- Ahmed, M.O.; El-adaway, I.H.; Coatney, K.T.; Eid, M.S. Construction Bidding and the Winner’s Curse: Game Theory Approach. J. Constr. Eng. Manag. 2016, 142, 04015076. [CrossRef]
Paper not yet in RePEc: Add citation now
- Akerlof, G.A. The market for “lemons”: Quality uncertainty and the market mechanism. Q. J. Econ. 1970, 8, 488–500. [CrossRef]
Paper not yet in RePEc: Add citation now
- Aven, T. On how to define, understand and describe risk. Reliab. Eng. Syst. 2010, 95, 623–631. [CrossRef]
Paper not yet in RePEc: Add citation now
- Badenfelt, U. The selection of sharing ratios in target cost contracts. Eng. Constr. Archit. Manag. 2008, 15, 54–65. [CrossRef]
Paper not yet in RePEc: Add citation now
- Bröchner, J. Construction contractors integrating into facilities management. Facilities 2008, 26, 6–15. [CrossRef]
Paper not yet in RePEc: Add citation now
- Cambridge University Press. Available online: https://dictionary.cambridge.org/dictionary/english/construction (accessed on 22 February 2023).
Paper not yet in RePEc: Add citation now
Cantarelli, C.C.; Chorus, C.G.; Cunningham, S.W. Explaining cost overruns of large-scale transportation infrastructure projects using a signalling game. Transp. A Transp. Sci. 2013, 9, 239–258. [CrossRef]
- Cao, D.; Wang, G. Contractor–Subcontractor Relationships with the Implementation of Emerging Interorganizational Technologies: Roles of Cross-Project Learning and Pre-Contractual Opportunism. Int. J. Constr. Educ. Res. 2014, 10, 268–284. [CrossRef]
Paper not yet in RePEc: Add citation now
- Carmichael, D.G.; Karantonis, J.P. Construction contracts with conversion capability: A way forward. J. Financ. Manag. Prop. Constr. 2015, 20, 132–146. [CrossRef] Sustainability 2023, 15, 9979 25 of 25
Paper not yet in RePEc: Add citation now
- Cerić, A. Reducing information asymmetry and building trust in projects using blockchain technology. Grad̄evinar 2021, 73, 967–978. [CrossRef]
Paper not yet in RePEc: Add citation now
- Cerić, A. Strategies for minimizing information asymmetries in construction projects: Project managers’ perceptions. J. Bus. Econ. Manag. 2014, 15, 424–440. [CrossRef]
Paper not yet in RePEc: Add citation now
- Cerić, A. Trust in Construction Projects; Routledge: Oxon, UK, 2016.
Paper not yet in RePEc: Add citation now
- Cerić, A.; Ivić, I. Network analysis of interconnections between theoretical concepts associated with principal-agent theory concerning construction projects. Organ. Technol. Manag. Constr. 2021, 13, 2450–2464. [CrossRef]
Paper not yet in RePEc: Add citation now
- Chang, C.-Y. Understanding the hold-up problem in the management of megaprojects: The case of the Channel Tunnel Rail Link project. Int. J. Proj. Manag. 2013, 31, 628–637. [CrossRef]
Paper not yet in RePEc: Add citation now
Chang, C.-Y.; Ive, G. Reversal of bargaining power in construction projects: Meaning, existence and implications. Constr. Manag. Econ. 2007, 25, 845–855. [CrossRef]
- Chang, C.-Y.; Ive, G. The hold-up problem in the management of construction projects: A case study of the Channel Tunnel. Int. J. Proj. Manag. 2007, 25, 394–404. [CrossRef]
Paper not yet in RePEc: Add citation now
- Chang, C.Y. Principal-agent model of risk allocation in construction contracts and its critique. J. Constr. Eng. M. 2014, 140, 04013032. [CrossRef]
Paper not yet in RePEc: Add citation now
