#1 Assignment Objectives
Explain the bid and proposal process to include preparing RFP
requirements, preparing a proposal, responding to and
evaluating bids, and contract formation.
Explain the use of contracting and procurement in project
management, with a focus on understanding specialized
contracting terms, defining proposal strategies, and evaluating
proposal strengths and weaknesses
400 words
Sometimes, the best solution in accomplishing work or
acquiring a component required for a project is to procure to
outside sources. Some of the pros for opting for an outside
source might include the ability to deliver a better product
because the source may have expertise or it may take the
outside source less time than it would take if completed in-
house. Some of the cons, however, are that there may be non-
delivery, or specifications may not be met. Selecting the best
provider or seller and having a contract with complete terms
and conditions are a few of the best ways to accomplish a
successful procurement experience. You will be evaluating
different types of contracts for a potential project deliverable
that you intend to procure as part of an overall project you will
be selecting in the Individual Project for this week.
Research at least 2 sources (which may include your textbook)
to support your response.
•Compare and contrast all of the types of contract listed in the
PMBOK® Guide.
•In your opinion, which is the best type of contract? Why?
•What criteria would you use to determine whether it is better to
contract out the work or develop it internally as part of the
project?
#2 Assignment Objectives
Explain the bid and proposal process to include preparing RFP
requirements, preparing a proposal, responding to and
evaluating bids, and contract formation.
Explain the use of contracting and procurement in project
management, with a focus on understanding specialized
contracting terms, defining proposal strategies, and evaluating
proposal strengths and weaknesses
2000 words
Overview
Project contract and procurement management involves making
a decision to outsource work, developing a statement of work,
submitting a request for proposal, awarding the contract, and
then managing the procurements until contract completion.
Having a detailed procurement plan lowers the risk for
nonfulfillment of contracted work. In this class, you are asked
to develop a Contract and Procurement Plan that identifies
planning and execution components from developing the
statement of work through the final contract delivery. You will
select a project that you may have developed in a previous class
or a known project in your organization to create this plan for.
Throughout this course, you will be working on developing
several components of the final Key Assignment. Additional
information and the deliverables for each Individual Project will
be provided in the assignment description for this project.
In this first Individual Project, you are asked to develop the
outline of the sections that will be included in the Contract and
Procurement Plan document, as well as a draft of a proposal to
submit to your instructor. The other information you will
include is a high-level description of the project you will be
conducting the project procurements for.
You will also be setting up the final Key Assignment outline
that you will add to each week. The combined Individual
Project (IP) assignments will be your final Key Assignment
deliverable.
Project Selection:
The first step will be to select a project for which you wish to
develop a contract and procurement plan. This project will be
used as the basis for each of the assignments throughout the
course and should conform to the following guidelines:
•Nontrivial: The selected project candidate should reflect a real
life project.
•Domain knowledge: You will be applying knowledge of this
project to address assignments related to purchasing products or
services outside the project team work, which requires the
fulfillment of terms laid out in a contract.
Select a project that fit these requirements, and submit your
proposal to your instructor before proceeding further with the
assignments in the course. Approval should be sought within the
first few days of the course. Your instructor will tell you how to
submit this proposal and what notification will be given for
project approval.
Assignment:
Your first task in this process will be to select a project to use
as the basis of your Key Assignment. You will also create the
shell document for the final project Key Assignment document
deliverable that you will be working on throughout the course.
As you proceed through each phase of the project, you will add
content to each section of the final document to gradually
complete the final project delivery, which is the Contract &
Procurement Management Plan.
The project deliverables are as follows:
1.Submit your project proposal to instructor for approval.
2.Contract & Procurement Management Plan Document Shell
◦Use Microsoft Word
◦Title Page
i.Course number and name
ii.Project name
iii.Your name
iv.Date
◦Table of Contents i.Use auto-generated TOC
ii.Separate page
iii.Maximum of 3 levels deep
iv.Update the fields of the TOC so it is up-to-date before
submitting your project
◦Section Headings (Create each heading on a new page with
TBD as content except for sections listed under New Content
below.) i.Project outline
ii.Make or buy analysis
iii.Contract type selection
iv.Request for proposal (RFP)
v.Statement of work (SOW)
vi.Source selection criteria
vii.Procurement contract award
viii.Procurement risks
ix.Procurement management process
x.Contract administration process
xi.Change control process
xii.Quality control plan
xiii.Performance reporting plan
xiv.Project procurement legal rights & responsibilities
xv.Project procurement closeout
3.New Content to be Inserted in Above Shell ◦Project Outline
i.Brief description of the project
ii.Material taken from approved proposal submitted to instructor
will serve as the draft for the proposal
iii.Project must be approved by the instructor
◦Make or Buy Analysis i.Discuss why the procurement portion
of the selected project is going to be sourced out (or buy).
