• Prepared for ArtaJasa
•Oracle Refreshment &
Database Migration
Agenda
1 2 3 4
Overview of
background, goal, and
solution
Findings and analysis
about current
environment
How we approach the
solutions
Project delivery
management and
scope definition
•The end of
general support
for Oracle
M4000
• Servers are all End of
Life and need Recovery
for production
• Disaster Recovery
Solution using
Database replication
• Preserve private IPv4
addressing
Overview
Migration Oracle 11 SE
to Oracle 12 SE
Database
SST Propose 2
Dell servers, Oracle SE &
DBVisit lisense, divided
between PDC & DRC. Professional Services are
included for both sites
Oracle Replication with DBvisit
• PowerEdge R440 Server – Qty 1
• Intel® Xeon® Silver 4210
• 2x8GB Memory RDIMM
• 2x2TB NLSAS Hard Drive
• 2x 1GB NIC Adapter
• 3 Year Warranty
• RHEL7
Specification Summary
PDC
• PowerEdge R440 Server – Qty 1
• Intel® Xeon® Silver 4210
• 2x8GB Memory RDIMM
• 2x2TB NLSAS Hard Drive
• 2x 1GB NIC Adapter
• 3 Year Warranty
• RHEL7
DRC
N-
SMUTerm1,
Dbvisit
Standby
Database
License and
Support - 1
Year Term
High-Level Implementation Plan
Design & Planning
Install All New Devices
Migrate & Upgrade
Database Single Instance
SE to SE on new primary
server
Design & plan works include existing environment assessment and provide
to be state low-level design.
Install all servers and Oracle 12 in both PDC & DRC, include upgrade required firmware and
configure ideal BIOS settings (for servers).
Migrate & Upgrade Database Single Instance 11g SE to 12c SE2 on new primary server
Install Oracle RDBMS 12.2.0.1 SE2 on new primary server and new standby server
Create Database on new primary server and new standby server
Export Database / Schemas on old server
Import Database / Schemas on new primary server
Setup Physical Standby Database on new standby server using Dbvisit
Full Backup and scp Database on new primary server to new standby server
Restore , Create Physical Standby Database and sync on new standby server using Dbvisit
DR Failover Testing DR failover testing.
Oracle Replication with DBvisit
Week-1 Week-2 Week-3 Week-4 Week-5 Week-6 Week-7 Week-8 Week-9 Week-9 Week-10 Week-11 Week-12 Week-13 Week-14
Contract Signature
Initiation
Implement PDC
Kick-Off &
Project Planning
Install & Configure
• Install & configure server
• Connect to database server
Migrate
• Oracle SE 11 to Oracle 12 SE
Database
High Level Timeline
Replicate &
Test
BAST
Hardware Delivery
Hardware Delivered
Design
Site Survey & Readiness
Design
• Existing infra & config assessment
• Create and discuss migration plan
Setup Replication
• Install & configure ODG
• Replicate Database
DR Failover Test
UAT
Knowledge Transfer
Implement DRC
Oracle Replication with DBvisit
• Overall project management. The project management focus on managing the initiation, planning, execution, and
closure of the project including coordinating delivery resources and communicating with stakeholders:
• Manages SST resources assigned to the project.
• Determines the engagement process and schedule.
• Develops a high-level project plan with critical path events and milestones.
• Conducts a kickoff meeting to review the project scope, expectations, communication plans, and availability of
required resources.
• Coordinates project closeout, review, and sign-off.
• Conduct data centre environment assessment to make sure the hardware will be delivered to the appropriate location
with power, rack space, and cooling requirements met
• Gather and analyse technical requirements, constraints, assumptions, and risks
• Provide design recommendation based on technical requirements, constraints, assumptions, risks, field condition,
vendor best practices, and SST’s own expertise and experiences
SST Scope of Services
• Communicate and provide validation plan or user acceptance test
• Hardware delivery to Artajasa’s data center and recovery center
• Installation and configuration of the new servers and Oracle database based on approved design
• Configure new servers access the existing and new database resources
• Conduct migration database to the new servers
• Perform DR testing with up to one (1) database and one (1) recovery plan
• Conduct user acceptance test (validation test) of configured hardware and database
• Provide knowledge transfer to the operation team with the implemented services and configuration
SST Scope of Services
• Project plan (Schedule) – PDF format
• Progress report – PDF format
• Minutes of meeting – PDF format
• Installation document – PDF format
• Migration plan document – XLS format
• Validation plan or user acceptance test document – PDF format
Document Deliverables
• The project will be delivered without interruption or suspension by
Artajasa
• Data centre facility requirement (e.g. rack space, power, and
cooling) to support additional devices have been met or will be met
during the allocated timeframe
• There are no other projects in progress that can hinder the
implementation of this project
• The link between PDC and DRC has sufficient bandwidth to support
required replication data traffic
• There is no OS level cluster implemented in the existing
environment as it will change migration process significantly
Project Key Assumptions
• SST will be responsible for the following items:
• Mounting the servers and database installation include DB migration
• Connection between servers
• Handling connect the cables to connect the servers to upstream
switches, and power cables to servers with PDU, with proper cable
placement
• Provide labelling to servers and cables with appropriate naming
convention
• Install new Oracle SE 12 editon and migration from the legacy
database Oracle 11
SST Responsibilities
• Artajasa’s timely provision to SST of office accommodations,
facilities, equipment, assistance, cooperation, complete and accurate
information and data from Artajasa officers, agents, and employees,
suitably configured computer products, and network access is
essential to the performance of the services set forth in this proposal.
Artajasa is responsible for ensuring that all Artajasa data has been
backed-up prior to commencement of the migration services (if
Artajasa choose SST to perform such services). SST assumes no
responsibility or liability for any loss of, loss of access to, or
unrecoverable data in connection with the services.
Artajasa Responsibilities
• Data center facility readiness (power, cooling, rack space, and structured cabling)
• Decommission and re-purpose existing IT infrastructure, if necessary
• Make appropriate system maintenance available for SST (or authorized agents) as needed to prepare
equipment.
• Provide technical support for implementation teams, all vendors, and third parties as necessary
• Provide access to facility for onsite work, and remote support work if necessary
• Provide device configuration standard
• Conduct internal change request process for existing device configurations, and perform the necessary
configuration changes
• Conduct advanced system hardening or compliance configuration, if necessary
Artajasa Responsibilities (Cont’d)
• Reconfigure any 3rd party apps that require integration with Database (e.g. backup solution)
• Installation of any applications, that is not related to the project, on top of operating system, if
necessary
• Provide Windows OS license that is required (if necessary)
• Make necessary changes to the core infrastructure (Active Directory, DNS, etc) when performing DR
testing
• If necessary, perform application and user functional testing
Artajasa Responsibilities (Cont’d)
• SST is responsible for performing only the services expressly
specified in this proposal. All other services, tasks, and activities are
considered out of scope.
Services Scope Exclusions
Oracle Replication with DBvisit
Thank You

