WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
CONTRACT No 1
Contract Nr 1 comprises the main sewerage system to the north of the River Suir
and the pressure mains under the river, to the proposed Bellview Treatment Works
(separate contract). The works include:
• Twin 800mm ND polyethylene Rising Mains under River Suir from existing
Waterpark Pump Station, 340m.
• Twin 450mm ND polyethylene Rising Mains under River Suir from proposed
Maypark Pump Station (Pumping Station by others), 340m.
• Main Collection Sewer from Christendom to the proposed Bellview Treatment
Works (separate contract). 1350mm diameter sewer.
• Ferrybank sewerage system, pumping station and rising main. (Pumping
installation by others)
• Rocklands sewerage system and rising main. (Pumping Station by others)
• Beacon Quay sewerage system and rising main. (Pumping Station by others)
• Slieverue rising main. (Pumping Station by others)
• 3Nr railway crossings by trenchless construction techniques
- 2x900mm dia. on North bank of Waterpark rising mains river crossing
- 2x600mm dia. on North bank of Maypark rising mains river crossing
- 1x600mm dia. on Ferrybank rising mains
Consultants: Mott MacDonald Pettit
Contractor: Pierse Contracting Ltd
CONTRACT No 1A
Contract Nr 1A comprises the Mechanical and Electrical works in the existing
Waterpark and proposed Ferrybank (by others) pumping stations. The works
include:
Waterpark Pumping Station
• Replacement of 4 of the 8 existing pumps, to allow pumping of 922litres/sec of
wastewater under the River Suir to the proposed main collection sewer which will
discharge to the proposed Belview Treatment Works. (Proposed collection sewer
and treatment works by others)
• Provision and installation of fine screens to foul and stormwater inflows to the
pumping station. Total flow of 3445litres/sec.
• Replacement of existing washpactor and launder system in the screen-house.
Ferrybank Pumping Station
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 3 nr submersible pumps to pump 58litres/sec.
WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
• Provision and installation of fine screens to foul and stormwater inflows to the
pumping station. Total flow of 1673litres/sec.
Consultants: EG Pettit & Company
Contractor: Earthech
CONTRACT No 2
Contract Nr 2 comprises the construction of an interceptor sewerage system and
the construction of 4 pumping stations on the southern bank of the River Suir, from
Glenville to Blenheim. The works include:
• Maypark Wet-well/Dry-well Pumping Station civil works. Pumping installation, by
others, to transfer wastewater under River Suir to collector sewer on north side of
river.
• Gravity sewers draining to Maypark Pump Station, Freshfields to Powerscourt.
• Glenville sewerage system, submersible pumping station and rising main.
(Pumping installation by others)
• Freshfields sewerage system, submersible pumping station and rising main.
(Pumping installation by others)
• Island View sewerage system (from Volan to Blenheim), wet-well/dry-well pumping
station and rising main. (Pumping installation by others)
• Construction of approximately 3,910m of gravity sewers with diameters ranging
from 225mm to 900mm. Construction of approximately 390m of 100mm diameter
rising mains and 1,400m of 300mm diameter rising mains.
• Decommissioning and demolition of existing septic tanks
Consultants: J.B. Barry & Partners Ltd. / White Young Green
CONTRACT NR 2A
Contract Nr 2A comprises the Mechanical and Electrical works in the proposed
Maypark, Island View, Freshfields and Glenville pumping stations on the north side
of the River Suir. Civil works by others. The works include:
Maypark Pumping Station – Wet Well / Dry Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 3 nr submersible pumps to pump 364litres/sec.
• Provision and installation of ventilation, gas detection, odour control systems;
mobile electrical generator; lifting and craneage equipment.