ii.Discuss pros and cons of making (or keeping within the
project team to do) versus sourcing out.
iii.Include a financial and schedule deadline justification.
◦Contract Type Selection i.Discuss the pros and cons of at least
3 contract types for this project.
ii.Identify the final contract type selected with a justification.
#3Assignment Objectives
Explain the bid and proposal process to include preparing RFP
requirements, preparing a proposal, responding to and
evaluating bids, and contract formation
400 words
Now that a decision has been made to outsource, there are a few
steps before the work commences. First, it is recommended that
at least 3 different vendors are solicited with a request for
proposal (RFP). This RFP should include scope of the project
and proposed time, along with other important sections. The
statement of work will thoroughly outline all of the work you
are requesting of the selected RFP. You will be researching
templates for both the RFP and the statement of work that work
best for your selected project.
Primary Task Response: Within the Discussion Board area,
write 350–600 words that respond to the following questions
with your thoughts, ideas, and comments. This will be the
foundation for future discussions by your classmates. Be
substantive and clear, and use examples to reinforce your ideas.
Research at least 2 sources (which may include your textbook)
to support your response.
•Research and present at least 2 templates for request for
proposal (RFP) that most closely align with your Key
Assignment project.
•Research and present at least 2 templates for statement of work
(SOW) that most closely aligns with your Key Assignment
project.
•Research and present at least 2 templates for procurement
contract award that most closely aligns with your Key
Assignment project.
•Why is using standard templates for the statement of work,
RFP, and procurement contract award so important?
Be sure to include an introduction and conclusion as well. Be
sure to also include your references (in APA format).
#4 Assignment Objectives
Explain the bid and proposal process to include preparing RFP
requirements, preparing a proposal, responding to and
evaluating bids, and contract formation.
800 words
For this assignment, you will select the best RFP, SOW
template, and procurement contract award template that you
researched in the Discussion Board. You should have at least 6
sections in each of the templates. Your next task is to fill in all
of your relevant project information in each of the templates.
For the compilation of your source selection criteria, you may
use similar to the following table or matrix:
Deliverables
The overall project deliverables are as follows:
•Update the Key Assignment document title page with the new
date and project name.
•Update previously completed sections based on instructor
feedback.
•Complete new content below, and copy it under the sections in
Key Assignment document called Request for Proposal,
Statement of Work, and Source Selection Criteria.
New content to be inserted is as follows:
1.Request For Proposal (RFP) i.Fill in all of the sections in the
selected RFP with sufficient detail.
ii.Prepare a brief letter to be sent with the RFP explaining why
you are sending it to the specific vendors.
iii.Build a list of at least 3 real or fictitious vendors.
2.Statement of Work (SOW) i.Fill in all of the sections in the
selected SOW with sufficient detail.
3.Source Selection Criteria i.Construct a selection criteria
matrix similar to the example with at least 6 or more criteria in
the first column to effectively rate your 3 vendors or suppliers.
ii.Fill in the names of each of the vendors across the top.
iii.Determine how you will rank them (e.g., 3 = high
probability, 2 = good probability, and 1 = low probability) to
allow you to tally these up for an overall ranking.
#5 Assignment Objectives
Demonstrate the ability to monitor the work of contractors and
thereby manage major contracts for projects from initial
planning through contract closeout.
Explain the bid and proposal process to include preparing RFP
requirements, preparing a proposal, responding to and
evaluating bids, and contract formation.
400 words
Many risks exist with work that is outsourced. In fact, the risks
may be greater because you do not have control over the
resources as you would for a project you are managing
internally. To help reduce these risks, you should establish
monitoring and control processes and procedures. They should
cover the work being delivered by the vendor per the contract
and tracking of the progress against the overall schedule.