- Chen, T.-C.; Lin, Y.-C.; Wang, L.-C. The analysis of BOT strategies based on game theory—Case study on Taiwan’s high speed railway project. J. Civ. Eng. Manag. 2012, 18, 662–674. [CrossRef]
Paper not yet in RePEc: Add citation now
- Chen, W.; Li, L. Incentive contracts for green building production with asymmetric information. Int. J. Prod. Res. 2021, 59, 1860–1874. [CrossRef]
Paper not yet in RePEc: Add citation now
Cheng, H.; Zheng, S. Incentive Compensation Mechanism for the Infrastructure Construction of Electric Vehicle Battery Swapping Station under Asymmetric Information. Sustainability 2022, 14, 7041. [CrossRef]
- Crispin, G. The essence of risk identification in project risk management: An overview. Int. J. Sci. Res. 2020, 9, 973–978. Sustainability 2023, 15, 9979 22 of 25
Paper not yet in RePEc: Add citation now
- Di Maddaloni, F.; Davis, K. The influence of local community stakeholders in megaprojects: Rethinking their inclusiveness to improve project performance. Int. J. Proj. Manag. 2017, 35, 1537–1556. [CrossRef]
Paper not yet in RePEc: Add citation now
Du, Y.; Zhou, H.; Yuan, Y.; Xue, H. Exploring the moral hazard evolutionary mechanism for BIM implementation in an integrated project team. Sustainability 2019, 11, 5719. [CrossRef]
- Ebers, M.; Gotsch, W. Institutionsökonomische Theorien der Organisation. In Organisationstheorien; Kieser, A., Ebers, M., Eds.; Kohlhammer: Stuttgart, Germany, 2006; pp. 247–308.
Paper not yet in RePEc: Add citation now
- Eisenhardt, K.M. Agency theory: An assessment and review. Acad. Manag. Rev. 1989, 14, 57–74. [CrossRef]
Paper not yet in RePEc: Add citation now
- Fellows, R.; Liu, A. Research Methods for Construction, 3rd ed.; Blackwell Science: Oxford, UK, 2008.
Paper not yet in RePEc: Add citation now
- Fernández-Solís, J.L.; Rybkowski, Z.K.; Xiao, C.; Lü, X.; Chae, L.S. General contractor’s project of projects—A meta-project: Understanding the new paradigm and its implications through the lens of entropy. Archit. Eng. Des. Manag. 2015, 11, 213–242. [CrossRef]
Paper not yet in RePEc: Add citation now
Feser, D.; Runst, P. Energy efficiency consultants as change agents? Examining the reasons for EECs’ limited success. Energy Policy 2016, 98, 309–317. [CrossRef]
- Flanagan, R.; Kendell, A.; Norman, G.; Robinson, G.D. Life cycle costing and risk management. Constr. Manag. Econ. 1987, 5, S53–S71. [CrossRef]
Paper not yet in RePEc: Add citation now
- Flanagan, R.; Norman, G. Risk Management and Construction; Blackwell Science: Oxford, UK, 1993.
Paper not yet in RePEc: Add citation now
Flyvbjerg, B. What you should know about megaprojects and why: An overview. Proj. Manag. J. 2014, 45, 6–19. [CrossRef]
Flyvbjerg, B.; Ansar, A.; Budzier, A.; Buhl, S.; Cantarelli, C.; Garbuio, M.; Glenting, C.; Skamris Holm, M.; Lovallo, D.; Lunn, D.; et al. Five things you should know about cost overrun. Transp. Res. Part A Policy Pract. 2018, 118, 174–190. [CrossRef]
- Forsythe, P.; Sankaran, S.; Biesenthal, C. How far can BIM reduce information asymmetry in the Australian construction context? Proj. Manag. J. 2015, 46, 75–87. [CrossRef]
Paper not yet in RePEc: Add citation now
- Frunza, M.-C. Moral Hazard and Financial Crime. In Introduction to the Theories and Varieties of Modern Crime in Financial Markets; Frunza, M.-C., Ed.; Elsevier: Amsterdam, The Netherlands, 2016; pp. 33–42.
