Setting Up Points of Distribution in Fort Bend County
Some Preliminary Assumptions……. A Catastrophic Event (e.g. Hurricane Ike) will require a vast amount of emergency resources in order to respond to the emergency needs of affected communities.  Citizens, businesses, state agencies, and industries will provide their own resources for the first three days; however, the need may exist to provide a limited amount of life sustaining resources to the community due to loss of infrastructure. Points of Distribution will be needed at the local level to support the distribution of life sustaining supplies to the community.
What are Points of Distribution or PODs? Points of Distribution Points of Distribution are centralized locations where the public picks up life sustaining commodities following a disaster or emergency Commodities usually include shelf stable food and water
Overview 2008 : Hurricane Ike Discussion : Lessons Learned About PODs 2009 : POD Preparations Best Practices : PODs
Hurricane Ike
Hurricane Ike Hits Galveston, Sept 13 2009
Ike Winds Approximately 110 mph at Landfall Landfall in Galveston at 2:00 AM on Saturday In Fort Bend County, duration of tropical storm force winds approximately 14 hours
Hurricane Ike Strikes Fort Bend County 20 homes destroyed 7,000 homes damaged 130,000 homes affected 3 dead, 8 injured, 4 hospitalized
Widespread Power Outages in Fort Bend County 67% of electrical services out One week later, still 25% of services out Impacts water and wastewater utilities severely
Cities Open POD Sites in County, Sept 16 2009 6 POD sites open County establishes POD re-supply site at County Fairgrounds Stafford POD site serves over 150,000 people
Lessons Learned About PODs
The Good……… Satisfied a Community Need  Excellent Volunteer Response Public – Private Collaboration Good Communication between Cities and County Logistics Console Government Works!
The Bad……. Self-Reporting Volunteers   Volunteers who Brought Children to Site Equipment Needs (fork lifts, pallet jacks) Personnel Needs (trained equipment operators) Support Needs (tents, toilets, dumpsters) Potential Liability Issues
The Ugly………. Frustrated citizens who treated the volunteers poorly Need for better communication about where PODs were located and hours of operations Citizens who complained about PODs shutting down, even though retail stores had re-opened Delivery of POD resources in the middle of the night when volunteers were unavailable
2009 POD Preparations
It is up to each individual city to: Determine the  location  and  type  of POD Coordinate the activation of the POD Designate resources for each POD Activate the POD Operate POD until demobilized Notify the County EOC that POD is operational
Types of PODs Type I: 20,000 persons per day, 560 vehicles per hour Type II: 10,000 persons per day, 280 vehicles per hour Type III: 5,000 persons per day, 140 vehicles per hour
Identification of POD Locations In Spring, County OEM requested that each municipality identify POD locations Information such as Points of Contacts; Type: Physical Address; GPS Coordinates; gathered by County OEM Information on 12 sites sent to TDEM
Fort Bend County POD Locations
Some POD Best Practices
The 4 S’s Staffing Site Layout Support Safety
STAFFING The  POD Manager  has overall responsibility for the safe operation of the POD   The  Loading Team  conducts loading operations and sustainment of staff, including customer commodity loading, overseeing staff feeding, establishing shift schedules, trash removal, maintenance of restrooms The  Support Team  supports the loading line by resupplying loading points, unloading bulk commodities, maintaining traffic control, and providing community relations
POD Staffing Org Chart
POD Staffing & POD Types Type III POD .  It serves 5,000 people a day based on one vehicle representing a household of 3 people.  A Type III POD is 150 feet by 300 feet and  requires a staff of 19 per day .  Three loading points and one vehicle lane are used. Type II POD . is twice the size of a Type III and serves 10,000 people a day based on one vehicle representing a household of 3 people.  A Type II POD is 250 feet by 300 feet and  requires a staff of 34 per day .  Six loading points and two vehicle lanes are used. Type I POD .  A Type I POD serves 20,000 people a day based on one vehicle representing a household of 3 people.  A Type I POD is 250 feet by 500 feet and  requires a staff of 78 per day .  Type I PODs are only used in large metropolitan areas.  Twelve loading points and four vehicle lanes are used.
