174–183.
    Paper not yet in RePEc: Add citation now
  8. Goh, Y.M.; Chua, D.K.H. Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization. J. Constr. Eng. Manag.-Asce 2010, 136, 170–178. [CrossRef]
    Paper not yet in RePEc: Add citation now
  9. Hamidi, J.K.; Shahriar, K.; Rezai, B.; Rostami, J.; Bejari, H. Risk assessment based selection of rock TBM for adverse geological conditions using Fuzzy-AHP. Bull. Eng. Geol. Environ. 2010, 69, 523–532. [CrossRef]
    Paper not yet in RePEc: Add citation now
  10. Huang, R.Q.; Li, Y.R.; Qu, K.; Wang, K. Engineering geological assessment for route selection of railway line in geologically active area: A case study in China. J. Mt. Sci. 2013, 10, 495–508. [CrossRef] Sustainability 2022, 14, 13698 14 of 14
    Paper not yet in RePEc: Add citation now
  11. Ji, T.; Liu, J.W.; Li, Q.F. Safety Risk Evaluation of Large and Complex Bridges during Construction Based on the Delphi-Improved FAHP-Factor Analysis Method. Adv. Civ. Eng. 2022, 2022, 5379032. [CrossRef]
    Paper not yet in RePEc: Add citation now
  12. KaAorek, K.; Krzeminski, M.; Ibadov, N. The problem of choosing risk management methodology at the example of railway construction. In Proceedings of the 26th R-S-P Seminar on Theoretical Foundation of Civil Engineering (RSP), Warsaw, Poland, 21–25 August 2017; p. 117.
    Paper not yet in RePEc: Add citation now
  13. Kuang, X.; Yi, D.Q.; Wang, C.L. Study on Construction Risk Assessment Method of Deep Buried Tunnels. In Proceedings of the 2nd International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2013), Zhuhai, China, 27–28 July 2013; pp. 1305–1308.
    Paper not yet in RePEc: Add citation now
  14. Leitner, B. A General Model for Railway Systems Risk Assessment with the Use of Railway Accident Scenarios Analysis. In Proceedings of the 10th International Scientific Conference on Transportation Science and Technology (TRANSBALTICA), Vilnius, Lithuania, 4–5 May 2017; pp. 150–159.
    Paper not yet in RePEc: Add citation now
  15. Lekan, A.; Clinton, A.; Fayomi, O.S.I.; James, O. Lean Thinking and Industrial 4.0 Approach to Achieving Construction 4.0 for Industrialization and Technological Development. Buildings 2020, 10, 221. [CrossRef]
    Paper not yet in RePEc: Add citation now
  16. Li, Q.; Zhang, Z.; Peng, F. Causality-Network-Based Critical Hazard Identification for Railway Accident Prevention: Complex Network-Based Model Development and Comparison. Entropy 2021, 23, 864. [CrossRef] [PubMed]
    Paper not yet in RePEc: Add citation now
  17. Liu, Q.L.; Peng, Y.M.; Li, Z.Y.; Zhao, P.; Qiu, Z.X. Hazard identification methodology for underground coal mine risk management— Root-State Hazard Identification. Resour. Policy 2021, 72, 102052. [CrossRef]

  18. Lu, C.F.; Cai, C.X. Challenges and Countermeasures for Construction Safety during the Sichuan-Tibet Railway Project. Engineering 2019, 5, 833–838. [CrossRef]
    Paper not yet in RePEc: Add citation now
  19. Magalhaes, H.; Pombo, J.; Ambrosio, J.; Madeira, J.F.A. Rail vehicle design optimization for operation in a mountainous railway track. Innov. Infrastruct. Solut. 2017, 2, 31. [CrossRef]
    Paper not yet in RePEc: Add citation now
  20. Meng, Q.F.; Peng, Q.Y.; Li, Z.; Hu, X. Big Data Technology in Construction Safety Management: Application Status, Trend and Challenge. Buildings 2022, 12, 533. [CrossRef]
    Paper not yet in RePEc: Add citation now
  21. Miao, J.X.; Huang, D.C.; He, Z.Q. Social Risk Assessment and Management for Major Construction Projects in China Based on Fuzzy Integrated Analysis. Complexity 2019, 2019, 2452895. [CrossRef]

