SafeStart introduction - DS October 2013

ABB Low Voltage SafeStart MCC
Optimised Solution for Mining
© ABB Group
November 4, 2013 | Slide 1
SafeStart Motor Control Centre
Introduction




The demand for an
Australian optimised Mining
MCC solution resulted in
the development of the
SafeStart MCC in 2012



© ABB Group
November 4, 2013 | Slide 2

For over 25 years ABB
have offered the global
MNS MCC’s solution to the
Australian market.

In 2013 SafeStart was fully
type tested to AS/NZS
3439.1 at Testing &
Certification Australia.
SafeStart Motor Control Centre
Design Aspects


Demountable (W-F-F design) IP54, Form 4a construction



Arc Fault Testing to AS3439.1 Annex ZD and IEC TR 61641



Choice of components:
Live Line Monitor ,ELR & controls
Conventional or
Smart MPR (M10X and UMC)

© ABB Group
Month DD, Year

| Slide 3
SafeStart Motor Control Centre
Design Aspects – Functional Units


Rail mounted electrical components



Handles for easy handling when removed



Interlocked so module can’t be inserted when
Isolator is “On”




| Slide 4

White mounting plates



© ABB Group
Month DD, Year

Isolator and Door padlocking

Lift off hinges
SafeStart Motor Control Centre
TTA to AS/NZS3439.1:2002
Requires Type Test –
Verification of

SafeStart

8.2.1

Temperature-rise limits

Diversity 1

8.2.2

The dielectric properties

690V/1000V/8kV

8.2.3

The short-circuit withstand strength

80kA 1 sec.

8.2.4

The effectiveness of the protective
circuit

8,2,5

Clearances & creepage distances

8.2.6

Mechanical operations

200 operations

8.2.7

Degrees of protection & internal
separation

IP54 – Form 4a

Cl.

© ABB Group
Month DD, Year

| Slide 5
SafeStart TTA to AS/NZS3439.1:2002
Clause 8.2.1- Temperature-rise limits


Temperature Monitoring:
Incomer, Main Bus, Dist. Bus & Outgoing units




© ABB Group
Month DD, Year

| Slide 6

183 sensors, 16 for each Outgoing Unit
To reach final temperature takes 5 to 12 hours
SafeStart TTA to AS/NZS3439.1:2002
Clause 8.2.2 Short-circuit Withstand Strength



Incomer



| Slide 7

Main Busbars



© ABB Group
Month DD, Year

80kA, 690V, 1 sec.

Outgoing Functional units
SafeStart TTA to AS/NZS3439.1:2002
Clause 8.2.7 Degree of Protection IP54



© ABB Group
Month DD, Year

| Slide 8

Enclosed dust chamber which
maintains the talcum powder
in suspension - SafeStart
under test for 8 hours



Splashing of water from any
direction shall have no
harmful effect
SafeStart LV MCC
Internal Arc Fault Containment (IAC)


© ABB Group
November 4, 2013 | Slide 9

To AS/NZS3439.1 Annex ZD . “ Standard Tests” & “Special
Tests” and IEC TR 6164. Prospective Current 80kA, 415
V, 300 miliseconds
ABB Low Voltage Switchgear Solutions
Customer’s Choice



Proven modular construction:

Incomers, Busbars & Starters ,
Short - circuit, temperature rise, IP and IAC tested


Choice :
Outgoing units - Withdrawable or Demountable.
SCPD - MCCB or Fuses.
MPR - Conventional or Intelligent

© ABB Group
Month DD, Year

| Slide 10
ABB safe start, optimised solution for mining by David Stonebridge

More Related Content

PPT
PPTX
Bare metal training_05_uart
PPT
Dish position control using Geared Motor
DOCX
HOSAM CV
PPTX
Bare metal training_04_adc_temp_sensor
DOCX
HONEYWELL Pid loop tuning
PDF
Acura systems on drilling rigs
PPT
ABB enhanced availability, online monitoring by Ramy Hajjar
Bare metal training_05_uart
Dish position control using Geared Motor
HOSAM CV
Bare metal training_04_adc_temp_sensor
HONEYWELL Pid loop tuning
Acura systems on drilling rigs
ABB enhanced availability, online monitoring by Ramy Hajjar

Similar to ABB safe start, optimised solution for mining by David Stonebridge (20)