More Related Content

DOC
Laura New_Resume
PPT
Infrastructure Strategy
DOC
Plan approach sdc
PPTX
Exploiting machine learning to keep Hadoop clusters healthy
PDF
Boost your Oracle RAC manageability with Policy-Managed Databases
PDF
Oow14 con7681-rman-1
PDF
Rman 12c new_features
DOC
rakesh_resume
Laura New_Resume
Infrastructure Strategy
Plan approach sdc
Exploiting machine learning to keep Hadoop clusters healthy
Boost your Oracle RAC manageability with Policy-Managed Databases
Oow14 con7681-rman-1
Rman 12c new_features
rakesh_resume

What's hot (20)

PPTX
Introduction to Cloud Data Center and Network Issues
DOCX
Biswajit_Sarkar_Database_Administrator
PDF
Architecting Your Own DBaaS in a Private Cloud with EM12c
PPTX
Data migration 2.0
PDF
NoCOUG_201411_Patel_Managing_a_Large_OLTP_Database
PPT
Data center disaster recovery.ppt
PPTX
Data Guard Architecture & Setup
PPTX
PPT
Cooper Oracle 11g Overview
PDF
How DBAs can garner the power of the Oracle Public Cloud?
PPTX
Teradata introduction - A basic introduction for Taradate system Architecture
PDF
Nabil Nawaz Oracle Oracle 12c Data Guard Deep Dive Presentation
PDF
Oracle 12c and its pluggable databases
PPT
Oracle DataGuard Online Training in USA | INDIA
DOCX
Data guard architecture
PDF
EnterpriseDB's Best Practices for Postgres DBAs
 
