The document is a final report summarizing the design of a sediment trap for a research flume. It describes the initial designs considered and the final designs selected, including drawings and calculations. The sediment trap will trap and continuously weigh sediment in the flume before removing and transporting it to a dumpster, separating the sediment from the water for recirculation.
Related topics: