SlideShare a Scribd company logo
Waterloo Moraine,Growth Pressures &
Gravel Risks
By Louisette Lanteigne
butterflybluelu@rogers.com
Federal Challenges

Fish are cross jurisdictional = Federal Fisheries Act

Water is cross jurisdictional = No Water Act
WHY NOT?
Provincial Challenges

Provinces control aggregate and fossil fuel extraction.

Aggregates and fossil fuels = Provincial $

Provincial Ministry of Transportation is largest
purchaser of aggregate materials for road repair.

The closer to the source, the cheaper.
Water + Aggregates = Aquifers
Aggregateact 120611192330-phpapp02
Waterloo Moraine's Complex Geology

Along coastal areas,
geological composition is
relatively consistent and
“predictable”.

The Waterloo Moraine is
located at the intersection
of multiple glacial lobes.

The geology is very
complex and less
predictable.
Cross Section of Waterloo Moraine
Why protect the Waterloo Moraine?

This system of glacial formed aggregates gathers
municipal water for our region and communities
downstream.

It has been filtering, transporting, storing water and
offsetting flood risk for 15,000 years for free!

The sediment distribution controls flow and flow rates to
our fisheries, wells systems, the Grand River & Lake Erie.

Water volumes are need to dilute contamination issues
and to keep wells running.

Grand River supports the same Gross National Revenue
as Nova Scotia and contains 51% of Canada's fish species
It is a Natural Heritage River.
The Waterloo Moraine
Yellow = 80% of the water
Development Encroaching!
Road Salt Risk
Source Water Protection Map: ROPP
Gravel Pits encroaching!
Contamination Issues

Effluent: 29 waste water plants drain effluent into the Grand
River

Animal wastes: 290,000 cows in the Grand River Watershed
produce waste = five million people.

Leaky Landfills: The Greenbrook well contaminated by 1,4
dioxane, Middleton Wells in Cambridge at risk too. Waterloo's
Landfill is leaking vinyl chloride.

Industrial waste: Elmira had contamination of NDMA
(nitrosodimethylamine) from Unroyal/Chemtura. Elmira lost it's
groundwater supply.

In Cambridge, North Star was sued for trichloroethylene (TCE)
contamination.
Opportunities to improve
-Composting toilets can conserve water & reduce
wastes in waterways. Wastes are reduced to 2% of
it's mass in 5 years and end product safe for
landscaping.
-Biofuel recovery from sewage and farm wastes can
replace gas from fracking to heat homes and run cars
-creation of aggregate materials from sewage and farm
wastes reduce dependency on gravel extraction for
roads and construction materials
-Biochemical in-situ remediation of contaminates
including TCE is available. Natural enzymes “eat”
toxins on site.
Challenges in Protecting it

Provincial Growth Targets may exceed carrying capacity of the Grand
River and deplete the moraine.

Gravel projects place the moraine and Grand River at risk.

Today's policies cannot be grandfathered so older plans approved
years back don't have to comply to today's laws. They pose a risk.

We don't know how much water we have. Our knowledge of ground
water volumes is limited to pre-development studies.

Some consulting firms make money re mediating the situations they
create. There is money in destruction for them but heavy costs to
taxpayers.
Challenges cont.

The MNR does not recognize municipal policies
so municipally protected lands (like the ESL) are
still at risk for aggregate extraction.

The MOE reviewed our request for a Waterloo
Moraine Act but the scope excluded socio-
economic, health and long term sustainability
issues as well as down stream impacts.
Challenges cont.
- The review lacked regard to the last five years
worth of source water protection legislation.
- The MOE report did not assess whether the
ecological capacity of the moraines can
realistically accommodate the projected growth in
the region.
- To protect the system, cross jurisdictional and
Federal water policies are needed.
Ontario Environmental Commissioner of
Ontario 2009/2010 Annual Report

If the principles of watershed-based planning are
applied, and the environmental and socio-economic
context of the moraines are examined to assess the
cumulative effects of development, the ECO believes that
the current provincial policies do not adequately
protect the ecological and hydrogeological integrity of
moraines.

Watersheds should be a key unit within land use
planning in which to frame decision-making.
 
ECO cont.

  The population projections for Growth Plan communities
were established before the future water and wastewater
infrastructure was identified, and their associated costs
and environment impacts, were assessed.

This clearly indicates that provincial policies, such as the
Growth Plan, favor economic development over
sustainable planning processes.
ECO cont.

   Not only does the Growth Plan fail to require that population
allocations be adjusted for communities with watersheds close
to or already at carrying capacity, it favors large-scale
infrastructure projects to overcome natural limits.

