create a website

Comprehensive metrological and content analysis of the public–private partnerships (PPPs) research field: a new bibliometric journey. (2020). Feng, Xiaowei ; Zhang, Rui ; Duan, Kaifeng ; Shi, Jiangang ; Wu, Guangdong.
In: Scientometrics.
RePEc:spr:scient:v:124:y:2020:i:3:d:10.1007_s11192-020-03607-1.

Full description at Econpapers || Download paper

Cited: 18

Citations received by this document

Cites: 115

References cited by this document

Cocites: 25

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. Uncovering Barriers to Circular Construction: A Global Scientometric Review and Future Research Agenda. (2025). Ayalp, Gulden Gumusburun ; Metinal, Yusuf Berkay.
    In: Sustainability.
    RePEc:gam:jsusta:v:17:y:2025:i:4:p:1381-:d:1586372.

    Full description at Econpapers || Download paper

  2. Global city data analysis using SciMAT: a bibliometric review. (2024). Bagheri, Bagher ; Azadi, Hossein ; Witlox, Frank ; Soltani, Ali.
    In: Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development.
    RePEc:spr:endesu:v:26:y:2024:i:6:d:10.1007_s10668-023-03255-4.

    Full description at Econpapers || Download paper

  3. Public–Private Partnership (PPP) in Road Infrastructure Projects: A Review of Evolution, Approaches, and Prospects. (2024). Esperilla-Nio, Yorela Yenifer ; Molina-Moreno, Valentin ; de los Angeles, Maria ; Galvez-Sanchez, Francisco Jesus.
    In: Sustainability.
    RePEc:gam:jsusta:v:16:y:2024:i:4:p:1430-:d:1335727.

    Full description at Econpapers || Download paper

  4. A Holistic Analysis on Risks of Post-Disaster Reconstruction Using RStudio Bibliometrix. (2024). Ayalp, Gulden Gumusburun ; Serter, Merve.
    In: Sustainability.
    RePEc:gam:jsusta:v:16:y:2024:i:21:p:9463-:d:1510946.

    Full description at Econpapers || Download paper

  5. A Roadmap for Reducing Construction Waste for Developing Countries. (2024). Bakan, Merve Karabeyeser ; Ana, Merve ; Ayalp, Gulden Gumusburun.
    In: Sustainability.
    RePEc:gam:jsusta:v:16:y:2024:i:12:p:5057-:d:1414416.

    Full description at Econpapers || Download paper

  6. Gender representation in textbooks: a bibliometric study. (2023). Li, Danyang ; Dong, Yijie.
    In: Scientometrics.
    RePEc:spr:scient:v:128:y:2023:i:11:d:10.1007_s11192-023-04834-y.

    Full description at Econpapers || Download paper

  7. Global Research on International Students€™ Intercultural Adaptation in a Foreign Context: A Visualized Bibliometric Analysis of the Scientific Landscape. (2023). Tang, Lingjie ; Zhang, Changaan.
    In: SAGE Open.
    RePEc:sae:sagope:v:13:y:2023:i:4:p:21582440231218849.

    Full description at Econpapers || Download paper

  8. Prefabricated Construction Risks: A Holistic Exploration through Advanced Bibliometric Tool and Content Analysis. (2023). Ana, Merve ; Erdayandi, Kamil ; Ayalp, Gulden Gumusburun.
    In: Sustainability.
    RePEc:gam:jsusta:v:15:y:2023:i:15:p:11916-:d:1209394.

    Full description at Econpapers || Download paper

  9. Investigating the nexus between green economy, sustainability, bitcoin and oil prices: Contextual evidence from the United States. (2023). Shahbaz, Muhammad ; Singh, Sanjeet ; Chopra, Ritika ; Cifuentes-Faura, Javier ; Sharma, Gagan Deep.
    In: Resources Policy.
    RePEc:eee:jrpoli:v:80:y:2023:i:c:s0301420722006110.

    Full description at Econpapers || Download paper

  10. Sustainability at the community level: A bibliometric journey around a set of sustainability‐related terms. (2022). Zhang, Rui ; Duan, Kaifeng ; Shi, Jiangang ; Si, Hongyun ; Wu, Guangdong.
    In: Sustainable Development.
    RePEc:wly:sustdv:v:30:y:2022:i:1:p:256-274.

    Full description at Econpapers || Download paper

  11. Increased Attention to Smart Development in Rural Areas: A Scientometric Analysis of Smart Village Research. (2022). Luo, Shixian ; Wang, Qian ; Furuya, Katsunori ; Zhang, Jiao.
    In: Land.
    RePEc:gam:jlands:v:11:y:2022:i:8:p:1362-:d:893805.

    Full description at Econpapers || Download paper

  12. Bibliometric Analysis of Publications on the Omicron Variant from 2020 to 2022 in the Scopus Database Using R and VOSviewer. (2022). Atif, Muhammad ; Hamza, Manhal Ahmed ; Abdalla, Khalid Omer ; Junaid, Kashaf ; Ejaz, Hasan ; Zeeshan, Hafiz Muhammad ; Ahmad, Fahad ; Alanazi, Awadh ; Abbas, Syed Nasir ; Sadiq, Ashina ; Younas, Sonia ; Iqbal, Abid ; Anwar, Naeem.
    In: IJERPH.
    RePEc:gam:jijerp:v:19:y:2022:i:19:p:12407-:d:928988.

    Full description at Econpapers || Download paper

  13. Green energy adoption and its determinants: A bibliometric analysis. (2022). Skare, Marinko ; Xu, Zeshui ; Qin, Yong ; Wang, Xinxin.
    In: Renewable and Sustainable Energy Reviews.
    RePEc:eee:rensus:v:153:y:2022:i:c:s1364032121010492.