SITE LAYOUT What type of POD?  Vehicle, pedestrian or mass transit?  Are there entrance and exit concerns?  Is there more than one entry/exit point?  What is the traffic flow around the site?  Will residents have to cross a busy street?  Will this POD Site halt the surrounding traffic and cause a traffic jam?  Will this site impede emergency response vehicles?  Are there turns within the site or at the entry/exit points that require extra maneuvering?  Can large semi trailer trucks get in and out without assistance?  Is the POD in a location that may flood?  Is there debris on the site that could injure someone?  Is there a structure that could fall on the POD?
A POD is divided into three areas: The  SUPPLY LINE  is where supply trucks, usually tractor-trailers, have room to unload.  This area also includes staff care facilities including restroom facilities and rest tent.  Having an informational bulletin board in the rest tent is a good way to keep your staff updated. The  LOADING LINE  is where supplies are kept waiting on stacked pallets to be distributed to the public. This is also where loaders wait while vehicles are moving through the Vehicle Line.  The  VEHICLE LINE  is where the public drives through to get supplies.  Entry into the vehicle line occurs only when all vehicles have come to a complete stop and the Traffic Controller has instructed the staff to “LOAD”.
POD Type III Site Layout:
POD Type II Site Layout:
POD Type I Site Layout:
SUPPORT At each POD location, it is best to have POD kit(s) on site to support the initial setup of the POD.  Each POD kit is designed for a Type III POD.  If a Type II POD is established at that site, the site should have  two  kits.  A Type I POD would need  four  kits.  The POD kit has supplies for the site and  individual staff positions.
Type III Pod Kit to Support Initial POD Setup One (1) 96 gal trash can, wheeled (for storage of the kit) Sixteen (16) pairs of leather work gloves Four (4) rolls of duct tape Nineteen (19) battery-powered (D-cell) flashlights Nineteen (19) reflective safety vests One (1) First Aid Kit Twelve (12) 36”, reflective traffic cones Sixteen (16) safety hard hats Thirty (30) orange or red glow sticks Thirty six (36) D-cell, batteries Eight (8) medium back support belts or vests Eight (8) large back support belts or vests One (1) 5 lb. fire extinguisher
Other Items Needed to Support Site: Dumpster Portable Restrooms Break Area Light Tower Fort Lifts Pallet Jacks
SAFETY The POD Manager is the primary safety officer and is responsible for the safety of all staff and visitors to the site The POD Manager trains the staff on proper and safe operation of all equipment and ensures safety measures are enforced  The POD Manager conducts safety training with staff and provides a safety briefing at the beginning of each shift The POD Manager accomplishes a site hazard assessment daily, develops preventive safety measures and communicates this to all staff
Safety by providing adequate space: When setting up a POD, there is a minimum space for each area: Vehicle Line – 20 feet wide Loading Point – 80 feet by 40 feet each Supply Line – 50 feet wide Use Traffic Cones and Signs to Improve Traffic Flow
Enhance Safety through use of PPE: Use of Personal Protective Equipment may include: Head Protection Hard Hats Hats w/ wide brims Hand Protection Leather Work Gloves High Visibility Vests Reflective traffic vests for all personnel Not only for safety, but worker identification Illumination Flashlights Glow sticks
Still thirsty for more POD knowledge?
For More Information: IS-26 Guide to Points of Distribution Course Overview   This guide was developed to provide an in-depth look into the planning, operations, and demobilization stages of a POD mission. The lessons detail the staffing and procedures any jurisdiction will need to plan for, execute, and shut down POD operations. The guide also includes key lessons such as safety, equipment, and resource accountability. http://training.fema.gov/EMIWeb/IS/is26.asp

More Related Content

PDF
COVID-19: THE WHEELY STANDARDS
PDF
PDF
529 Distribution Analysis 2015
PDF
Sales strategy pepsi tropicana
DOCX
Project report. amul
PPTX
Feasibility report -basic concepts with example
PDF
Project planning and feasibility study
PPTX
What is a Crisis Intervention Team?
