This document provides an analysis of low Earth orbit (LEO) launch capabilities to transport mass into LEO for constructing a permanent commercial space structure. It examines technical advances that could enable lower costs, as well as political and investment factors. Models are developed to determine optimal launch systems given constraints like a 2.5 year timeframe and 30 launches. Systems like Falcon Heavy and Proton are identified as most suitable based on cost-effectiveness and ability to meet mass and schedule requirements for the proposed LEO construction.