1.0 SCOPE AND PURPOSE
This procedure defines requirements for the control of Nonconforming Material.
This applies to the identification, control, reporting, and disposition of conforming material.
2.0 RESPONSIBILTIES
See Flow chart Page #5.
3.0 DEFINITIONS
NONCONFORMING MATERIAL or DISCREPANCY – any material that does not
comply with dimensional, visual or hydrostatic specifications, is damaged or was not
processed in the manner defined in the Quality Assurance Plan; or, any material/service not
meeting requirements set forth in the purchase order.
MRB – Material Review Board consisting of Product Development, Engineering, and
Manufacturing, and the ensuing agreement of the Quality Assurance Manager.
Defect –Out-of-specification condition, resultant from faults in “visual appearance design,
process, procedures, that require reporting” using the Discrepant Material Form.
Root Cause Analysis – Determining the actual root cause of the defect will be determined by
the following departments:
Hydrostatic Implosions / Failures: Product Development
Mixing issues: Engineering Assistant
Workmanship issues: Control Configuration Officer
4.0 INPUTS
Discrepant Material Report F4-8.3-F001 Rev. A
Manufacturing Traveler F4-7.5-F007 Rev. C
Red Scrap Tag 8.5” x 11”
Quality Procedure
ISO9001:2008 – Cuming Corporation
Document #:
8.3
Rev.:
A
Title:
Control of Nonconforming Material
Page #:
2 of 4
Approval: Approval:
5.0 PROCEDURE
5.1 All suspect nonconforming material shall be identified by the DMR. Defects reported
using the Discrepant Material Report (DMR), form number F4-8.3-F001. All discrepant
material shall be identified and segregated (if possible) to prevent further processing
during the nonconforming material control process. Defective product shall be
indentified using Form F4-8.3-F001, or Red Reject Tag.
5.2 The discrepancy is documented clearly, concisely, and in sufficient detail using photos
as well to describe exactly what the discrepancy is. References to associated
documents and specification shall be noted when applicable.
5.3 When a DMR is initiated, the originator shall use the next DMR number from the DMR
Log book. The DMR number shall be noted in the space provided on the DMR form.
Electronic copies “are then distributed to individual(s) notated at the “Assigned to:”
Hard copies with the product traveler “are given to “Assigned to:” at the morning
production meeting. The DMR # will be transferred to the traveler to demonstrate full
traceability.
5.4 The discrepancy noted on the DMR by Quality Assurance is reviewed by one or more
individuals on MRB to disposition the defective part(s). If the part(s) require rework,
adequate instructions are to be applied in the Disposition field. Immediate corrective
action is defined by the MRB action. “Possible dispositions include” UAI = Use as is;
RTV = Return to Vendor; REWORK; REPAIR; SCRAP; Other (Specify).
5.5 Cycle time of the disposition of the DMR is a maximum of 10 working days. The cycle
time of closing the DMR is a maximum of 30 working days. Extreme cases where a
CAR is required, cycle time to close the DMR will take longer. The exception to this is
when Corrective Action is linked to the discrepancy.
5.6 If needed a root cause analysis will be performed and the findings will be attached to
the DMR. The department assigned to this exercise is described in section 3.0 of this
procedure.
5.7 Agreement is demonstrated by Engineering or Manufacturing signature and is required
for all DMR dispositions. If customer concurrence is necessary, the Project Manager
will inform the customer of the nonconformance and forward a copy of the DMR to the
customer representative. The customer will return a signed copy of the DMR to
Cuming Corp. for inclusion in the customer job file.
Quality Procedure
ISO9001:2008 – Cuming Corporation
Document #:
8.3
Rev.:
A
Title:
Control of Nonconforming Material
Page #:
3 of 4
Approval: Approval:
5.8 The Quality Assurance Manager shall monitor reports of nonconforming material for
trends associated with workmanship, process, materials, or outside services using
Statistical Analysis. DMR stats will be included in the management review process.
6.0 OUTPUTS
DMR Parato analysis, DMR summary data and DMR database.
7.0 METRICS
Quality Assurance Dashboard
Revision History
Revision Date Description
A 4/6/11 Initial Release
Quality Procedure
ISO9001:2008 – Cuming Corporation
Document #:
8.3
Rev.:
A
Title:
Control of Nonconforming Material
Page #:
4 of 4
Approval: Approval:
Discrepant Material Report
DMR Number:
Reason Code:
Location: Incoming Insp.: In-Process: Final:
Assigned To: Date:
Job Detail:
Job # : Part # : Customer Name:
Discrepancy:
Rework / Repair / Instruction:
Authorized
Signature:______________________
Person / Dept. Responsible for (Rework Comments):
Signature:______________________
Estimated Material Cost: $ Actual Material Cost: $
Estimated Labor Hrs: Actual Labor Cost: $
Total Cost: $ Total Cost: $
Disposition:
(Quantity) UAI RTV Rework Repair Scrap Other
Root Cause Attached: Yes No CAR Required: Yes No
Material Review Board: Approvals Date
Engineering Y N
Manufacturing Y N
Quality Assurance Y N
DMR Process 8.3
EngineeringQualityAssuranceManufacturing
Phase
Defective
Q.A. generates a DMR
(Defective Material Report)
DMR document
DMR information is
logged into
database
DMR Review
Mfg. or Eng.
Disposition
(Use As Is, Repair, or
Scrap)
Yes
Eng.
Scrap
Repair
Use As Is
Send to paint dept.
Rework the part(s) Manufacture part(s)
Scrap cost
collected and
applied to
DMR
Q.A. notifies
Mfg.
Make new
part(s)
Inspection
Q.A. inspects parts
Yes InspectionYes
No
Disposition
(Use As Is, Repair, or
Scrap
Mfg.
Scrap
Repair
Use As Is
Rework Instruction
Root Cause
Analysis