  22. Mohammadi, A.; Tavakolan, M.; Khosravi, Y. Factors influencing safety performance on construction projects: A review. Saf. Sci. 2018, 109, 382–397. [CrossRef]
    Paper not yet in RePEc: Add citation now
  23. Shen, Z.B.; Zhang, M.J.; Liu, Y.Y.; Jiang, C.L.; IOP. Research on the influence mechanism of safety risk factors on traffic organization of high-speed railway construction. In Proceedings of the 6th International Conference on Advances in Energy Resources and Environment Engineering (ICAESEE), Chongqing, China, 20–22 November 2020; p. 012174.
    Paper not yet in RePEc: Add citation now
  24. Shi, D.H.; Guan, J.; Zurada, J.; Manikas, A. A Data-Mining Approach to Identification of Risk Factors in Safety Management Systems. J. Manag. Inf. Syst. 2017, 34, 1054–1081. [CrossRef]
    Paper not yet in RePEc: Add citation now
  25. Song, Y.; Zhang, M.J.; Oseth, O.; Ronnquist, A. Wind deflection analysis of railway catenary under crosswind based on nonlinear finite element model and wind tunnel test. Mech. Mach. Theory 2022, 168, 104608. [CrossRef]
    Paper not yet in RePEc: Add citation now
  26. Sun, Y.Y.; Li, Z.Y.; Shahidehpour, M.; Ai, B. Battery-Based Energy Storage Transportation for Enhancing Power System Economics and Security. IEEE Trans. Smart Grid 2015, 6, 2395–2402. [CrossRef]
    Paper not yet in RePEc: Add citation now
  27. Vishwas, H.S.; Gidwani, G.D. Hazards Identification and Risk Assessment in Metro Railway Line Construction Project at Hyderabad. Int. J. Eng. Tech. Res. 2017, V6, 8. [CrossRef]
    Paper not yet in RePEc: Add citation now
  28. Wang, W.D.; Li, J.Y.; Han, Z. Comprehensive assessment of geological hazard safety along railway engineering using a novel method: A case study of the Sichuan-Tibet railway, China. Geomat. Nat. Hazards Risk 2020, 11, 1–21. [CrossRef]
    Paper not yet in RePEc: Add citation now
  29. Wang, Y.P.; Bai, Z.C.; Zhang, Y.; Qin, Y.X.; Lin, Y.; Li, Y.; Shen, W.J. Using TerraSAR X-Band and Sentinel-1 C-Band SAR Interferometry for Deformation Along Beijing-Tianjin Intercity Railway Analysis. IEEE J. Sel. Top. Appl. Earth Obs. Remote Sens. 2021, 14, 4832–4841. [CrossRef]
    Paper not yet in RePEc: Add citation now
  30. Yan, H.Y.; Gao, C.; Elzarka, H.; Mostafa, K.; Tang, W.B. Risk assessment for construction of urban rail transit projects. Saf. Sci. 2019, 118, 583–594. [CrossRef]
    Paper not yet in RePEc: Add citation now
  31. Yi, M.G. Path Exploration of Grid Management of Marine Communities Based on Numerical Assimilation. J. Coast. Res. 2020, 115, 327–332. [CrossRef]
    Paper not yet in RePEc: Add citation now
  32. Zhang, L.; Li, H.B. Construction Risk Assessment of Deep Foundation Pit Projects Based on the Projection Pursuit Method and Improved Set Pair Analysis. Appl. Sci. 2022, 12, 1922. [CrossRef]
    Paper not yet in RePEc: Add citation now
  33. Zhang, L.M.; Wu, X.G.; Ding, L.Y.; Skibniewski, M.J.; Lu, Y.J. BIM-based risk identification system in tunnel construction. J. Civ. Eng. Manag. 2016, 22, 529–539. [CrossRef]
    Paper not yet in RePEc: Add citation now
  34. Zhang, S.R.; Shang, C.; Wang, C.; Song, R.; Wang, X.H. Real-Time Safety Risk Identification Model during Metro Construction Adjacent to Buildings. J. Constr. Eng. Manag. 2019, 145, 04019034. [CrossRef]
    Paper not yet in RePEc: Add citation now

Cocites

Documents in RePEc which have cited the same bibliography

  1. Dynamic simulation and control strategy exploration of the unsafe behavior of coal mine employees. (2023). Feng, Rui ; Liu, Pingping ; Zhou, Lujie ; Yu, Kai ; Chen, Jing ; Hao, Jian.
    In: Resources Policy.
    RePEc:eee:jrpoli:v:86:y:2023:i:pa:s030142072300778x.

    Full description at Econpapers || Download paper

  2. Where risk, where capability? Building the emergency management capability structure of coal mining enterprises based on risk matching perspective. (2023). Li, Zequan ; Xiong, Yachao ; Zhang, Qiuhan ; Qi, Hui.
    In: Resources Policy.
    RePEc:eee:jrpoli:v:83:y:2023:i:c:s0301420723004063.

    Full description at Econpapers || Download paper

  3. Safety Risk Identification Method for Railway Construction in Complex and Dangerous Areas. (2022). Yin, Yang ; Wei, Qiang ; Wang, Peng ; Zhao, Guotang.
    In: Sustainability.
    RePEc:gam:jsusta:v:14:y:2022:i:21:p:13698-:d:950234.

    Full description at Econpapers || Download paper

  4. Safety Analysis and Evaluation of Hydrogen Cylinder Periodic Inspection Station. (2022). Tan, Yue ; Li, Wei ; Xia, LI ; Guo, Jin ; Chen, Guohua ; Zhang, Geng ; Zhou, Chilou.
    In: Energies.
    RePEc:gam:jeners:v:15:y:2022:i:18:p:6617-:d:911534.

    Full description at Econpapers || Download paper

  5. Improved Z-number based fuzzy fault tree approach to analyze health and safety risks in surface mines. (2022). Hosseini, Shahab ; Jiskani, Izhar Mithal ; Yasli, Fatma ; Ur, Atta.
    In: Resources Policy.
    RePEc:eee:jrpoli:v:76:y:2022:i:c:s0301420722000423.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-10-04 10:58:14 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated August, 3 2024. Contact: Jose Manuel Barrueco.