    Full description at Econpapers || Download paper

  14. How do family businesses adapt to the rapid pace of globalization? a bibliometric analysis. (2022). Skare, Marinko ; Xu, Zeshui ; Wu, Hangyao.
    In: Journal of Business Research.
    RePEc:eee:jbrese:v:153:y:2022:i:c:p:59-74.

    Full description at Econpapers || Download paper

  15. A look at the focus shift in innovation literature due to Covid-19 pandemic. (2022). Skare, Marinko ; Xu, Zeshui ; Qin, Yong ; Wang, Xinxin.
    In: Journal of Business Research.
    RePEc:eee:jbrese:v:145:y:2022:i:c:p:1-20.

    Full description at Econpapers || Download paper

  16. Exploring the black box of competitive advantage – An integrated bibliometric and chronological literature review approach. (2022). Bhattacharyya, Som Sekhar ; Nayak, Bishwajit ; Krishnamoorthy, Bala.
    In: Journal of Business Research.
    RePEc:eee:jbrese:v:139:y:2022:i:c:p:964-982.

    Full description at Econpapers || Download paper

  17. Use of multicriteria decision aid methods in the context of sustainable innovations: bibliometrics, applications and trends. (2021). Narcizo, Ramon Baptista ; Meirio, Marcelo Jasmim ; Duncan, Luis Alberto ; Delesposte, Jamile Eleuterio ; Mendona, Andre Armando.
    In: Environment Systems and Decisions.
    RePEc:spr:envsyd:v:41:y:2021:i:4:d:10.1007_s10669-021-09814-2.

    Full description at Econpapers || Download paper

  18. Service networks for sustainable business: A dynamic evolution analysis over half a century. (2021). Skare, Marinko ; Xu, Zeshui ; Qin, Yong ; Wang, Xinxin.
    In: Journal of Business Research.
    RePEc:eee:jbrese:v:136:y:2021:i:c:p:543-557.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Abdel Aziz, A. M. (2007). Successful delivery of public–private partnerships for infrastructure development. Journal of Construction Engineering and Management,133(12), 918–931. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(918) .
    Paper not yet in RePEc: Add citation now
  2. Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., & Asenova, D. (2003). Achieving best value in private finance initiative project procurement. Construction Management and Economics,21(5), 461–470. https://doi.org/10.1080/0144619032000087285 .

  3. Andon, P. (2012). Accounting-related research in PPPs/PFIs: Present contributions and future opportunities. Accounting, Auditing and Accountability Journal,25(5), 876–924. https://doi.org/10.1108/09513571211234286 .

  4. Aria, M., & Cuccurullo, C. (2017). Bibliometrix: An R-tool for comprehensive science mapping analysis. Journal of Informetrics,11(4), 959–975. https://doi.org/10.1016/j.joi.2017.08.007 .

  5. Ashuri, B., Kashani, H., Molenaar, K. R., Lee, S., & Lu, J. (2012). Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options. Journal of Construction Engineering and Management,138(4), 545–557. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000447 .
    Paper not yet in RePEc: Add citation now
  6. Bao, F., Chan, A. P. C., Chen, C., & Darko, A. (2018). Review of public–private partnership literature from a project lifecycle perspective. Journal of Infrastructure Systems,24(3), 04018008. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000424 .
    Paper not yet in RePEc: Add citation now
  7. Bennett, J., & Iossa, E. (2006). Building and managing facilities for public services. Journal of Public Economics,90(10–11), 2143–2160. https://doi.org/10.1016/j.jpubeco.2006.04.001 .

  8. Bloomfield, P. (2006). The challenging business of long-term public–private partnerships: Reflections on local experience. Public Administration Review,66(3), 400–411. https://doi.org/10.1111/j.1540-6210.2006.00597.x .
    Paper not yet in RePEc: Add citation now
  9. Bovaird, T. (2004). Public–private partnerships: From contested concepts to prevalent practice. International Review of Administrative Sciences,70(2), 199–215. https://doi.org/10.1177/0020852304044250 .
    Paper not yet in RePEc: Add citation now
  10. Brandao, L. E. T., & Saraiva, E. (2008). The option value of government guarantees in infrastructure projects. Construction Management and Economics,26(11), 1171–1180. https://doi.org/10.1080/01446190802428051 .

  11. Brinkerhoff, D. W., & Brinkerhoff, J. M. (2011). Public–private partnerships: Perspectives on purposes, publicness, and good governance. Public Administration and Development,31(1), 2–14. https://doi.org/10.1002/pad .
    Paper not yet in RePEc: Add citation now
  12. Broadus, R. N. (1987). Toward a definition of “bibliometrics”. Scientometrics,12(5–6), 373–379. https://doi.org/10.1007/BF02016680 .
    Paper not yet in RePEc: Add citation now
  13. Button, K. (2016). Public–private partnerships: A review of economic considerations with particular reference to transportation projects. Transportation Planning and Technology,39(2), 136–161. https://doi.org/10.1080/03081060.2015.1127538 .

  14. Buyukyoran, F., & Gundes, S. (2018). Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics,36(4), 203–216. https://doi.org/10.1080/01446193.2017.1347267 .