More Related Content

PPT
PDF
1 control of non-conforming product & materials
PPT
Basic quality concepts(3)
PPTX
Quality management system
PPTX
ISO13485 Awareness Training (9-10th November 2021).pptx
PPTX
MRM - Management Review Meeting Presentation
PPT
Non confirming products
PPTX
What is quality
1 control of non-conforming product & materials
Basic quality concepts(3)
Quality management system
ISO13485 Awareness Training (9-10th November 2021).pptx
MRM - Management Review Meeting Presentation
Non confirming products
What is quality

What's hot (20)

PPTX
Ncr writing and_closure
PPT
Quality assurance vs Quality control
PPT
Root cause analysis
PPT
Good documentation practices
PPTX
Sequence and interaction of qms processes
PPTX
Deviation and root cause analysis in Pharma
DOCX
Example of quality manual
PDF
Quality & Quality tools
PPTX
Good Documentation Practice
PPT
Document Control
PPTX
Quality Awareness Session.pptx
PPTX
Presentation on Establishing Quality Objectives
PPTX
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
PPTX
Quality Manual
PPT
Quality Awareness Training
PDF
Sop 820 capa procedure corrective preventive action med dev
PPTX
PPTX
HSE Training Presentation for ISO 14001, ISO 45001 Integration
PDF
Root cause analysis
PDF
Non conformity and corrective action
Ncr writing and_closure
Quality assurance vs Quality control
Root cause analysis
Good documentation practices
Sequence and interaction of qms processes
Deviation and root cause analysis in Pharma
Example of quality manual
Quality & Quality tools
Good Documentation Practice
Document Control
Quality Awareness Session.pptx
Presentation on Establishing Quality Objectives
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
Quality Manual
Quality Awareness Training
Sop 820 capa procedure corrective preventive action med dev
HSE Training Presentation for ISO 14001, ISO 45001 Integration
Root cause analysis
Non conformity and corrective action
Ad

