- Abdallah, A.; Assaf, S.; Hassanain, M.A. Assessment of the Consequences of Deficiencies in Design Documents in Saudi Arabia. Archit. Eng. Des. Manag. 2019, 15, 282–296. [CrossRef]
Paper not yet in RePEc: Add citation now
Abraham, F.; Schmukler, S.L. Addressing the SME Finance Problem. In World Bank Research Policy Briefs No. 120333; 2017. Available online: https://ssrn.com/abstract=3249560 (accessed on 11 November 2024).
- AbuElnasr, M.; Etman, E.; Sanad, H. Optimizing Cash Flow of Construction Projects through Material Procurement Plans. Int. J. Adv. Struct. Geotech. Eng. 2022, 6, 131–141.
Paper not yet in RePEc: Add citation now
- Adebowale, O.; Agumba, J. Productivity Improvement Framework for South African Construction SMEs. J. Constr. Proj. Manag. Innov. 2023, 13, 1–18.
Paper not yet in RePEc: Add citation now
- Adjei, E.A.G.; Fugar, F.D.K.; Adinyira, E.; Edwards, D.J.; Pärn, E.A. Exploring the Significant Cash Flow Factors Influencing Building Projects Profitability in Ghana. Int. J. Constr. Eng. Manag. 2018, 7, 35–46.
Paper not yet in RePEc: Add citation now
- Ahmadisheykhsarmast, S.; Sonmez, R. A Smart Contract System for Security of Payment of Construction Contracts. Autom. Constr. 2020, 120, 103401. [CrossRef]
Paper not yet in RePEc: Add citation now
- Akinradewo, O.; Aigbavboa, C.; Oke, A.; Coffie, H. Appraisal of Risk Contingency Planning for Construction Projects. In Proceedings of the IOP Conference Series: Materials Science and Engineering, Ota, Nigeria, 24–28 June 2019; IOP Publishing: Bristol, UK, 2019; Volume 640, p. 12019. Sustainability 2024, 16, 10221 21 of 23
Paper not yet in RePEc: Add citation now
- Akob, Z.; Zaidee, M.; Hipni, A.; Koka, R. Coordination and Collaboration of Information for Pan Borneo Highway (Sarawak) via Common Data Environment (CDE). In Proceedings of the IOP Conference Series: Materials Science and Engineering, Selangor, Malaysia, 29–31 October 2018; IOP Publishing: Bristol, UK, 2019; Volume 512, p. 12001.
Paper not yet in RePEc: Add citation now
- Al-Ashmori, Y.Y.; Othman, I.; Rahmawati, Y.; Amran, Y.H.M.; Sabah, S.H.A.; Rafindadi, A.D.; Mikić, M. BIM Benefits and Its Influence on the BIM Implementation in Malaysia. Ain Shams Eng. J. 2020, 11, 1013–1019. [CrossRef]
Paper not yet in RePEc: Add citation now
- Al-Joburi, K.I.; Al-Aomar, R.; Bahri, M.E. Analyzing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area. J. Manag. Eng. 2012, 28, 382–390. [CrossRef]
Paper not yet in RePEc: Add citation now
- Al-Yami, A.; Sanni-Anibire, M.O. BIM in the Saudi Arabian Construction Industry: State of the Art, Benefit and Barriers. Int. J. Build. Pathol. Adapt. 2021, 39, 33–47. [CrossRef]
Paper not yet in RePEc: Add citation now
Alaboud, N.; Alshahrani, A. Adoption of Building Information Modelling in the Saudi Construction Industry: An Interpretive Structural Modelling. Sustainability 2023, 15, 6130. [CrossRef]
- Alirezaei, S.; Taghaddos, H.; Ghorab, K.; Tak, A.N.; Alirezaei, S. BIM-Augmented Reality Integrated Approach to Risk Management. Autom. Constr. 2022, 141, 104458. [CrossRef]
Paper not yet in RePEc: Add citation now
- Alomar, A.A.; Alzahrani, A.A.; Alzahim, A.S.; Alajaji, M.A. COVID-19 and the Digital Transformation That Followed in the Kingdom of Saudi Arabia. Acad. J. Res. Sci. Publ. Vol. 2023, 5. [CrossRef]
Paper not yet in RePEc: Add citation now
- Ariono, B.; Wasesa, M.; Dhewanto, W. The Drivers, Barriers, and Enablers of Building Information Modeling (BIM) Innovation in Developing Countries: Insights from Systematic Literature Review and Comparative Analysis. Buildings 2022, 12, 1912. [CrossRef]
Paper not yet in RePEc: Add citation now
- Awosina, A.; Ndihokubwayo, R.; Fapohunda, J. Effects of Inaccurate Cost Estimate on Construction Project Stakeholders. J. Constr. Proj. Manag. Innov. 2018, 8, 1886–1904.
