- Abdi M. R., Labib A., (2016). RMS capacity utilisation: product family and supply chain. International Journal of Production Research, 55(7), 1930–1956.
Paper not yet in RePEc: Add citation now
- Ahmed W., Moazzam M., Sarkar B., Ur Rehman S., (2021). Synergic effect of reworking for imperfect quality items with the integration of multi-period delay-in-payment and partial backordering in global supply chains. Engineering, 7(2), 260–271. https://doi.org/10.1016/j.eng.2020.07.022.
Paper not yet in RePEc: Add citation now
- Almomani M. A., Aladeemy M., Abdelhadi A., Mumani A., (2013). A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques. Computers & Industrial Engineering, 66(2), 461–469.
Paper not yet in RePEc: Add citation now
- Azadeh A., Haghighi S. M., Asadzadeh S. M., (2014). A novel algorithm for layout optimization of injection process with random demands and sequence dependent setup times. Journal of Manufacturing Systems, 33(2), 287–302.
Paper not yet in RePEc: Add citation now
- Bhuniya S., Pareek S., Sarkar B., (2021). A supply chain model with service level constraints and strategies under uncertainty. Alexandria Engineering Journal, 60(6), 6035–6052. https://doi.org/10.1016/j.aej.2021.03.039.
Paper not yet in RePEc: Add citation now
- Deliktas D., Torkul O., Ustun O., (2019). A flexible job shop cell scheduling with sequence-dependent family setup times and intercellular transportation times using conic scalarization method. International Transactions in Operational Research, 26(6), 2410–2431. https://doi.org/10.1111/itor.12407.
Paper not yet in RePEc: Add citation now
- Duan J., Zhang Q., Zhou Y., Wang Y., (2021). Sustainable scheduling optimization of mixed-line production for large marine power components. Journal of Cleaner Production, 280, 124461. https://doi.org/10.1016/j.jclepro.2020.124461.
Paper not yet in RePEc: Add citation now
- Entezaminia A., Gharbi A., Ouhimmou M., (2021). A joint production and carbon trading policy for unreliable manufacturing systems under cap-and-trade regulation. Journal of Cleaner Production, 293(2), 125973–125992.
Paper not yet in RePEc: Add citation now
- Fachini R. F., Esposto K. F., Camargo V. C. B., (2018). A framework for development of advanced planning and scheduling (APS) systems in glass container industry. Journal of Manufacturing Technology Management, 29(3), 570–587.
Paper not yet in RePEc: Add citation now
Gahm C., Denz F., Dirr M., Tuma A., (2016). Energy-efficient scheduling in manufacturing companies: A review and research framework. European Journal of Operational Research, 248(3), 744–757. https://doi.org/10.1016/j.ejor.2015.07.017.
Gong G., Chiong R., Deng Q., Han W., Zhang L., Lin W., Li K., (2020). Energy-efficient flexible flow shop scheduling with worker flexibility. Expert Systems With Applications, 141, 112902. https://doi.org/10.1016/j.eswa.2019.112902.
- Grundemann L., Gonschorowski V., Fischer N., Scholl S., (2012). Cleaning waste minimization for multiproduct plants: Transferring macro batch to micro conti manufacturing. Journal of Cleaner Production, 24, 92–101.
Paper not yet in RePEc: Add citation now
- Gungor Z. E., Evans S., (2017). Understanding the hidden cost and identifying the root causes of changeover impacts. Journal of Cleaner Production, 160, 1138–1147.
Paper not yet in RePEc: Add citation now
- He L., Li W., Zhang Y., Cao Y., (2019). A discrete multiobjective fireworks algorithm for flowshop scheduling with sequence-dependent setup times. Swarm and Evolutionary Computation, 51, 100575.
Paper not yet in RePEc: Add citation now
Hu X., Blocher J. D., Heese H. S., Zhou F., (2016). Scheduling products with subassemblies and changeover time. Journal of the Operational Research Society, 67(8), 1025–1033.
