TRIC Training Log:  09-30-04 Client: West Point Solutions, San Mateo, CA Job: Apartment Complex, replace broken and clogged line Pull: 90’ / downstream / 6” SDR17 / bursting 6” AC
We at TRIC Tools have specific requirements for the use and maintenance of our equipment with regard to safety and efficiency on the job. Our written and verbal recommendations coincide with safety regulations set by local, state, and national government agencies. Our clients may have standards over and above industry regulations. However, the safety equipment, apparel, and operating procedures demonstrated by our clients in this presentation may or may not comply with above mentioned government regulations.
Entry pit:   Washed out and backed up due to collapsed or root infested pipe downstream. Sewer passes under and alongside utility room foundation at this point.
Exit (pulling) pit:   Also washed out (landfill at bay’s edge), requiring constant sump pumping.
Backup release:   Worker drills pilot hole in sewer at upstream (entry) pit to release backflow from blockage downstream between pits. Note gas and irrigation lines.
Diversion:   Removing backflow from work area.
Entry prepared:   Excess water is pumped out and concrete pipe section removed. Note coupling (and plug) on upstream section where new pipe will be connected.
Entry:   A “saddle” is cut out at edge of pit. Just a few shovel strokes can ease entry angle immensely.
The wonders of PE pipe:   100’ section of pipe curves to accommodate the surrounding buildings.
Easy turn:   Impossible with any other type of pipe, with PE this entry is relatively simple.
Shoring:   In this case, 10-foot sections of 2” galvanized pipe are used to support pull. Area behind resistance plate is completely collapsed, yet upper wall is intact and useful.
Cable view:   Sump pump is in continuous use to keep pulley and cable visible. Ram can operate completely immersed; however, operator needs to see when clevis appears at threshold of pulley base.
Best Vantage Point:   Out of the hole and with a view of pulley from above. (In this case, there was plenty of open area to watch for the clevis and bursting head in the wash-out behind the resistance plate and steel poles.)
Safe Landing:   Extender cage was used against galvanized pipe shoring to extract last couple of feet.
Bumping:   In most cases involving 4” and 6” pipe, a 12 to 16 pound sledge hammer will move the pipe along nicely after the cable and bursting head are removed.
PE pipe “memory”:   At entry pit, pipe will hold the curve resulting from flexed entry. Note pin bar used to hold pipe down while cleanup is underway.

More Related Content

PPT
Subsea well intervention: Learning from the past - planning for the future
PPT
Plug & Abandonment
PPS
2004 0520 Tx
PPS
2005 0928 CA
PDF
Transitioin_Sleeve 2014E
PPS
2005 0324 Fl
DOC
Bj news cement squeeze job - vlc-1433
PPTX
How to Install Water Pump | Water Pump Installation - Pumpkart.com
Subsea well intervention: Learning from the past - planning for the future
Plug & Abandonment
2004 0520 Tx
2005 0928 CA
Transitioin_Sleeve 2014E
2005 0324 Fl
Bj news cement squeeze job - vlc-1433
How to Install Water Pump | Water Pump Installation - Pumpkart.com

What's hot (19)

PPTX
How to install centrifugal water pump
PPT
maintenance of gates
PDF
Safety inspection of gates
PPT
fabrication,erection and repairing oF Dam's Gate
PPT
Submersible Pumps Trouble Shooting
PPSX
Methods of holding work piece
PPTX
Well intervention
PPTX
PIPE LAYING
PPT
inspection of gates of Dam
PDF
Wellhead basics
PPT
Pitfalls Of Pumps Piping
PPTX
ZURN BACKFLOW PREVENTER
PDF
RAMEN Ball Sector Valve
PDF
Offshore platform slot recovery process
PDF
Coiled Tubing Conveyed Perforations
DOC
C489
PDF
Site Report
PPTX
Stop valve ppt
How to install centrifugal water pump
maintenance of gates
Safety inspection of gates
fabrication,erection and repairing oF Dam's Gate
Submersible Pumps Trouble Shooting
Methods of holding work piece
Well intervention
PIPE LAYING
inspection of gates of Dam
Wellhead basics
Pitfalls Of Pumps Piping
ZURN BACKFLOW PREVENTER
RAMEN Ball Sector Valve
Offshore platform slot recovery process
Coiled Tubing Conveyed Perforations
C489
Site Report
Stop valve ppt
Ad

