While starting the modeling process, I would like to suggest following a structured sequence of service placement to minimize clashes and improve coordination: First Level (Bottom of Slab): Drainage pipes, water supply pipes, lighting conduits, and ELV trays. Second Level: HVAC ducts, fire-fighting pipes, and fire-fighting main lines. Third Level (Top of Ceiling): Water supply and power trays. By following this arrangement: Major clashes will be reduced, especially at 50-class detection level. First and third sub-disciplines (drainage/ELV and water supply/power tray) will not require frequent clash detection. It will be easier and faster to resolve clashes during project execution. I believe this approach will streamline coordination and improve efficiency in the project.
Structured Service Placement for Efficient Modeling
More Relevant Posts
-
A Technical Office Float Chart is usually a planning and monitoring tool used in construction projects (especially in large-scale projects like airports, hospitals, or industrial facilities). It shows the time buffer (float/slack) available for the technical office’s deliverables, such as: • Shop drawings • Material submittals • Method statements • As-built drawings • Coordination drawings • BOQs & take-offs
To view or add a comment, sign in
-
Installation Challenges & Importance of Constructability Review ♻️Reality vs. Drawing Installation works often deviate from original drawings as site surveys may not fully capture: ❌ Constructability aspects ❌ Actual site conditions ❌ Existing constraints 🌐Consequences 📣 Alternative (Plan B) solutions are frequently required to address unforeseen challenges. 🔆Way Forward 🌈Conducting a thorough constructability review is critical to: ✅ Proactively identify and mitigate site constraints ✅ Align design with actual site conditions ✅ Enhance efficiency, safety, and project reliability ✅ Enable effective recovery plans to minimize delays and optimize delivery
To view or add a comment, sign in
-
❌ One design mistake can cost you a lot… In a real-life project: A building failed to meet thermal insulation requirements under SBC 601. The outcome? Rework in finishes 🚧 Increased costs 💸 Delays in delivery ⏳ If a BIM model with energy performance analysis had been used early on… the issue would’ve been detected before construction. At TSR BIM Solutions, we help identify these risks early, saving unnecessary costs and time. 👉 Have you ever faced rework due to code non-compliance?
To view or add a comment, sign in
-
-
*The Importance of Riser Diagrams: Visualizing Building Systems! 📈* Riser diagrams are crucial for: ✨ *System visualization*: Clearly depicting building systems, such as plumbing, electrical, and HVAC ✨ *Design and coordination*: Facilitating collaboration and clash detection among trades ✨ *Installation and maintenance*: Providing essential information for system installation, testing, and maintenance *Benefits of riser diagrams:* ✨ *Improved communication*: Enhancing understanding among stakeholders, including designers, contractors, and building owners ✨ *Reduced errors*: Minimizing clashes and conflicts during construction ✨ *Increased efficiency*: Streamlining installation, testing, and maintenance processes *Riser diagrams: a key component of effective building design and construction! 💡* *#RiserDiagrams #BuildingSystems #DesignCoordination #ConstructionPlanning #BuildingInformationModeling*
To view or add a comment, sign in
-
Being an electrical design engineer is exciting, but it comes with its share of hurdles. Some key challenges we tackle daily: 1️⃣ Balancing Standards & Practicality – Aligning designs with IEC/IS/NEC and local codes while still making them constructible and cost-effective. 2️⃣ Coordination with Other Services – Ensuring electrical layouts don’t clash with HVAC, plumbing, fire, and architectural elements. 3️⃣ Load Estimation Accuracy – Getting the right demand load, diversity factor, and future expansion while keeping costs optimized. 4️⃣ Panel & Raceway Routing – Finding practical routes for cables, bus ducts, and raceways without clashes, especially in congested floor plans. 5️⃣ Safety & Compliance – Designing for fault levels, earthing, and protection coordination while ensuring all statutory approvals. 6⃣Client Expectations vs Budget – Striking the balance between innovative solutions and cost limitations. #ElectricalEngineering #DesignEngineering #BuildingServices #MEP #EngineeringChallenges
To view or add a comment, sign in
-
EPDM insulation and MEP coordination. Project Milestone Achieved: EPDM INSULATION application over the slab soffit is successfully completed, forming the primary envelope for thermal and acoustic control within the future workspace .All ceiling services—including FIRE -FIGHTING pipelines (red), electrical conduits, and ELV lines—have been installed per coordinated shop drawings to avoid future conflicts and optimize service accessibility. #Technical Execution Notes. - EPDM membrane employed for its superior thermal resistance and long-term performance, supporting both HVAC efficiency and noise attenuation. - Fire-fighting pipe network runs along designated service zones, maintaining minimum slab clearance as per code compliance. - Electrical conduits routed parallel to fire lines, with standardized bends and drop points for ease of fit-out and future maintenance. - Next phase will initiate partition wall framing and raised access flooring, following approved construction schedule and PMC quality benchmarks. Progress inspected and documented daily by site the Classic projects- PMC team. #ProjectManagement #EPDMInsulation #ServiceCoordination #InteriorFitout #ConstructionTech #theclassicpmc #PMC
To view or add a comment, sign in
-
-
🏗 Case Study – General Contractor, New York Scope: Multi-family Residential Project (50,000 sq.ft.) Challenge: The GC needed a detailed cost estimate within 5 days to submit a competitive bid. They had received a $3.8M internal estimate but were unsure of accuracy. Our Solution: Delivered a line-by-line quantity takeoff and material/labor breakdown using PlanSwift & Bluebeam. Identified missed scope items (fireproofing, MEP rough-ins) worth $280,000. Suggested value engineering options saving $95,000. Result: ✅ Client submitted a more accurate bid of $3.62M ✅ Saved $250,000 in over-estimation and avoided underbidding risk ✅ Awarded the project due to competitive pricing & complete scope coverage
To view or add a comment, sign in
-
-
🔎 Pre-Construction Site Visit Before construction begins, a pre-construction site visit is key to setting the project up for success. Some of the important activities include: ✅ Getting to know the contractor. ✅ Addressing any issues the contractor may have with the structural and architectural drawings. ✅ Advising the contractor on the most suitable construction methodology to adopt. ✅ Reviewing site logistics such as access, storage, and safety considerations. When all stakeholders are aligned from the start, execution becomes smoother, safer, and more efficient. 👷♂️ As structural engineers, our role goes beyond drawings—we ensure that what is designed can be built effectively on site.
To view or add a comment, sign in
-
-
🔎 Pre-Construction Site Visit Before construction begins, a pre-construction site visit is key to setting the project up for success. Some of the important activities include: ✅ Getting to know the contractor. ✅ Addressing any issues the contractor may have with the structural and architectural drawings. ✅ Advising the contractor on the most suitable construction methodology to adopt. ✅ Reviewing site logistics such as access, storage, and safety considerations. When all stakeholders are aligned from the start, execution becomes smoother, safer, and more efficient. 👷♂️ As structural engineers, our role goes beyond drawings—we ensure that what is designed can be built effectively on site.
To view or add a comment, sign in
-
-
Technical Inquiry: Fire-Rated Wall Retrofit Solutions 🏗️ During a recent site inspection, it was observed that the existing wall system comprises sheet cladding supported by approximately 2 meters of blockwork. At present, this wall is non-fire-rated. The project requirement is to upgrade this wall to achieve a 2-hour fire-resistance rating, with minimal dismantling or adverse impact on the existing structural and architectural elements. I would appreciate insights from industry professionals and fire protection engineers who have faced similar retrofit challenges. 📚 Are there recommended practices, specific product solutions, or case studies that can be referenced to achieve compliance in an efficient and effective manner?