  15. Callon, M., Courtial, J. P., & Laville, F. (1991). Co-word analysis as a tool for describing the network of interactions between basic and technological research—The case of polymer chemistry. Scientometrics,22(1), 155–205.
    Paper not yet in RePEc: Add citation now
  16. Castro e Silva Neto, D., Cruz, C. O., Rodrigues, F., & Silva, P. (2016). Bibliometric analysis of PPP and PFI literature: Overview of 25 years of research. Journal of Construction Engineering and Management,142(10), 06016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001163 .
    Paper not yet in RePEc: Add citation now
  17. Chan, A. P. C., Lam, P. T. I., Chan, D. W. M., Cheung, E., & Ke, Y. (2010). Critical success factors for PPPs in infrastructure developments: Chinese perspective. Journal of Construction Engineering and Management,136(5), 484–494. https://doi.org/10.1061/(asce)co.1943-7862.0000152 .
    Paper not yet in RePEc: Add citation now
  18. Chan, A. P. C., Yeung, J. F. Y., Yu, C. C. P., Wang, S. Q., & Ke, Y. (2011). Empirical study of risk assessment and allocation of public–private partnership projects in China. Journal of Management in Engineering,27(3), 136–148. https://doi.org/10.1061/(asce)me.1943-5479.0000049 .
    Paper not yet in RePEc: Add citation now
  19. Cheah, C. Y. J., & Liu, J. (2006). Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics,24(5), 545–554. https://doi.org/10.1080/01446190500435572 .

  20. Chen, Z., Daito, N., & Gifford, J. L. (2016). Data review of transportation infrastructure public–private partnership: A meta-analysis. Transport Reviews,36(2), 228–250. https://doi.org/10.1080/01441647.2015.1076535 .

  21. Cheung, E., & Chan, A. P. C. (2011). Risk factors of public–private partnership projects in China: Comparison between the water, power, and transportation sectors. Journal of Urban Planning and Development,137(4), 409–415. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000086 .
    Paper not yet in RePEc: Add citation now
  22. Cheung, E., Chan, A. P. C., & Kajewski, S. (2012). Factors contributing to successful public private partnership projects: Comparing Hong Kong with Australia and the United Kingdom. Journal of Facilities Management,10(1), 45–58. https://doi.org/10.1108/14725961211200397 .
    Paper not yet in RePEc: Add citation now
  23. Chiara, N., & Kokkaew, N. (2013). Alternative to government revenue guarantees: Dynamic revenue insurance contracts. Journal of Infrastructure Systems,19(3), 287–296. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000145 .
    Paper not yet in RePEc: Add citation now
  24. Cobo, M. J., López-Herrera, A. G., Herrera-Viedma, E., & Herrera, F. (2011). Science mapping software tools: Review, analysis, and cooperative study among tools. Journal of the American Society for Information Science and Technology,62(7), 1382–1402. https://doi.org/10.1002/asi.21525 .

  25. Cruz, C. O., & Marques, R. C. (2013). Flexible contracts to cope with uncertainty in public–private partnerships. International Journal of Project Management,31(3), 473–483. https://doi.org/10.1016/j.ijproman.2012.09.006 .
    Paper not yet in RePEc: Add citation now
  26. Cui, C., Liu, Y., Hope, A., & Wang, J. (2018). Review of studies on the public–private partnerships (PPP) for infrastructure projects. International Journal of Project Management,36(5), 773–794. https://doi.org/10.1016/j.ijproman.2018.03.004 .
    Paper not yet in RePEc: Add citation now
  27. Eisenhardt, K. M. (1989). Building theories from case study research. The Academy of Management Review,14(4), 532–550.
    Paper not yet in RePEc: Add citation now
  28. El-Gohary, N. M., Osman, H., & El-Diraby, T. E. (2006). Stakeholder management for public private partnerships. International Journal of Project Management,24(7), 595–604. https://doi.org/10.1016/j.ijproman.2006.07.009 .
    Paper not yet in RePEc: Add citation now
  29. Flinders, M. (2005). The politics of public–private partnerships. The British Journal of Politics and International Relations,7(2), 215–239. https://doi.org/10.4324/9780203992326 .
    Paper not yet in RePEc: Add citation now
  30. Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association,68(3), 279–295. https://doi.org/10.1080/01944360208976273 .
    Paper not yet in RePEc: Add citation now
  31. Froud, J. (2003). The private finance initiative: Risk, uncertainty and the state. Accounting, Organizations and Society,28(6), 567–589. https://doi.org/10.1108/eb021046 .

  32. Grimsey, D., & Lewis, M. K. (2002). Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management,20(2), 107–118. https://doi.org/10.1016/S0263-7863(00)00040-5 .
    Paper not yet in RePEc: Add citation now
  33. Grimsey, D., & Lewis, M. K. (2005). Are public private partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views. Accounting Forum,29(4), 345–378. https://doi.org/10.1016/j.accfor.2005.01.001 .

  34. Grout, P. A. (1997). The economics of the private finance initiative. Oxford Review of Economic Policy,13(4), 53–66. https://doi.org/10.1093/oxrep/13.4.53 .

  35. Guasch, J. L., Laffont, J. J., & Straub, S. (2008). Renegotiation of concession contracts in Latin America: Evidence from the water and transport sectors. International Journal of Industrial Organization,26(2), 421–442. https://doi.org/10.1016/j.ijindorg.2007.05.003 .

  36. Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public–private partnerships. The Economic Journal,113(486), 69–76. https://doi.org/10.1111/1468-0297.00119 .

  37. Hart, O., Shleifer, A., & Vishny, R. W. (1997). The proper scope of government: Theory and an application to prisons. The Quarterly Journal of Economics,112(4), 1127–1161. https://doi.org/10.1162/003355300555448 .

