Paradigm Shift : Early detection of deviations from
operating parameters to extend plant availability
Swapnil Sharma Maintenance Manger Cairn India Ltd
2
Preventing turnaround failures
Early detection of deviations from operating parameters andEarly detection of deviations from operating parameters andEarly detection of deviations from operating parameters andEarly detection of deviations from operating parameters and
monitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround to
extend plant availabilityextend plant availabilityextend plant availabilityextend plant availability
Surveying performance monitoring of mechanical assets like pumps, valves,
heat exchangers and turbo compressors to identify deviation from acceptable
thresholds
Using condition and performance monitoring tools apart from preventive and
predictive maintenance diagnostics to extend plant availability
Integrating asset monitoring software with alarm management to understand
diagnostic functions and impact of deviation
3
Detection of Deviation : A processDetection of Deviation : A processDetection of Deviation : A processDetection of Deviation : A process
4
Making the Detection of Deviation ExplicitMaking the Detection of Deviation ExplicitMaking the Detection of Deviation ExplicitMaking the Detection of Deviation Explicit
There is an almost universal quest for easy answers and half-baked solutions……………………..Martin Luther King, Jr.
Making the
deviation
Explicit
Dealing with
uncertainty
Identifying
alternatives
Rationalising
the deviation
Deviation Statement
Goal Tree
Causal diagram
SMART
Deviation diagram
Triangulation
Scenarios
Impact-Table
Score-Card
estimates NPV equations
Conceptualisation
Complex plant with complex problems
Rationalisation
Professional group decision-making
support – bringing actors
together
5
Parameters Monitoring/Augmenting Reliability
FLOW/PR./TEMP.
TRENDS
VIBRATION/TEMP.
TRENDS
6
Making an Overview : ConceptualizeMaking an Overview : ConceptualizeMaking an Overview : ConceptualizeMaking an Overview : Conceptualize
7
Frame DeviationFrame DeviationFrame DeviationFrame Deviation SSSStatementtatementtatementtatement
8
Causal Diagram : Underperformance
155
160
165
170
175
Discharge pressure (bar)Discharge pressure (bar)Discharge pressure (bar)Discharge pressure (bar)
Discharge pressure
(bar)
3800
3900
2nd
June
23rd
June
20th
July
12th
August
RPM
Pump performance comparison for
turbine driven power fluid pumps.
Decrease in discharge pressure observed at
same RPM
9
Identify problem Triangulation :Comparing Trends
Normal
Trend
Before
Inspection
Trend showing
abnormality
Normal trend after corrective
maintenance
Corrective repair job being carried out
10
Traingulation Data Analysis through System 1:
Normal Trend Before Inspection
Increasing trend showing abnormality
Normal trend after Maiaintenance
PANEL OBS. : Decrease in throughput and discharge pressure
11
Culprit fixation through Orbit plot :
Distortion in orbit indicating restriction in shaft movement due to
improper fluid dynamics( bearing oil or process fluid)
Normal plot
Turbine Plot Before Turbine Plot After
Pump Plot Before Pump Plot After
12
Elimination of uncertainties :Problem Eradication
Confirmation Through Waterfall plot
Sub-harmonics observed before inspection
showing abnormalities Plot showing pump in healthy condition
13
Another Example : Heat ExchangerAnother Example : Heat ExchangerAnother Example : Heat ExchangerAnother Example : Heat Exchanger
14
GA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: Conceptualize
url.htm
15
Technical Data: Making deviation ExplicitTechnical Data: Making deviation ExplicitTechnical Data: Making deviation ExplicitTechnical Data: Making deviation Explicit
FluidFluidFluidFluid AllocationAllocationAllocationAllocation ShellShellShellShell sidesidesideside TubeTubeTubeTube sidesidesideside
