Confidentiality Statement
©2014 Adastra Corporation. All rights reserved. This
document and its contents remain the exclusive property
of Adastra Corporation. The information in this document
is provided solely for the purpose of evaluation by the
organization it has been prepared for (identified on Slide
1). Neither the document nor any of its contents is to be
duplicated or shared without explicit written authorization
from Adastra Corporation.
3
Table of Contents
 About Adastra
 Adastra Values
 The Adastra Consultant
 EDW
 Application in the context of a Project
 Enjoy the special fun part and win our Adastra Gift by sharing
your personal, unique +1
4
About Adastra
5
Adastra Fast Facts
6
PROJECTS in 30+ countries
Adastra Group
Albania Australia Austria
Bosnia and
Herzegovina
Brazil Belarus Bulgaria Canada China
Croatia
Czech
Republic
Germany Ghana Greece Hungary India Kazakhstan Kosovo Malta Montenegro
Nigeria Romania Russia Serbia Slovakia Slovenia Ukraine
United
Kingdom
United
States
Vietnam
Prague
CZ
London
UK
Frankfurt
DE
Bratislava
SK
Montreal
CA
New York
USA
Moscow
RU
Varna
BG
Wolfsburg
DE
Toronto
CA
Sofia
BG
7
Among Canada’s Best
2005, 2006, 2007
2008, 2009, 2010, 2011,
2012, 2013…
Since 2005
8
Global
Local
Clients
9
Technologies and Expertise
10
Business
Information
Management
BA
Business
Analysis QA
Quality
Assurance
DQ
Data
Quality
ETL
Data
Integration
DM
Advanced
Analytics
& Data
Mining
MDM
Master Data
Management
BD
Big Data
PM
Project
Management
SA
Solution
Architecture
BI
Business
Intelligence
DG
Data
Governance
Information Management at a glance
11
Adastra Values
Vision
Mission
Objectives
12
13
14
The Adastra Consultant
15
Role of an Adastra Consultant
The Adastra Consultant is a dynamic
individual delivering value to Adastra’s
customers in every role!
•Documentation
•Communicate!
•Keep up-to-date
•Understand the big picture
•Communicate!
•Take ownership
•Show leadership
•Deliver Quality
•Communicate!
•Needs
•Environment
•Standards
Customer
understanding
Delivery
ClosureExplore
16
Respect Client Policies and
Practices
Be Value Driven and Action
Oriented
Be Generous with Praise
and Careful with Criticism
Resolve Conflicts in an
Appropriate Manner
Take Making and Keeping
Commitments Seriously
Take Accountability for
Mistakes
Keep Confidences
Language Dress for Success
Treat People with Courtesy
and Respect
Your Online Image
Adastra Consultant
Consultant Behavior & Ethics
17
Adastra Plus One
Adastra Consultants go an ‘’extra mile’’
• to provide creative, novel solutions that stand out
• and flexibly set and juggle priorities, multiple tasks
and projects
• to develop a “sixth sense” for issue solving
• to understand the big picture and hidden risks or
dependencies
• to learn rapidly and proactively to stay “one step
ahead” in knowledge and ideas
• to seek out new challenges
18
EDW
19
Example of EDW
DWH
Core banking system 1
Core banking system 2
Front-office
applications
Group
extracts
Landing Area
Staging Layer
Integration Layer
Load Parameters
Manual Inputs
Working
Area
Error
Records
LA
L0
L1
MI
MD
ER
WR
API
...
API
On-line channles
API
L2
GL
API