  38. Heald, D. (2006). Value for money tests and accounting treatment in PFI schemes. Accounting, Auditing & Accountability Journal,16(3), 342–371. https://doi.org/10.1108/09513570310482291 .
    Paper not yet in RePEc: Add citation now
  39. Heravi, G., & Hajihosseini, Z. (2012). Risk allocation in public–private partnership infrastructure projects in developing countries: Case study of the Tehran–Chalus toll road. Journal of Infrastructure Systems,18(3), 210–217. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000090 .
    Paper not yet in RePEc: Add citation now
  40. Hirsch, J. E. (2005). An index to quantify an individual’s scientific research output. Proceedings of the National Academy of Sciences,102(46), 16569–16572.
    Paper not yet in RePEc: Add citation now
  41. Hodge, G. A. (2004). The risky business of public–private partnerships. Australian Journal of Public Administration,63(4), 37–49.
    Paper not yet in RePEc: Add citation now
  42. Hodge, G. A., & Greve, C. (2007). Public–private partnerships: An international performance review. Public Administration Review,67(3), 545–558.
    Paper not yet in RePEc: Add citation now
  43. Hodge, G. A., & Greve, C. (2010). Public–private partnerships: Governance scheme or language game? Australian Journal of Public Administration,69(S1), 8–22. https://doi.org/10.1111/j.1467-8500.2009.00659.x .
    Paper not yet in RePEc: Add citation now
  44. Huang, Y. L., & Chou, S. P. (2006). Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics,24(4), 379–389. https://doi.org/10.1080/01446190500434997 .

  45. Hwang, B. G., Zhao, X., & Gay, M. J. S. (2013). Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors. International Journal of Project Management,31(3), 424–433. https://doi.org/10.1016/j.ijproman.2012.08.003 .
    Paper not yet in RePEc: Add citation now
  46. Jamali, D. (2004). Success and failure mechanisms of public private partnerships (PPPs) in developing countries. International Journal of Public Sector Management,17(5), 414–430. https://doi.org/10.1108/09513550410546598 .
    Paper not yet in RePEc: Add citation now
  47. Jefferies, M., Gameson, R., & Rowlinson, S. (2002). Critical success factors of the BOOT procurement system: Reflections from the Stadium Australia case study. Engineering, Construction and Architectural Management,9(4), 352–361. https://doi.org/10.1108/eb021230 .
    Paper not yet in RePEc: Add citation now
  48. Jin, X. H. (2010a). Neurofuzzy decision support system for efficient risk allocation in public–private partnership infrastructure projects. Journal of Computing in Civil Engineering,24(6), 525–538. https://doi.org/10.1061/(asce)cp.1943-5487.0000058 .
    Paper not yet in RePEc: Add citation now
  49. Jin, X. H. (2010b). Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia. Journal of Construction Engineering and Management,136(2), 138–150. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000118 .
    Paper not yet in RePEc: Add citation now
  50. Kamalski, J., & Kirby, A. (2012). Bibliometrics and urban knowledge transfer. Cities,29(SUPPL.2), S3–S8. https://doi.org/10.1016/j.cities.2012.06.012 .
    Paper not yet in RePEc: Add citation now
  51. Ke, Y., Wang, S. Q., Chan, A. P. C., & Lam, P. T. I. (2010). Preferred risk allocation in China’s public–private partnership (PPP) projects. International Journal of Project Management,28(5), 482–492. https://doi.org/10.1016/j.ijproman.2009.08.007 .
    Paper not yet in RePEc: Add citation now
  52. Ke, Y., Wang, S., Chan, A. P., & Cheung, E. (2009). Research trend of public–private partnership in construction journals. Journal of Construction Engineering and Management,135(10), 1076–1086. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(1076) .
    Paper not yet in RePEc: Add citation now
  53. Klijn, E. H., & Teisman, G. R. (2003). Institutional and strategic barriers to public–private partnership: An analysis of Dutch case. Public Money & Management,23(3), 137–146.

  54. Koppenjan, J. F. M. (2005). The formation of public–private partnerships: Lessons from nine transport infrastructure projects in the Netherlands. Public Administration,83(1), 135–157.
    Paper not yet in RePEc: Add citation now
  55. Kumaraswamy, M. M., & Zhang, X. Q. (2001). Governmental role in BOT-led infrastructure development. International Journal of Project Management,19(4), 195–205. https://doi.org/10.1016/S0263-7863(99)00069-1 .
    Paper not yet in RePEc: Add citation now
  56. Lam, K. C., Wang, D., Lee, P. T. K., & Tsang, Y. T. (2007). Modelling risk allocation decision in construction contracts. International Journal of Project Management,25(5), 485–493. https://doi.org/10.1016/j.ijproman.2006.11.005 .
    Paper not yet in RePEc: Add citation now
  57. Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005a). Critical success factors for PPP/PFI projects in the UK construction industry. Construction Management and Economics,23(5), 459–471. https://doi.org/10.1080/01446190500041537 .
    Paper not yet in RePEc: Add citation now
  58. Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005b). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management,23(1), 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006 .
    Paper not yet in RePEc: Add citation now
  59. Liu, J., & Cheah, C. Y. J. (2009). Real option application in PPP/PFI project negotiation. Construction Management and Economics,27(4), 331–342. https://doi.org/10.1080/01446190902807071 .
    Paper not yet in RePEc: Add citation now
  60. Lonsdale, C. (2005). Post-contractual lock-in and the UK Private Finance Initiative (PFI): The cases of national savings and investments and the Lord Chancellor’s Department. Public Administration,83(1), 67–88. https://doi.org/10.1111/j.0033-3298.2005.00438.x .
    Paper not yet in RePEc: Add citation now
  61. Ma, G., Du, Q., & Wang, K. (2018). A concession period and price determination model for PPP projects: Based on real options and risk allocation. Sustainability,10(3), 706. https://doi.org/10.3390/su10030706 .

  62. Marques, R. C., & Berg, S. (2011). Risks, contracts, and private-sector participation in infrastructure. Journal of Construction Engineering and Management,137(11), 925–932. https://doi.org/10.1061/(asce)co.1943-7862.0000347 .
    Paper not yet in RePEc: Add citation now
  63. Marsilio, M., Cappellaro, G., & Cuccurullo, C. (2011). The intellectual structure of research into PPPS: A bibliometric analysis. Public Management Review,13(6), 763–782. https://doi.org/10.1080/14719037.2010.539112 .