Steam Produced Water
Fluid Quantity, total (kg/hr.) 97775.4 1476407
Fluid Name 97775.4
Water (In/Out) kg/hr. 97775.4 1476407 1476407
Temperature °C (In/Out) 170.10 169.57 57.10 88.00
Inlet Pressure kPa 790.012 900.013
Velocity m/s 4.60 1.39
Pressure Drop, Allow/Cal kPa 15.000 6.043 70.001 16.436
Fouling Resistance (min.) m2K/W 0.000176 0.000352
Heat Transfer Rate , W/mHeat Transfer Rate , W/mHeat Transfer Rate , W/mHeat Transfer Rate , W/m2222KKKK ServiceServiceServiceService---- 772.69 W/m772.69 W/m772.69 W/m772.69 W/m2222KKKK CleanCleanCleanClean---- 2150.55 W/m2150.55 W/m2150.55 W/m2150.55 W/m2222KKKK
ConstructionalConstructionalConstructionalConstructional ParametersParametersParametersParameters Shell SideShell SideShell SideShell Side Tube SideTube SideTube SideTube Side
Design Pressure kPaG 1800 1800
Design Temperature °C 220 220
No. of passes per shell 1 1
No. of tubes : 2116
Tube O.D. : 19.05mm
Average Thickness of tube : 2.77mm
Length of tube : 6.096mm
Material of tube : CR-NI-FE-MO-CU-CB Alloy 20 CB
Shell I.D. : 1296mm
16
What happened ????...... Deviation StatementWhat happened ????...... Deviation StatementWhat happened ????...... Deviation StatementWhat happened ????...... Deviation Statement
Fouling or Scaling : Calcium carbonate/phosphate/sulfate, silica, salts, corrosion products
Additional resistance to reduce operational capability
Increased pressure drop
Unprecedented hardness
Tubular deposition, typically at both ends effectively1M length and in 358/2116
no’s of tubes.
17
Some statistical data…..Deviation DiagramSome statistical data…..Deviation DiagramSome statistical data…..Deviation DiagramSome statistical data…..Deviation Diagram
Effective time of tube cleaning > 2 hrs./tube (excessive hard).
Historically the cleaning has never took more than 6 days.
0
2
4
6
8
10
12
14
16
11/12/2010
3/1/2011
15/3/2011
17/6/2011
2/9/2011
12/10/2011
27/11/2011
1/4/2012
29/1/2012
18/2/2012
10/3/2012
18/5/2012
28/7/2012
15/8/2012
29/8/2012
18/9/2012
8/10/2012
E-415B Cleaning Days
What about tools??.....What about tools??.....What about tools??.....What about tools??.....
18
MPTMPTMPTMPT---- Chemical Lab Report: Causal DiagramChemical Lab Report: Causal DiagramChemical Lab Report: Causal DiagramChemical Lab Report: Causal Diagram
Lab ReferenceLab ReferenceLab ReferenceLab Reference #### MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036----038038038038
S.NoS.NoS.NoS.No Parameters
Unit
s
Sample" A" Sample" B" Sample" C"
1111 Appearance -
Grey hollow
tubular
Brownish
flakes
Soft black
cylindrical
2222
Toluene Soluble
(Hydrocarbons)
% 5.91 15.94 31.63
3333 Acid Soluble % 88.68 76.37 55.83
4444 Acid Insoluble % 5.41 7.69 12.54
5555
Iron in acid soluble
as Fe
% 3.89 38.64 23.30
6666
Calcium in acid
soluble as CaCO3
% 94.3794.3794.3794.37 Absent Absent
7777
Sulfate in acid
soluble
% 0.25 Traces Traces
8888
Spot test with
con.HCl
-
Effervescence
confirms
presence of
carbonate
Effervescenc
e with H2S
smell
Effervescenc
e with H2S
smell
9999 Magnetic nature - Non magnetic Magnetic
Partially
magnetic
RemarksRemarksRemarksRemarks
CaCO3 scale
mostly
Oil coated
Iron oxide,
Iron sulfide
flakes
Oil coated
Iron sulfide
schmoo
The deposits collected was segregated in three portions according to the difference in appearance and was checked for composition.
19
How to clean these tubes???...... TriangulationHow to clean these tubes???...... TriangulationHow to clean these tubes???...... TriangulationHow to clean these tubes???...... Triangulation
• HydroHydroHydroHydro----jettingjettingjettingjetting: conventional mechanical cleaning
• MultiMultiMultiMulti----lancinglancinglancinglancing: rigid high-pressure multiple lances, operator controlled . 10,000 psi
up to 40,000 psi, three times faster. lance moves into the tube bundle with up to
400 lb. force.