Similar to 8.3 Control of Nonconforming Material (20)

PDF
jabil-production-part-approval-process.pdf
PPT
2 1 Determine Measure Vsw Edits(Rev)
PPT
Six sigma-measure-phase2505
PDF
Quality manual
PDF
FMEA.pdf
PPTX
Zero Defect Competition @ July 22.pptx
PDF
A Next-Generation Approach to Integrated Warranty Management
PPTX
Supplier Requirements Specifications (SRS) Presentation
PDF
Example BHP QCP Revision 3
PDF
RDSO Guidelines for new Vendors- Rajni Ranjan
PDF
Rdso vendor registration guideline
PDF
209422504 process-audit-check-list
PPTX
quality-guidelines.pptx quality guide quality guide quality guide quality gui...
PDF
Digital forensic-cons
PPTX
Vendor selection
PPT
Managing non conformance colonel sri(titto sunny)
PPTX
Requirements validation - requirements engineering
PPTX
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
PDF
Si quality manual
PDF
Disposition of Defective Materials by Implementing Various Japanese Techniques
jabil-production-part-approval-process.pdf
2 1 Determine Measure Vsw Edits(Rev)
Six sigma-measure-phase2505
Quality manual
FMEA.pdf
Zero Defect Competition @ July 22.pptx
A Next-Generation Approach to Integrated Warranty Management
Supplier Requirements Specifications (SRS) Presentation
Example BHP QCP Revision 3
RDSO Guidelines for new Vendors- Rajni Ranjan
Rdso vendor registration guideline
209422504 process-audit-check-list
quality-guidelines.pptx quality guide quality guide quality guide quality gui...
Digital forensic-cons
Vendor selection
Managing non conformance colonel sri(titto sunny)
Requirements validation - requirements engineering
PFMEA, Risk Reduction and Effectiveness – Advance (AIAG FMEA #4 Edition)
Si quality manual
Disposition of Defective Materials by Implementing Various Japanese Techniques
Ad