- Karasu M. K., Cakmakci M., Cakiroglu M. B., Ayva E., Demirel-Ortabas N., (2014). Improvement of changeover times via Taguchi empowered SMED/case study on injection molding production. Measurement, 47(1), 741–748.
Paper not yet in RePEc: Add citation now
Konur D., Campbell J. F., Monfared S. A., (2017). Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers. Omega, 71, 46–65. https://doi.org/10.1016/j.omega.2016.08.013.
- Li L., Wang Z., Wang X., Tang L., (2019). A multiobjective evolutionary algorithm for multi-energy allocation problem considering production changeover in the integrated iron and steel enterprise. IEEE Access, 7, 40428–40444. http://doi.org/10.1109/ACCESS.2019.2904299.
Paper not yet in RePEc: Add citation now
Liu L., Wang J. J., Wang X. Y., (2016). Single machine due-window assignment scheduling with resource-dependent processing times to minimise total resource consumption cost. International Journal of Production Research, 54(4), 1186–1195.
Mahapatra A. S., Soni H. N., Mahapatra M. S., Sarkar B., Majumder S., (2021). A continuous review production-inventory system with a variable preparation time in a fuzzy random environment. Mathematics, 9(7), 747. https://doi.org/10.3390/math9070747.
Mota B., Gomes M. I., Carvalho A., Barbosa-Povoa A. P., (2018). Sustainable supply chains: An integrated modeling approach under uncertainty. Omega, 77, 32–57. https://doi.org/10.1016/j.omega.2017.05.006.
- Murtagh F., Contreras P., (2017). Algorithms for hierarchical clustering: an overview, II. WIREs Data Mining and Knowledge Discovery, 7(6), e1219. https://doi.org/10.1002/widm.1219.
Paper not yet in RePEc: Add citation now
- Navaei J., Elmaraghy H., (2016). Grouping part/product variants based on networked operations sequence. Journal of Manufacturing Systems, 38, 63–76.
Paper not yet in RePEc: Add citation now
- Nekouie N., Yaghoobi M., (2016). A new method in multimodal optimization based on firefly algorithm. Artificial Intelligence Review, 46(2), 267–287.
Paper not yet in RePEc: Add citation now
- Olabanji O., Mpofu K., Batta A, O., (2015). Design, simulation and experimental investigation of a novel reconfigurable assembly fixture for press brakes. International Journal of Advanced Manufacturing Technology, 82(1), 663–679.
Paper not yet in RePEc: Add citation now
- Osman M. S., (2020). A computational optimization method for scheduling resource-constraint sequence-dependent changeovers on multi-machine production lines. Expert Systems With Applications, 168, 114265.
Paper not yet in RePEc: Add citation now
- Pawar G. J., Sirdeshpande N. S., Atram A. B., Patil P. R., (2014). Reduction in setup change time of a machine in a bearing manufacturing plant using SMED and ECRS. International Journal of Engineering Research, 3(5), 321–323. https://doi.org/10.17950/ijer/v3s5/506.
Paper not yet in RePEc: Add citation now
- Pena P. N., Vilela J. N., Alves M. R., Rafael G. C., (2022). Abstraction of the supervisory control solution to deal with planning problems in manufacturing systems. IEEE Transactions on Automatic Control, 67(1), 344-350. http://doi.org/10.1109/TAC.2021.3053228.
Paper not yet in RePEc: Add citation now
Rossi A., (2014). Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships. International Journal of Production Economics, 153(4), 253–267.
- Ruppert T., Csalodi R., Abonyi J., (2021). Estimation of machine setup and changeover times by survival analysis. Computers & Industrial Engineering, 153, 107026. https://doi.org/10.1016/j.cie.2020.107026.
Paper not yet in RePEc: Add citation now
- Saberi-Aliabad H., Reisi-Nafchi M., Moslehi G., (2020). Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs. Journal of Cleaner Production, 249, 119393. https://doi.org/10.1016/j.jclepro.2019.119393.
Paper not yet in RePEc: Add citation now
- Sarkar B., Debnath A., Chiu A. S. F., Ahmed W., (2022). Circular economy-driven two-stage supply chain management for nullifying waste. Journal of Cleaner Production, 339, 130513. https://doi.org/10.1016/j.jclepro.2022.130513.