Island View Pumping Station – Wet Well / Dry Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 3 nr submersible pumps to pump 232litres/sec.
WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
• Provision and installation of ventilation, gas detection, odour control systems;
mobile electrical generator; lifting and craneage equipment.
Glenville Pumping Station – Submersible Wet Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 2 nr submersible pumps to pump 5litres/sec.
• Provision and installation of ancillary equipment.
Freshfields Pumping Station – Submersible Wet Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 2 nr submersible pumps to pump 16litres/sec.
• Provision and installation of ancillary equipment.
Consultants: J.B. Barry & Partners Ltd. / White Young Green
CONTRACT NR 3
Contract Nr 3 comprises the construction of 3 pumping stations on the north side of
the River Suir to discharge into the proposed collector sewer draining to the new
Bellview Treatment Works (separate contracts). The mechanical and electrical
installations at the pumping stations will be under a separate contract. The works include:
• Rocklands Pumping Station and associated site works.
• Slieverue Pumping Station and associated site works.
• Beacon Quay Pumping Station and associated site works.
• Decommissioning and demolition of existing Rocklands comminutor station.
• Decommissioning and demolition of existing septic tank at Slieverue.
Consultants: EG Pettit & Company
CONTRACT NR 3A
Contract Nr 3A comprises the Mechanical and Electrical works in the proposed
Rocklands, Slieverue and Beacon Quay pumping stations on the north side of the
River Suir. Civil works by others. The works include:
Rocklands Pumping Station – Submersible Wet Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 3 nr submersible pumps to pump 205litres/sec.
• Provision and installation of ancillary equipment.
Beacon Quay Pumping Station – Submersible Wet Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 2 nr submersible pumps to pump 9litres/sec.
WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
• Provision and installation of ancillary equipment.
Slieverue Pumping Station – Submersible Wet Well configuration
• Full M&E installation to the proposed pumping station. (Pumping Station civil
works by others)
• Provision and installation of 2 nr submersible pumps to pump 9litres/sec.
• Provision and installation of ancillary equipment.
Consultants: EG Pettit & Company
CONTRACT NR 4
Contract Nr 4 comprises the Belview sewerage system to the north of the River Suir,
to the proposed Bellview Treatment Works (separate contract). The works include:
• The construction of approximately 4,075m of 225mm diameter gravity sewers
draining the areas of Drumdowney, Belview and Gorteens to pumping stations and
the treatment works.
• The construction of 3 nr pumping stations and the associated M&E installations.
• The construction of approximately 1,475m of 125mm diameter rising mains.
Consultants: EG Pettit & Company
CONTRACT NR 5
Contract Nr 5 comprises the design, construction and operation of the proposed
Bellview Treatment Works. The works include:
• The design and construction of approved wastewater treatment facilities to cater
for
190,600 population equivalent
27,465 m3
/day dry weather flow
• Wastewater treatment processes :
- grit and screenings removal and disposal
- primary sedimentation
- activated sludge secondary treatment
- stormwater storage and treatment
- final settlement tanks
- sludge treatment, storage and reuse disposal
- all mechanical and electrical installations
- telemetry system
• The civil works:
- access and site roads
- process unit structures
- administration building
- other site works.
- treated effluent outfall to River Suir
• The operation and maintenance of the treatment works for a period of 20 years.
WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
Consultants: EG Pettit & Company
WATERFORD MAIN DRAINAGE SCHEME – PHASE 2
Consultants: EG Pettit & Company

