Business Considerations For Propellant Depots Rand Simberg WYSIS Space Access 2008 March 28, 2008
Depots Open Up Cis-Lunar Space Contra Mike, ESAS Is  Not  The Interstate Highway System True Equivalent Of IHS Would Have Gas Stations Even More Important For Space Vehicles Than Ground Transportation, Due To Rocket Equation And Exponential Nature Of Propellant Requirements As Function Of Distance (Velocity)
Depots As Fuel “Caches” Think Of Depots As A Form Of Staging Analogies Pre-placed Caches For Antarctic Exploration Hanging Scuba Tanks For Intermediate Safety Stops Depots Extend Reach/Increase Payload  If : Propellant Can Be Delivered More Cheaply Than Time-Critical Cargoes And Personnel Ex: Low-Thrust Tankers Or Cycling Depots
Infrastructure Should Be Robust Propellant Depot Architecture Renders Depots Essential For Continuing Operations Cannot Have Single-Point Failure Solution: Redundancy Depots Depot Designs Propellant Providers
Redundancy/Competition Unaffordable Without High Volume Of Operations Cost Amortization Multiple Depot Types Involve Multiple Developments Multiple Depots Multiply Production Costs Multiple Providers Need Enough Market To Support Them All Don’t Want To Show Up At The Depot With No Capacity To Offload Demand Has To Support Supply (Oil Tanker Analogy) Have To Find Sufficient Customers And Build Markets
LEO Depot Location Considerations LEO 28.5 Equatorial Plane Change Penalty To GEO Constant For Any Inclination Maximizing Lunar Departure/Return Opportunities Requires Multiple LEO Depots For Non-Equatorial Orbits Another Driver For Redundancy
Other Depot Locations For Complete Cis-Lunar Infrastructure Lagrange Points (Propellants From Lunar Surface Or LEO…Or Other) L1 (Shorter Trip Times) L2 (Lower Delta V) Lunar Surface—Various Locations (Propellants Locally Produced Or Delivered From Lagrange Points) Opportunities Between Lunar Surface And Lagrange Points Continuous
Hybrid Location Consider Tankers Cycling Between LEO and Lagrange Points Dual Function: Propellant Storage (And Perhaps Processing) Propellant Transfer, Both Ways Possibly Nuclear Powered At Least  Four: One At LEO One At Lagrange Point One In Transit From L? To LEO One In Transit From LEO To L? Propellant Source Function Of Relative Cost If Lunar (Or Asteroidal) Propellants Can Be Delivered To LEO Cheaply, No More Need For Earth Supply
Three Business Models NASA Cost-Plus Contract Public Utility (Comsat Model) Private Model (Existing Comsat Industry)
NASA Cost-Plus Contract Overspecify Initial System Cost Estimate Results In Single One Requirements Creep To Justify High Cost Congressional Interference Overruns, Slipped Schedule Program Completion Just Prior To Obsolescence In Other Words, Business As Usual
Public Utility (Comsat Model) Develop Specification Establish Quasi-Governmental Corporation Build/Operate Depots Provide Services
Private Model (Comsat Industry) Establish Basic Interface Standards (NIST?  AIAA?) Get Anchor Tenant Contracts From NASA (And Others?) Contractors Design/Build Depots In Various Locations Operators Provide Propellant Storage/Transfer Services A La Gas Stations System Expands To Meet Demand Either Via Additional Depots Or Depot Growth
Comsat Industry Model? Perhaps All Three Models Will Be Utilized, Time Phased: NASA Develops Basic Technology Establishment Of Quasi-Government Corporation Transition To Private Industry Eventual Result: Robust Space Transportation Infrastructure To Dramatically Decrease In-Space Costs

More Related Content

PPT
Sa08 Prop Depot Panel Jon Goff
PDF
Trilogiq usa capabilities overview 5 1-13
PPSX
TransAT Hydro and Water
PDF
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
PDF
Analog Field Testing Opportunities in Hawai`i Paper82613
PPTX
Programacion de microcontrolador
PPTX
S/4 HANA & HCP – How will you reach 2020?
PPTX
2015 Identity Summit - CTO Innovation Center
Sa08 Prop Depot Panel Jon Goff
Trilogiq usa capabilities overview 5 1-13
TransAT Hydro and Water
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
Analog Field Testing Opportunities in Hawai`i Paper82613
Programacion de microcontrolador
S/4 HANA & HCP – How will you reach 2020?
2015 Identity Summit - CTO Innovation Center