Viewers also liked (20)

PPTX
Limitations of AS/NZ2566.1 For The Trenchless Technology Industry
PDF
Pneumatic Pipe Bursting Systems
PPT
In Rural Trenchless Apps
PPTX
Pipe Bursting Project Considerations
PPTX
TRENCHLESS TECHNOLOGY
PPT
Trenchless technology
PPT
Seminari habilitats socials. Lleida
PPT
PPT
Limpeza do percurso do Corta-mato
PDF
LAMP_TRAINING_SESSION_3
PPTX
Obsluga srodowiska programistycznego - Badanie programistów
ODP
ASPgems Company Profile
PPS
2004 0513 Ca
PDF
Santa Ana, CA 6/19/04
PDF
Kamil brzezinski allegro - dlaczego nie warto tworzyc aplikacji na i phone
PPT
PPS
2004 0824 Mt
PPT
Corta-Mato 07/08 EST
PDF
LAMP_TRAINING_SESSION_6
Limitations of AS/NZ2566.1 For The Trenchless Technology Industry
Pneumatic Pipe Bursting Systems
In Rural Trenchless Apps
Pipe Bursting Project Considerations
TRENCHLESS TECHNOLOGY
Trenchless technology
Seminari habilitats socials. Lleida
Limpeza do percurso do Corta-mato
LAMP_TRAINING_SESSION_3
Obsluga srodowiska programistycznego - Badanie programistów
ASPgems Company Profile
2004 0513 Ca
Santa Ana, CA 6/19/04
Kamil brzezinski allegro - dlaczego nie warto tworzyc aplikacji na i phone
2004 0824 Mt
Corta-Mato 07/08 EST
LAMP_TRAINING_SESSION_6
Ad

Similar to 2004 0930 Ca (20)

PPT
West Palm Beach, FL 3/24/2005
PPS
2004 0923 Ca
PPS
2004 0722 Ca
PPS
2004_0619CA
PDF
Rehab Solutions for Today's Infrastructure
PPT
TRIC Trenchless LA building & safety
PPTX
Pipe Extrusion Line
PDF
Failure in synthesis converter
PDF
Linestop.com - Chevron Phillips HDPE Linestops Bypass
PPT
Sub Station Training Program
PDF
Wastewater pump station_design_problems_and_solutions
PPTX
Conventional shaft sinking by manual means
PPS
2004_0605TN
PPT
Pipe Support & EJ Field Examples & Case Studies
PPS
Oakland, CA 8/17/2004
PPT
POTW Showcase Webinar - August
PDF
Stage presentation v07
DOCX
PPT
Pipe Support Field Examples & Case Studies
PPT
Product of the Week Showcase - May
West Palm Beach, FL 3/24/2005
2004 0923 Ca
2004 0722 Ca
2004_0619CA
Rehab Solutions for Today's Infrastructure
TRIC Trenchless LA building & safety
Pipe Extrusion Line
Failure in synthesis converter
Linestop.com - Chevron Phillips HDPE Linestops Bypass
Sub Station Training Program
Wastewater pump station_design_problems_and_solutions
Conventional shaft sinking by manual means
2004_0605TN
Pipe Support & EJ Field Examples & Case Studies
Oakland, CA 8/17/2004
POTW Showcase Webinar - August
Stage presentation v07
Pipe Support Field Examples & Case Studies
Product of the Week Showcase - May

More from TRIC Tools (18)

PPS
Valco Mall 5/13/2004
PPS
Burbank, CA 5/25/2004
PDF
2007 04 27 Japan
PDF
2006 06 Squaw Valley
PDF
Tric Patents
PDF
2005 0504 Ca
PDF
2006 0515 Ca
PDF
TRIC High Performance Infrastructure
PDF
Ram Detensioning
PPS
2004_0525CA
PDF
2007 0516 Nj
PDF
2006 1114 Ca
PPS
2004 0903 Ca
PPS
2004 0817 Ca
PPS
2004 0804 Tx
PPS
2004_0528CA
PDF
2007 0709 Ca
PDF
2007 0419 Ca
Valco Mall 5/13/2004
Burbank, CA 5/25/2004
2007 04 27 Japan
2006 06 Squaw Valley
Tric Patents
2005 0504 Ca
2006 0515 Ca
TRIC High Performance Infrastructure
Ram Detensioning
2004_0525CA
2007 0516 Nj
2006 1114 Ca
2004 0903 Ca
2004 0817 Ca
2004 0804 Tx
2004_0528CA
2007 0709 Ca
2007 0419 Ca