Paper not yet in RePEc: Add citation now
- Azungah, T. Qualitative Research: Deductive and Inductive Approaches to Data Analysis. Qual. Res. J. 2018, 18, 383–400. [CrossRef]
Paper not yet in RePEc: Add citation now
- Ben Mahmoud, B.; Lehoux, N.; Blanchet, P.; Cloutier, C. Barriers, Strategies, and Best Practices for BIM Adoption in Quebec Prefabrication Small and Medium-Sized Enterprises (SMEs). Buildings 2022, 12, 390. [CrossRef]
Paper not yet in RePEc: Add citation now
- Bhosekar, S.K.; Vyas, G. Cost Controlling Using Earned Value Analysis in Construction Industries. Int. J. Eng. Innov. Technol. 2012, 1, 324–332.
Paper not yet in RePEc: Add citation now
- Bujang, M.A.; Omar, E.D.; Baharum, N.A. A Review on Sample Size Determination for Cronbach’s Alpha Test: A Simple Guide for Researchers. Malaysian J. Med. Sci. MJMS 2018, 25, 85. [CrossRef]
Paper not yet in RePEc: Add citation now
- Chen, J.-H.; Chen, W.-H. Contractor Costs of Factoring Account Receivables for a Construction Project. J. Civ. Eng. Manag. 2012, 18, 227–234. [CrossRef]
Paper not yet in RePEc: Add citation now
- Creswell, J.W. Qualitative, Quantitative and Mixed Methods Approaches. Res. Des. 2014, 10, 723954.
Paper not yet in RePEc: Add citation now
- Creswell, J.W. Research Design: Qualitative, Quantitative and Mixed Methods Approaches; Sage Publications: Thousand Oaks, CA, USA, 2014; Volume s4.
Paper not yet in RePEc: Add citation now
- Doloi, H.; Sawhney, A.; Iyer, K.C.; Rentala, S. Analysing Factors Affecting Delays in Indian Construction Projects. Int. J. Proj. Manag. 2012, 30, 479–489. [CrossRef] Sustainability 2024, 16, 10221 23 of 23
Paper not yet in RePEc: Add citation now
- Doukari, O.; Seck, B.; Greenwood, D. The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches. Buildings 2022, 12, 1145. [CrossRef]
Paper not yet in RePEc: Add citation now
- Eadie, R.; Browne, M.; Odeyinka, H.; McKeown, C.; McNiff, S. BIM Implementation throughout the UK Construction Project Lifecycle: An Analysis. Autom. Constr. 2013, 36, 145–151. [CrossRef]
Paper not yet in RePEc: Add citation now
- Elghaish, F.; Abrishami, S.; Abu Samra, S.; Gaterell, M.; Hosseini, M.R.; Wise, R. Cash Flow System Development Framework within Integrated Project Delivery (IPD) Using BIM Tools. Int. J. Constr. Manag. 2021, 21, 555–570. [CrossRef]
Paper not yet in RePEc: Add citation now
- Elhassan, O.M. Obstacles and Problems Facing the Financing of Small and Medium Enterprises in KSA. J. Financ. Account. 2019, 7, 168–183.