COVID-19: THE WHEELY STANDARDS
529 Distribution Analysis 2015
Sales strategy pepsi tropicana
Project report. amul
Feasibility report -basic concepts with example
Project planning and feasibility study
What is a Crisis Intervention Team?

More from Fort Bend County Office of Emergency Management (20)

PPTX
Greater Harris County Text-to-911
PPTX
Rosenberg Police Department's Use of Social Media
PPT
Fort bend flood management association feb 16 2013
PPT
Fort Bend County Flood Management Association Conclusion
PPTX
PPTX
PPT
Fort Bend Regional S.W.A.T. Team
PPTX
The 2012 Gulf Hurricane Season
PPTX
Medical Reserve Corps in Fort Bend County
PPTX
The San Jacinto All Hazards Incident Management Team (AHIMT)
PDF
PDF
Fort Bend County LEPC Hazardous Materials Commodity Flow Study
PPT
Hurricane Preparedness in Fort Bend County
PPT
Engaging The Conversation ( Homeland Security Conference)
PPT
Municipal Utility Districts and Emergency Response
PDF
Denise Davis' Pictures from the Haiti Earthquake
Greater Harris County Text-to-911
Rosenberg Police Department's Use of Social Media
Fort bend flood management association feb 16 2013
Fort Bend County Flood Management Association Conclusion
Fort Bend Regional S.W.A.T. Team
The 2012 Gulf Hurricane Season
Medical Reserve Corps in Fort Bend County
The San Jacinto All Hazards Incident Management Team (AHIMT)
Fort Bend County LEPC Hazardous Materials Commodity Flow Study
Hurricane Preparedness in Fort Bend County
Engaging The Conversation ( Homeland Security Conference)
Municipal Utility Districts and Emergency Response
Denise Davis' Pictures from the Haiti Earthquake
Ad

Recently uploaded (20)

PPTX
Core Concepts of Personalized Learning and Virtual Learning Environments
PDF
LEARNERS WITH ADDITIONAL NEEDS ProfEd Topic
PDF
English Textual Question & Ans (12th Class).pdf
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Empowerment Technology for Senior High School Guide
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
Computer Architecture Input Output Memory.pptx
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Journal of Dental Science - UDMY (2021).pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
My India Quiz Book_20210205121199924.pdf
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PPTX
Education and Perspectives of Education.pptx
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
PDF
Race Reva University – Shaping Future Leaders in Artificial Intelligence
PPTX
What’s under the hood: Parsing standardized learning content for AI
PDF
Hazard Identification & Risk Assessment .pdf
Core Concepts of Personalized Learning and Virtual Learning Environments
LEARNERS WITH ADDITIONAL NEEDS ProfEd Topic
English Textual Question & Ans (12th Class).pdf
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Empowerment Technology for Senior High School Guide
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Computer Architecture Input Output Memory.pptx
Virtual and Augmented Reality in Current Scenario
What if we spent less time fighting change, and more time building what’s rig...
Journal of Dental Science - UDMY (2021).pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
My India Quiz Book_20210205121199924.pdf
Cambridge-Practice-Tests-for-IELTS-12.docx
Education and Perspectives of Education.pptx
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
LIFE & LIVING TRILOGY- PART (1) WHO ARE WE.pdf
Race Reva University – Shaping Future Leaders in Artificial Intelligence
What’s under the hood: Parsing standardized learning content for AI
Hazard Identification & Risk Assessment .pdf
Ad

Setting Up Points of Distribution in Fort Bend County

  • 1. Setting Up Points of Distribution in Fort Bend County
  • 2. Some Preliminary Assumptions……. A Catastrophic Event (e.g. Hurricane Ike) will require a vast amount of emergency resources in order to respond to the emergency needs of affected communities. Citizens, businesses, state agencies, and industries will provide their own resources for the first three days; however, the need may exist to provide a limited amount of life sustaining resources to the community due to loss of infrastructure. Points of Distribution will be needed at the local level to support the distribution of life sustaining supplies to the community.