Recently uploaded (20)

PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PDF
ICv2 White Paper - Gen Con Trade Day 2025
PPT
Lecture notes on Business Research Methods
PDF
income tax laws notes important pakistan
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PDF
Environmental Law Communication: Strategies for Advocacy (www.kiu.ac.ug)
PDF
Introduction to Generative Engine Optimization (GEO)
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PPTX
Astra-Investor- business Presentation (1).pptx
DOCX
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
basic introduction to research chapter 1.pptx
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
533158074-Saudi-Arabia-Companies-List-Contact.pdf
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
ICv2 White Paper - Gen Con Trade Day 2025
Lecture notes on Business Research Methods
income tax laws notes important pakistan
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
Environmental Law Communication: Strategies for Advocacy (www.kiu.ac.ug)
Introduction to Generative Engine Optimization (GEO)
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
Astra-Investor- business Presentation (1).pptx
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
Lecture 3344;;,,(,(((((((((((((((((((((((
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
basic introduction to research chapter 1.pptx
IITM - FINAL Option - 01 - 12.08.25.pptx
Hand book of Entrepreneurship 4 Chapters.docx
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij

2004 0930 Ca

  • 1. TRIC Training Log: 09-30-04 Client: West Point Solutions, San Mateo, CA Job: Apartment Complex, replace broken and clogged line Pull: 90’ / downstream / 6” SDR17 / bursting 6” AC
  • 2. We at TRIC Tools have specific requirements for the use and maintenance of our equipment with regard to safety and efficiency on the job. Our written and verbal recommendations coincide with safety regulations set by local, state, and national government agencies. Our clients may have standards over and above industry regulations. However, the safety equipment, apparel, and operating procedures demonstrated by our clients in this presentation may or may not comply with above mentioned government regulations.
  • 3. Entry pit: Washed out and backed up due to collapsed or root infested pipe downstream. Sewer passes under and alongside utility room foundation at this point.
  • 4. Exit (pulling) pit: Also washed out (landfill at bay’s edge), requiring constant sump pumping.
  • 5. Backup release: Worker drills pilot hole in sewer at upstream (entry) pit to release backflow from blockage downstream between pits. Note gas and irrigation lines.
  • 6. Diversion: Removing backflow from work area.
  • 7. Entry prepared: Excess water is pumped out and concrete pipe section removed. Note coupling (and plug) on upstream section where new pipe will be connected.
  • 8. Entry: A “saddle” is cut out at edge of pit. Just a few shovel strokes can ease entry angle immensely.
  • 9. The wonders of PE pipe: 100’ section of pipe curves to accommodate the surrounding buildings.
  • 10. Easy turn: Impossible with any other type of pipe, with PE this entry is relatively simple.
  • 11. Shoring: In this case, 10-foot sections of 2” galvanized pipe are used to support pull. Area behind resistance plate is completely collapsed, yet upper wall is intact and useful.
  • 12. Cable view: Sump pump is in continuous use to keep pulley and cable visible. Ram can operate completely immersed; however, operator needs to see when clevis appears at threshold of pulley base.
  • 13. Best Vantage Point: Out of the hole and with a view of pulley from above. (In this case, there was plenty of open area to watch for the clevis and bursting head in the wash-out behind the resistance plate and steel poles.)
  • 14. Safe Landing: Extender cage was used against galvanized pipe shoring to extract last couple of feet.
  • 15. Bumping: In most cases involving 4” and 6” pipe, a 12 to 16 pound sledge hammer will move the pipe along nicely after the cable and bursting head are removed.
  • 16. PE pipe “memory”: At entry pit, pipe will hold the curve resulting from flexed entry. Note pin bar used to hold pipe down while cleanup is underway.