Similar to Sa08 Prop Depot Panel Rand Simberg (20)

PPT
Swearengen 7437
PDF
LV4_optimization_white_paper
PPS
Conceptual Design of a Crewed Lunar Lander
PDF
A Simulation Based Model for the Berth Allocation and Quay Crane Assignment P...
PDF
3a09fc7ee1175120b31399b1ce06b175_lect21.pdf
PPT
Material Handling System
PPSX
Fast forward project
 
PPT
ESA and the Cloud
PDF
Lean&Mean Terminal Design benefits from advanced modelling (Terminal Operator...
PPT
Scenarios S and X
PDF
Leo final presentation
PDF
LEO final presentation 2012
PPTX
Rangeland hydrology and erosion model
PPTX
Dealing With Drift - Building an Enterprise Data Lake
PDF
my final paper
PDF
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
PPTX
Dealing with Drift: Building an Enterprise Data Lake
PDF
MetaLoop_MoonShot2030-LNG-REV-290822.pdf
PPT
Muirhead
PDF
MetaLoop For Aerotropolis
Swearengen 7437
LV4_optimization_white_paper
Conceptual Design of a Crewed Lunar Lander
A Simulation Based Model for the Berth Allocation and Quay Crane Assignment P...
3a09fc7ee1175120b31399b1ce06b175_lect21.pdf
Material Handling System
Fast forward project
 
ESA and the Cloud
Lean&Mean Terminal Design benefits from advanced modelling (Terminal Operator...
Scenarios S and X
Leo final presentation
LEO final presentation 2012
Rangeland hydrology and erosion model
Dealing With Drift - Building an Enterprise Data Lake
my final paper
Improved Upstream Production Efficiency with Remote Optimization Centers, Fie...
Dealing with Drift: Building an Enterprise Data Lake
MetaLoop_MoonShot2030-LNG-REV-290822.pdf
Muirhead
MetaLoop For Aerotropolis
Ad

Recently uploaded (20)

PDF
Value-based IP Management at Siemens: A Cross-Divisional Analysis
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
PDF
Business Communication for MBA Students.
PDF
Second Hand Fashion Call to Action March 2025
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
PDF
Challenges of Managing International Schools (www.kiu. ac.ug)
PPTX
chapter 2 entrepreneurship full lecture ppt
PDF
Middle East's Most Impactful Business Leaders to Follow in 2025
PDF
income tax laws notes important pakistan
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
DOCX
Handbook of entrepreneurship- Chapter 7- Types of business organisations
PPT
BCG内部幻灯片撰写. slide template BCG.slide template
PDF
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
PDF
HQ #118 / 'Building Resilience While Climbing the Event Mountain
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PDF
Handouts for Housekeeping.pdfhsjsnvvbdjsnwb
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Comments on Clouds that Assimilate Parts I&II.pdf
DOCX
ola and uber project work (Recovered).docx
Value-based IP Management at Siemens: A Cross-Divisional Analysis
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
Business Communication for MBA Students.
Second Hand Fashion Call to Action March 2025
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Challenges of Managing International Schools (www.kiu. ac.ug)
chapter 2 entrepreneurship full lecture ppt
Middle East's Most Impactful Business Leaders to Follow in 2025
income tax laws notes important pakistan
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Stacey L Stevens - Canada's Most Influential Women Lawyers Revolutionizing Th...
Handbook of entrepreneurship- Chapter 7- Types of business organisations
BCG内部幻灯片撰写. slide template BCG.slide template
Vinod Bhatt - Most Inspiring Supply Chain Leader in India 2025.pdf
HQ #118 / 'Building Resilience While Climbing the Event Mountain
CTG - Business Update 2Q2025 & 6M2025.pptx
Handouts for Housekeeping.pdfhsjsnvvbdjsnwb
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Comments on Clouds that Assimilate Parts I&II.pdf
ola and uber project work (Recovered).docx
Ad