Research at least 2 sources (which may include your textbook)
to support your response.
•Identify at least 4 potential overall risks that you can
experience in the execution of the contract.
•What tools and techniques will you use to manage your
relationship with the seller or vendor?
•What tasks should be added to the project plan to track
progress from a project management point of view?
Write 2 more paragraphs that are an introduction and conclusion
to this topic. Be sure to include your references, which should
follow APA format.
#6 Assignment Objectives
Address contract and procurement management issues,
including contract close out and conflict management
methodologies as they relate to projects.
800 words
Assignment:
For this assignment, you will expand upon what you started in
the Discussion Board. You will expand on the risks identified in
the Discussion Board, and describe how you will prevent or
mitigate them. For the procurement management process, you
will update your project schedule to include the extra tasks
related to this work and develop a contingency budget
component. For the contract administration process, you will
supply the details for how you will manage the overall contract
process, and define your relationship with the vendor doing the
work including checkpoints and payments.
1.New Content to be Inserted in Above Shell ◦Procurement
Contract Award i.Complete award letter
◦Procurement Risks
i.Provide the list of risks related to the procured or contracted
work.
ii.Rate the risks according to likelihood and impact.
iii.Include the mitigation strategy for each.
iv.Include potential cost of each if it occurs.
◦Procurement Management Process
i.Update the existing schedule or plan to include the additional
tasks related to the deliverable that is now outsourced.
ii.Update the contingency budget to include additional costs that
may be related to resolving risks.
iii.Design the overall communications process related
specifically to the procured work.
◦Contract Administration Process
i.Determine the communications process through status
meetings, how often they occur, and what information will be
supplied.
ii.Describe each of the checkpoints and what reviews and sign
offs will take place.
iii.Identify the roles and responsibilities of both the vendor
(seller) and the project manager (buyer).
iv.When problems arise, describe in detail what the process will
be to solve them.
# 7 Assignment Objectives
Address contract and procurement management issues,
including contract close out and conflict management
methodologies as they relate to projects.
100 words
#8 Assignment Objectives
Address contract and procurement management issues,
including contract close out and conflict management
methodologies as they relate to projects.
800 words
For this assignment, you will further enhance your overall
Contract and Procurement Management Plan or Key Assignment
by adding in a section for change control, quality control, and
overall performance reporting. Addressing these up-front adds
to the chances for a successful execution of this project.
1.New Content to be Inserted in Above Shell ◦Change Control
Process
i.Describe how a change is submitted and a sample change
request form.
ii.Identify who has control over the review and approval process
for the change.
iii.Discuss how this change is submitted to the vendor for sizing
and estimate of the cost.
◦Quality Control Plan
i.Identify how the outsourced or procured work will be
inspected/verified, and by whom.
ii.Discuss the process if the work is rejected due to
noncompliance with requirements.
◦Performance Reporting Plan
i.Identify specific reports that will be utilized to track
performance of this deliverable and in relation to whole
schedule.
ii.Provide mock-ups of the reports (these can be reports that are
generated by Microsoft Project).
iii.Determine how often and who will receive the reports.
#9 Assignment Objectives
300 words
Summative Discussion Board
Review and reflect on the knowledge you have gained from this
course. Based on your review and reflection, write at least 3
paragraphs on the following:
•What were the most compelling topics learned in this course?
•How did participating in discussions help your understanding
of the subject matter? Is anything still unclear that could be
clarified?
•What approaches could have yielded additional valuable
information?
Assignment Objectives #10
800 words
In the previous weeks, you selected a project to develop your
Contract and Procurement Management Plan Key Assignment
around. In Week 1, you provided compelling documentation on
make versus buy, which led to determining a contract type that
you would outsource the work with. In Week 2, you developed a
detailed statement of work, included it in a formal RFP, and
developed the section criteria to select the source the contract
would be awarded to. In Week 3, you evaluated all of the risks
involved with procuring out this work, and determined what the
overall management and contract administration processes
would be. In Week 4, you implemented processes for change
control and quality control to reduce some of the risks
identified in Week 3.
At this point, you are planning for procurement closure, which
includes attention being given to the legal aspects, rights, and
responsibilities as well as all of the closure activities. In the
final week, you are also revising the Key Assignment draft
document based on feedback from your instructor and peer.