PDF
Oracle Trace File Analyzer - What's New in 12.2.1.1.0
PDF
Data guard oracle
DOCX
Updated Resume
Introduction to Cloud Data Center and Network Issues
Biswajit_Sarkar_Database_Administrator
Architecting Your Own DBaaS in a Private Cloud with EM12c
Data migration 2.0
NoCOUG_201411_Patel_Managing_a_Large_OLTP_Database
Data center disaster recovery.ppt
Data Guard Architecture & Setup
Cooper Oracle 11g Overview
How DBAs can garner the power of the Oracle Public Cloud?
Teradata introduction - A basic introduction for Taradate system Architecture
Nabil Nawaz Oracle Oracle 12c Data Guard Deep Dive Presentation
Oracle 12c and its pluggable databases
Oracle DataGuard Online Training in USA | INDIA
Data guard architecture
EnterpriseDB's Best Practices for Postgres DBAs
 
Oracle Trace File Analyzer - What's New in 12.2.1.1.0
Data guard oracle
Updated Resume
Ad

Similar to Oracle Replication with DBvisit (20)

DOCX
Amjad_Oracle_2016
DOC
Chaitanyadba profile (1) (1) gg
DOC
DOCX
PONNUPANDI-CV
DOCX
Aneez Hasan_Resume
PDF
Pavansai_CV_Modified
DOCX
RamakrishnaCV
DOC
Pratyusa_Resume
DOC
Original resume
DOC
Shuchi_Agrawal
DOC
Pankaj Jagtap_Resume_Project Manager_TechMahindra
DOCX
resume_pramod
DOC
Santhosh resume
DOCX
Resume
DOC
AnandhR_Resume_2015
DOCX
Patrick_Rebrook_Resume
PPTX
DOC
Sanjaykumar Kakaso Mane_MAY2016
DOCX
LALIT-TCS
DOC
Srinivasa_N_V_DB2_UDB_7.6_Years
Amjad_Oracle_2016
Chaitanyadba profile (1) (1) gg
PONNUPANDI-CV
Aneez Hasan_Resume
Pavansai_CV_Modified
RamakrishnaCV
Pratyusa_Resume
Original resume
Shuchi_Agrawal
Pankaj Jagtap_Resume_Project Manager_TechMahindra
resume_pramod
Santhosh resume
Resume
AnandhR_Resume_2015
Patrick_Rebrook_Resume
Sanjaykumar Kakaso Mane_MAY2016
LALIT-TCS
Srinivasa_N_V_DB2_UDB_7.6_Years
Ad

More from Anton An (6)

PPTX
Disaster Recovery Solution for common industry
PPTX
DC-Best Practices Design and Implementation.pptx
PPT
Private cloud with vmware
PPTX
Hci solution with VxRail
PPTX
Datacenter best practices design and implementation
PPTX
Disaster recovery solution
Disaster Recovery Solution for common industry
DC-Best Practices Design and Implementation.pptx
Private cloud with vmware
Hci solution with VxRail
Datacenter best practices design and implementation
Disaster recovery solution

Recently uploaded (20)