  64. Marzouk, M., & Ali, M. (2018). Mitigating risks in wastewater treatment plant PPPs using minimum revenue guarantee and real options. Utilities Policy,53, 121–133. https://doi.org/10.1016/j.jup.2018.06.012 .

  65. Medda, F. (2007). A game theory approach for the allocation of risks in transport public private partnerships. International Journal of Project Management,25(3), 213–218. https://doi.org/10.1016/j.ijproman.2006.06.003 .
    Paper not yet in RePEc: Add citation now
  66. Modak, N. M., Merigó, J. M., Weber, R., Manzor, F., & Ortúzar, J. D. D. (2019). Fifty years of transportation research journals: A bibliometric overview. Transportation Research Part A: Policy and Practice,120, 188–223.

  67. Murgado-Armenteros, E. M., Gutiérrez-Salcedo, M., Torres-Ruiz, F. J., & Cobo, M. J. (2015). Analysing the conceptual evolution of qualitative marketing research through science mapping analysis. Scientometrics,102(1), 519–557. https://doi.org/10.1007/s11192-014-1443-z .

  68. Narbaev, T., De Marco, A., & Orazalin, N. (2020). A multi-disciplinary meta-review of the public–private partnerships research. Construction Management and Economics,38(2), 109–124. https://doi.org/10.1080/01446193.2019.1643033 .
    Paper not yet in RePEc: Add citation now
  69. Ng, S. T., Wong, Y. M. W., & Wong, J. M. W. (2012). Factors influencing the success of PPP at feasibility stage—A tripartite comparison study in Hong Kong. Habitat International,36(4), 423–432. https://doi.org/10.1016/j.habitatint.2012.02.002 .
    Paper not yet in RePEc: Add citation now
  70. Osei-Kyei, R., & Chan, A. P. C. (2015). Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013. International Journal of Project Management,33(6), 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008 .
    Paper not yet in RePEc: Add citation now
  71. Papajohn, D., Cui, Q., & Bayraktar, M. E. (2011). Public–private partnerships in U.S. transportation: Research overview and a path forward. Journal of Management in Engineering,27(3), 126–135. https://doi.org/10.1061/(asce)me.1943-5479.0000050 .
    Paper not yet in RePEc: Add citation now
  72. Pellegrino, R., Vajdic, N., & Carbonara, N. (2013). Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management,3(2), 199–213. https://doi.org/10.1108/BEPAM-05-2012-0027 .
    Paper not yet in RePEc: Add citation now
  73. Pollack, J., & Adler, D. (2015). Emergent trends and passing fads in project management research: A scientometric analysis of changes in the field. International Journal of Project Management,33(1), 236–248. https://doi.org/10.1016/j.ijproman.2014.04.011 .
    Paper not yet in RePEc: Add citation now
  74. Pollock, A. M., Shaoul, J., & Vickers, N. (2002). Private finance and “value for money” in NHS hospitals: A policy in search of a rationale? British Medical Journal,324(7347), 1205–1209. https://doi.org/10.1136/bmj.325.7356.142 .
    Paper not yet in RePEc: Add citation now
  75. Qiao, L., Wang, S. Q., Tiong, R. L. K., & Chan, T.-S. (2001). Framework for critical success factors of BOT projects in China. The Journal of Structured Finance,7(1), 53–61. https://doi.org/10.3905/jsf.2001.320244 .
    Paper not yet in RePEc: Add citation now
  76. Quelin, B. V., Cabral, S., Lazzarini, S., & Kivleniece, I. (2019). The private scope in public–private collaborations: An institutional and capability-based perspective. Organization Science. https://doi.org/10.1287/orsc.2018.1251 . (Forthcoming).

  77. Reeves, E. (2008). The practice of contracting in public private partnerships: Transaction costs and relational contracting in the Irish schools sector. Public Administration,86(4), 969–986. https://doi.org/10.1111/j.1467-9299.2008.00743.x .
    Paper not yet in RePEc: Add citation now
  78. Shahrara, N., Çelik, T., & Gandomi, A. H. (2017). Risk analysis of BOT contracts using soft computing. Journal of Civil Engineering and Management,23(2), 232–240. https://doi.org/10.3846/13923730.2015.1068844 .
    Paper not yet in RePEc: Add citation now
  79. Shaoul, J. (2005). A critical financial analysis of the Private Finance Initiative: Selecting a financing method or allocating economic wealth? Critical Perspectives on Accounting,16(4), 441–471. https://doi.org/10.1016/j.cpa.2003.06.001 .
    Paper not yet in RePEc: Add citation now
  80. Sharafi, A., Taleizadeh, A. A., & Amalnick, M. S. (2018). Fair allocation in financial disputes between public–private partnership stakeholders using game theory. Service Science,10(1), 1–11. https://doi.org/10.1287/serv.2017.0179 .
    Paper not yet in RePEc: Add citation now
  81. Shen, L. Y., & Wu, Y. Z. (2005). Risk concession model for build/operate/transfer contract projects. Journal of Construction Engineering and Management,131(2), 211–220. https://doi.org/10.1061/(asce)0733-9364(2005)131:2(211) .
    Paper not yet in RePEc: Add citation now
  82. Shen, L. Y., Bao, H. J., Wu, Y. Z., & Lu, W. S. (2007). Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management,133(5), 385–392. https://doi.org/10.1061/(asce)0733-9364(2007)133:5(385) .
    Paper not yet in RePEc: Add citation now
  83. Shen, L. Y., Li, H., & Li, Q. M. (2002). Alternative concession model for build operate transfer contract projects. Journal of Construction Engineering and Management,128(4), 326–330. https://doi.org/10.1061/(asce)0733-9364(2002)128:4(326) .
    Paper not yet in RePEc: Add citation now
  84. Si, H., Shi, J., Wu, G., Chen, J., & Zhao, X. (2019). Mapping the bike sharing research published from 2010 to 2018: A scientometric review. Journal of Cleaner Production,213, 415–427. https://doi.org/10.1016/j.jclepro.2018.12.157 .
    Paper not yet in RePEc: Add citation now
  85. Smyth, H., & Edkins, A. (2007). Relationship management in the management of PFI/PPP projects in the UK. International Journal of Project Management,25(3), 232–240. https://doi.org/10.1016/j.ijproman.2006.08.003 .
    Paper not yet in RePEc: Add citation now
  86. Sollño, A. S., & de Santos, P. G. (2010). Transaction costs in transport public–private partnerships: Comparing procurement procedures. Transport Reviews,30(3), 389–406. https://doi.org/10.1080/01441640903037941 .
    Paper not yet in RePEc: Add citation now
  87. Song, J., Li, Y., Feng, Z., & Wang, H. (2019). Cluster analysis of the intellectual structure of PPP research. Journal of Management in Engineering,35(1), 04018053. https://doi.org/10.1061/(asce)me.1943-5479.0000664 .
    Paper not yet in RePEc: Add citation now
  88. Song, J., Zhang, H., & Dong, W. (2016). A review of emerging trends in global PPP research: Analysis and visualization. Scientometrics,107(3), 1111–1147. https://doi.org/10.1007/s11192-016-1918-1 .
    Paper not yet in RePEc: Add citation now
  89. Spackman, M. (2002). Public–private partnerships: Lessons from the British approach. Economic Systems,26, 283–301.