More Related Content

PPTX
Emergency Repair of Sanitary Sewer Line Crossing Lake Thoreau January 2016
PDF
UKWP Case study - Mauchline Final copy 23 06 15
DOC
Barker.R.CV.
PPTX
Gadsen Drive Emergency Gravity Sewer Repairs
PPTX
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
PDF
Coal Combustible Presentation 7 30_2015
PPTX
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
PPTX
Little Hunting Creek Pump Station Rehabilitation
Emergency Repair of Sanitary Sewer Line Crossing Lake Thoreau January 2016
UKWP Case study - Mauchline Final copy 23 06 15
Barker.R.CV.
Gadsen Drive Emergency Gravity Sewer Repairs
Hayfield Road Project Citizens Association Meeting Oct. 18, 2017
Coal Combustible Presentation 7 30_2015
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Little Hunting Creek Pump Station Rehabilitation

What's hot (20)

PDF
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
DOCX
KDK RES 2016 Sunoco
DOC
Chandler Geoff 2016 cv
PPSX
Fort indraprastha-egm v1.0
DOC
Brian Welch-Resume 2015
PDF
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PPTX
Project Controls planning & Scheduling Engineer-Portfolio
DOC
CV -mosleh
PDF
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
PDF
Well integrity lifecycle Santos
PDF
Feb. 16 Waste Management Daily Progress Report
PDF
ProTec Recent Projects Brochure
PDF
Resume 1
PPTX
Penn South Building 8 Gas Project - February 2016
PDF
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
PDF
Feb. 15 Waste Management Daily Progress Report
PDF
ASCE San Ramon Canyon Storm Drain 6 4-15
PDF
Migaa progress update september 2016-1
PDF
Feb. 24 Waste Management Daily Progress Report
PPT
Linkedin Presentation Krysyian Gnysinski
Noise management: Meeting of the Verdun/Sud-Ouest Good Neighbourly Relations ...
KDK RES 2016 Sunoco
Chandler Geoff 2016 cv
Fort indraprastha-egm v1.0
Brian Welch-Resume 2015
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
Project Controls planning & Scheduling Engineer-Portfolio
CV -mosleh
61T01411 Monthly Report for Month of Nov 2014 for Valeo FS Project - 20141129
Well integrity lifecycle Santos
Feb. 16 Waste Management Daily Progress Report
ProTec Recent Projects Brochure
Resume 1
Penn South Building 8 Gas Project - February 2016
Check out our Oil and Gas (Fuel Storage Tanks, LPG, LPG Bullets) Slide share ...
Feb. 15 Waste Management Daily Progress Report
ASCE San Ramon Canyon Storm Drain 6 4-15
Migaa progress update september 2016-1
Feb. 24 Waste Management Daily Progress Report
Linkedin Presentation Krysyian Gnysinski
Ad

Viewers also liked (11)

PPT
Konflikt mizh ditmi_i_batkami
PPTX
ACME presentation
PDF
Using database in android
PPTX
Watch 2015 tsonga vs muller live tennis
PDF
Hongkong : हांगकांग हॉलिडे में देखिये क्या और विकल्प हैं आपके पास
PPT
PPT
Top Reasons To Visit South Africa
PPTX
Blue Led: Key to modern energy efficient lighting
PPT
Series parallel ac networks
PPTX
Library Networks
PDF
Next-generation Python Big Data Tools, powered by Apache Arrow
Konflikt mizh ditmi_i_batkami
ACME presentation
Using database in android
Watch 2015 tsonga vs muller live tennis
Hongkong : हांगकांग हॉलिडे में देखिये क्या और विकल्प हैं आपके पास
Top Reasons To Visit South Africa
Blue Led: Key to modern energy efficient lighting
Series parallel ac networks
Library Networks
Next-generation Python Big Data Tools, powered by Apache Arrow
Ad