PPTX
2015 Arc Flash Conference MV Switchgear Standards
PDF
Switchgear presentation
PPT
Fire Pump Short Circuit and WIC Considerations
PDF
Hazards of Electricity. Mr. Elkin
PPTX
LV SWITCHGEAR -Final PPT.pptx
PDF
20120504 LISAT slides Dube
PDF
Presentation smart city presentation by cs electric (4)
PDF
Fire, Pressure & Ice – Oh My! Motion Control in Hostile Environments
PPTX
ABB switchgear safety hazards passive & active arc fault protection by David ...
PPTX
ABB passive & active arc fault protection by David Stonebridge
PDF
Frank Conte Arc flash program
PPTX
Electrical Saftey.pptx
PDF
Getting the Most out of your Electrical Room
PPT
Arc Flash as it Relates to AC Drives
PDF
An Overview of Products Certfication Webinar
PDF
Lecture 3.pdf ,
PPTX
Product presentation usa
PPT
ac switchgears
PPTX
BU_LPBS_Presentation_External _July_2014.pptx
DOCX
MM Electrical Safety Policy-Procedure draft 2
2015 Arc Flash Conference MV Switchgear Standards
Switchgear presentation
Fire Pump Short Circuit and WIC Considerations
Hazards of Electricity. Mr. Elkin
LV SWITCHGEAR -Final PPT.pptx
20120504 LISAT slides Dube
Presentation smart city presentation by cs electric (4)
Fire, Pressure & Ice – Oh My! Motion Control in Hostile Environments
ABB switchgear safety hazards passive & active arc fault protection by David ...
ABB passive & active arc fault protection by David Stonebridge
Frank Conte Arc flash program
Electrical Saftey.pptx
Getting the Most out of your Electrical Room
Arc Flash as it Relates to AC Drives
An Overview of Products Certfication Webinar
Lecture 3.pdf ,
Product presentation usa
ac switchgears
BU_LPBS_Presentation_External _July_2014.pptx
MM Electrical Safety Policy-Procedure draft 2
Ad

More from Keren Meers (6)

PPTX
ABB optimised solutions electrification by Jonathan Maher
PPTX
ABB retrofit by Alberto DeAlmeida
PPTX
ABB The importance of power quality in mining by Rob Symonds
PPTX
ABB Future of mining; automating mining processes by Llewellyn Best
PPTX
ABB safer HV substation by Mira Gorma
PPTX
ABB equipment availability, reduced resources by Don Etheridge
ABB optimised solutions electrification by Jonathan Maher
ABB retrofit by Alberto DeAlmeida
ABB The importance of power quality in mining by Rob Symonds
ABB Future of mining; automating mining processes by Llewellyn Best
ABB safer HV substation by Mira Gorma
ABB equipment availability, reduced resources by Don Etheridge
Ad

Recently uploaded (20)

PDF
A contest of sentiment analysis: k-nearest neighbor versus neural network
PDF
Taming the Chaos: How to Turn Unstructured Data into Decisions
PDF
sustainability-14-14877-v2.pddhzftheheeeee
PDF
1 - Historical Antecedents, Social Consideration.pdf
PDF
Unlock new opportunities with location data.pdf
PPTX
Final SEM Unit 1 for mit wpu at pune .pptx
PDF
A comparative study of natural language inference in Swahili using monolingua...
PDF
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
PDF
A review of recent deep learning applications in wood surface defect identifi...
PDF
Hindi spoken digit analysis for native and non-native speakers
PDF
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
PDF
Zenith AI: Advanced Artificial Intelligence
PDF
DP Operators-handbook-extract for the Mautical Institute
PPTX
Benefits of Physical activity for teenagers.pptx
PDF
Getting started with AI Agents and Multi-Agent Systems
PDF
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
PPTX
Web Crawler for Trend Tracking Gen Z Insights.pptx
PDF
CloudStack 4.21: First Look Webinar slides
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PPTX
O2C Customer Invoices to Receipt V15A.pptx
A contest of sentiment analysis: k-nearest neighbor versus neural network
Taming the Chaos: How to Turn Unstructured Data into Decisions
sustainability-14-14877-v2.pddhzftheheeeee
1 - Historical Antecedents, Social Consideration.pdf
Unlock new opportunities with location data.pdf
Final SEM Unit 1 for mit wpu at pune .pptx
A comparative study of natural language inference in Swahili using monolingua...
A Late Bloomer's Guide to GenAI: Ethics, Bias, and Effective Prompting - Boha...
A review of recent deep learning applications in wood surface defect identifi...
Hindi spoken digit analysis for native and non-native speakers
Transform Your ITIL® 4 & ITSM Strategy with AI in 2025.pdf
Zenith AI: Advanced Artificial Intelligence
DP Operators-handbook-extract for the Mautical Institute
Benefits of Physical activity for teenagers.pptx
Getting started with AI Agents and Multi-Agent Systems
How ambidextrous entrepreneurial leaders react to the artificial intelligence...
Web Crawler for Trend Tracking Gen Z Insights.pptx
CloudStack 4.21: First Look Webinar slides
Group 1 Presentation -Planning and Decision Making .pptx
O2C Customer Invoices to Receipt V15A.pptx