• Chemical Injection:Chemical Injection:Chemical Injection:Chemical Injection: Sulphamic Acid is super efficient descaling agent
• ATCSATCSATCSATCS: Automated tube Cleaning System online cleaning of the tubes
Measures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertainties
• Online Heat exchanger cleaning (soft ball cleaning system)
• Installation of Water filter before the heat exchanger (having back wash arrangements).
• Skimming of oil at Injection Water Tank (omni directional pivoted arm skimming arrangement).
• Increased backwash frequency.
• Preheating of Injection water (prior to u/s of heater, ie steam heating coils in the Injection water Tank)
• Low operational pH : an effective way to prevent Calcium Carbonate formation
• Engineered Scale inhibitors: that being adsorbed on the surface of calcium carbonate causing delay of crystal growth
at very early stages.
20
Page 20
Integration of Asset Management Software with AlarmIntegration of Asset Management Software with AlarmIntegration of Asset Management Software with AlarmIntegration of Asset Management Software with Alarm
Management System :ConsiderationsManagement System :ConsiderationsManagement System :ConsiderationsManagement System :Considerations
A combination of hardware,hardware,hardware,hardware, softwaresoftwaresoftwaresoftware andandandand servicesservicesservicesservices used to assess the healthhealthhealthhealth ofofofof plantplantplantplant assetsassetsassetsassets by
monitoring asset condition periodically or in real-time to identify potentialpotentialpotentialpotential problemsproblemsproblemsproblems before they
affectaffectaffectaffect thethethethe processprocessprocessprocess or lead to a catastrophiccatastrophiccatastrophiccatastrophic failurefailurefailurefailure.
Plant Measurements & Historian Information
Control Systems
PAM
EAM / CMMS
Maintenance Operations
* EAM: Enterprise Asset Management
CMMS: Computerized Maintenance
Management system
AM Information Flow
AM Systems
EAM
CMMS
Real-Time
AM
Systems
RealRealRealReal----timetimetimetime predictive asset health information with an intelligentintelligentintelligentintelligent analyticalanalyticalanalyticalanalytical engineengineengineengine to predict
potential asset problems
21
Audit Trail
Maintenance Information
Management
AssetAssetAssetAsset Monitoring SoftwareMonitoring SoftwareMonitoring SoftwareMonitoring Software ---- Integrated Platform forIntegrated Platform forIntegrated Platform forIntegrated Platform for
Maintenance & DiagnosisMaintenance & DiagnosisMaintenance & DiagnosisMaintenance & Diagnosis
Core Integrated Maintenance Platform
Device status viewing
Tuning, Adjustment
& Calibration
Maintenance Alarm
Diagnostics
Online Maintenance
Core
Predictive Diagnostics
Core
22
Rate per Operator Acceptability
> 1 per minute Unacceptable
1 per 2 minutes Likely Over-
Demanding
1 per 5 minutes Manageable
1 per 10 minutes Acceptable
Some TargetsSome TargetsSome TargetsSome Targets----Where Do You Stand?Where Do You Stand?Where Do You Stand?Where Do You Stand?
You either have a working alarm system or
another distraction for operators in the control
room.
Alarms are intended to forewarn of an event
that could lead to major equipment damage,
business interruption, safety concern, or
environmental risk.
Alarms should require immediate operator
attention, provide a critical layer of safety,
minimize the demands on emergency
shutdown systems, diagnose problems before
they escalate, and quickly guide operators to
clear corrective action.
Source: EEMUA 191
Good Alarm Characteristics
Relevant
Unique
Timely
Prioritized
Understandable
Diagnostic
Advisory
Focusing
23
Alarm NotificationAlarm NotificationAlarm NotificationAlarm Notification ---- Device DiagnosisDevice DiagnosisDevice DiagnosisDevice Diagnosis ((((Device ViewerDevice ViewerDevice ViewerDevice Viewer function)function)function)function)
Normal
Abnormal
24
Alarm NotificationAlarm NotificationAlarm NotificationAlarm Notification –––– Maintenance AlarmMaintenance AlarmMaintenance AlarmMaintenance Alarm
(Blue)
GE System 1 Status -Device to
be investigated
(Orange)
GE System 1 Status –
Device Non Critical
Icon Detail
(Green) Healthy by Device Patrol
(Red) Maintenance alarming
by Device patrol
(Yellow) Maintenance Warning
By Device patrol
(Gray) Communication failure
(White) Status not yet confirmed
(Background
Gray)
Alarm Off
Un-confirmed alarm
25
PST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) Scheduler
PST Scheduler works on the Asset Monitoring Softwareworks on the Asset Monitoring Softwareworks on the Asset Monitoring Softwareworks on the Asset Monitoring Software, and executes andexecutes andexecutes andexecutes and
manages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valves
by partially operating them during the plant operation with intervals.