Paper not yet in RePEc: Add citation now
- Etikan, I. Comparision of Snowball Sampling and Sequential Sampling Technique. Biometrics Biostat. Int. J. 2016, 3, 1–2. [CrossRef]
Paper not yet in RePEc: Add citation now
- Faisal Shehzad, H.M.; Binti Ibrahim, R.; Yusof, A.F.; Mohamed Khaidzir, K.A.; Shawkat, S.; Ahmad, S. Recent Developments of BIM Adoption Based on Categorization, Identification and Factors: A Systematic Literature Review. Int. J. Constr. Manag. 2022, 22, 3001–3013. [CrossRef]
Paper not yet in RePEc: Add citation now
- Gerrish, T.; Ruikar, K.; Cook, M.; Johnson, M.; Phillip, M.; Lowry, C. BIM Application to Building Energy Performance Visualisation and Management: Challenges and Potential. Energy Build. 2017, 144, 218–228. [CrossRef]
Paper not yet in RePEc: Add citation now
- Hwee, N.G.; Tiong, R.L.K. Model on Cash Flow Forecasting and Risk Analysis for Contracting Firms. Int. J. Proj. Manag. 2002, 20, 351–363. [CrossRef]
Paper not yet in RePEc: Add citation now
- Ikediashi, D.I.; Okolie, K.C. An Assessment of Risks Associated with Contractor’s Cash Flow Projections in South-South, Nigeria. Int. J. Constr. Manag. 2022, 22, 2051–2058. [CrossRef]
Paper not yet in RePEc: Add citation now
- Isaac, S.; Navon, R. A Graph-Based Model for the Identification of the Impact of Design Changes. Autom. Constr. 2013, 31, 31–40. [CrossRef]
Paper not yet in RePEc: Add citation now
- Johnson, R.M.; Babu, R.I.I. Time and Cost Overruns in the UAE Construction Industry: A Critical Analysis. Int. J. Constr. Manag. 2020, 20, 402–411. [CrossRef]
Paper not yet in RePEc: Add citation now
- Jung, M.; You, S.; Chi, S.; Yu, I.; Hwang, B.-G. The Relationship between Unbilled Accounts Receivable and Financial Performance of Construction Contractors. Sustainability 2018, 10, 2679. [CrossRef]
Paper not yet in RePEc: Add citation now
- Jurgenson, S.; Bayyari, F.M.; Parker, J. A Comprehensive Renewable Energy Program for Saudi Vision 2030. Renew. Energy Focus 2016, 17, 182–183. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kaka, A.P. Towards More Flexible and Accurate Cash Flow Forecasting. Constr. Manag. Econ. 1996, 14, 35–44. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kamal, E.M.; Lou, E.C.W.; Yusof, N.; Osmadi, A. Absorptive Capacity of Malaysian SME Construction Organisations. Archit. Eng. Des. Manag. 2022, 18, 313–324. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kim, M.O.; Park, H.K. The Algorithm of Cash Flow Forecasting in Planning Stage for Construction Project. In Proceedings of the 2012 IEEE International Conference on Management of Innovation & Technology (ICMIT), Bali, Indonesia, 11–13 June 2012; pp. 674–677.
Paper not yet in RePEc: Add citation now
- Konior, J.; Szóstak, M. Methodology of Planning the Course of the Cumulative Cost Curve in Construction Projects. Sustainability 2020, 12, 2347. [CrossRef]
Paper not yet in RePEc: Add citation now
- Kumar, V.; Albashrawi, S. Quality Infrastructure of Saudi Arabia and Its Importance for Vision 2030. Mapan 2022, 37, 97–106. [CrossRef]
Paper not yet in RePEc: Add citation now
- Leskinen, N.; Vimpari, J.; Junnila, S. A Review of the Impact of Green Building Certification on the Cash Flows and Values of Commercial Properties. Sustainability 2020, 12, 2729. [CrossRef]
Paper not yet in RePEc: Add citation now
- Lu, Q.; Won, J.; Cheng, J.C.P. A Financial Decision Making Framework for Construction Projects Based on 5D Building Information Modeling (BIM). Int. J. Proj. Manag. 2016, 34, 3–21. [CrossRef]
Paper not yet in RePEc: Add citation now
Mahmoud, H.; Ahmed, V.; Beheiry, S. Construction Cash Flow Risk Index. J. Risk Financ. Manag. 2021, 14, 269. [CrossRef]
- Mahmudnia, D.; Arashpour, M.; Yang, R. Blockchain in Construction Management: Applications, Advantages and Limitations. Autom. Constr. 2022, 140, 104379. [CrossRef]
Paper not yet in RePEc: Add citation now
Manzoor, F.; Wei, L.; Sahito, N. The Role of SMEs in Rural Development: Access of SMEs to Finance as a Mediator. PLoS ONE 2021, 16, e0247598. [CrossRef]
- Marshall, B.; Cardon, P.; Poddar, A.; Fontenot, R. Does Sample Size Matter in Qualitative Research?: A Review of Qualitative Interviews in IS Research. J. Comput. Inf. Syst. 2013, 54, 11–22. [CrossRef]
Paper not yet in RePEc: Add citation now
- Memon, A.H.; Rahman, I.A.; Memon, I.; Azman, N.I.A. BIM in Malaysian Construction Industry: Status, Advantages, Barriers and Strategies to Enhance the Implementation Level. Res. J. Appl. Sci. Eng. Technol. 2014, 8, 606–614. [CrossRef]
Paper not yet in RePEc: Add citation now
- Müller, J.M.; Buliga, O.; Voigt, K.-I. The Role of Absorptive Capacity and Innovation Strategy in the Design of Industry 4.0 Business Models-A Comparison between SMEs and Large Enterprises. Eur. Manag. J. 2021, 39, 333–343. [CrossRef]
Paper not yet in RePEc: Add citation now
- Muratova, A.; Ptukhina, I. BIM as an Instrument of a Conceptual Project Cost Estimation. In Proceedings of the International Scientific Conference on Energy, Environmental and Construction Engineering, St. Petersburg, Russia, 19–20 November 2019; Springer: Berlin/Heidelberg, Germany, 2019; pp. 469–477.
Paper not yet in RePEc: Add citation now
- Navon, R. Resource-Based Model for Automatic Cash-Flow Forecasting. Constr. Manag. Econ. 1995, 13, 501–510. [CrossRef]
Paper not yet in RePEc: Add citation now
- Nowotarski, P.; Paslawski, J. Barriers in Running Construction SME–Case Study on Introduction of Agile Methodology to Electrical Subcontractor. Procedia Eng. 2015, 122, 47–56. [CrossRef]
Paper not yet in RePEc: Add citation now
- Odeyinka, H.A.; Lowe, J.; Kaka, A. An Evaluation of Risk Factors Impacting Construction Cash Flow Forecast. J. Financ. Manag. Prop. Constr. 2008, 13, 5–17. [CrossRef]
Paper not yet in RePEc: Add citation now
- Östlund, U.; Kidd, L.; Wengström, Y.; Rowa-Dewar, N. Combining Qualitative and Quantitative Research within Mixed Method Research Designs: A Methodological Review. Int. J. Nurs. Stud. 2011, 48, 369–383. [CrossRef] [PubMed]
Paper not yet in RePEc: Add citation now
- Pablo, Z.; London, K.A. Stable Relationality and Dynamic Innovation: Two Models of Collaboration in SME-Driven Offsite Manufacturing Supply Chains in Housing Construction. Eng. Constr. Archit. Manag. 2020, 27, 1553–1577. [CrossRef]
Paper not yet in RePEc: Add citation now
- Palinkas, L.A.; Horwitz, S.M.; Green, C.A.; Wisdom, J.P.; Duan, N.; Hoagwood, K. Purposeful Sampling for Qualitative Data Collection and Analysis in Mixed Method Implementation Research. Adm. Policy Ment. Health Ment. Health Serv. Res. 2015, 42, 533–544. [CrossRef]
Paper not yet in RePEc: Add citation now
- Parylo, O. Qualitative, Quantitative, or Mixed Methods: An Analysis of Research Design in Articles on Principal Professional Development (1998-2008). Int. J. Mult. Res. Approaches 2012, 6, 297–313. [CrossRef]
Paper not yet in RePEc: Add citation now
- Patacas, J.; Dawood, N.; Kassem, M. BIM for Facilities Management: A Framework and a Common Data Environment Using Open Standards. Autom. Constr. 2020, 120, 103366. [CrossRef]
Paper not yet in RePEc: Add citation now
- Porwal, A.; Parsamehr, M.; Szostopal, D.; Ruparathna, R.; Hewage, K. The Integration of Building Information Modeling (BIM) and System Dynamic Modeling to Minimize Construction Waste Generation from Change Orders. Int. J. Constr. Manag. 2023, 23, 156–166. [CrossRef]
Paper not yet in RePEc: Add citation now
- Prasad, K.V.; Vasugi, V.; Bhat, N. Analysis of Causes of Delay in Indian Construction Projects and Mitigation Measures. J. Financ. Manag. Prop. Constr. 2019, 24, 58–78.