Middleware
APIAPI
XLS
CSV
Salesforce Controling Risk
analyst
Marketing
analyst
Customer
unification engine
Online
Service
Customer
Cleansing
Logic
Unification
logic
ICT External
datamarts
Regulatory
reports
BI Tool
Semantic
Layer
Analytical Layer
Analytst
ICT
Party
Address
Contact Point
Agent/Channel
Contract
Account
Collateral
Product Ownership
Balances
Contract Facts
Transactions
Fees
Campaign
Repayment plans
Payments
Deals
Business
(Sales)
MIS Controlling
Profitability
Risk
&Fraud
Targeting
& Analysis
1:1 table copies
Batch data flow
Online data flow
Database
Component (process, schema)
System
Legend
20
Environments
21
Project Initiation
22
Project Initiation
Requirements analysis
Detailed requirements specification
Identification of:
Stakeholders
Dependencies
Restrictions
 KYC (Know Your Customer)
17 new attributes
14 tables
4 sources
23
KYC FATCA
17 new attributes 9 new attributes
14 tables 6 tables
4 sources 5 sources
The extra mile
Project Initiation
24
Project Planning
25
Project Planning
Scope
Timeline
Resources
UAT environmentThe extra mile
26
Technical Specifications
27
Technical Specifications
Detailed analyses
Impact analyses
Data quality
Dependencies and data flow analyses
Result document
 Transformation specification
 Mapping specification
 System extract specification
 Common warehouse controls
 Exception handling
 Data patch specification
28
Technical Specifications
The extra mile
Reduce transformation
Predict data quality issues
Optimize data flow
Optimize data extraction
The extra mile
29
DBA
30
Data Base Administration
Planning and development
 Changes
 Backup
 Synchronization
Check data volumeThe extra mile
31
ETL
32
Extract Transform Load
Planning and Development
 Technical architecture
 Unit test
 Schedule
 Implementation
Create common tools
Fix some existing issues
Predict some implementation issues
The extra mile
33
QA
34
Quality Assurance
Planning and Development:
 Test case
 System integration test
 User acceptance testing
 Development
Optimize test scenario
Data analyses
The extra mile
35
The Magic Triangle
36
The Magic Triangle
BA
ETLQA
37
Implementation
38
Implementation
Pre-implementation activities
Code drop
Implementation steps
Data patch
39
Support
40
Example of EDW
DWH
Core banking system 1
Core banking system 2
Front-office
applications
Group
extracts
Landing Area
Staging Layer
Integration Layer
Load Parameters
Manual Inputs
Working
Area
Error
Records
LA
L0
L1
MI
MD
ER
WR
API
...
API
On-line channles
API
L2
GL
API
Middleware
APIAPI
XLS
CSV
Salesforce Controling Risk
analyst
Marketing
analyst
Customer
unification engine
Online
Service
Customer
Cleansing
Logic
Unification
logic
ICT External
datamarts
Regulatory
reports
BI Tool
Semantic
Layer
Analytical Layer
Analytst
ICT
Party
Address
Contact Point
Agent/Channel
Contract
Account
Collateral
Product Ownership
Balances
Contract Facts
Transactions
Fees
Campaign
Repayment plans
Payments
Deals
Business
(Sales)
MIS Controlling
Profitability
Risk
&Fraud
Targeting
& Analysis
1:1 table copies
Batch data flow
Online data flow
Database
Component (process, schema)
System
Legend
41
Thank You!