PPTX
How After-School Art Classes Enhance Social Skills.pptx
PDF
AI Staffing for Startups & Growing Businesses | Rubixe
PDF
Why Corporate Relocations Need Professional Packers and Movers.pdf
PDF
NAV to Microsoft Dynamics 365 Business Central Upgrade in London UK (1).pdf
PDF
Threat Intelligence Services in Abu Dhabi
PDF
Top 7 Cybersecurity Companies in Abu Dhabi
PDF
Choosing an Entrepreneurial Path Based on Your Personality.pdf
PDF
The Dark Web’s Front Door: Finding the Real Hidden Wiki
PDF
Secure Your World with Acme Enterprises PDF Sharing.pdf
PPTX
Zulu Airline Systems – Innovative Airline Planning Solutions
PDF
Looking to Work Abroad_ Here’s Why Canada is a Great Option.pdf
PDF
Bisleri vs Coca Cola.pdf intellectual property rights
PDF
Effective Bad Luck Removal In Sydney.pdf
PPTX
Driving Accountability The Power of Business Responsibility and Sustainabilit...
PDF
Blush & Brown Modern Minimalist eBook Workbook.pdf
PDF
Investhill_Report OCD (2007-2024)_2025-1.pdf
PDF
How to Inspect Exterior Paint for Early Signs of Summer Damage.pdf
PPTX
Unlocking-Business-Potential-Power-BI-Development-Services.pptx
PDF
Why Should Call Centers Use Inbound Call Tracking in 2025.pdf
PDF
Digital Marketing Skills in Demand for 2025.pdf
How After-School Art Classes Enhance Social Skills.pptx
AI Staffing for Startups & Growing Businesses | Rubixe
Why Corporate Relocations Need Professional Packers and Movers.pdf
NAV to Microsoft Dynamics 365 Business Central Upgrade in London UK (1).pdf
Threat Intelligence Services in Abu Dhabi
Top 7 Cybersecurity Companies in Abu Dhabi
Choosing an Entrepreneurial Path Based on Your Personality.pdf
The Dark Web’s Front Door: Finding the Real Hidden Wiki
Secure Your World with Acme Enterprises PDF Sharing.pdf
Zulu Airline Systems – Innovative Airline Planning Solutions
Looking to Work Abroad_ Here’s Why Canada is a Great Option.pdf
Bisleri vs Coca Cola.pdf intellectual property rights
Effective Bad Luck Removal In Sydney.pdf
Driving Accountability The Power of Business Responsibility and Sustainabilit...
Blush & Brown Modern Minimalist eBook Workbook.pdf
Investhill_Report OCD (2007-2024)_2025-1.pdf
How to Inspect Exterior Paint for Early Signs of Summer Damage.pdf
Unlocking-Business-Potential-Power-BI-Development-Services.pptx
Why Should Call Centers Use Inbound Call Tracking in 2025.pdf
Digital Marketing Skills in Demand for 2025.pdf