Paper not yet in RePEc: Add citation now
Giraudet, L.-G. Energy efficiency as a credence good: A review of informational barriers to energy savings in the building sector. Energy Econ. 2020, 87, 104698. [CrossRef]
- Gomez, C.; Castiblanco, D.; Lozano, J.M.; Daza, C. An exact optimization approach to the principal-agent problem in infrastructure projects via PPPs. Int. J. Constr. Manag. 2020, 20, 679–689. [CrossRef]
Paper not yet in RePEc: Add citation now
González-Díaz, M.; Arruñada, B.; Fernández, A. Causes of subcontracting: Evidence from panel data on construction firms. J. Econ. Behav. Organ. 2000, 42, 167–187. [CrossRef]
- Guo, S.; Wang, J.; Xiong, H. The influence of effort level on profit distribution strategies in IPD projects. Eng. Constr. Archit. Manag. 2023, in press. [CrossRef]
Paper not yet in RePEc: Add citation now
- Hajjej, I.; Hillairet, C.; Mnif, M.; Pontier, M. Optimal contract with moral hazard for Public Private Partnerships. Stochastics 2017, 89, 1015–1038. [CrossRef]
Paper not yet in RePEc: Add citation now
Han, H.; Shen, J.; Liu, B.; Han, H. Dynamic Incentive Mechanism for Large-scale Projects Based on the Reputation Effects. SAGE Open 2022, 12, 21582440221133280. [CrossRef]
- Ho, P.S.; Levitt, R.; Tsui, C.-W.; Hsu, Y. Opportunism-focused transaction cost analysis of public-private partnerships. J. Manag. Eng. 2015, 31, 04015007. [CrossRef]
Paper not yet in RePEc: Add citation now
- ISO 31073:2022; Risk management—Vocabulary. ISO: Geneva, Switzerland, 2022.
Paper not yet in RePEc: Add citation now
Ive, G.; Chang, C.-Y. The principle of inconsistent trinity in the selection of procurement systems. Constr. Manag. Econ. 2007, 25, 677–690. [CrossRef]
- Jäger, C. The Principal-Agent Theory within the Context of Economic Sciences; Herstellung und Verlag; Books on Demand GmbH: Norderstedt, Germany, 2008.
Paper not yet in RePEc: Add citation now
- Jallan, Y.; Ashuri, B. Text Mining of the Securities and Exchange Commission Financial Filings of Publicly Traded Construction Firms Using Deep Learning to Identify and Assess Risk. J. Constr. Eng. Manag. 2020, 146, 04020137. [CrossRef]
Paper not yet in RePEc: Add citation now
- Juan, Y.-K. A hybrid approach using data envelopment analysis and case-based reasoning for housing refurbishment contractors selection and performance improvement. Expert. Syst. Appl. 2009, 36, 5702–5710. [CrossRef]
Paper not yet in RePEc: Add citation now
- Juan, Y.-K.; Kim, J.H.; Roper, K.; Castro-Lacouture, D. GA-based decision support system for housing condition assessment and refurbishment strategies. Autom. Constr. 2009, 18, 394–401. [CrossRef]
Paper not yet in RePEc: Add citation now
- Juan, Y.-K.; Perng, Y.-H.; Castro-Lacouture, D.; Lu, K.-S. Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. Autom. Constr. 2009, 18, 139–144. [CrossRef]
Paper not yet in RePEc: Add citation now
Kiani Mavi, R.; Gengatharen, D.; Kiani Mavi, N.; Hughes, R.; Campbell, A.; Yates, R. Sustainability in Construction Projects: A Systematic Literature Review. Sustainability 2021, 13, 1932. [CrossRef]
Kim, J.W.; Park, C.K. Can ESG Performance Mitigate Information Asymmetry? Moderating Effect of Assurance Services. Appl. Econ. 2023, 55, 2993–3007. [CrossRef]
- Kulkarni, S.P. Environmental Ethics and Information Asymmetry among Organizational Stakeholders. J. Bus. Ethics 2000, 27, 215–228. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kwofie, T.E.; Ohis Aigbavboa, C.; Thwala, W.D. Communication performance challenges in PPP projects: Cases of Ghana and South Africa. Built. Environ. Proj. Asset. Manag. 2019, 9, 628–641. [CrossRef]
Paper not yet in RePEc: Add citation now