More Related Content

PDF
Fraud Detection with Graphs at the Danish Business Authority
PDF
Knowledge Graphs Webinar- 11/7/2017
PDF
Transport routing optimization
PDF
Location decisions Center of Gravity
PDF
Supply Chain and Logistics Management with Graph & AI
PPT
Servicenow Introduction ppt on what is servicenow and how it is beneficial
PDF
Intellect SEEC: End-to-End Insurance Innovation
PDF
AXA x DSSG Meetup Sharing (Feb 2016)
Fraud Detection with Graphs at the Danish Business Authority
Knowledge Graphs Webinar- 11/7/2017
Transport routing optimization
Location decisions Center of Gravity
Supply Chain and Logistics Management with Graph & AI
Servicenow Introduction ppt on what is servicenow and how it is beneficial
Intellect SEEC: End-to-End Insurance Innovation
AXA x DSSG Meetup Sharing (Feb 2016)

Similar to ADASTRA +1 or How YOU generate additional value in the project lifecycle - Петър Кацаров, ADASTRA (20)

PDF
The 4th Generation Kingland platform
PDF
Enterprise Data Marketplace: A Centralized Portal for All Your Data Assets
PPTX
DataOps - Big Data and AI World London - March 2020 - Harvinder Atwal
PDF
Empowering your Enterprise with a Self-Service Data Marketplace (ASEAN)
PDF
BDW Chicago 2016 - Ramu Kalvakuntla, Sr. Principal - Technical - Big Data Pra...
PPTX
EY + Neo4j: Why graph technology makes sense for fraud detection and customer...
PDF
Self-Service Analytics Framework - Connected Brains 2018
PDF
Vema The Story of True SaaS Solution
PPT
Cardware Conference presentation on BIG DATA June 17-18 2014
PPTX
Agile Mumbai 2022 - Balvinder Kaur & Sushant Joshi | Real-Time Insights and A...
PDF
Maximize the Value of Your Data: Neo4j Graph Data Platform
PDF
Augmentation, Collaboration, Governance: Defining the Future of Self-Service BI
PPTX
Power BI Overview
PPTX
EY + Neo4j: Why graph technology makes sense for fraud detection and customer...
PDF
Accelerate Self-Service Analytics with Data Virtualization and Visualization
PDF
Graph Databases – Benefits and Risks
PPT
BI and Predictive analytics 2011 shyam desigan presentation
PPTX
Saksoft Inc
PPTX
Presented at CDOIQ 2024: How to Unlock Data for AI by Breaking Through the Da...
PDF
Empowering your Enterprise with a Self-Service Data Marketplace (EMEA)
The 4th Generation Kingland platform
Enterprise Data Marketplace: A Centralized Portal for All Your Data Assets
DataOps - Big Data and AI World London - March 2020 - Harvinder Atwal
Empowering your Enterprise with a Self-Service Data Marketplace (ASEAN)
BDW Chicago 2016 - Ramu Kalvakuntla, Sr. Principal - Technical - Big Data Pra...
EY + Neo4j: Why graph technology makes sense for fraud detection and customer...
Self-Service Analytics Framework - Connected Brains 2018
Vema The Story of True SaaS Solution
Cardware Conference presentation on BIG DATA June 17-18 2014
Agile Mumbai 2022 - Balvinder Kaur & Sushant Joshi | Real-Time Insights and A...
Maximize the Value of Your Data: Neo4j Graph Data Platform
Augmentation, Collaboration, Governance: Defining the Future of Self-Service BI
Power BI Overview
EY + Neo4j: Why graph technology makes sense for fraud detection and customer...
Accelerate Self-Service Analytics with Data Virtualization and Visualization
Graph Databases – Benefits and Risks
BI and Predictive analytics 2011 shyam desigan presentation
Saksoft Inc
Presented at CDOIQ 2024: How to Unlock Data for AI by Breaking Through the Da...
Empowering your Enterprise with a Self-Service Data Marketplace (EMEA)
Ad

More from beITconference (7)

PDF
NoSQL and Cloud Services - Philip Balinow, Comfo
PDF
Mobile First with Angular.JS - Владимир Цветков, Obecto
PDF
Уроците от работата ми по WordPress.com - Веселин Николов
PDF
Scrum Crash Course - Anatoli Iliev and Lyubomir Cholakov, Infragistics
PPTX
Развитие на финансовите приложения от транзакционни услуги към комплексно реш...
PPTX
The Web and The Social - Harry Birimirski, Smart IT
PDF
Unit & Automation Testing in Android - Stanislav Gatsev, Melon
NoSQL and Cloud Services - Philip Balinow, Comfo
Mobile First with Angular.JS - Владимир Цветков, Obecto
Уроците от работата ми по WordPress.com - Веселин Николов
Scrum Crash Course - Anatoli Iliev and Lyubomir Cholakov, Infragistics
Развитие на финансовите приложения от транзакционни услуги към комплексно реш...
The Web and The Social - Harry Birimirski, Smart IT
Unit & Automation Testing in Android - Stanislav Gatsev, Melon
Ad

Recently uploaded (20)