Deliverables:
The overall project deliverables are as follows:
1.Update previously completed sections based on instructor
feedback.
2.Complete new content below, and copy it under the
appropriate sections in Key Assignment Document called
Project Procurement Legal Rights & Responsibilities and
Project Procurement Closeout. ◦New Content ◾Project
Procurement Legal Rights, & Responsibilities
i.Discuss legal aspects involved with contract management and
closure.
ii.Discuss the process to be used to handle any outstanding
issues, claims, and disputes such as through an alternative
dispute resolution (ADR).
iii.Document what might be terms for contract termination by
either the seller or buyer.
iv.Outline rights and responsibilities of both the seller and
buyer as they relate to procurement closure.
◾Project Procurement Closeout
i.Determine the acceptance criteria for determining that the
project procurement is complete.
ii.Identify process for obtaining final sign-offs and final
payments to close out the contract.
iii.Determine final documentation to be included in the project
procurement closure package.
iv.Identify the techniques that will be utilized to elicit lessons
learned.
3.Update the Key Assignment title page with new date and
project name.
4.Update previously completed sections based on instructor
feedback.
5.Be sure to update your table of contents before submission.
#1 Assignment Objectives Explain the bid and proposal process to.docx

More Related Content

PPT
Project procurement Management.ppt
PPTX
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
DOCX
Research PaperThe final assignment for the course will be a rese.docx
PPTX
Procurement ops450
PPT
project implimentation.-Three.Procurement.ppt
DOCX
This assignment has several different pieces that complete a proje.docx
PPT
16-20procurement.ppt
PPTX
Procurement management
Project procurement Management.ppt
Procurement Managementxxxxxxxxxxxxxxxxxxxxxx.pptx
Research PaperThe final assignment for the course will be a rese.docx
Procurement ops450
project implimentation.-Three.Procurement.ppt
This assignment has several different pieces that complete a proje.docx
16-20procurement.ppt
Procurement management

Similar to #1 Assignment Objectives Explain the bid and proposal process to.docx (20)

DOCX
Contracting Process Paper CPMGT_302.docx
PDF
Conduct procurements
DOCX
Section-1 250 words Subject Initiating the ProjectR.docx
PPTX
Project Management-Project procurement Management
PPTX
Procurement part 1.
DOCX
ProjectManagementDocs.comProcurement Management Plan Temp.docx
DOCX
ProjectManagementDocs.comProcurement Management Plan Temp.docx
PPTX
12 projectprocurementmanagement
DOCX
#1 Assignment ObjectivesManaging a Project Schedule400 words.docx
PDF
Plan procurement management
PPTX
Unit 12 (1).pptx project management introduction
PPT
Procurement Mgmt Supplement1
PPTX
Procurement lecture
PPTX
11- PMP Training - Procurement Management
PPTX
Proj management of site work and locations .pptx
PPTX
Project Procurement Management - PMP preparation course
DOC
Proj 598 Massive Success / snaptutorial.com
PDF
L7_PROJECT PROCUREMENT Management.pdf
DOCX
RFP1. Project Initiation Phase The purpose of the RFP document.docx
PDF
9. project procurement management
Contracting Process Paper CPMGT_302.docx
Conduct procurements
Section-1 250 words Subject Initiating the ProjectR.docx
Project Management-Project procurement Management
Procurement part 1.