Lampel, J.; Miller, R.; Floricel, S. Impact of owner involvement on innovation in large projects: Lessons from power plants construction. Int. Bus. Rev. 1996, 5, 561–578. [CrossRef]
- Lampel, J.; Miller, R.; Floricel, S. Information asymmetries and technological innovation in large engineering construction projects. R D Manag. 1996, 26, 357–369. [CrossRef]
Paper not yet in RePEc: Add citation now
- Laplume, A.O.; Sonpar, K.; Litz, R.A. Stakeholder theory: Reviewing a theory that moves us. J. Manag. 2008, 34, 1152–1189. [CrossRef]
Paper not yet in RePEc: Add citation now
Lewis, G.; Bajari, P. Moral hazard, incentive contracts, and risk: Evidence from procurement. Rev. Econ. Stud. 2014, 81, 1201–1228. [CrossRef]
- Li, H.; Lv, L.; Zuo, J.; Su, L.; Wang, L.; Yuan, C. Dynamic Reputation Incentive Mechanism for Urban Water Environment Treatment PPP Projects. J. Constr. Eng. Manag. 2020, 146, 04020088. [CrossRef]
Paper not yet in RePEc: Add citation now
- Li, Y.; He, N.; Li, H.; Liu, Z.; Qi, J. Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Eng. Constr. Archit. Manag. 2021, 28, 308–331. [CrossRef]
Paper not yet in RePEc: Add citation now
- Li, Y.; Ning, Y. Mitigating Opportunistic Behaviors in Consulting Projects: Evidence from the Outsourced Architectural and Engineering Design. J. Constr. Eng. Manag. 2022, 148, 04022044. [CrossRef]
Paper not yet in RePEc: Add citation now
Liang, X.; Shen, G.Q.; Guo, L. Optimizing incentive policy of energy-efficiency retrofit in public buildings: A principal-agent model. Sustainability 2019, 11, 3442. [CrossRef]
- Littau, P.; Jujagiri, N.J.; Gerald, A. 25 Years of Stakeholder Theory in Project Management Literature (1984–2009). Proj. Manag. J. 2010, 41, 17–29. [CrossRef]
Paper not yet in RePEc: Add citation now
- Liu, D.; Xu, W.; Li, H.; Zhang, W.; Wang, W. Moral hazard and adverse selection in Chinese construction tender market a case of Wenchuan earthquake. Disaster Prev. Manag. 2011, 20, 363–377. [CrossRef] Sustainability 2023, 15, 9979 23 of 25
Paper not yet in RePEc: Add citation now
- Liu, J.; Ma, G. Study on incentive and supervision mechanisms of technological innovation in megaprojects based on the principal-agent theory. Eng. Constr. Archit. Manag. 2020, 28, 1593–1614. [CrossRef]
Paper not yet in RePEc: Add citation now
- Liu, J.; Wang, Y.; Wang, Z. Multidimensional drivers: Exploring contractor rule violations in the construction industry. Eng. Constr. Archit. Manag. 2023, 30, 1496–1518. [CrossRef]
Paper not yet in RePEc: Add citation now
Liu, X.; Lin, S.; Liu, L.; Qian, F.; Zhang, K. Exploring the Factors Triggering Occupational Ethics Risk of Technology Transaction in Chinese Construction Industry. Int. J. Environ. Res. Public Health 2020, 17, 1175. [CrossRef] [PubMed]
- Loosemore, M.; Denny-Smith, G.; Barraket, J.; Keast, R.; Chamberlain, D.; Muir, K.; Powell, A.; Higgon, D.; Osborne, J. Optimising social procurement policy outcomes through cross-sector collaboration in the Australian construction industry. Eng. Constr. Archit. Manag. 2020, 28, 1908–1928. [CrossRef]
Paper not yet in RePEc: Add citation now
- Lu, W.; Zhang, L.; Zhang, L. Effect of contract completeness on contractors’ opportunistic behavior and the moderating role of interdependence. J. Constr. Eng. Manag. 2016, 142, 04016004. [CrossRef]
Paper not yet in RePEc: Add citation now
- Lützkendorf, T.; Speer, T.M. Alleviating asymmetric information in property markets: Building performance and product quality as signals for consumers. Build. Res. Inf. 2005, 33, 182–195. [CrossRef]
Paper not yet in RePEc: Add citation now
- Ma, L.; Zhang, P. Game analysis on moral hazard of construction project managers in China. Int. J. Civ. Eng. 2014, 12, 429–438.