PPTX
2025-08-17 Joseph 03 (shared slides).pptx
PPTX
ANICK 6 BIRTHDAY....................................................
DOCX
Action plan to easily understanding okey
PPTX
INDIGENOUS-LANGUAGES-AND-LITERATURE.pptx
PPTX
CASEWORK Power Point Presentation - pointers
PPTX
Kompem Part Untuk MK Komunikasi Pembangunan 5.pptx
PPT
Lessons from Presentation Zen_ how to craft your story visually
PDF
Presentation on cloud computing and ppt..
PDF
PM Narendra Modi's speech from Red Fort on 79th Independence Day.pdf
PPTX
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
PPTX
Unit 8#Concept of teaching and learning.pptx
PPTX
Module_4_Updated_Presentation CORRUPTION AND GRAFT IN THE PHILIPPINES.pptx
PDF
IKS PPT.....................................
PPTX
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
PDF
5_tips_to_become_a_Presentation_Jedi_@itseugenec.pdf
PPTX
Lesson-7-Gas. -Exchange_074636.pptx
PPTX
Copy- of-Lesson-6-Digestive-System.pptx
PPTX
HOW TO HANDLE THE STAGE FOR ACADEMIA AND OTHERS.pptx
PPTX
CAPE CARIBBEAN STUDIES- Integration-1.pptx
PPTX
NORMAN_RESEARCH_PRESENTATION.in education
2025-08-17 Joseph 03 (shared slides).pptx
ANICK 6 BIRTHDAY....................................................
Action plan to easily understanding okey
INDIGENOUS-LANGUAGES-AND-LITERATURE.pptx
CASEWORK Power Point Presentation - pointers
Kompem Part Untuk MK Komunikasi Pembangunan 5.pptx
Lessons from Presentation Zen_ how to craft your story visually
Presentation on cloud computing and ppt..
PM Narendra Modi's speech from Red Fort on 79th Independence Day.pdf
3RD-Q 2022_EMPLOYEE RELATION - Copy.pptx
Unit 8#Concept of teaching and learning.pptx
Module_4_Updated_Presentation CORRUPTION AND GRAFT IN THE PHILIPPINES.pptx
IKS PPT.....................................
Phylogeny and disease transmission of Dipteran Fly (ppt).pptx
5_tips_to_become_a_Presentation_Jedi_@itseugenec.pdf
Lesson-7-Gas. -Exchange_074636.pptx
Copy- of-Lesson-6-Digestive-System.pptx
HOW TO HANDLE THE STAGE FOR ACADEMIA AND OTHERS.pptx
CAPE CARIBBEAN STUDIES- Integration-1.pptx
NORMAN_RESEARCH_PRESENTATION.in education

ADASTRA +1 or How YOU generate additional value in the project lifecycle - Петър Кацаров, ADASTRA