ProjectManagementDocs.comProcurement Management Plan Temp.docx
ProjectManagementDocs.comProcurement Management Plan Temp.docx
12 projectprocurementmanagement
#1 Assignment ObjectivesManaging a Project Schedule400 words.docx
Plan procurement management
Unit 12 (1).pptx project management introduction
Procurement Mgmt Supplement1
Procurement lecture
11- PMP Training - Procurement Management
Proj management of site work and locations .pptx
Project Procurement Management - PMP preparation course
Proj 598 Massive Success / snaptutorial.com
L7_PROJECT PROCUREMENT Management.pdf
RFP1. Project Initiation Phase The purpose of the RFP document.docx
9. project procurement management
Ad

More from mayank272369 (20)

DOCX
NEW YORK STATE It is important to identify and develop vario.docx
DOCX
Next, offer your perspective on transparency. In Chapter 3 of th.docx
DOCX
New research suggests that the m ost effective executives .docx
DOCX
NewFCFF2StageTwo-Stage FCFF Discount ModelThis model is designed t.docx
DOCX
Negotiation StylesWe negotiate multiple times every day in e.docx
DOCX
Neurological SystemThe nervous system is a collection of nerves .docx
DOCX
Neuroleadership is an emerging trend in the field of management..docx
DOCX
Network security A firewall is a network security device tha.docx
DOCX
Network Forensics Use the Internet or the Strayer Library to.docx
DOCX
Negotiation Process in the International ArenaNegotiation is.docx
DOCX
Needs to be 150 word min. Perform a scholarly search (using Pu.docx
DOCX
Needing assistance with powerpoint presentation for Sociology in the.docx
DOCX
Need to write essay on 1000 words about Guns and Crimes , in context.docx
DOCX
Need Research Paper related to the course Related topic in the.docx
DOCX
Need it in about 12 hours. There are 3 docx file each one of.docx
DOCX
Need plagiarism very important Select one type of cryptography o.docx
DOCX
Need the below with in 24 hours.Provide 2 references,500 words.docx
DOCX
Need it within 12-14 hours of time.One paragraph with 300 words .docx
DOCX
Need it to be 300 words. Two paragraphs only. What would you co.docx
DOCX
Need it for tomorrow morning!!!!For your synthesis essay, yo.docx
NEW YORK STATE It is important to identify and develop vario.docx
Next, offer your perspective on transparency. In Chapter 3 of th.docx
New research suggests that the m ost effective executives .docx
NewFCFF2StageTwo-Stage FCFF Discount ModelThis model is designed t.docx
Negotiation StylesWe negotiate multiple times every day in e.docx
Neurological SystemThe nervous system is a collection of nerves .docx
Neuroleadership is an emerging trend in the field of management..docx
Network security A firewall is a network security device tha.docx
Network Forensics Use the Internet or the Strayer Library to.docx
Negotiation Process in the International ArenaNegotiation is.docx
Needs to be 150 word min. Perform a scholarly search (using Pu.docx
Needing assistance with powerpoint presentation for Sociology in the.docx
Need to write essay on 1000 words about Guns and Crimes , in context.docx
Need Research Paper related to the course Related topic in the.docx
Need it in about 12 hours. There are 3 docx file each one of.docx
Need plagiarism very important Select one type of cryptography o.docx
Need the below with in 24 hours.Provide 2 references,500 words.docx
Need it within 12-14 hours of time.One paragraph with 300 words .docx
Need it to be 300 words. Two paragraphs only. What would you co.docx
Need it for tomorrow morning!!!!For your synthesis essay, yo.docx
Ad

Recently uploaded (20)

PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
master seminar digital applications in india
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PDF
Yogi Goddess Pres Conference Studio Updates
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
O7-L3 Supply Chain Operations - ICLT Program
Module 4: Burden of Disease Tutorial Slides S2 2025
202450812 BayCHI UCSC-SV 20250812 v17.pptx
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
master seminar digital applications in india
Chinmaya Tiranga quiz Grand Finale.pdf
Weekly quiz Compilation Jan -July 25.pdf
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Yogi Goddess Pres Conference Studio Updates
Anesthesia in Laparoscopic Surgery in India
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Supply Chain Operations Speaking Notes -ICLT Program
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
A systematic review of self-coping strategies used by university students to ...