PST enables to extend the interval of proof test that is to be conducted during
the plant shutdown, and it reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdown.
The combination ofThe combination ofThe combination ofThe combination of ProSafeProSafeProSafeProSafe----RS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valves
from various vendorsfrom various vendorsfrom various vendorsfrom various vendors is Asset management Software safety solution to
support safe plant operations.
PST Scheduler enables planning and execution of PST efficiently and safely
to realize more efficient and safer plant operationsto realize more efficient and safer plant operationsto realize more efficient and safer plant operationsto realize more efficient and safer plant operations
26
IntegratingIntegratingIntegratingIntegrating Asset Monitoring Software with AlarmAsset Monitoring Software with AlarmAsset Monitoring Software with AlarmAsset Monitoring Software with Alarm
Management System:Management System:Management System:Management System: BenefitsBenefitsBenefitsBenefits
Acquire and display the device diagnosis information
Notify the alarms related to the field devices
Manage the field device information
Record the historical and maintenance messages
Receive Real Time KPIs
Receive Alerts
View Production screens
Issue orders, setpoints, etc.
View Production reports
Enables management by exception
27
Thank you

More Related Content

PDF
Overpressure protection
PDF
2 delugevalve a
PDF
Rupture Disks for Process Engineers
PPT
Optimized maspi pama april 2009 rev1 pomer point
PDF
Eng handbook crosby pressure relief valve engineering handbook
PPT
Safety Council of Western New England 2011
PPTX
Pressure Relief Valve Sizing for Single Phase Flow
DOCX
Internship Report
Overpressure protection
2 delugevalve a
Rupture Disks for Process Engineers
Optimized maspi pama april 2009 rev1 pomer point
Eng handbook crosby pressure relief valve engineering handbook
Safety Council of Western New England 2011
Pressure Relief Valve Sizing for Single Phase Flow
Internship Report

What's hot (20)

PDF
Productos de sso
PDF
Pressure Relief Devices_Presenation
PDF
Comparison of Pressure Drop Characteristics of Swing Plate and Dual Plate Che...
PPTX
Drill stem test (mtm)
PDF
Chemical injection brochure
PPTX
Tightness testing of gravity pipelines
PPT
Control principles and procedures
PDF
Wfmc wfxd washer training_2004
PPTX
Drill stem test
PDF
Bomba Dosadora Milton Roy _ Primeroyal
DOCX
Wash machine test equipment
PPTX
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
PDF
Prvs 2. asme section i fired vessel rev4
PDF
Catálogo Geral Milton Roy
PDF
Maitenance of transformer
PDF
Understanding iso codes
PDF
D004 e81
PDF
Well control manual_bharat_petro_resource (1)
PDF
Vd Presentation Cvs
PPTX
Actis maina-tumiatti v4-final-1 4383
Productos de sso
Pressure Relief Devices_Presenation
Comparison of Pressure Drop Characteristics of Swing Plate and Dual Plate Che...
Drill stem test (mtm)
Chemical injection brochure
Tightness testing of gravity pipelines
Control principles and procedures
Wfmc wfxd washer training_2004
Drill stem test
Bomba Dosadora Milton Roy _ Primeroyal
Wash machine test equipment
"Deepwater Managed Pressure Drilling and Well Drillability, Efficiency and Pr...
Prvs 2. asme section i fired vessel rev4
Catálogo Geral Milton Roy
Maitenance of transformer
Understanding iso codes
D004 e81
Well control manual_bharat_petro_resource (1)
Vd Presentation Cvs
Actis maina-tumiatti v4-final-1 4383
Ad

Viewers also liked (9)

PPT
Why Turnarounds Fail - Best Practices
PPTX
Trade-Off Economics for Plant Turnarounds
PDF
Australian Plant Shutdown and Turnaround Forum
PPT
Making Turnarounds Work !