Paper not yet in RePEc: Add citation now
Ma, T.; Wang, Z.; Ding, J. Governing the moral hazard in China’s sponge city projects: A managerial analysis of the construction in the non-public land. Sustainability 2018, 10, 3018. [CrossRef]
- Marinho, A.; Couto, J.; Teixeira, J. Relational contracting and its combination with the BIM methodology in mitigating asymmetric information problems in construction projects. J. Civ. Eng. Manag. 2021, 27, 217–229. [CrossRef] Sustainability 2023, 15, 9979 24 of 25
Paper not yet in RePEc: Add citation now
- Medda, F. A game theory approach for the allocation of risks in transport public private partnerships. Int. J. Proj. Manag. 2007, 25, 213–218. [CrossRef]
Paper not yet in RePEc: Add citation now
- Mendeley. Available online: https://www.mendeley.com/?interaction_required=true (accessed on 22 February 2023).
Paper not yet in RePEc: Add citation now
Missbauer, H.; Hauber, W. Bid calculation for construction projects: Regulations and incentive effects of unit price contracts. Eur. J. Oper. Res. 2006, 171, 1005–1019. [CrossRef]
- Montrimas, A.; Bruneckienė, J.; Gaidelys, V. Beyond the socio-economic impact of transport megaprojects. Sustainability 2021, 13, 8547. [CrossRef]
Paper not yet in RePEc: Add citation now
- Nie, X.; Wang, Y.; Wang, B. Quality Control of Water Conservancy Construction Projects Considering Contractor’s Credibility. J. Coast. Res. 2020, 104, 410–414. [CrossRef]
Paper not yet in RePEc: Add citation now
- Osipova, E. Establishing cooperative relationships and joint risk management in construction projects: Agency theory perspective. J. Manag. Eng. 2015, 31, 5014026. [CrossRef]
Paper not yet in RePEc: Add citation now
- Owusu-Manu, D.-G.; Edwards, D.J.; Kukah, A.S.; Parn, E.A.; El-Gohary, H.; Hosseini, M.R. An empirical examination of moral hazards and adverse selection on PPP projects: A case study of Ghana. J. Eng. Des. Technol. 2018, 16, 910–924. [CrossRef]
Paper not yet in RePEc: Add citation now
- Owusu-Manu, D.-G.; Kukah, A.S.; Boateng, F.; Asumadu, G.; Edwards, D.J. Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public–private partnership (PPP) construction projects. J. Eng. Des. Technol. 2021, 19, 358–372. [CrossRef]
Paper not yet in RePEc: Add citation now
- Owusu-Manu, D.-G.; Kukah, A.S.; Edwards, D.J.; Pärn, E.A.; El-Gohary, H.; Aigbavboa, C. Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership (PPP) construction projects. J. Eng. Des. Technol. 2018, 16, 439–460. [CrossRef]
Paper not yet in RePEc: Add citation now
- Owusu-Manu, D.-G.; Kukah, A.S.K.; Edwards, D.J.; Ameyaw, E.E. Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects. Int. J. Constr. Manag. 2023, 23, 1805–1814. [CrossRef]
Paper not yet in RePEc: Add citation now
- Page, M.J.; McKenzie, J.E.; Bossuyt, P.M.; Boutron, I.; Hoffmann, T.C.; Mulrow, C.D.; Shamseer, L.; Tetzlaff, J.M.; Akl, E.A.; Brennan, S.E.; et al. The PRISMA 2020 statement: An updated guideline for reporting systematic reviews. BMJ 2021, 372, n71. [CrossRef]
Paper not yet in RePEc: Add citation now
- Pesek, A.E.; Smithwick, J.B.; Saseendran, A.; Sullivan, K.T. Information Asymmetry on Heavy Civil Projects: Deficiency Identification by Contractors and Owners. J. Manag. Eng. 2019, 35, 04019008. [CrossRef]
