- Ahmed, M.; AlQadhi, S.; Mallick, J.; Kahla, N.B.; Le, H.A.; Singh, C.K.; Hang, H.T. Artificial neural networks for sustainable development of the construction industry. Sustainability 2022, 14, 14738. [CrossRef]
Paper not yet in RePEc: Add citation now
- Belayutham, S.; González, V.A.; Yiu, T.W. Lean-based clean earthworks operation. J. Clean. Prod. 2017, 142, 2195–2208. [CrossRef]
Paper not yet in RePEc: Add citation now
- Besklubova, S.; Zhang, X. Improving construction productivity by integrating the lean concept and the Clancey heuristic model. Sustainability 2019, 11, 4535. [CrossRef]
Paper not yet in RePEc: Add citation now
- Caterpillar Performance Handbook; Edition 49; Cat Publication by Caterpillar Inc.: Peoria, IL, USA, 2019.
Paper not yet in RePEc: Add citation now
- Dagostino, F.R.; Peterson, S.J. Estimating in Building Construction, 7th ed.; Prentice Hall: Hoboken, NJ, USA, 2011.
Paper not yet in RePEc: Add citation now
- de Almeida Barbosa Franco, J.; Domingues, A.M.; de Almeida Africano, N.; Deus, R.M.; Battistelle, R.A.G. Sustainability in the civil construction sector supported by industry 4.0 technologies: Challenges and opportunities. Infrastructures 2022, 7, 43. [CrossRef]
Paper not yet in RePEc: Add citation now
- Fu, J.; Jenelius, E.; Koutsopoulos, H.N. Identification of workstations in earthwork operations from vehicle GPS data. Autom. Constr. 2017, 83, 237–246. [CrossRef]
Paper not yet in RePEc: Add citation now
Gao, X.; Feng, H. AI-driven productivity gains: Artificial intelligence and firm productivity. Sustainability 2023, 15, 8934. [CrossRef]
- Gašparík, J.; Motyčka, V.; Št’astný, P.; Szalayová, S. Multi-criteria optimization of mechanized earth processes and its impact on economic and environmental sustainability. Sustainability 2022, 14, 78. [CrossRef]
Paper not yet in RePEc: Add citation now
- Google Earth Pro Software. Available online: https://earth.google.com/web/ (accessed on 23 April 2024).
Paper not yet in RePEc: Add citation now
- Gunduz, M.; Abu-Hijleh, A. Assessment of human productivity drivers for construction labor through importance rating and risk mapping. Sustainability 2020, 12, 8614. [CrossRef]
Paper not yet in RePEc: Add citation now
- Gwak, H.S.; Seo, J.; Lee, D.E. Optimal cut-fill pairing and sequencing method in earthwork operation. Autom. Constr. 2018, 87, 60–73. [CrossRef]
Paper not yet in RePEc: Add citation now
- Hammad, A.W.; Akbarnezhad, A.; Wu, P.; Wang, X.; Haddad, A. Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors. J. Clean. Prod. 2019, 228, 1264–1281. [CrossRef]
Paper not yet in RePEc: Add citation now
- Han, S.; Hong, T.; Kim, G.; Lee, S. Technical comparisons of simulation-based productivity prediction methodologies by means of estimation tools focusing on conventional earthmovings. J. Civ. Eng. Manag. 2011, 17, 265–277. [CrossRef]
Paper not yet in RePEc: Add citation now
- Jaafar, K.; El-Halawani, L.I. Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. Int. J. Constr. Manag. 2020, 22, 1–10. [CrossRef]
Paper not yet in RePEc: Add citation now
- Jassim, H.S.; Krantz, J.; Lu, W.; Olofsson, T. A model to reduce earthmoving impacts. J. Civ. Eng. Manag. 2020, 26, 490–512. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kang, S.H.; Seo, J.W.; Baik, K.G. 3D-GIS based earthwork planning system for productivity improvement. In Proceedings of the Construction Research Congress 2009: Building a Sustainable Future, Seattle, WA, USA, 5–7 April 2009; pp. 151–160.