PPTX
PCHEM – Fundamental Analysis FY15
PDF
Turnaround Project Planner Primer
PPT
E0 shut downs-safety-class
PDF
International Turnaround Management Standard Version 1.5 ONLY PREVIEW first 1...
PPTX
Shutdown Turnaround and Outage Competency Improvement Program
Why Turnarounds Fail - Best Practices
Trade-Off Economics for Plant Turnarounds
Australian Plant Shutdown and Turnaround Forum
Making Turnarounds Work !
PCHEM – Fundamental Analysis FY15
Turnaround Project Planner Primer
E0 shut downs-safety-class
International Turnaround Management Standard Version 1.5 ONLY PREVIEW first 1...
Shutdown Turnaround and Outage Competency Improvement Program
Ad

Similar to Paradigm Shift Detection of Deviation_Swapnil Sharma (20)

PDF
Essential_HPLC_Troubleshooting_Techniques_1722488642.pdf
PPT
Improving Energy Efficiency of Pumps and Fans
PPT
Power Plant Boiler feed pump
PDF
CCC_Turbomachinery_Controls_System.pdf
PDF
Centrifugal pump health check up before start
PDF
Hydraulic_ModelTh1000Potp_Hydraulic_Model.pdf
PDF
Waterex softener installation manual
PPTX
Optimum overhaul of pumps 2014
PPTX
Appraisal ppt ankur
PPTX
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
PDF
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
PPTX
Ozone plant final Presendation 2023 Aquatech.pptx
PPT
Pumps for Process Industries
PDF
Catalytic Reforming Technology - Infographics
PPTX
TSE SCADA Design presentation new
PPTX
Vibration signature analysis
PPTX
Artificial Lift Methods
PDF
Converter station water-cooled pump vibration monitoring and condition assess...
PDF
Deepwater rig improvement ops
PPTX
Stress Analysis Training - Tank Bulging.pptx
Essential_HPLC_Troubleshooting_Techniques_1722488642.pdf
Improving Energy Efficiency of Pumps and Fans
Power Plant Boiler feed pump
CCC_Turbomachinery_Controls_System.pdf
Centrifugal pump health check up before start
Hydraulic_ModelTh1000Potp_Hydraulic_Model.pdf
Waterex softener installation manual
Optimum overhaul of pumps 2014
Appraisal ppt ankur
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Study of Time Reduction in Manufacturing of Screws Used in Twin Screw Pump
Ozone plant final Presendation 2023 Aquatech.pptx
Pumps for Process Industries
Catalytic Reforming Technology - Infographics
TSE SCADA Design presentation new
Vibration signature analysis
Artificial Lift Methods
Converter station water-cooled pump vibration monitoring and condition assess...
Deepwater rig improvement ops
Stress Analysis Training - Tank Bulging.pptx

Paradigm Shift Detection of Deviation_Swapnil Sharma

  • 1. © 2015 Cairn India Limited Paradigm Shift : Early detection of deviations from operating parameters to extend plant availability Swapnil Sharma Maintenance Manger Cairn India Ltd
  • 2. 2 Preventing turnaround failures Early detection of deviations from operating parameters andEarly detection of deviations from operating parameters andEarly detection of deviations from operating parameters andEarly detection of deviations from operating parameters and monitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround tomonitoring electrical and mechanical assets during a turnaround to extend plant availabilityextend plant availabilityextend plant availabilityextend plant availability Surveying performance monitoring of mechanical assets like pumps, valves, heat exchangers and turbo compressors to identify deviation from acceptable thresholds Using condition and performance monitoring tools apart from preventive and predictive maintenance diagnostics to extend plant availability Integrating asset monitoring software with alarm management to understand diagnostic functions and impact of deviation
  • 3. 3 Detection of Deviation : A processDetection of Deviation : A processDetection of Deviation : A processDetection of Deviation : A process