Paper not yet in RePEc: Add citation now
- Picot, A.; Dietl, H.; Franck, E. Organisation—Eine ökonomische Perspektive; Schäffer-Poeschel: Stuttgart, Germany, 1999.
Paper not yet in RePEc: Add citation now
- Poulson, D.; Ashby, M.; Richardson, S. USERfit. A Practical Handbook on User-Centred Design for Assistive Technology; TIDE EC-DG XIII, ECSC-ECEAEC: Brussels, Luxembourg, 1996.
Paper not yet in RePEc: Add citation now
- Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide), 6th ed.; Project Management Institute, Inc.: Newtown Square, PA, USA, 2017.
Paper not yet in RePEc: Add citation now
- Raji, A.U. Conceptual model for minimization of transaction costs in building energy efficiency (BEE) for affordable housing delivery. Malays. Constr. Res. J. 2019, 8, 107–122. [CrossRef]
Paper not yet in RePEc: Add citation now
- Robinson, G.; Leonard, J.; Whittington, T. Future of Construction: A Global Forecast for Construction to 2030; Marsh & GuyCarpenter, Oxford Economics: London, UK, 2021.
Paper not yet in RePEc: Add citation now
- Rosenfeld, Y.; Geltner, D. Cost-plus and incentive contracting: Some false benefits and inherent drawbacks. Constr. Manag. Econ. 1991, 9, 481–490. [CrossRef]
Paper not yet in RePEc: Add citation now
- Sabini, L.; Muzio, D.; Alderman, N. 25 years of ‘sustainable projects’. What we know and what the literature says. Int. J. Proj. Manag. 2019, 37, 820–838. [CrossRef] Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.
Paper not yet in RePEc: Add citation now
- Schieg, M. Strategies for avoiding asymmetric information in construction project management. J. Bus. Econ. Manag. 2008, 9, 47–51. [CrossRef]
Paper not yet in RePEc: Add citation now
- Seuring, S.; Gold, S. Conducting content-analysis based literature reviews in supply chain management. Supply Chain. Manag. 2012, 17, 544–555. [CrossRef]
Paper not yet in RePEc: Add citation now
Sha, K.X. Incentive strategies for construction project manager: A common agency perspective. Constr. Manag. Econ. 2019, 37, 461–471. [CrossRef]
- Shi, L.; He, Y.J.; Onishi, M.; Kobayashi, K. Double moral hazard and risk-sharing in construction projects. IEEE Trans. Eng. Manag. 2021, 68, 1919–1929. [CrossRef]
Paper not yet in RePEc: Add citation now
Shi, S.; Yin, Y.; An, Q.; Chen, K. Optimal build-operate-transfer road contracts under information asymmetry and uncertainty. Transp. Res. Part B Methodol. 2021, 152, 65–86. [CrossRef]
- Shi, S.; Yin, Y.; Guo, X. Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost information. Transp. Res. Part B Methodol. 2016, 85, 56–69. [CrossRef]
Paper not yet in RePEc: Add citation now
- Singh, A.K.; Prasath Kumar, V.R. Smart contracts and supply chain management using blockchain. J. Eng. Res. 2022, 9, 6092792. [CrossRef]
Paper not yet in RePEc: Add citation now
Snippert, T.; Witteveen, W.; Boes, H.; Voordijk, H. Barriers to realizing a stewardship relation between client and vendor: The Best Value approach. Constr. Manag. Econ. 2015, 33, 569–586. [CrossRef]
Su, P.; Peng, Y.; Hu, Q.; Tan, R. Incentive Mechanism and Subsidy Design for Construction and Demolition Waste Recycling under Information Asymmetry with Reciprocal Behaviors. Int. J. Environ. Res. Public Health 2020, 17, 4346. [CrossRef]