Paper not yet in RePEc: Add citation now
- Kassem, M.; Mahamedi, E.; Rogage, K.; Duffy, K.; Huntingdon, J. Measuring and benchmarking the productivity of excavators in infrastructure projects: A deep neural network approach. Autom. Constr. 2021, 124, 103532. [CrossRef]
Paper not yet in RePEc: Add citation now
- Katavić, M. Osnove Ekonomike za Graditelje (Book Title on Engl.: Basics of Economics for Builders); Hrvatska sveučilišna naklada (Publisher on Engl.: Croatian University Press): Zagreb, Croatia, 2009.
Paper not yet in RePEc: Add citation now
- Kim, J.; Chi, S. Multi-camera vision-based productivity monitoring of earthmoving operations. Autom. Constr. 2020, 112, 103121. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kim, S.K.; Jang, J.W.; Na, W.S. Automatic Creation of Heuristic-Based Truck Movement Paths for Construction Equipment Control. Appl. Sci. 2021, 11, 5837. [CrossRef]
Paper not yet in RePEc: Add citation now
- Komatsu. Specifications and Application Handbook, 31st ed.; Komatsu: Tokyo, Japan, 2013.
Paper not yet in RePEc: Add citation now
- Krantz, J.; Feng, K.; Larsson, J.; Olofsson, T. ‘Eco-Hauling’ principles to reduce carbon emissions and the costs of earthmoving—A case study. J. Clean. Prod. 2019, 208, 479–489. [CrossRef]
Paper not yet in RePEc: Add citation now
- Lambropoulos, S.; Manolopoulos, N.; Pantouvakis, J.P. SEMANTIC: Smart EarthMoving analysis and estimation of cost. Constr. Manag. Econ. 1996, 14, 79–92. [CrossRef]
Paper not yet in RePEc: Add citation now
- Lee, H.C.; Gwak, H.S.; Seo, J.; Lee, D.E. Eco-economic excavator configuration method. Autom. Constr. 2018, 86, 138–149. [CrossRef]
Paper not yet in RePEc: Add citation now
- MathWorks. Available online: https://www.mathworks.com/products/matlab.html (accessed on 23 April 2024).
Paper not yet in RePEc: Add citation now
- Navon, R. Automated project performance control of construction projects. Autom. Constr. 2005, 14, 467–476. [CrossRef]
Paper not yet in RePEc: Add citation now
- Nichols, H.L., Jr.; Day, D. Moving the Earth: The Workbook of Excavation; McGraw-Hill Education: New York, NY, USA, 2005.
Paper not yet in RePEc: Add citation now
- Nunnally, S.W. Construction Methods and Management [by] SW Nunnally; Prentice-Hall: Hoboken, NJ, USA, 2007.
Paper not yet in RePEc: Add citation now
- Ogunbiyi, O.; Goulding, J.S.; Oladapo, A. An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Constr. Innov. 2014, 14, 88–107. [CrossRef]
Paper not yet in RePEc: Add citation now
Ok, S.C.; Sinha, S.K. Construction equipment productivity estimation using artificial neural network model. Constr. Manag. Econ. 2006, 24, 1029–1044. [CrossRef]
- Parente, M.; Correia, A.G.; Cortez, P. A novel integrated optimization system for earthwork tasks. Transp. Res. Procedia 2016, 14, 3601–3610. [CrossRef]
Paper not yet in RePEc: Add citation now
- Peurifoy, R.; Schexnayder, C.; Schmitt, R.; Shapira, A. Construction Planning, Equipment, and Methods; McGraw-Hill Education: New York, NY, USA, 2006.
Paper not yet in RePEc: Add citation now
- Pilger, J.D.; Machado, E.L.; de Assis Lawisch-Rodriguez, A.; Zappe, A.L.; Rodriguez-Lopez, D.A. Environmental impacts and cost overrun derived from adjustments of a road construction project setting. J. Clean. Prod. 2020, 256, 120731. [CrossRef]
Paper not yet in RePEc: Add citation now
- Radujković, M.; Burcar Dunović, I.; Dolaček Alduk, Z.; Nahod, M.M.; Vukomanović, M. Organizacija Grad̄enja (Book Title on Engl.: Construction Organization); Sveučilište u Zagrebu, Grad̄evinski Fakultet (Publisher on Engl.: University of Zagreb, Faculy of Civil Engineering): Zagreb, Croatia, 2015.