Paper not yet in RePEc: Add citation now
- Sarkar B., Ullah M., Sarkar M., (2022). Environmental and economic sustainability through innovative green products by remanufacturing. Journal of Cleaner Production, 332, 129813. https://doi.org/10.1016/j.jclepro.2021.129813.
Paper not yet in RePEc: Add citation now
- Taleizadeh A. A., Ahmadzadeh K., Sarker B. R., Ghavamifar A., (2022). Designing an optimal sustainable supply chain system considering pricing decisions and resilience factors. Journal of Cleaner Production, 332, 129895. https://doi.org/10.1016/j.jclepro.2021.129895.
Paper not yet in RePEc: Add citation now
Thürer M., Stevenson M., (2022). Order release, dispatching and resource assignment in multiple resource-constrained job shops: An assessment by simulation. International Journal of Production Research, 60(12), 3669–3681.
- Tuerhong G., Kim S. B., (2014). Gower distance-based multivariate control charts for a mixture of continuous and categorical variables. Expert Systems With Applications, 41(4), 1701–1707.
Paper not yet in RePEc: Add citation now
- Ullah M., Sarkar M., (2022). Environmental and economic sustainability through innovative green products by remanufacturing. Journal of Cleaner Production, 332, 129813. https://doi.org/10.1016/j.jclepro.2021.129813.
Paper not yet in RePEc: Add citation now
Waheed A., Zhang Q., Rashid Y., Tahir M. S., Zafar M. W., (2020). Impact of green manufacturing on consumer ecological behavior: Stakeholder engagement through green production and innovation. Sustainable Development, 28(5), 1395–1403.
- Wang P., Zhu H., Wilamowska-Korsak M., Bi Z., Li L., . (2014). Determination of weights for multiobjective decision making or machine learning. IEEE Systems Journal, 8(1), 63–72. https://doi.org/10.1109/JSYST.2013.2265663.
Paper not yet in RePEc: Add citation now
Wang Z., Hu H., (2018). Dynamic response to demand variability for precast production rescheduling with multiple lines. International Journal of Production Research, 56(16), 5386–5401.
- Yadav D., Kumari R., Kumar N., Sarkar B., (2021). Reduction of waste and carbon emission through the selection of items with cross-price elasticity of demand to form a sustainable supply chain with preservation technology. Journal of Cleaner Production, 297, 126298. https://doi.org/10.1016/j.jclepro.2021.126298.
Paper not yet in RePEc: Add citation now
Yazıcı K., Gökler S. H., Boran S., (2021). An integrated SMED-fuzzy FMEA model for reducing setup time. Journal of Intelligent Manufacturing, 32(6), 1547–1561. http://doi.org/10.1007/s10845-020-01675-x.
Zanoni S., Bettoni L., Glock C. H., (2014). Energy implications in a two-stage production system with controllable production rates. International Journal of Production Economics, 149, 164–171. https://doi.org/10.1016/j.ijpe.2013.06.025.
Zhang S., Wong T. N., (2016). Studying the impact of sequence-dependent setup times in integrated process planning and scheduling with E-ACO heuristic. International Journal of Production Research, 54(15–16), 1–24.
- Zhao C., Li J., (2015). Analysis and improvement of multiproduct Bernoulli serial lines: Theory and Application. IEEE Transactions on Systems Man & Cybernetics Systems, 45(9), 1218–1230.
Paper not yet in RePEc: Add citation now
Zhou X., Wei X., Lin J., Tian X., Lev B., Wang S., (2021). Supply chain management under carbon taxes: A review and bibliometric analysis. Omega, 98, 102295. https://doi.org/10.1016/j.omega.2020.102295.
- Zulkafli N. I., Kopanos G. M., (2017). Integrated condition-based planning of production and utility systems under uncertainty. Journal of Cleaner Production, 167, 776–805. https://doi.org/10.1016/j.jclepro.2017.08.152.
Paper not yet in RePEc: Add citation now