  • 4. 4 Making the Detection of Deviation ExplicitMaking the Detection of Deviation ExplicitMaking the Detection of Deviation ExplicitMaking the Detection of Deviation Explicit There is an almost universal quest for easy answers and half-baked solutions……………………..Martin Luther King, Jr. Making the deviation Explicit Dealing with uncertainty Identifying alternatives Rationalising the deviation Deviation Statement Goal Tree Causal diagram SMART Deviation diagram Triangulation Scenarios Impact-Table Score-Card estimates NPV equations Conceptualisation Complex plant with complex problems Rationalisation Professional group decision-making support – bringing actors together
  • 6. 6 Making an Overview : ConceptualizeMaking an Overview : ConceptualizeMaking an Overview : ConceptualizeMaking an Overview : Conceptualize
  • 7. 7 Frame DeviationFrame DeviationFrame DeviationFrame Deviation SSSStatementtatementtatementtatement
  • 8. 8 Causal Diagram : Underperformance 155 160 165 170 175 Discharge pressure (bar)Discharge pressure (bar)Discharge pressure (bar)Discharge pressure (bar) Discharge pressure (bar) 3800 3900 2nd June 23rd June 20th July 12th August RPM Pump performance comparison for turbine driven power fluid pumps. Decrease in discharge pressure observed at same RPM
  • 9. 9 Identify problem Triangulation :Comparing Trends Normal Trend Before Inspection Trend showing abnormality Normal trend after corrective maintenance Corrective repair job being carried out
  • 10. 10 Traingulation Data Analysis through System 1: Normal Trend Before Inspection Increasing trend showing abnormality Normal trend after Maiaintenance PANEL OBS. : Decrease in throughput and discharge pressure
  • 11. 11 Culprit fixation through Orbit plot : Distortion in orbit indicating restriction in shaft movement due to improper fluid dynamics( bearing oil or process fluid) Normal plot Turbine Plot Before Turbine Plot After Pump Plot Before Pump Plot After
  • 12. 12 Elimination of uncertainties :Problem Eradication Confirmation Through Waterfall plot Sub-harmonics observed before inspection showing abnormalities Plot showing pump in healthy condition
  • 13. 13 Another Example : Heat ExchangerAnother Example : Heat ExchangerAnother Example : Heat ExchangerAnother Example : Heat Exchanger
  • 14. 14 GA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: ConceptualizeGA of Injection Water Heater: Conceptualize url.htm
  • 15. 15 Technical Data: Making deviation ExplicitTechnical Data: Making deviation ExplicitTechnical Data: Making deviation ExplicitTechnical Data: Making deviation Explicit FluidFluidFluidFluid AllocationAllocationAllocationAllocation ShellShellShellShell sidesidesideside TubeTubeTubeTube sidesidesideside Steam Produced Water Fluid Quantity, total (kg/hr.) 97775.4 1476407 Fluid Name 97775.4 Water (In/Out) kg/hr. 97775.4 1476407 1476407 Temperature °C (In/Out) 170.10 169.57 57.10 88.00 Inlet Pressure kPa 790.012 900.013 Velocity m/s 4.60 1.39 Pressure Drop, Allow/Cal kPa 15.000 6.043 70.001 16.436 Fouling Resistance (min.) m2K/W 0.000176 0.000352 Heat Transfer Rate , W/mHeat Transfer Rate , W/mHeat Transfer Rate , W/mHeat Transfer Rate , W/m2222KKKK ServiceServiceServiceService---- 772.69 W/m772.69 W/m772.69 W/m772.69 W/m2222KKKK CleanCleanCleanClean---- 2150.55 W/m2150.55 W/m2150.55 W/m2150.55 W/m2222KKKK ConstructionalConstructionalConstructionalConstructional ParametersParametersParametersParameters Shell SideShell SideShell SideShell Side Tube SideTube SideTube SideTube Side Design Pressure kPaG 1800 1800 Design Temperature °C 220 220 No. of passes per shell 1 1 No. of tubes : 2116 Tube O.D. : 19.05mm Average Thickness of tube : 2.77mm Length of tube : 6.096mm Material of tube : CR-NI-FE-MO-CU-CB Alloy 20 CB Shell I.D. : 1296mm
  • 16. 16 What happened ????...... Deviation StatementWhat happened ????...... Deviation StatementWhat happened ????...... Deviation StatementWhat happened ????...... Deviation Statement Fouling or Scaling : Calcium carbonate/phosphate/sulfate, silica, salts, corrosion products Additional resistance to reduce operational capability Increased pressure drop Unprecedented hardness Tubular deposition, typically at both ends effectively1M length and in 358/2116 no’s of tubes.