Paper not yet in RePEc: Add citation now
- Regona, M.; Yigitcanlar, T.; Hon, C.K.; Teo, M. Mapping Two Decades of AI in Construction Research: A Scientometric Analysis from the Sustainability and Construction Phases Lenses. Buildings 2023, 13, 2346. [CrossRef]
Paper not yet in RePEc: Add citation now
- Salem, A.; Salah, A.; Ibrahim, M.; Moselhi, O. Study of factors influencing productivity of hauling equipment in earthmoving projects using fuzzy set theory. Int. J. Innov. Manag. Technol. 2017, 8, 151–154. [CrossRef]
Paper not yet in RePEc: Add citation now
- Sharma, J.K.; Rajeshkannan, A.; Sharma, A.A.; Seenivasagam, D.R. Some aspects on the sustainable process design in a timber mill using the design for manufacturability/sustainability. Int. J. Sustain. Eng. 2020, 13, 194–203. [CrossRef]
Paper not yet in RePEc: Add citation now
- Shawki, K.M.; Kilani, K.; Gomaa, M.A. Analysis of earth-moving systems using discrete-event simulation. Alex. Eng. J. 2015, 54, 533–540. [CrossRef]
Paper not yet in RePEc: Add citation now
- Shehadeh, A.; Alshboul, O.; Tatari, O.; Alzubaidi, M.A.; Salama AH, E.S. Selection of heavy machinery for earthwork activities: A multi-objective optimization approach using a genetic algorithm. Alex. Eng. J. 2022, 61, 7555–7569. [CrossRef]
Paper not yet in RePEc: Add citation now
Šopić, M.; Vukomanović, M.; Car-Pušić, D. Protocol Proposal for Data Collection and Processing in Productivity Assessment of Earthworks Using Audio-Visual and Location-Sensing Technology. Sustainability 2023, 15, 12358. [CrossRef]
- Su, Y.Y. Construction Crew Productivity Monitoring Supported by Location Awareness Technologies. Doctoral Dissertation, University of Illinois at Urbana-Champaign, Champaign, IL, USA, 2010.
Paper not yet in RePEc: Add citation now
- Tazmeen, T.; Mir, F.Q. Sustainability through materials: A review of green options in construction. Results Surf. Interfaces 2024, 14,
Paper not yet in RePEc: Add citation now
- Vukomanović, M. Teaching Materials, Faculty of Civil Engineering, University of Zagreb, University Graduate Study. Available online: https://www.grad.unizg.hr/predmet/grastr_c (accessed on 20 April 2024).
Paper not yet in RePEc: Add citation now
- Waris, M.; Liew, M.S.; Khamidi, M.F.; Idrus, A. Criteria for the selection of sustainable onsite construction equipment. Int. J. Sustain. Built Environ. 2014, 3, 96–110. [CrossRef]
Paper not yet in RePEc: Add citation now
- Wu, Y.; Wang, M.; Liu, X.; Wang, Z.; Ma, T.; Lu, Z.; Liu, D.; Xie, Y.; Li, X.; Wang, X. Monitoring the Work Cycles of Earthmoving Excavators in Earthmoving Projects Using UAV Remote Sensing. Remote Sens. 2021, 13, 3853. [CrossRef]
Paper not yet in RePEc: Add citation now
- Yang, J.; Edwards, D.J.; Love, P.E. A computational intelligent fuzzy model approach for excavator cycle time simulation. Autom. Constr. 2003, 12, 725–735. [CrossRef]
Paper not yet in RePEc: Add citation now
- Yi, C.; Lu, M. Planning Rough-Grading Projects: CAT Handbook vs. RS Means. In Proceedings of the Computing in Civil Engineering 2017, Seattle, WA, USA, 25–27 June 2017; pp. 246–253.
Paper not yet in RePEc: Add citation now