The document describes a simulation study of workers and machine performance in an Ethiopian plastics industry. An Arena simulation model was developed to model the production processes and determine throughput, waiting times, and potential bottlenecks. The model included three submodels for worker distribution, continuous extrusion, and injection molding. Data was collected from the factory and fitted to distributions. The model was verified and validated. Simulation results identified bottlenecks and low throughput due to worker and machine performance issues. Recommendations were made to address bottlenecks and improve performance.