- Sun, J.; Wang, L. The interaction between BIM’s promotion and interest game under information asymmetry. J. Ind. Manag. Optim. 2015, 11, 1301–1319. [CrossRef]
Paper not yet in RePEc: Add citation now
- Tao, Z.; Wang, B.; Shu, L. Analysis on the Procurement Cost of Construction Supply Chain based on Evolutionary Game Theory. Arab. J. Sci. Eng. 2021, 46, 1925–1940. [CrossRef]
Paper not yet in RePEc: Add citation now
- Taofeeq, M.D.; Adeleke, A.Q.; Lee, C.-K. Government policy as a key moderator to contractors’ risk attitudes among Malaysian construction companies. J. Eng. Des. Technol. 2020, 18, 1543–1569. [CrossRef]
Paper not yet in RePEc: Add citation now
- Thakur, A.I.; Khan, S.; Siddiqui, M.J. Risk Management and Life Cycle Costing of Infrastructure Project. Int. J. Adv. Eng. Technol. 2016, 4, 70–75.
Paper not yet in RePEc: Add citation now
- Tserng, H.P.; Ho, S.-P.; Chou, J.-S.; Lin, C. Proactive measures of governmental debt guarantees to facilitate Public-Private Partnerships project. J. Civ. Eng. Manag. 2014, 20, 548–560. [CrossRef]
Paper not yet in RePEc: Add citation now
- Wang, Y.; Cui, P.; Liu, J. Analysis of the risk-sharing ratio in PPP projects based on government minimum revenue guarantees. Int. J. Proj. Manag. 2018, 36, 899–909. [CrossRef]
Paper not yet in RePEc: Add citation now
Wang, Y.; Gao, H.O.; Liu, J. Incentive game of investor speculation in PPP highway projects based on the government minimum revenue guarantee. Transp. Res. Part A Policy Pract. 2019, 125, 20–34. [CrossRef]
- Ward, S.C.; Chapman, C.B.; Curtis, B. On the allocation of risk in construction projects. Int. J. Proj. Manag. 1991, 9, 140–147. [CrossRef]
Paper not yet in RePEc: Add citation now
- Warsame, A.; Borg, L.; Lind, H. How Can Clients Improve the Quality of Transport Infrastructure Projects? The Role of Knowledge Management and Incentives. Sci. World J. 2013, 2013, 709423. [CrossRef]
Paper not yet in RePEc: Add citation now
- Wu, G. A multi-objective trade-off model in sustainable construction projects. Sustainability 2017, 9, 1929. [CrossRef]
Paper not yet in RePEc: Add citation now
Wu, G.; Zuo, J.; Zhao, X. Incentive model based on cooperative relationship in Sustainable construction projects. Sustainability 2017, 9, 1191. [CrossRef]
- Wu, Y.; Huang, Y.; Luo, W.; Li, C. Construction supervision mechanism for public projects in China: Progress goal-oriented perspective. J. Manag. Eng. 2014, 30, 205–213. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xia, N.; Zou, P.X.W.; Griffin, M.A.; Wang, X.; Zhong, R. Towards integrating construction risk management and stakeholder management: A systematic literature review and future research agendas. Int. J. Proj. Manag. 2018, 36, 701–715. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xiang, P.; Huo, X.; Shen, L. Research on the phenomenon of asymmetric information in construction projects—The case of China. Int. J. Proj. Manag. 2015, 33, 589–598. [CrossRef]
Paper not yet in RePEc: Add citation now
Xiang, P.; Jia, F.; Li, X. Critical behavioral risk factors among principal participants in the Chinese construction industry. Sustainability 2018, 10, 3158. [CrossRef]