  • 3. What are Points of Distribution or PODs? Points of Distribution Points of Distribution are centralized locations where the public picks up life sustaining commodities following a disaster or emergency Commodities usually include shelf stable food and water
  • 4. Overview 2008 : Hurricane Ike Discussion : Lessons Learned About PODs 2009 : POD Preparations Best Practices : PODs
  • 6. Hurricane Ike Hits Galveston, Sept 13 2009
  • 7. Ike Winds Approximately 110 mph at Landfall Landfall in Galveston at 2:00 AM on Saturday In Fort Bend County, duration of tropical storm force winds approximately 14 hours
  • 8. Hurricane Ike Strikes Fort Bend County 20 homes destroyed 7,000 homes damaged 130,000 homes affected 3 dead, 8 injured, 4 hospitalized
  • 9. Widespread Power Outages in Fort Bend County 67% of electrical services out One week later, still 25% of services out Impacts water and wastewater utilities severely
  • 10. Cities Open POD Sites in County, Sept 16 2009 6 POD sites open County establishes POD re-supply site at County Fairgrounds Stafford POD site serves over 150,000 people
  • 12. The Good……… Satisfied a Community Need Excellent Volunteer Response Public – Private Collaboration Good Communication between Cities and County Logistics Console Government Works!
  • 13. The Bad……. Self-Reporting Volunteers Volunteers who Brought Children to Site Equipment Needs (fork lifts, pallet jacks) Personnel Needs (trained equipment operators) Support Needs (tents, toilets, dumpsters) Potential Liability Issues
  • 14. The Ugly………. Frustrated citizens who treated the volunteers poorly Need for better communication about where PODs were located and hours of operations Citizens who complained about PODs shutting down, even though retail stores had re-opened Delivery of POD resources in the middle of the night when volunteers were unavailable
  • 16. It is up to each individual city to: Determine the location and type of POD Coordinate the activation of the POD Designate resources for each POD Activate the POD Operate POD until demobilized Notify the County EOC that POD is operational
  • 17. Types of PODs Type I: 20,000 persons per day, 560 vehicles per hour Type II: 10,000 persons per day, 280 vehicles per hour Type III: 5,000 persons per day, 140 vehicles per hour
  • 18. Identification of POD Locations In Spring, County OEM requested that each municipality identify POD locations Information such as Points of Contacts; Type: Physical Address; GPS Coordinates; gathered by County OEM Information on 12 sites sent to TDEM
  • 19. Fort Bend County POD Locations
  • 20. Some POD Best Practices
  • 21. The 4 S’s Staffing Site Layout Support Safety
  • 22. STAFFING The POD Manager has overall responsibility for the safe operation of the POD The Loading Team conducts loading operations and sustainment of staff, including customer commodity loading, overseeing staff feeding, establishing shift schedules, trash removal, maintenance of restrooms The Support Team supports the loading line by resupplying loading points, unloading bulk commodities, maintaining traffic control, and providing community relations
  • 24. POD Staffing & POD Types Type III POD . It serves 5,000 people a day based on one vehicle representing a household of 3 people. A Type III POD is 150 feet by 300 feet and requires a staff of 19 per day . Three loading points and one vehicle lane are used. Type II POD . is twice the size of a Type III and serves 10,000 people a day based on one vehicle representing a household of 3 people. A Type II POD is 250 feet by 300 feet and requires a staff of 34 per day . Six loading points and two vehicle lanes are used. Type I POD . A Type I POD serves 20,000 people a day based on one vehicle representing a household of 3 people. A Type I POD is 250 feet by 500 feet and requires a staff of 78 per day . Type I PODs are only used in large metropolitan areas. Twelve loading points and four vehicle lanes are used.