Paper not yet in RePEc: Add citation now
- Puolitaival, T.; Booth, T.; Ghaffarian Hoseini, A.; Park, K.S. BIM Education: Case New Zealand. EPiC Ser. Educ. Sci. 2017, 1, 210–218. Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.
Paper not yet in RePEc: Add citation now
- Radl, J.; Kaiser, J. Benefits of Implementation of Common Data Environment (CDE) into Construction Projects. In Proceedings of the IOP Conference Series: Materials Science and Engineering, Prague, Czech Republic, 18–22 June 2019; IOP Publishing: Bristol, UK, 2019; Volume 471, p. 22021.
Paper not yet in RePEc: Add citation now
- Rawindaran, N.; Nawaf, L.; Alarifi, S.; Alghazzawi, D.; Carroll, F.; Katib, I.; Hewage, C. Enhancing Cyber Security Governance and Policy for SMEs in Industry 5.0: A Comparative Study between Saudi Arabia and the United Kingdom. Digital 2023, 3, 200–231. [CrossRef]
Paper not yet in RePEc: Add citation now
- Sacks, R.; Eastman, C.; Lee, G.; Teicholz, P. BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers; John Wiley & Sons: Hoboken, NJ, USA, 2018; ISBN 1119287537. Sustainability 2024, 16, 10221 22 of 23
Paper not yet in RePEc: Add citation now
- Saka, A.B.; Chan, D.W.M.; Siu, F.M.F. Drivers of Sustainable Adoption of Building Information Modelling (BIM) in the Nigerian Construction Small and Medium-Sized Enterprises (SMEs). Sustainability 2020, 12, 3710. [CrossRef]
Paper not yet in RePEc: Add citation now
- Saunders, M.; Lewis, P.; Thornhill, A. Research Methods for Business Students; Pearson Education: London, UK, 2009; ISBN 0273716867.
Paper not yet in RePEc: Add citation now
- Shash, A.A.; Qarra, A. Al Cash Flow Management of Construction Projects in Saudi Arabia. Proj. Manag. J. 2018, 49, 48–63. [CrossRef]
Paper not yet in RePEc: Add citation now
- Shojaei, A.; Flood, I.; Moud, H.I.; Hatami, M.; Zhang, X. An Implementation of Smart Contracts by Integrating BIM and Blockchain. In Proceedings of the Future Technologies Conference (FTC) 2019, San Francisco, CA, USA, 24–25 October 2019; Springer: Berlin/Heidelberg, Germany, 2020; Volume 2, pp. 519–527. [CrossRef]
Paper not yet in RePEc: Add citation now
- Smith, P. BIM Implementation–Global Strategies. Procedia Eng. 2014, 85, 482–492. [CrossRef]
Paper not yet in RePEc: Add citation now
- Sonmez, R.; Ahmadisheykhsarmast, S.; Güngör, A.A. BIM Integrated Smart Contract for Construction Project Progress Payment Administration. Autom. Constr. 2022, 139, 104294. [CrossRef]
Paper not yet in RePEc: Add citation now
- Succar, B.; Kassem, M. Macro-BIM Adoption: Conceptual Structures. Autom. Constr. 2015, 57, 64–79. [CrossRef]
Paper not yet in RePEc: Add citation now
- Sutrisna, M.; Pellicer, E.; Torres-Machi, C.; Picornell, M. Exploring Earned Value Management in the Spanish Construction Industry as a Pathway to Competitive Advantage. Int. J. Constr. Manag. 2020, 20, 1–12. [CrossRef]
Paper not yet in RePEc: Add citation now
- Taherdoost, H. How to Design and Create an Effective Survey/Questionnaire; A Step by Step Guide. Int. J. Acad. Res. Manag. 2016, 5, 37–41.
Paper not yet in RePEc: Add citation now
- Taherdoost, H. What Are Different Research Approaches? Comprehensive Review of Qualitative, Quantitative, and Mixed Method Research, Their Applications, Types, and Limitations. J. Manag. Sci. Eng. Res. 2022, 5, 53–63. [CrossRef]
Paper not yet in RePEc: Add citation now
- Tarawneh, S.; Almahmoud, A.F.; Hajjeh, H. Impact of Cash Flow Variation on Project Performance: Contractors’ Perspective. Eng. Manag. Prod. Serv. 2023, 15, 73–85. [CrossRef]
Paper not yet in RePEc: Add citation now
- Thomas, K. An Investigation of the Challenges Faced by the Small and Medium Enterprise Contractors in the Construction Industry of Windhoek. Ph.D. Thesis, University of Namibia, Windhoek, Namibia, 2022.
Paper not yet in RePEc: Add citation now
- Ullah, K.; Lill, I.; Witt, E. An Overview of BIM Adoption in the Construction Industry: Benefits and Barriers. In Proceedings of the 10th Nordic Conference on Construction Economics and Organization, Tallinn, Estonia, 7–8 May 2019; Emerald Publishing Limited: Bingley, UK, 2019; pp. 297–303.
Paper not yet in RePEc: Add citation now
- Uwonda, G.; Okello, N.; Okello, N.G. Cash Flow Management Utilization by Small Medium Enterprises (SMEs) in Northern Uganda. Merit Res. J. Account. Audit. Econ. Financ. 2013, 1, 67–80.
Paper not yet in RePEc: Add citation now
- Viklund Tallgren, M.; Roupé, M.; Johansson, M.; Bosch-Sijtsema, P. BIM-Tool Development Enhancing Collaborative Scheduling for Pre-Construction. J. Inf. Technol. Constr. 2020, 25, 374–397.
Paper not yet in RePEc: Add citation now
- Wang, G.; Lu, H.; Hu, W.; Gao, X.; Pishdad-Bozorgi, P. Understanding Behavioral Logic of Information and Communication Technology Adoption in Small-and Medium-Sized Construction Enterprises: Empirical Study from China. J. Manag. Eng. 2020, 36, 5020013. [CrossRef]
Paper not yet in RePEc: Add citation now
- Weerapperuma, U.S.; Rathnasinghe, A.P.; Jayasena, H.S.; Wijewickrama, C.S.; Thurairajah, N. A Knowledge Framework for Blockchain-Enabled Smart Contract Adoption in the Construction Industry. Eng. Constr. Archit. Manag. 2023, ahead of print. [CrossRef]
Paper not yet in RePEc: Add citation now
- Wong, J.K.W.; Zhou, J. Enhancing Environmental Sustainability over Building Life Cycles through Green BIM: A Review. Autom. Constr. 2015, 57, 156–165. [CrossRef]
Paper not yet in RePEc: Add citation now
- Xie, W.; Deng, B.; Yin, Y.; Lv, X.; Deng, Z. Critical Factors Influencing Cost Overrun in Construction Projects: A Fuzzy Synthetic Evaluation. Buildings 2022, 12, 2028. [CrossRef]
Paper not yet in RePEc: Add citation now
- Younis, G.; Wood, G.; Malak, M.A.A. Minimizing Construction Disputes: The Relationship between Risk Allocation and Behavioural Attitudes. In Proceedings of the International Conference on Building Education and Research, Heritance Kandalama, Sri Lanka, 11–15 February 2008; University of Salford: Salford, UK, 2008; pp. 728–740.
Paper not yet in RePEc: Add citation now
- Zamberi Ahmad, S. Micro, Small and Medium-sized Enterprises Development in the Kingdom of Saudi Arabia: Problems and Constraints. World J. Entrep. Manag. Sustain. Dev. 2012, 8, 217–232. [CrossRef]
Paper not yet in RePEc: Add citation now
- Zou, Y.; Kiviniemi, A.; Jones, S.W. A Review of Risk Management through BIM and BIM-Related Technologies. Saf. Sci. 2017, 97, 88–98. [CrossRef]
Paper not yet in RePEc: Add citation now