  90. Spielman, D. J., Hartwich, F., & Grebmer, K. (2010). Public–private partnerships and developing-country agriculture: Evidence from the international agricultural research system. Public Administration and Development,30(4), 261–276. https://doi.org/10.1002/pad .
    Paper not yet in RePEc: Add citation now
  91. Tang, L. Y., Shen, Q., & Cheng, E. W. L. (2010). A review of studies on public–private partnership projects in the construction industry. International Journal of Project Management,28(7), 683–694. https://doi.org/10.1016/j.ijproman.2009.11.009 .
    Paper not yet in RePEc: Add citation now
  92. Tiong, R. L. K. (1996). CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management,122(3), 205–211.
    Paper not yet in RePEc: Add citation now
  93. Tiong, R. L. K., Yeo, K., & McCarthy, S. C. (1992). Critical success factors in winning BOT contracts. Journal of Construction Engineering and Management,118(2), 217–228. https://doi.org/10.1061/(asce)0733-9364(1992)118:2(217) .
    Paper not yet in RePEc: Add citation now
  94. van Eck, N. J., & Waltman, L. (2010). Software survey: VOSviewer, a computer program for bibliometric mapping. Scientometrics,84(2), 523–538. https://doi.org/10.1007/s11192-009-0146-3 .

  95. van Nunen, K., Li, J., Reniers, G., & Ponnet, K. (2018). Bibliometric analysis of safety culture research. Safety Science,108, 248–258. https://doi.org/10.1016/j.ssci.2017.08.011 .
    Paper not yet in RePEc: Add citation now
  96. Vasudevan, V., Prakash, P., & Sahu, B. (2018). Options framework and valuation of highway infrastructure under real and financial uncertainties. Journal of Infrastructure Systems,24(3), 04018014. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000433 .
    Paper not yet in RePEc: Add citation now
  97. Vining, A. R., & Boardman, A. E. (2008). Public–private partnerships: Eight rules for governments. Public Works Management & Policy,13(2), 149–161. https://doi.org/10.1177/1087724X08323843 .
    Paper not yet in RePEc: Add citation now
  98. Wang, H., Xiong, W., Wu, G., & Zhu, D. (2018). Public–private partnership in Public Administration discipline: A literature review. Public Management Review,20(2), 293–316. https://doi.org/10.1080/14719037.2017.1313445 .

  99. Weihe, G. (2008). Ordering disorder—On the perplexities of the partnership literature. Australian Journal of Public Administration,67(4), 430–442. https://doi.org/10.1111/j.1467-8500.2008.00600.x .
    Paper not yet in RePEc: Add citation now
  100. Wettenhall, R. (2003). The rhetoric and reality of public–private partnerships. Public Organization Review,3(1), 77–107. https://doi.org/10.1057/9780230554702 .
    Paper not yet in RePEc: Add citation now
  101. Xie, H., Zhang, Y., & Duan, K. (2020). Evolutionary overview of urban expansion based on bibliometric analysis in Web of Science from 1990 to 2019. Habitat International,95, 102100. https://doi.org/10.1016/j.habitatint.2019.102100 .
    Paper not yet in RePEc: Add citation now
  102. Xiong, W., & Zhang, X. (2016). The real option value of renegotiation in public–private partnerships. Jouranl of Construction Engineering and Management,142(8), 1–11. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001130 .
    Paper not yet in RePEc: Add citation now
  103. Xiong, W., Zhao, X., & Wang, H. (2018). Information asymmetry in renegotiation of public–private partnership projects. Journal of Computing in Civil Engineering,32(4), 04018028. https://doi.org/10.1061/(asce)cp.1943-5487.0000763 .
    Paper not yet in RePEc: Add citation now
  104. Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010). Developing a risk assessment model for PPP projects in China—A fuzzy synthetic evaluation approach. Automation in Construction,19(7), 929–943. https://doi.org/10.1016/j.autcon.2010.06.006 .
    Paper not yet in RePEc: Add citation now
  105. Yang, H., & Meng, Q. (2000). Highway pricing and capacity choice in a road network under a build–operate–transfer scheme. Transportation Research Part A,34(3), 207–222.

  106. Yuan, J., Zeng, A. Y., Skibniewski, M. J., & Li, Q. (2009). Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Construction Management and Economics,27(3), 253–270. https://doi.org/10.1080/01446190902748705 .