8.3 Control of Nonconforming Material

  • 1. Quality Procedure ISO9001:2008 – Cuming Corporation Document #: 8.3 Rev.: A Title: Control of Nonconforming Material Page #: 1 of 4 Approval: Approval: 1.0 SCOPE AND PURPOSE This procedure defines requirements for the control of Nonconforming Material. This applies to the identification, control, reporting, and disposition of conforming material. 2.0 RESPONSIBILTIES See Flow chart Page #5. 3.0 DEFINITIONS NONCONFORMING MATERIAL or DISCREPANCY – any material that does not comply with dimensional, visual or hydrostatic specifications, is damaged or was not processed in the manner defined in the Quality Assurance Plan; or, any material/service not meeting requirements set forth in the purchase order. MRB – Material Review Board consisting of Product Development, Engineering, and Manufacturing, and the ensuing agreement of the Quality Assurance Manager. Defect –Out-of-specification condition, resultant from faults in “visual appearance design, process, procedures, that require reporting” using the Discrepant Material Form. Root Cause Analysis – Determining the actual root cause of the defect will be determined by the following departments: Hydrostatic Implosions / Failures: Product Development Mixing issues: Engineering Assistant Workmanship issues: Control Configuration Officer 4.0 INPUTS Discrepant Material Report F4-8.3-F001 Rev. A Manufacturing Traveler F4-7.5-F007 Rev. C Red Scrap Tag 8.5” x 11”
  • 2. Quality Procedure ISO9001:2008 – Cuming Corporation Document #: 8.3 Rev.: A Title: Control of Nonconforming Material Page #: 2 of 4 Approval: Approval: 5.0 PROCEDURE 5.1 All suspect nonconforming material shall be identified by the DMR. Defects reported using the Discrepant Material Report (DMR), form number F4-8.3-F001. All discrepant material shall be identified and segregated (if possible) to prevent further processing during the nonconforming material control process. Defective product shall be indentified using Form F4-8.3-F001, or Red Reject Tag. 5.2 The discrepancy is documented clearly, concisely, and in sufficient detail using photos as well to describe exactly what the discrepancy is. References to associated documents and specification shall be noted when applicable. 5.3 When a DMR is initiated, the originator shall use the next DMR number from the DMR Log book. The DMR number shall be noted in the space provided on the DMR form. Electronic copies “are then distributed to individual(s) notated at the “Assigned to:” Hard copies with the product traveler “are given to “Assigned to:” at the morning production meeting. The DMR # will be transferred to the traveler to demonstrate full traceability. 5.4 The discrepancy noted on the DMR by Quality Assurance is reviewed by one or more individuals on MRB to disposition the defective part(s). If the part(s) require rework, adequate instructions are to be applied in the Disposition field. Immediate corrective action is defined by the MRB action. “Possible dispositions include” UAI = Use as is; RTV = Return to Vendor; REWORK; REPAIR; SCRAP; Other (Specify). 5.5 Cycle time of the disposition of the DMR is a maximum of 10 working days. The cycle time of closing the DMR is a maximum of 30 working days. Extreme cases where a CAR is required, cycle time to close the DMR will take longer. The exception to this is when Corrective Action is linked to the discrepancy. 5.6 If needed a root cause analysis will be performed and the findings will be attached to the DMR. The department assigned to this exercise is described in section 3.0 of this procedure. 5.7 Agreement is demonstrated by Engineering or Manufacturing signature and is required for all DMR dispositions. If customer concurrence is necessary, the Project Manager will inform the customer of the nonconformance and forward a copy of the DMR to the customer representative. The customer will return a signed copy of the DMR to Cuming Corp. for inclusion in the customer job file.
  • 3. Quality Procedure ISO9001:2008 – Cuming Corporation Document #: 8.3 Rev.: A Title: Control of Nonconforming Material Page #: 3 of 4 Approval: Approval: 5.8 The Quality Assurance Manager shall monitor reports of nonconforming material for trends associated with workmanship, process, materials, or outside services using Statistical Analysis. DMR stats will be included in the management review process. 6.0 OUTPUTS DMR Parato analysis, DMR summary data and DMR database. 7.0 METRICS Quality Assurance Dashboard Revision History Revision Date Description A 4/6/11 Initial Release
  • 4. Quality Procedure ISO9001:2008 – Cuming Corporation Document #: 8.3 Rev.: A Title: Control of Nonconforming Material Page #: 4 of 4 Approval: Approval: Discrepant Material Report DMR Number: Reason Code: Location: Incoming Insp.: In-Process: Final: Assigned To: Date: Job Detail: Job # : Part # : Customer Name: Discrepancy: Rework / Repair / Instruction: Authorized Signature:______________________ Person / Dept. Responsible for (Rework Comments): Signature:______________________ Estimated Material Cost: $ Actual Material Cost: $ Estimated Labor Hrs: Actual Labor Cost: $ Total Cost: $ Total Cost: $ Disposition: (Quantity) UAI RTV Rework Repair Scrap Other Root Cause Attached: Yes No CAR Required: Yes No Material Review Board: Approvals Date Engineering Y N Manufacturing Y N Quality Assurance Y N
  • 5. DMR Process 8.3 EngineeringQualityAssuranceManufacturing Phase Defective Q.A. generates a DMR (Defective Material Report) DMR document DMR information is logged into database DMR Review Mfg. or Eng. Disposition (Use As Is, Repair, or Scrap) Yes Eng. Scrap Repair Use As Is Send to paint dept. Rework the part(s) Manufacture part(s) Scrap cost collected and applied to DMR Q.A. notifies Mfg. Make new part(s) Inspection Q.A. inspects parts Yes InspectionYes No Disposition (Use As Is, Repair, or Scrap Mfg. Scrap Repair Use As Is Rework Instruction Root Cause Analysis