  • 1. Confidential Adastra +1 or How YOU generate additional value in the project lifecycle Be IT Conference May 21, 2014 Prepared for Adastra Bulgaria Prepared by Peter Katzarov, TM July Karchev, AM
  • 2. 2 Confidentiality Statement ©2014 Adastra Corporation. All rights reserved. This document and its contents remain the exclusive property of Adastra Corporation. The information in this document is provided solely for the purpose of evaluation by the organization it has been prepared for (identified on Slide 1). Neither the document nor any of its contents is to be duplicated or shared without explicit written authorization from Adastra Corporation.
  • 3. 3 Table of Contents  About Adastra  Adastra Values  The Adastra Consultant  EDW  Application in the context of a Project  Enjoy the special fun part and win our Adastra Gift by sharing your personal, unique +1
  • 6. 6 PROJECTS in 30+ countries Adastra Group Albania Australia Austria Bosnia and Herzegovina Brazil Belarus Bulgaria Canada China Croatia Czech Republic Germany Ghana Greece Hungary India Kazakhstan Kosovo Malta Montenegro Nigeria Romania Russia Serbia Slovakia Slovenia Ukraine United Kingdom United States Vietnam Prague CZ London UK Frankfurt DE Bratislava SK Montreal CA New York USA Moscow RU Varna BG Wolfsburg DE Toronto CA Sofia BG
  • 7. 7 Among Canada’s Best 2005, 2006, 2007 2008, 2009, 2010, 2011, 2012, 2013… Since 2005
  • 10. 10 Business Information Management BA Business Analysis QA Quality Assurance DQ Data Quality ETL Data Integration DM Advanced Analytics & Data Mining MDM Master Data Management BD Big Data PM Project Management SA Solution Architecture BI Business Intelligence DG Data Governance Information Management at a glance
  • 12. 12
  • 13. 13
  • 15. 15 Role of an Adastra Consultant The Adastra Consultant is a dynamic individual delivering value to Adastra’s customers in every role! •Documentation •Communicate! •Keep up-to-date •Understand the big picture •Communicate! •Take ownership •Show leadership •Deliver Quality •Communicate! •Needs •Environment •Standards Customer understanding Delivery ClosureExplore
  • 16. 16 Respect Client Policies and Practices Be Value Driven and Action Oriented Be Generous with Praise and Careful with Criticism Resolve Conflicts in an Appropriate Manner Take Making and Keeping Commitments Seriously Take Accountability for Mistakes Keep Confidences Language Dress for Success Treat People with Courtesy and Respect Your Online Image Adastra Consultant Consultant Behavior & Ethics
  • 17. 17 Adastra Plus One Adastra Consultants go an ‘’extra mile’’ • to provide creative, novel solutions that stand out • and flexibly set and juggle priorities, multiple tasks and projects • to develop a “sixth sense” for issue solving • to understand the big picture and hidden risks or dependencies • to learn rapidly and proactively to stay “one step ahead” in knowledge and ideas • to seek out new challenges
  • 19. 19 Example of EDW DWH Core banking system 1 Core banking system 2 Front-office applications Group extracts Landing Area Staging Layer Integration Layer Load Parameters Manual Inputs Working Area Error Records LA L0 L1 MI MD ER WR API ... API On-line channles API L2 GL API Middleware APIAPI XLS CSV Salesforce Controling Risk analyst Marketing analyst Customer unification engine Online Service Customer Cleansing Logic Unification logic ICT External datamarts Regulatory reports BI Tool Semantic Layer Analytical Layer Analytst ICT Party Address Contact Point Agent/Channel Contract Account Collateral Product Ownership Balances Contract Facts Transactions Fees Campaign Repayment plans Payments Deals Business (Sales) MIS Controlling Profitability Risk &Fraud Targeting & Analysis 1:1 table copies Batch data flow Online data flow Database Component (process, schema) System Legend
  • 22. 22 Project Initiation Requirements analysis Detailed requirements specification Identification of: Stakeholders Dependencies Restrictions  KYC (Know Your Customer) 17 new attributes 14 tables 4 sources
  • 23. 23 KYC FATCA 17 new attributes 9 new attributes 14 tables 6 tables 4 sources 5 sources The extra mile Project Initiation
  • 27. 27 Technical Specifications Detailed analyses Impact analyses Data quality Dependencies and data flow analyses Result document  Transformation specification  Mapping specification  System extract specification  Common warehouse controls  Exception handling  Data patch specification
  • 28. 28 Technical Specifications The extra mile Reduce transformation Predict data quality issues Optimize data flow Optimize data extraction The extra mile
  • 30. 30 Data Base Administration Planning and development  Changes  Backup  Synchronization Check data volumeThe extra mile
  • 32. 32 Extract Transform Load Planning and Development  Technical architecture  Unit test  Schedule  Implementation Create common tools Fix some existing issues Predict some implementation issues The extra mile
  • 33. 33 QA
  • 34. 34 Quality Assurance Planning and Development:  Test case  System integration test  User acceptance testing  Development Optimize test scenario Data analyses The extra mile
  • 40. 40 Example of EDW DWH Core banking system 1 Core banking system 2 Front-office applications Group extracts Landing Area Staging Layer Integration Layer Load Parameters Manual Inputs Working Area Error Records LA L0 L1 MI MD ER WR API ... API On-line channles API L2 GL API Middleware APIAPI XLS CSV Salesforce Controling Risk analyst Marketing analyst Customer unification engine Online Service Customer Cleansing Logic Unification logic ICT External datamarts Regulatory reports BI Tool Semantic Layer Analytical Layer Analytst ICT Party Address Contact Point Agent/Channel Contract Account Collateral Product Ownership Balances Contract Facts Transactions Fees Campaign Repayment plans Payments Deals Business (Sales) MIS Controlling Profitability Risk &Fraud Targeting & Analysis 1:1 table copies Batch data flow Online data flow Database Component (process, schema) System Legend