19-07-06 Scheme Description details

  • 1. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 CONTRACT No 1 Contract Nr 1 comprises the main sewerage system to the north of the River Suir and the pressure mains under the river, to the proposed Bellview Treatment Works (separate contract). The works include: • Twin 800mm ND polyethylene Rising Mains under River Suir from existing Waterpark Pump Station, 340m. • Twin 450mm ND polyethylene Rising Mains under River Suir from proposed Maypark Pump Station (Pumping Station by others), 340m. • Main Collection Sewer from Christendom to the proposed Bellview Treatment Works (separate contract). 1350mm diameter sewer. • Ferrybank sewerage system, pumping station and rising main. (Pumping installation by others) • Rocklands sewerage system and rising main. (Pumping Station by others) • Beacon Quay sewerage system and rising main. (Pumping Station by others) • Slieverue rising main. (Pumping Station by others) • 3Nr railway crossings by trenchless construction techniques - 2x900mm dia. on North bank of Waterpark rising mains river crossing - 2x600mm dia. on North bank of Maypark rising mains river crossing - 1x600mm dia. on Ferrybank rising mains Consultants: Mott MacDonald Pettit Contractor: Pierse Contracting Ltd CONTRACT No 1A Contract Nr 1A comprises the Mechanical and Electrical works in the existing Waterpark and proposed Ferrybank (by others) pumping stations. The works include: Waterpark Pumping Station • Replacement of 4 of the 8 existing pumps, to allow pumping of 922litres/sec of wastewater under the River Suir to the proposed main collection sewer which will discharge to the proposed Belview Treatment Works. (Proposed collection sewer and treatment works by others) • Provision and installation of fine screens to foul and stormwater inflows to the pumping station. Total flow of 3445litres/sec. • Replacement of existing washpactor and launder system in the screen-house. Ferrybank Pumping Station • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 3 nr submersible pumps to pump 58litres/sec.
  • 2. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 • Provision and installation of fine screens to foul and stormwater inflows to the pumping station. Total flow of 1673litres/sec. Consultants: EG Pettit & Company Contractor: Earthech CONTRACT No 2 Contract Nr 2 comprises the construction of an interceptor sewerage system and the construction of 4 pumping stations on the southern bank of the River Suir, from Glenville to Blenheim. The works include: • Maypark Wet-well/Dry-well Pumping Station civil works. Pumping installation, by others, to transfer wastewater under River Suir to collector sewer on north side of river. • Gravity sewers draining to Maypark Pump Station, Freshfields to Powerscourt. • Glenville sewerage system, submersible pumping station and rising main. (Pumping installation by others) • Freshfields sewerage system, submersible pumping station and rising main. (Pumping installation by others) • Island View sewerage system (from Volan to Blenheim), wet-well/dry-well pumping station and rising main. (Pumping installation by others) • Construction of approximately 3,910m of gravity sewers with diameters ranging from 225mm to 900mm. Construction of approximately 390m of 100mm diameter rising mains and 1,400m of 300mm diameter rising mains. • Decommissioning and demolition of existing septic tanks Consultants: J.B. Barry & Partners Ltd. / White Young Green CONTRACT NR 2A Contract Nr 2A comprises the Mechanical and Electrical works in the proposed Maypark, Island View, Freshfields and Glenville pumping stations on the north side of the River Suir. Civil works by others. The works include: Maypark Pumping Station – Wet Well / Dry Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 3 nr submersible pumps to pump 364litres/sec. • Provision and installation of ventilation, gas detection, odour control systems; mobile electrical generator; lifting and craneage equipment. Island View Pumping Station – Wet Well / Dry Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 3 nr submersible pumps to pump 232litres/sec.
  • 3. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 • Provision and installation of ventilation, gas detection, odour control systems; mobile electrical generator; lifting and craneage equipment. Glenville Pumping Station – Submersible Wet Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 2 nr submersible pumps to pump 5litres/sec. • Provision and installation of ancillary equipment. Freshfields Pumping Station – Submersible Wet Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 2 nr submersible pumps to pump 16litres/sec. • Provision and installation of ancillary equipment. Consultants: J.B. Barry & Partners Ltd. / White Young Green CONTRACT NR 3 Contract Nr 3 comprises the construction of 3 pumping stations on the north side of the River Suir to discharge into the proposed collector sewer draining to the new Bellview Treatment Works (separate contracts). The mechanical and electrical installations at the pumping stations will be under a separate contract. The works include: • Rocklands Pumping Station and associated site works. • Slieverue Pumping Station and associated site works. • Beacon Quay Pumping Station and associated site works. • Decommissioning and demolition of existing Rocklands comminutor station. • Decommissioning and demolition of existing septic tank at Slieverue. Consultants: EG Pettit & Company CONTRACT NR 3A Contract Nr 3A comprises the Mechanical and Electrical works in the proposed Rocklands, Slieverue and Beacon Quay pumping stations on the north side of the River Suir. Civil works by others. The works include: Rocklands Pumping Station – Submersible Wet Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 3 nr submersible pumps to pump 205litres/sec. • Provision and installation of ancillary equipment. Beacon Quay Pumping Station – Submersible Wet Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 2 nr submersible pumps to pump 9litres/sec.
  • 4. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 • Provision and installation of ancillary equipment. Slieverue Pumping Station – Submersible Wet Well configuration • Full M&E installation to the proposed pumping station. (Pumping Station civil works by others) • Provision and installation of 2 nr submersible pumps to pump 9litres/sec. • Provision and installation of ancillary equipment. Consultants: EG Pettit & Company CONTRACT NR 4 Contract Nr 4 comprises the Belview sewerage system to the north of the River Suir, to the proposed Bellview Treatment Works (separate contract). The works include: • The construction of approximately 4,075m of 225mm diameter gravity sewers draining the areas of Drumdowney, Belview and Gorteens to pumping stations and the treatment works. • The construction of 3 nr pumping stations and the associated M&E installations. • The construction of approximately 1,475m of 125mm diameter rising mains. Consultants: EG Pettit & Company CONTRACT NR 5 Contract Nr 5 comprises the design, construction and operation of the proposed Bellview Treatment Works. The works include: • The design and construction of approved wastewater treatment facilities to cater for 190,600 population equivalent 27,465 m3 /day dry weather flow • Wastewater treatment processes : - grit and screenings removal and disposal - primary sedimentation - activated sludge secondary treatment - stormwater storage and treatment - final settlement tanks - sludge treatment, storage and reuse disposal - all mechanical and electrical installations - telemetry system • The civil works: - access and site roads - process unit structures - administration building - other site works. - treated effluent outfall to River Suir • The operation and maintenance of the treatment works for a period of 20 years.
  • 5. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 Consultants: EG Pettit & Company
  • 6. WATERFORD MAIN DRAINAGE SCHEME – PHASE 2 Consultants: EG Pettit & Company