Oracle Replication with DBvisit

  • 1. 07 June 2020 • Prepared for ArtaJasa •Oracle Refreshment & Database Migration
  • 2. Agenda 1 2 3 4 Overview of background, goal, and solution Findings and analysis about current environment How we approach the solutions Project delivery management and scope definition
  • 3. •The end of general support for Oracle M4000 • Servers are all End of Life and need Recovery for production • Disaster Recovery Solution using Database replication • Preserve private IPv4 addressing Overview Migration Oracle 11 SE to Oracle 12 SE Database SST Propose 2 Dell servers, Oracle SE & DBVisit lisense, divided between PDC & DRC. Professional Services are included for both sites
  • 5. • PowerEdge R440 Server – Qty 1 • Intel® Xeon® Silver 4210 • 2x8GB Memory RDIMM • 2x2TB NLSAS Hard Drive • 2x 1GB NIC Adapter • 3 Year Warranty • RHEL7 Specification Summary PDC • PowerEdge R440 Server – Qty 1 • Intel® Xeon® Silver 4210 • 2x8GB Memory RDIMM • 2x2TB NLSAS Hard Drive • 2x 1GB NIC Adapter • 3 Year Warranty • RHEL7 DRC N- SMUTerm1, Dbvisit Standby Database License and Support - 1 Year Term
  • 6. High-Level Implementation Plan Design & Planning Install All New Devices Migrate & Upgrade Database Single Instance SE to SE on new primary server Design & plan works include existing environment assessment and provide to be state low-level design. Install all servers and Oracle 12 in both PDC & DRC, include upgrade required firmware and configure ideal BIOS settings (for servers). Migrate & Upgrade Database Single Instance 11g SE to 12c SE2 on new primary server Install Oracle RDBMS 12.2.0.1 SE2 on new primary server and new standby server Create Database on new primary server and new standby server Export Database / Schemas on old server Import Database / Schemas on new primary server Setup Physical Standby Database on new standby server using Dbvisit Full Backup and scp Database on new primary server to new standby server Restore , Create Physical Standby Database and sync on new standby server using Dbvisit DR Failover Testing DR failover testing.
  • 8. Week-1 Week-2 Week-3 Week-4 Week-5 Week-6 Week-7 Week-8 Week-9 Week-9 Week-10 Week-11 Week-12 Week-13 Week-14 Contract Signature Initiation Implement PDC Kick-Off & Project Planning Install & Configure • Install & configure server • Connect to database server Migrate • Oracle SE 11 to Oracle 12 SE Database High Level Timeline Replicate & Test BAST Hardware Delivery Hardware Delivered Design Site Survey & Readiness Design • Existing infra & config assessment • Create and discuss migration plan Setup Replication • Install & configure ODG • Replicate Database DR Failover Test UAT Knowledge Transfer Implement DRC
  • 10. • Overall project management. The project management focus on managing the initiation, planning, execution, and closure of the project including coordinating delivery resources and communicating with stakeholders: • Manages SST resources assigned to the project. • Determines the engagement process and schedule. • Develops a high-level project plan with critical path events and milestones. • Conducts a kickoff meeting to review the project scope, expectations, communication plans, and availability of required resources. • Coordinates project closeout, review, and sign-off. • Conduct data centre environment assessment to make sure the hardware will be delivered to the appropriate location with power, rack space, and cooling requirements met • Gather and analyse technical requirements, constraints, assumptions, and risks • Provide design recommendation based on technical requirements, constraints, assumptions, risks, field condition, vendor best practices, and SST’s own expertise and experiences SST Scope of Services
  • 11. • Communicate and provide validation plan or user acceptance test • Hardware delivery to Artajasa’s data center and recovery center • Installation and configuration of the new servers and Oracle database based on approved design • Configure new servers access the existing and new database resources • Conduct migration database to the new servers • Perform DR testing with up to one (1) database and one (1) recovery plan • Conduct user acceptance test (validation test) of configured hardware and database • Provide knowledge transfer to the operation team with the implemented services and configuration SST Scope of Services
  • 12. • Project plan (Schedule) – PDF format • Progress report – PDF format • Minutes of meeting – PDF format • Installation document – PDF format • Migration plan document – XLS format • Validation plan or user acceptance test document – PDF format Document Deliverables
  • 13. • The project will be delivered without interruption or suspension by Artajasa • Data centre facility requirement (e.g. rack space, power, and cooling) to support additional devices have been met or will be met during the allocated timeframe • There are no other projects in progress that can hinder the implementation of this project • The link between PDC and DRC has sufficient bandwidth to support required replication data traffic • There is no OS level cluster implemented in the existing environment as it will change migration process significantly Project Key Assumptions
  • 14. • SST will be responsible for the following items: • Mounting the servers and database installation include DB migration • Connection between servers • Handling connect the cables to connect the servers to upstream switches, and power cables to servers with PDU, with proper cable placement • Provide labelling to servers and cables with appropriate naming convention • Install new Oracle SE 12 editon and migration from the legacy database Oracle 11 SST Responsibilities
  • 15. • Artajasa’s timely provision to SST of office accommodations, facilities, equipment, assistance, cooperation, complete and accurate information and data from Artajasa officers, agents, and employees, suitably configured computer products, and network access is essential to the performance of the services set forth in this proposal. Artajasa is responsible for ensuring that all Artajasa data has been backed-up prior to commencement of the migration services (if Artajasa choose SST to perform such services). SST assumes no responsibility or liability for any loss of, loss of access to, or unrecoverable data in connection with the services. Artajasa Responsibilities
  • 16. • Data center facility readiness (power, cooling, rack space, and structured cabling) • Decommission and re-purpose existing IT infrastructure, if necessary • Make appropriate system maintenance available for SST (or authorized agents) as needed to prepare equipment. • Provide technical support for implementation teams, all vendors, and third parties as necessary • Provide access to facility for onsite work, and remote support work if necessary • Provide device configuration standard • Conduct internal change request process for existing device configurations, and perform the necessary configuration changes • Conduct advanced system hardening or compliance configuration, if necessary Artajasa Responsibilities (Cont’d)
  • 17. • Reconfigure any 3rd party apps that require integration with Database (e.g. backup solution) • Installation of any applications, that is not related to the project, on top of operating system, if necessary • Provide Windows OS license that is required (if necessary) • Make necessary changes to the core infrastructure (Active Directory, DNS, etc) when performing DR testing • If necessary, perform application and user functional testing Artajasa Responsibilities (Cont’d)
  • 18. • SST is responsible for performing only the services expressly specified in this proposal. All other services, tasks, and activities are considered out of scope. Services Scope Exclusions