Sa08 Prop Depot Panel Rand Simberg

  • 1. Business Considerations For Propellant Depots Rand Simberg WYSIS Space Access 2008 March 28, 2008
  • 2. Depots Open Up Cis-Lunar Space Contra Mike, ESAS Is Not The Interstate Highway System True Equivalent Of IHS Would Have Gas Stations Even More Important For Space Vehicles Than Ground Transportation, Due To Rocket Equation And Exponential Nature Of Propellant Requirements As Function Of Distance (Velocity)
  • 3. Depots As Fuel “Caches” Think Of Depots As A Form Of Staging Analogies Pre-placed Caches For Antarctic Exploration Hanging Scuba Tanks For Intermediate Safety Stops Depots Extend Reach/Increase Payload If : Propellant Can Be Delivered More Cheaply Than Time-Critical Cargoes And Personnel Ex: Low-Thrust Tankers Or Cycling Depots
  • 4. Infrastructure Should Be Robust Propellant Depot Architecture Renders Depots Essential For Continuing Operations Cannot Have Single-Point Failure Solution: Redundancy Depots Depot Designs Propellant Providers
  • 5. Redundancy/Competition Unaffordable Without High Volume Of Operations Cost Amortization Multiple Depot Types Involve Multiple Developments Multiple Depots Multiply Production Costs Multiple Providers Need Enough Market To Support Them All Don’t Want To Show Up At The Depot With No Capacity To Offload Demand Has To Support Supply (Oil Tanker Analogy) Have To Find Sufficient Customers And Build Markets
  • 6. LEO Depot Location Considerations LEO 28.5 Equatorial Plane Change Penalty To GEO Constant For Any Inclination Maximizing Lunar Departure/Return Opportunities Requires Multiple LEO Depots For Non-Equatorial Orbits Another Driver For Redundancy
  • 7. Other Depot Locations For Complete Cis-Lunar Infrastructure Lagrange Points (Propellants From Lunar Surface Or LEO…Or Other) L1 (Shorter Trip Times) L2 (Lower Delta V) Lunar Surface—Various Locations (Propellants Locally Produced Or Delivered From Lagrange Points) Opportunities Between Lunar Surface And Lagrange Points Continuous
  • 8. Hybrid Location Consider Tankers Cycling Between LEO and Lagrange Points Dual Function: Propellant Storage (And Perhaps Processing) Propellant Transfer, Both Ways Possibly Nuclear Powered At Least Four: One At LEO One At Lagrange Point One In Transit From L? To LEO One In Transit From LEO To L? Propellant Source Function Of Relative Cost If Lunar (Or Asteroidal) Propellants Can Be Delivered To LEO Cheaply, No More Need For Earth Supply
  • 9. Three Business Models NASA Cost-Plus Contract Public Utility (Comsat Model) Private Model (Existing Comsat Industry)
  • 10. NASA Cost-Plus Contract Overspecify Initial System Cost Estimate Results In Single One Requirements Creep To Justify High Cost Congressional Interference Overruns, Slipped Schedule Program Completion Just Prior To Obsolescence In Other Words, Business As Usual
  • 11. Public Utility (Comsat Model) Develop Specification Establish Quasi-Governmental Corporation Build/Operate Depots Provide Services
  • 12. Private Model (Comsat Industry) Establish Basic Interface Standards (NIST? AIAA?) Get Anchor Tenant Contracts From NASA (And Others?) Contractors Design/Build Depots In Various Locations Operators Provide Propellant Storage/Transfer Services A La Gas Stations System Expands To Meet Demand Either Via Additional Depots Or Depot Growth
  • 13. Comsat Industry Model? Perhaps All Three Models Will Be Utilized, Time Phased: NASA Develops Basic Technology Establishment Of Quasi-Government Corporation Transition To Private Industry Eventual Result: Robust Space Transportation Infrastructure To Dramatically Decrease In-Space Costs