  • 25. SITE LAYOUT What type of POD? Vehicle, pedestrian or mass transit? Are there entrance and exit concerns? Is there more than one entry/exit point? What is the traffic flow around the site? Will residents have to cross a busy street? Will this POD Site halt the surrounding traffic and cause a traffic jam? Will this site impede emergency response vehicles? Are there turns within the site or at the entry/exit points that require extra maneuvering? Can large semi trailer trucks get in and out without assistance? Is the POD in a location that may flood? Is there debris on the site that could injure someone? Is there a structure that could fall on the POD?
  • 26. A POD is divided into three areas: The SUPPLY LINE is where supply trucks, usually tractor-trailers, have room to unload. This area also includes staff care facilities including restroom facilities and rest tent. Having an informational bulletin board in the rest tent is a good way to keep your staff updated. The LOADING LINE is where supplies are kept waiting on stacked pallets to be distributed to the public. This is also where loaders wait while vehicles are moving through the Vehicle Line. The VEHICLE LINE is where the public drives through to get supplies. Entry into the vehicle line occurs only when all vehicles have come to a complete stop and the Traffic Controller has instructed the staff to “LOAD”.
  • 27. POD Type III Site Layout:
  • 28. POD Type II Site Layout:
  • 29. POD Type I Site Layout:
  • 30. SUPPORT At each POD location, it is best to have POD kit(s) on site to support the initial setup of the POD. Each POD kit is designed for a Type III POD. If a Type II POD is established at that site, the site should have two kits. A Type I POD would need four kits. The POD kit has supplies for the site and individual staff positions.
  • 31. Type III Pod Kit to Support Initial POD Setup One (1) 96 gal trash can, wheeled (for storage of the kit) Sixteen (16) pairs of leather work gloves Four (4) rolls of duct tape Nineteen (19) battery-powered (D-cell) flashlights Nineteen (19) reflective safety vests One (1) First Aid Kit Twelve (12) 36”, reflective traffic cones Sixteen (16) safety hard hats Thirty (30) orange or red glow sticks Thirty six (36) D-cell, batteries Eight (8) medium back support belts or vests Eight (8) large back support belts or vests One (1) 5 lb. fire extinguisher
  • 32. Other Items Needed to Support Site: Dumpster Portable Restrooms Break Area Light Tower Fort Lifts Pallet Jacks
  • 33. SAFETY The POD Manager is the primary safety officer and is responsible for the safety of all staff and visitors to the site The POD Manager trains the staff on proper and safe operation of all equipment and ensures safety measures are enforced The POD Manager conducts safety training with staff and provides a safety briefing at the beginning of each shift The POD Manager accomplishes a site hazard assessment daily, develops preventive safety measures and communicates this to all staff
  • 34. Safety by providing adequate space: When setting up a POD, there is a minimum space for each area: Vehicle Line – 20 feet wide Loading Point – 80 feet by 40 feet each Supply Line – 50 feet wide Use Traffic Cones and Signs to Improve Traffic Flow
  • 35. Enhance Safety through use of PPE: Use of Personal Protective Equipment may include: Head Protection Hard Hats Hats w/ wide brims Hand Protection Leather Work Gloves High Visibility Vests Reflective traffic vests for all personnel Not only for safety, but worker identification Illumination Flashlights Glow sticks
  • 36. Still thirsty for more POD knowledge?
  • 37. For More Information: IS-26 Guide to Points of Distribution Course Overview This guide was developed to provide an in-depth look into the planning, operations, and demobilization stages of a POD mission. The lessons detail the staffing and procedures any jurisdiction will need to plan for, execute, and shut down POD operations. The guide also includes key lessons such as safety, equipment, and resource accountability. http://training.fema.gov/EMIWeb/IS/is26.asp