ABB safe start, optimised solution for mining by David Stonebridge

  • 1. SafeStart introduction - DS October 2013 ABB Low Voltage SafeStart MCC Optimised Solution for Mining © ABB Group November 4, 2013 | Slide 1
  • 2. SafeStart Motor Control Centre Introduction   The demand for an Australian optimised Mining MCC solution resulted in the development of the SafeStart MCC in 2012  © ABB Group November 4, 2013 | Slide 2 For over 25 years ABB have offered the global MNS MCC’s solution to the Australian market. In 2013 SafeStart was fully type tested to AS/NZS 3439.1 at Testing & Certification Australia.
  • 3. SafeStart Motor Control Centre Design Aspects  Demountable (W-F-F design) IP54, Form 4a construction  Arc Fault Testing to AS3439.1 Annex ZD and IEC TR 61641  Choice of components: Live Line Monitor ,ELR & controls Conventional or Smart MPR (M10X and UMC) © ABB Group Month DD, Year | Slide 3
  • 4. SafeStart Motor Control Centre Design Aspects – Functional Units  Rail mounted electrical components  Handles for easy handling when removed  Interlocked so module can’t be inserted when Isolator is “On”   | Slide 4 White mounting plates  © ABB Group Month DD, Year Isolator and Door padlocking Lift off hinges
  • 5. SafeStart Motor Control Centre TTA to AS/NZS3439.1:2002 Requires Type Test – Verification of SafeStart 8.2.1 Temperature-rise limits Diversity 1 8.2.2 The dielectric properties 690V/1000V/8kV 8.2.3 The short-circuit withstand strength 80kA 1 sec. 8.2.4 The effectiveness of the protective circuit 8,2,5 Clearances & creepage distances 8.2.6 Mechanical operations 200 operations 8.2.7 Degrees of protection & internal separation IP54 – Form 4a Cl. © ABB Group Month DD, Year | Slide 5
  • 6. SafeStart TTA to AS/NZS3439.1:2002 Clause 8.2.1- Temperature-rise limits  Temperature Monitoring: Incomer, Main Bus, Dist. Bus & Outgoing units   © ABB Group Month DD, Year | Slide 6 183 sensors, 16 for each Outgoing Unit To reach final temperature takes 5 to 12 hours
  • 7. SafeStart TTA to AS/NZS3439.1:2002 Clause 8.2.2 Short-circuit Withstand Strength   Incomer  | Slide 7 Main Busbars  © ABB Group Month DD, Year 80kA, 690V, 1 sec. Outgoing Functional units
  • 8. SafeStart TTA to AS/NZS3439.1:2002 Clause 8.2.7 Degree of Protection IP54  © ABB Group Month DD, Year | Slide 8 Enclosed dust chamber which maintains the talcum powder in suspension - SafeStart under test for 8 hours  Splashing of water from any direction shall have no harmful effect
  • 9. SafeStart LV MCC Internal Arc Fault Containment (IAC)  © ABB Group November 4, 2013 | Slide 9 To AS/NZS3439.1 Annex ZD . “ Standard Tests” & “Special Tests” and IEC TR 6164. Prospective Current 80kA, 415 V, 300 miliseconds
  • 10. ABB Low Voltage Switchgear Solutions Customer’s Choice  Proven modular construction: Incomers, Busbars & Starters , Short - circuit, temperature rise, IP and IAC tested  Choice : Outgoing units - Withdrawable or Demountable. SCPD - MCCB or Fuses. MPR - Conventional or Intelligent © ABB Group Month DD, Year | Slide 10