  107. Zhang, S., Chan, A. P. C., Feng, Y., Duan, H., & Ke, Y. (2016). Critical review on PPP research—A search from the Chinese and International Journals. International Journal of Project Management,34(4), 597–612. https://doi.org/10.1016/j.ijproman.2016.02.008 .
    Paper not yet in RePEc: Add citation now
  108. Zhang, X. (2001). Hong Kong experience in managing BOT projects. Journal of Construction Engineering and Management,127(2), 154–162.
    Paper not yet in RePEc: Add citation now
  109. Zhang, X. (2004). Concessionaire selection: Methods and criteria. Journal of Construction Engineering and Management,130(2), 235–244. https://doi.org/10.1061/(asce)0733-9364(2004)130:2(235) .
    Paper not yet in RePEc: Add citation now
  110. Zhang, X. (2005a). Critical success factors for public–private partnerships in infrastructure development. Journal of Construction Engineering and Management,131(1), 3–14. https://doi.org/10.1061/(asce)0733-9364(2005)131:1(3) .
    Paper not yet in RePEc: Add citation now
  111. Zhang, X. (2005b). Criteria for selecting the private-sector partner in public–private partnerships. Journal of Construction Engineering and Management,131(6), 631–644. https://doi.org/10.1061/(asce)0733-9364(2005)131:6(631) .
    Paper not yet in RePEc: Add citation now
  112. Zhang, X. (2005c). Paving the way for public–private partnerships in infrastructure development. Journal of Construction Engineering and Management,131(1), 71–80. https://doi.org/10.1061/(asce)0733-9364(2005)131:1(71) .
    Paper not yet in RePEc: Add citation now
  113. Zhao, X. (2017). A scientometric review of global BIM research: Analysis and visualization. Automation in Construction,80, 37–47. https://doi.org/10.1016/j.autcon.2017.04.002 .
    Paper not yet in RePEc: Add citation now
  114. Zhao, X., Zuo, J., Wu, G., & Huang, C. (2018). A bibliometric review of green building research 2000–2016. Architectural Science Review,8628, 1–15. https://doi.org/10.1080/00038628.2018.1485548 .
    Paper not yet in RePEc: Add citation now
  115. Zheng, X., Le, Y., Chan, A. P. C., Hu, Y., & Li, Y. (2016). Review of the application of social network analysis (SNA) in construction project management research. International Journal of Project Management,34(7), 1214–1225. https://doi.org/10.1016/j.ijproman.2016.06.005 .
    Paper not yet in RePEc: Add citation now

Cocites

Documents in RePEc which have cited the same bibliography

  1. Critical success factors for public-private partnership projects in Uganda. (2024). Tumwesige, Joshua ; Nabwami, Ruth ; Mayengo, Joseph ; Nanteza, Justine ; Mwesigwa, Rogers.
    In: SN Business & Economics.
    RePEc:spr:snbeco:v:4:y:2024:i:11:d:10.1007_s43546-024-00718-2.

    Full description at Econpapers || Download paper

  2. Management of stakeholders engaged in port energy transition. (2024). Ballini, Fabio ; Oler, Aykut I ; Alamoush, Anas S.
    In: Energy Policy.
    RePEc:eee:enepol:v:188:y:2024:i:c:s0301421524000946.

    Full description at Econpapers || Download paper

  3. Incentive Mechanism of Utility Tunnel PPP Projects with User Involvement. (2023). He, Haiyan.
    In: Sustainability.
    RePEc:gam:jsusta:v:15:y:2023:i:14:p:10771-:d:1190177.

    Full description at Econpapers || Download paper

  4. Measurement of Innovation-Driven Development Performance of Large-Scale Environmental Protection Enterprises Investing in Public–Private Partnership Projects Based on the Hybrid Method. (2022). Wang, Nannan ; Feng, Jiao ; Sun, Guoshuai.
    In: Sustainability.
    RePEc:gam:jsusta:v:14:y:2022:i:9:p:5096-:d:800507.

    Full description at Econpapers || Download paper

  5. Perceived Quality and Users’ Satisfaction with Public–Private Partnerships in Health Sector. (2022). Rodrigues, Nuno.
    In: IJERPH.
    RePEc:gam:jijerp:v:19:y:2022:i:13:p:8188-:d:855506.

    Full description at Econpapers || Download paper

  6. Value for money in transport infrastructure investment: An enhanced model for better procurement decisions. (2022). Haigh, Richard ; Thurairajah, Niraj ; Zhao, Jianfeng ; Liu, Henry J ; Greenwood, David.
    In: Transport Policy.
    RePEc:eee:trapol:v:118:y:2022:i:c:p:68-78.

    Full description at Econpapers || Download paper

  7. The role of public private partnerships in fostering innovation. (2020). Pellegrino, Roberta ; Carbonara, Nunzia.
    In: Construction Management and Economics.
    RePEc:taf:conmgt:v:38:y:2020:i:2:p:140-156.

    Full description at Econpapers || Download paper

  8. Comprehensive metrological and content analysis of the public–private partnerships (PPPs) research field: a new bibliometric journey. (2020). Feng, Xiaowei ; Zhang, Rui ; Duan, Kaifeng ; Shi, Jiangang ; Wu, Guangdong.
    In: Scientometrics.
    RePEc:spr:scient:v:124:y:2020:i:3:d:10.1007_s11192-020-03607-1.

    Full description at Econpapers || Download paper

  9. OPERATIONS STRATEGIES AND COMPETITIVENESS OF KENYAN COOPERATIVE SECTOR. (2020). Ongeri, Richard Nyaanga ; Magutu, Peterson Obara ; Kiloh, Khatolwaasman.
    In: Noble International Journal of Social Sciences Research.
    RePEc:nap:nijssr:2020:p:22-33.