STATICS OF THE RIGID BODIES Hibbelers.pdf
human mycosis Human fungal infections are called human mycosis..pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
O7-L3 Supply Chain Operations - ICLT Program

#1 Assignment Objectives Explain the bid and proposal process to.docx

  • 1. #1 Assignment Objectives Explain the bid and proposal process to include preparing RFP requirements, preparing a proposal, responding to and evaluating bids, and contract formation. Explain the use of contracting and procurement in project management, with a focus on understanding specialized contracting terms, defining proposal strategies, and evaluating proposal strengths and weaknesses 400 words Sometimes, the best solution in accomplishing work or acquiring a component required for a project is to procure to outside sources. Some of the pros for opting for an outside source might include the ability to deliver a better product because the source may have expertise or it may take the outside source less time than it would take if completed in- house. Some of the cons, however, are that there may be non- delivery, or specifications may not be met. Selecting the best provider or seller and having a contract with complete terms and conditions are a few of the best ways to accomplish a successful procurement experience. You will be evaluating different types of contracts for a potential project deliverable that you intend to procure as part of an overall project you will be selecting in the Individual Project for this week. Research at least 2 sources (which may include your textbook) to support your response. •Compare and contrast all of the types of contract listed in the PMBOK® Guide. •In your opinion, which is the best type of contract? Why? •What criteria would you use to determine whether it is better to contract out the work or develop it internally as part of the project? #2 Assignment Objectives Explain the bid and proposal process to include preparing RFP
  • 2. requirements, preparing a proposal, responding to and evaluating bids, and contract formation. Explain the use of contracting and procurement in project management, with a focus on understanding specialized contracting terms, defining proposal strategies, and evaluating proposal strengths and weaknesses 2000 words Overview Project contract and procurement management involves making a decision to outsource work, developing a statement of work, submitting a request for proposal, awarding the contract, and then managing the procurements until contract completion. Having a detailed procurement plan lowers the risk for nonfulfillment of contracted work. In this class, you are asked to develop a Contract and Procurement Plan that identifies planning and execution components from developing the statement of work through the final contract delivery. You will select a project that you may have developed in a previous class or a known project in your organization to create this plan for. Throughout this course, you will be working on developing several components of the final Key Assignment. Additional information and the deliverables for each Individual Project will be provided in the assignment description for this project. In this first Individual Project, you are asked to develop the outline of the sections that will be included in the Contract and Procurement Plan document, as well as a draft of a proposal to submit to your instructor. The other information you will include is a high-level description of the project you will be conducting the project procurements for. You will also be setting up the final Key Assignment outline that you will add to each week. The combined Individual
  • 3. Project (IP) assignments will be your final Key Assignment deliverable. Project Selection: The first step will be to select a project for which you wish to develop a contract and procurement plan. This project will be used as the basis for each of the assignments throughout the course and should conform to the following guidelines: •Nontrivial: The selected project candidate should reflect a real life project. •Domain knowledge: You will be applying knowledge of this project to address assignments related to purchasing products or services outside the project team work, which requires the fulfillment of terms laid out in a contract. Select a project that fit these requirements, and submit your proposal to your instructor before proceeding further with the assignments in the course. Approval should be sought within the first few days of the course. Your instructor will tell you how to submit this proposal and what notification will be given for project approval. Assignment: Your first task in this process will be to select a project to use as the basis of your Key Assignment. You will also create the shell document for the final project Key Assignment document deliverable that you will be working on throughout the course. As you proceed through each phase of the project, you will add content to each section of the final document to gradually complete the final project delivery, which is the Contract & Procurement Management Plan. The project deliverables are as follows: 1.Submit your project proposal to instructor for approval.
  • 4. 2.Contract & Procurement Management Plan Document Shell ◦Use Microsoft Word ◦Title Page i.Course number and name ii.Project name iii.Your name iv.Date ◦Table of Contents i.Use auto-generated TOC ii.Separate page iii.Maximum of 3 levels deep iv.Update the fields of the TOC so it is up-to-date before submitting your project ◦Section Headings (Create each heading on a new page with TBD as content except for sections listed under New Content below.) i.Project outline ii.Make or buy analysis iii.Contract type selection iv.Request for proposal (RFP) v.Statement of work (SOW) vi.Source selection criteria vii.Procurement contract award viii.Procurement risks ix.Procurement management process x.Contract administration process xi.Change control process xii.Quality control plan xiii.Performance reporting plan xiv.Project procurement legal rights & responsibilities xv.Project procurement closeout 3.New Content to be Inserted in Above Shell ◦Project Outline i.Brief description of the project ii.Material taken from approved proposal submitted to instructor will serve as the draft for the proposal
  • 5. iii.Project must be approved by the instructor ◦Make or Buy Analysis i.Discuss why the procurement portion of the selected project is going to be sourced out (or buy). ii.Discuss pros and cons of making (or keeping within the project team to do) versus sourcing out. iii.Include a financial and schedule deadline justification. ◦Contract Type Selection i.Discuss the pros and cons of at least 3 contract types for this project. ii.Identify the final contract type selected with a justification. #3Assignment Objectives Explain the bid and proposal process to include preparing RFP requirements, preparing a proposal, responding to and evaluating bids, and contract formation 400 words Now that a decision has been made to outsource, there are a few steps before the work commences. First, it is recommended that at least 3 different vendors are solicited with a request for proposal (RFP). This RFP should include scope of the project and proposed time, along with other important sections. The statement of work will thoroughly outline all of the work you are requesting of the selected RFP. You will be researching templates for both the RFP and the statement of work that work best for your selected project. Primary Task Response: Within the Discussion Board area, write 350–600 words that respond to the following questions with your thoughts, ideas, and comments. This will be the foundation for future discussions by your classmates. Be substantive and clear, and use examples to reinforce your ideas.