  • 17. 17 Some statistical data…..Deviation DiagramSome statistical data…..Deviation DiagramSome statistical data…..Deviation DiagramSome statistical data…..Deviation Diagram Effective time of tube cleaning > 2 hrs./tube (excessive hard). Historically the cleaning has never took more than 6 days. 0 2 4 6 8 10 12 14 16 11/12/2010 3/1/2011 15/3/2011 17/6/2011 2/9/2011 12/10/2011 27/11/2011 1/4/2012 29/1/2012 18/2/2012 10/3/2012 18/5/2012 28/7/2012 15/8/2012 29/8/2012 18/9/2012 8/10/2012 E-415B Cleaning Days What about tools??.....What about tools??.....What about tools??.....What about tools??.....
  • 18. 18 MPTMPTMPTMPT---- Chemical Lab Report: Causal DiagramChemical Lab Report: Causal DiagramChemical Lab Report: Causal DiagramChemical Lab Report: Causal Diagram Lab ReferenceLab ReferenceLab ReferenceLab Reference #### MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036MPT/LAB/SS/2012/July/036----038038038038 S.NoS.NoS.NoS.No Parameters Unit s Sample" A" Sample" B" Sample" C" 1111 Appearance - Grey hollow tubular Brownish flakes Soft black cylindrical 2222 Toluene Soluble (Hydrocarbons) % 5.91 15.94 31.63 3333 Acid Soluble % 88.68 76.37 55.83 4444 Acid Insoluble % 5.41 7.69 12.54 5555 Iron in acid soluble as Fe % 3.89 38.64 23.30 6666 Calcium in acid soluble as CaCO3 % 94.3794.3794.3794.37 Absent Absent 7777 Sulfate in acid soluble % 0.25 Traces Traces 8888 Spot test with con.HCl - Effervescence confirms presence of carbonate Effervescenc e with H2S smell Effervescenc e with H2S smell 9999 Magnetic nature - Non magnetic Magnetic Partially magnetic RemarksRemarksRemarksRemarks CaCO3 scale mostly Oil coated Iron oxide, Iron sulfide flakes Oil coated Iron sulfide schmoo The deposits collected was segregated in three portions according to the difference in appearance and was checked for composition.
  • 19. 19 How to clean these tubes???...... TriangulationHow to clean these tubes???...... TriangulationHow to clean these tubes???...... TriangulationHow to clean these tubes???...... Triangulation • HydroHydroHydroHydro----jettingjettingjettingjetting: conventional mechanical cleaning • MultiMultiMultiMulti----lancinglancinglancinglancing: rigid high-pressure multiple lances, operator controlled . 10,000 psi up to 40,000 psi, three times faster. lance moves into the tube bundle with up to 400 lb. force. • Chemical Injection:Chemical Injection:Chemical Injection:Chemical Injection: Sulphamic Acid is super efficient descaling agent • ATCSATCSATCSATCS: Automated tube Cleaning System online cleaning of the tubes Measures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertaintiesMeasures to prevent scaling: Dealing uncertainties • Online Heat exchanger cleaning (soft ball cleaning system) • Installation of Water filter before the heat exchanger (having back wash arrangements). • Skimming of oil at Injection Water Tank (omni directional pivoted arm skimming arrangement). • Increased backwash frequency. • Preheating of Injection water (prior to u/s of heater, ie steam heating coils in the Injection water Tank) • Low operational pH : an effective way to prevent Calcium Carbonate formation • Engineered Scale inhibitors: that being adsorbed on the surface of calcium carbonate causing delay of crystal growth at very early stages.