    Full description at Econpapers || Download paper

  10. Sustainable Location Selection for Investing in Public–Private Partnership Infrastructure Projects: From a Developing Country’s Perspective. (2020). Kim, Soo-Yong ; Thuc, Le Dinh.
    In: Sustainability.
    RePEc:gam:jsusta:v:12:y:2020:i:15:p:5914-:d:388340.

    Full description at Econpapers || Download paper

  11. The optimal combinations of the eligible functions in multiple property assets enhancement. (2020). Morano, Pierluigi ; Tajani, Francesco ; di Liddo, Felicia.
    In: Land Use Policy.
    RePEc:eee:lauspo:v:99:y:2020:i:c:s0264837719321040.

    Full description at Econpapers || Download paper

  12. The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran. (2019). Heravi, Gholamreza ; Ahmadabadi, Ali Akbari.
    In: Transport Policy.
    RePEc:eee:trapol:v:73:y:2019:i:c:p:152-161.

    Full description at Econpapers || Download paper

  13. Measuring the value for money of transport infrastructure procurement; an intergenerational approach. (2019). Peñalver, Domingo ; Turro, Mateu ; Williamson, John B ; Penyalver, Domingo.
    In: Transportation Research Part A: Policy and Practice.
    RePEc:eee:transa:v:119:y:2019:i:c:p:238-254.

    Full description at Econpapers || Download paper

  14. UNDERSTANDING THE RELATIONSHIP BETWEEN INFRASTRUCTURE PUBLIC‒PRIVATE PARTNERSHIPS AND INNOVATION. (2019). Ågren, Robert ; Scherrer, Walter ; Lember, Veiko ; Petersen, Ole Helby.
    In: Annals of Public and Cooperative Economics.
    RePEc:bla:annpce:v:90:y:2019:i:2:p:371-391.

    Full description at Econpapers || Download paper

  15. Investigating Private Sectors’ Behavioral Intention to Participate in PPP Projects: An Empirical Examination Based on the Theory of Planned Behavior. (2018). Xiao, Yazhi ; Zhang, Yanchun ; Shan, Ming ; Gu, Jianglin ; Darko, Amos.
    In: Sustainability.
    RePEc:gam:jsusta:v:10:y:2018:i:8:p:2692-:d:161215.

    Full description at Econpapers || Download paper

  16. Risk Assessment in PPP Projects by Applying Different MCDM Methods and Comparative Results Analysis. (2018). Tamoaitiene, Jolanta ; Sarvari, Hadi ; Valipour, Alireza.
    In: Administrative Sciences.
    RePEc:gam:jadmsc:v:8:y:2018:i:4:p:80-:d:188506.

    Full description at Econpapers || Download paper

  17. On the fast track? Using standard contracts in public–private partnerships for sports facilities: A case study. (2017). van den Hurk, Martijn ; Verhoest, Koen.
    In: Sport Management Review.
    RePEc:eee:spomar:v:20:y:2017:i:2:p:226-239.

    Full description at Econpapers || Download paper

  18. Stakeholders Involvement or Public Subsidy of Private Interests? Appraising the Case of Public Private Partnerships in Pakistan. (2015). Khan, Iram ; Hossain, Farhad ; Ghalib, Asad.
    In: Public Organization Review.
    RePEc:kap:porgrv:v:15:y:2015:i:2:p:281-296.

    Full description at Econpapers || Download paper

  19. Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory. (2014). Patrick T. I. Lam, ; Javed, Arshad Ali ; Albert P. C. Chan, .
    In: Construction Management and Economics.
    RePEc:taf:conmgt:v:32:y:2014:i:4:p:323-348.

    Full description at Econpapers || Download paper

  20. Are public–private partnerships a healthy option? A systematic literature review. (2014). Roehrich, Kurt ; Lewis, Michael A. ; George, Gerard.
    In: Social Science & Medicine.
    RePEc:eee:socmed:v:113:y:2014:i:c:p:110-119.

    Full description at Econpapers || Download paper

  21. Analiza wspolpracy sektora publicznego z doradcami zewnetrznymi w realizacji projektow w systemie koncesyjnym oraz w formie partnerstwa publiczno-prywatnego w Polsce (Analysis of public sector cooperation with external consultants in the implementation of projects in the concession model and in the form of public-private partnerships in Poland). (2013). Wasowski, Krzysztof .
    In: Problemy Zarzadzania.
    RePEc:sgm:pzwzuw:v:11:i:43:y:2013:p:136-155.

    Full description at Econpapers || Download paper

  22. Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project. (2013). Chang, Chen Yu ; Park, Abraham.
    In: ERES.
    RePEc:arz:wpaper:eres2013_97.

    Full description at Econpapers || Download paper

  23. Innovation in public--private partnerships (PPPs): the Spanish case of highway concessions. (2010). Rangel, Thais ; Jesús Galende, .
    In: Public Money & Management.
    RePEc:taf:pubmmg:v:30:y:2010:i:1:p:49-54.

    Full description at Econpapers || Download paper

  24. The execution of public-private partnership projects in the UAE. (2010). Kumaraswamy, Mohan ; Dulaimi, Mohammed Fadhil ; Alhashemi, Mohamed ; Florence Yean Yng Ling, .
    In: Construction Management and Economics.
    RePEc:taf:conmgt:v:28:y:2010:i:4:p:393-402.

    Full description at Econpapers || Download paper

  25. The private finance initiative, project form and design innovation: The UKs hospitals programme. (2008). Koberle-Gaiser, Martina ; Barlow, James.
    In: Research Policy.
    RePEc:eee:respol:v:37:y:2008:i:8:p:1392-1402.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-10-05 21:43:22 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Last updated August, 3 2024. Contact: Jose Manuel Barrueco.