- Xiang, P.; Wang, J. Research on preventing moral hazard of construction project based on information asymmetries. Open Constr. Build. Technol. J. 2014, 8, 468–475. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xiang, P.; Zhou, J.; Zhou, X.; Ye, K. Construction project risk management based on the view of asymmetric information. J. Constr. Eng. M. 2012, 138, 1303–1311. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xie, L.; Xu, T.; Ju, T.; Xia, B. Explaining the alienation of megaproject environmental responsibility behavior: A fuzzy set qualitative comparative analysis study in China. Eng. Constr. Archit. Manag. 2023, in press. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xiong, W.; Chen, B.; Wang, H.; Zhu, D. Transaction Hazards and Governance Mechanisms in Public-Private Partnerships: A Comparative Study of Two Cases. Public Perform. Manag. Rev. 2019, 42, 1279–1304. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xu, Q.; Chong, H.-Y.; Liao, P.-C. Collaborative information integration for construction safety monitoring. Autom. Constr. 2019, 102, 120–134. [CrossRef]
Paper not yet in RePEc: Add citation now
Xue, F.; Chen, G.; Huang, S.; Xie, H. Design of Social Responsibility Incentive Contracts for Stakeholders of Megaprojects under Information Asymmetry. Sustainability 2022, 14, 1465. [CrossRef]
- Yao, M.; Wang, F.; Chen, Z.; Ye, H. Optimal Incentive Contract with Asymmetric Cost Information. J. Constr. Eng. Manag. 2020, 146, 04020054. [CrossRef]
Paper not yet in RePEc: Add citation now
- Yiyong, L.; Yousong, W.; Jingkuang, L. Analysis of adverse selection for motivation mechanism in engineering project cost management. Res. J. Appl. Sci. Eng. Technol. 2013, 5, 3777–3782. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zeng, S.X.X.; Lou, G.X.; Tam, V.W.Y. Managing information flows for quality improvement of projects. Meas. Bus. Excell. 2007, 11, 30–40. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zeng, W.; Wang, H.; Li, H.; Zhou, H.T.; Wu, P.; Le, Y. Incentive mechanisms for supplier development in mega construction projects. IEEE Trans. Eng. Manag. 2019, 66, 252–265. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zhang, R.; Zhou, Y.; Zhuang, H.; Zhu, X. Study on the project supervision system based on the principal-agent theory. J. Ind. Eng. Manag. 2015, 8, 491–508. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zhang, Y.; Yi, X.; Li, S.; Qiu, H. Evolutionary game of government safety supervision for prefabricated building construction using system dynamics. Eng. Constr. Archit. Manag. 2023, in press. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zhao, H.; Liu, X.; Wang, Y. Evolutionary game analysis of opportunistic behavior of Sponge City PPP projects: A perceived value perspective. Sci. Rep. 2022, 12, 8798. [CrossRef] [PubMed]
Paper not yet in RePEc: Add citation now
- Zhao, L.; Zhong, S. Analysis of collusion between contractors and supervisors in constructions. J. Southwest Jiaotong Univ. 2013, 48, 1136–1141. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zheng, L.; Lu, W.; Chen, K.; Chau, K.W.; Niu, Y. Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation. Int. J. Proj. Manag. 2017, 35, 393–405. [CrossRef]
Paper not yet in RePEc: Add citation now