  • 20. 20 Page 20 Integration of Asset Management Software with AlarmIntegration of Asset Management Software with AlarmIntegration of Asset Management Software with AlarmIntegration of Asset Management Software with Alarm Management System :ConsiderationsManagement System :ConsiderationsManagement System :ConsiderationsManagement System :Considerations A combination of hardware,hardware,hardware,hardware, softwaresoftwaresoftwaresoftware andandandand servicesservicesservicesservices used to assess the healthhealthhealthhealth ofofofof plantplantplantplant assetsassetsassetsassets by monitoring asset condition periodically or in real-time to identify potentialpotentialpotentialpotential problemsproblemsproblemsproblems before they affectaffectaffectaffect thethethethe processprocessprocessprocess or lead to a catastrophiccatastrophiccatastrophiccatastrophic failurefailurefailurefailure. Plant Measurements & Historian Information Control Systems PAM EAM / CMMS Maintenance Operations * EAM: Enterprise Asset Management CMMS: Computerized Maintenance Management system AM Information Flow AM Systems EAM CMMS Real-Time AM Systems RealRealRealReal----timetimetimetime predictive asset health information with an intelligentintelligentintelligentintelligent analyticalanalyticalanalyticalanalytical engineengineengineengine to predict potential asset problems
  • 21. 21 Audit Trail Maintenance Information Management AssetAssetAssetAsset Monitoring SoftwareMonitoring SoftwareMonitoring SoftwareMonitoring Software ---- Integrated Platform forIntegrated Platform forIntegrated Platform forIntegrated Platform for Maintenance & DiagnosisMaintenance & DiagnosisMaintenance & DiagnosisMaintenance & Diagnosis Core Integrated Maintenance Platform Device status viewing Tuning, Adjustment & Calibration Maintenance Alarm Diagnostics Online Maintenance Core Predictive Diagnostics Core
  • 22. 22 Rate per Operator Acceptability > 1 per minute Unacceptable 1 per 2 minutes Likely Over- Demanding 1 per 5 minutes Manageable 1 per 10 minutes Acceptable Some TargetsSome TargetsSome TargetsSome Targets----Where Do You Stand?Where Do You Stand?Where Do You Stand?Where Do You Stand? You either have a working alarm system or another distraction for operators in the control room. Alarms are intended to forewarn of an event that could lead to major equipment damage, business interruption, safety concern, or environmental risk. Alarms should require immediate operator attention, provide a critical layer of safety, minimize the demands on emergency shutdown systems, diagnose problems before they escalate, and quickly guide operators to clear corrective action. Source: EEMUA 191 Good Alarm Characteristics Relevant Unique Timely Prioritized Understandable Diagnostic Advisory Focusing
  • 23. 23 Alarm NotificationAlarm NotificationAlarm NotificationAlarm Notification ---- Device DiagnosisDevice DiagnosisDevice DiagnosisDevice Diagnosis ((((Device ViewerDevice ViewerDevice ViewerDevice Viewer function)function)function)function) Normal Abnormal
  • 24. 24 Alarm NotificationAlarm NotificationAlarm NotificationAlarm Notification –––– Maintenance AlarmMaintenance AlarmMaintenance AlarmMaintenance Alarm (Blue) GE System 1 Status -Device to be investigated (Orange) GE System 1 Status – Device Non Critical Icon Detail (Green) Healthy by Device Patrol (Red) Maintenance alarming by Device patrol (Yellow) Maintenance Warning By Device patrol (Gray) Communication failure (White) Status not yet confirmed (Background Gray) Alarm Off Un-confirmed alarm
  • 25. 25 PST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) SchedulerPST (Partial Stroke Test) Scheduler PST Scheduler works on the Asset Monitoring Softwareworks on the Asset Monitoring Softwareworks on the Asset Monitoring Softwareworks on the Asset Monitoring Software, and executes andexecutes andexecutes andexecutes and manages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valvesmanages all the partial stroke test (PST) of the emergency shutdown valves by partially operating them during the plant operation with intervals. PST enables to extend the interval of proof test that is to be conducted during the plant shutdown, and it reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdownit reduces the losses caused by the plant shutdown. The combination ofThe combination ofThe combination ofThe combination of ProSafeProSafeProSafeProSafe----RS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valvesRS, Asset Monitoring Software, and ESD valves from various vendorsfrom various vendorsfrom various vendorsfrom various vendors is Asset management Software safety solution to support safe plant operations. PST Scheduler enables planning and execution of PST efficiently and safely to realize more efficient and safer plant operationsto realize more efficient and safer plant operationsto realize more efficient and safer plant operationsto realize more efficient and safer plant operations
  • 26. 26 IntegratingIntegratingIntegratingIntegrating Asset Monitoring Software with AlarmAsset Monitoring Software with AlarmAsset Monitoring Software with AlarmAsset Monitoring Software with Alarm Management System:Management System:Management System:Management System: BenefitsBenefitsBenefitsBenefits Acquire and display the device diagnosis information Notify the alarms related to the field devices Manage the field device information Record the historical and maintenance messages Receive Real Time KPIs Receive Alerts View Production screens Issue orders, setpoints, etc. View Production reports Enables management by exception