  • 6. Research at least 2 sources (which may include your textbook) to support your response. •Research and present at least 2 templates for request for proposal (RFP) that most closely align with your Key Assignment project. •Research and present at least 2 templates for statement of work (SOW) that most closely aligns with your Key Assignment project. •Research and present at least 2 templates for procurement contract award that most closely aligns with your Key Assignment project. •Why is using standard templates for the statement of work, RFP, and procurement contract award so important? Be sure to include an introduction and conclusion as well. Be sure to also include your references (in APA format). #4 Assignment Objectives Explain the bid and proposal process to include preparing RFP requirements, preparing a proposal, responding to and evaluating bids, and contract formation. 800 words For this assignment, you will select the best RFP, SOW template, and procurement contract award template that you researched in the Discussion Board. You should have at least 6 sections in each of the templates. Your next task is to fill in all of your relevant project information in each of the templates. For the compilation of your source selection criteria, you may use similar to the following table or matrix: Deliverables The overall project deliverables are as follows: •Update the Key Assignment document title page with the new date and project name. •Update previously completed sections based on instructor feedback.
  • 7. •Complete new content below, and copy it under the sections in Key Assignment document called Request for Proposal, Statement of Work, and Source Selection Criteria. New content to be inserted is as follows: 1.Request For Proposal (RFP) i.Fill in all of the sections in the selected RFP with sufficient detail. ii.Prepare a brief letter to be sent with the RFP explaining why you are sending it to the specific vendors. iii.Build a list of at least 3 real or fictitious vendors. 2.Statement of Work (SOW) i.Fill in all of the sections in the selected SOW with sufficient detail. 3.Source Selection Criteria i.Construct a selection criteria matrix similar to the example with at least 6 or more criteria in the first column to effectively rate your 3 vendors or suppliers. ii.Fill in the names of each of the vendors across the top. iii.Determine how you will rank them (e.g., 3 = high probability, 2 = good probability, and 1 = low probability) to allow you to tally these up for an overall ranking. #5 Assignment Objectives Demonstrate the ability to monitor the work of contractors and thereby manage major contracts for projects from initial planning through contract closeout. Explain the bid and proposal process to include preparing RFP requirements, preparing a proposal, responding to and evaluating bids, and contract formation. 400 words Many risks exist with work that is outsourced. In fact, the risks may be greater because you do not have control over the resources as you would for a project you are managing internally. To help reduce these risks, you should establish monitoring and control processes and procedures. They should cover the work being delivered by the vendor per the contract and tracking of the progress against the overall schedule. Research at least 2 sources (which may include your textbook)
  • 8. to support your response. •Identify at least 4 potential overall risks that you can experience in the execution of the contract. •What tools and techniques will you use to manage your relationship with the seller or vendor? •What tasks should be added to the project plan to track progress from a project management point of view? Write 2 more paragraphs that are an introduction and conclusion to this topic. Be sure to include your references, which should follow APA format. #6 Assignment Objectives Address contract and procurement management issues, including contract close out and conflict management methodologies as they relate to projects. 800 words Assignment: For this assignment, you will expand upon what you started in the Discussion Board. You will expand on the risks identified in the Discussion Board, and describe how you will prevent or mitigate them. For the procurement management process, you will update your project schedule to include the extra tasks related to this work and develop a contingency budget component. For the contract administration process, you will supply the details for how you will manage the overall contract process, and define your relationship with the vendor doing the work including checkpoints and payments. 1.New Content to be Inserted in Above Shell ◦Procurement Contract Award i.Complete award letter ◦Procurement Risks i.Provide the list of risks related to the procured or contracted work.
  • 9. ii.Rate the risks according to likelihood and impact. iii.Include the mitigation strategy for each. iv.Include potential cost of each if it occurs. ◦Procurement Management Process i.Update the existing schedule or plan to include the additional tasks related to the deliverable that is now outsourced. ii.Update the contingency budget to include additional costs that may be related to resolving risks. iii.Design the overall communications process related specifically to the procured work. ◦Contract Administration Process i.Determine the communications process through status meetings, how often they occur, and what information will be supplied. ii.Describe each of the checkpoints and what reviews and sign offs will take place. iii.Identify the roles and responsibilities of both the vendor (seller) and the project manager (buyer). iv.When problems arise, describe in detail what the process will be to solve them. # 7 Assignment Objectives Address contract and procurement management issues, including contract close out and conflict management methodologies as they relate to projects. 100 words #8 Assignment Objectives Address contract and procurement management issues, including contract close out and conflict management methodologies as they relate to projects.
  • 10. 800 words For this assignment, you will further enhance your overall Contract and Procurement Management Plan or Key Assignment by adding in a section for change control, quality control, and overall performance reporting. Addressing these up-front adds to the chances for a successful execution of this project. 1.New Content to be Inserted in Above Shell ◦Change Control Process i.Describe how a change is submitted and a sample change request form. ii.Identify who has control over the review and approval process for the change. iii.Discuss how this change is submitted to the vendor for sizing and estimate of the cost. ◦Quality Control Plan i.Identify how the outsourced or procured work will be inspected/verified, and by whom. ii.Discuss the process if the work is rejected due to noncompliance with requirements. ◦Performance Reporting Plan i.Identify specific reports that will be utilized to track performance of this deliverable and in relation to whole schedule. ii.Provide mock-ups of the reports (these can be reports that are generated by Microsoft Project). iii.Determine how often and who will receive the reports. #9 Assignment Objectives 300 words Summative Discussion Board Review and reflect on the knowledge you have gained from this course. Based on your review and reflection, write at least 3 paragraphs on the following: •What were the most compelling topics learned in this course? •How did participating in discussions help your understanding
  • 11. of the subject matter? Is anything still unclear that could be clarified? •What approaches could have yielded additional valuable information? Assignment Objectives #10 800 words In the previous weeks, you selected a project to develop your Contract and Procurement Management Plan Key Assignment around. In Week 1, you provided compelling documentation on make versus buy, which led to determining a contract type that you would outsource the work with. In Week 2, you developed a detailed statement of work, included it in a formal RFP, and developed the section criteria to select the source the contract would be awarded to. In Week 3, you evaluated all of the risks involved with procuring out this work, and determined what the overall management and contract administration processes would be. In Week 4, you implemented processes for change control and quality control to reduce some of the risks identified in Week 3. At this point, you are planning for procurement closure, which includes attention being given to the legal aspects, rights, and responsibilities as well as all of the closure activities. In the final week, you are also revising the Key Assignment draft document based on feedback from your instructor and peer. Deliverables: The overall project deliverables are as follows: 1.Update previously completed sections based on instructor feedback. 2.Complete new content below, and copy it under the appropriate sections in Key Assignment Document called
  • 12. Project Procurement Legal Rights & Responsibilities and Project Procurement Closeout. ◦New Content ◾Project Procurement Legal Rights, & Responsibilities i.Discuss legal aspects involved with contract management and closure. ii.Discuss the process to be used to handle any outstanding issues, claims, and disputes such as through an alternative dispute resolution (ADR). iii.Document what might be terms for contract termination by either the seller or buyer. iv.Outline rights and responsibilities of both the seller and buyer as they relate to procurement closure. ◾Project Procurement Closeout i.Determine the acceptance criteria for determining that the project procurement is complete. ii.Identify process for obtaining final sign-offs and final payments to close out the contract. iii.Determine final documentation to be included in the project procurement closure package. iv.Identify the techniques that will be utilized to elicit lessons learned. 3.Update the Key Assignment title page with new date and project name. 4.Update previously completed sections based on instructor feedback. 5.Be sure to update your table of contents before submission.