Waterloo is proposing to address any future water shortages
by constructing a pipe to Lake Erie to pump water in and out of
the city. Not only do infrastructure projects like these override
natural ecological carrying capacity, they are also extremely
costly and energy intensive, and as a sewage and water
systems, ("infrastructure") they are exempt from natural heritage
protections in the PPS and Greenbelt Plan despite their
potential for significant environmental effects.
ECO's recommendation:
The ECO recommends that the Ministry of Municipal
Affairs and Housing amend the Provincial Policy
Statement to require that long term ecological
function and biodiversity of natural heritage systems
are maintained.
http://www.eco.on.ca
Lake Erie Pipeline
- Cost: $1.2 billion (2008)
- no treatment or
transportation costs
estimates
- Does not include cost
to upgrade intake
facilities.
- Water delivered uphill
- The Grand River would
be “infrastructure” and
lose heritage status.
Lake Erie:Under Stress
Toxic Algae Issues
Growing “Dead Zone”
Declining water volumes
Contamination issues
Climate Change
Zebra Mussel blocks intake
Invasive species
Canadian and US water
taking
Bulk Water Shipments
Toxic Blue Green Algae seen from space.
International Joint Commission
biennial report on the state of the Great Lakes
Calling Lake Erie the "poster child" for eutrophication, the
commission's U.S. co-chair, Lana Pollack, said much of
the lake is back to being coated with slimy green algal
blooms in the summer, as it was in the 1960s and early
'70s.
"They said, 'Well, we have this one fixed.' Well, we don't have this one fixed," she said.
March 9, 2011 CBC NEWS
http://www.cbc.ca/news/canada/windsor/story/2011/03/09/tech-ijc-great-lakes.html
IJC: full report page 33
It is clear that human and ecosystem health
in the Great Lakes basin cannot be
protected without protecting ground-water
resources.
http://www.ijc.org/rel/news/2011/110308_e.htm
TAKE ACTION!
-Source Water
Protection Act must
include Quarries as
a risk
-Environmental
Assessments for
Quarries in Ontario
Mandate test times and methods
Conserve Aggregates
Protect the function of Aggregates
Aggregates = Water Supplies

More Related Content

PPT
Aggregateact
PPT
Ecological impacts of dams
PDF
4. Two years on the ground identifying problems and fixing them - Carol McCar...
PPTX
Hydrogeology of Kerala
PPTX
Waste water purification using cnstructed wetlands
PPTX
Rejuvenation of lakes
PPTX
[Challenge:Future] Water Banks of Future
PPT
Conn Bar Assoc. - Stormwater
Aggregateact
Ecological impacts of dams
4. Two years on the ground identifying problems and fixing them - Carol McCar...
Hydrogeology of Kerala
Waste water purification using cnstructed wetlands
Rejuvenation of lakes
[Challenge:Future] Water Banks of Future
Conn Bar Assoc. - Stormwater

What's hot (20)

PDF
Protecting the Source of Drinking Water
PPT
Stewardship Station
PDF
BeiraLakeWaterQualityImprove with FTW_design report
PPTX
Ga presentation - scc capitol lake 10-12-10a
PPTX
Ga presentation - scc capitol lake 10-12-10a
PPTX
RECONSTRUCTION OF LAKES
PPTX
Water ressource assessment
DOCX
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
PPTX
Sand mining
PDF
R. Klingbeil, 2012. Water Management Challenges Under Drought Conditions
PPSX
Lesotho - Land & Water management for good IWRM
PDF
Mekong ARCC - Final workshop - Socio-Economic Study
PPTX
Flooding on the somerset levels
PDF
Case Study No. 1-Groundwater Supply of Cavite Province
PDF
2. The road ahead - European water policy and developments - Dr Leanne Roche,...
PPT
Environmental Study of The RíA
PPT
Chapt10 Lecture
KEY
Staten Island Bluebelt
PDF
Water For Life
PPTX
The Staten Island Bluebelt
Protecting the Source of Drinking Water
Stewardship Station
BeiraLakeWaterQualityImprove with FTW_design report
Ga presentation - scc capitol lake 10-12-10a
Ga presentation - scc capitol lake 10-12-10a
RECONSTRUCTION OF LAKES
Water ressource assessment
Lake Ontario Waterkeeper's Darlington Relicensing Hearing presentation- Novem...
Sand mining
R. Klingbeil, 2012. Water Management Challenges Under Drought Conditions
Lesotho - Land & Water management for good IWRM
Mekong ARCC - Final workshop - Socio-Economic Study
Flooding on the somerset levels
Case Study No. 1-Groundwater Supply of Cavite Province
2. The road ahead - European water policy and developments - Dr Leanne Roche,...
Environmental Study of The RíA
Chapt10 Lecture
Staten Island Bluebelt
Water For Life
The Staten Island Bluebelt
Ad

Similar to Aggregateact 120611192330-phpapp02 (20)

PPT
Lanteigne line9hearing
PDF
Lanteigneline9hearing 120610184611-phpapp02
PPT
Brant's Water Risks
PDF
Arasubmissionlanteigneaggregaterisksgdpimpacts 120705153334-phpapp01
PPT
Lgu services amp
PPT
Ara submission lanteigne: aggregate risks & gdp impacts
PPT
Lanteigne re: nuclear waste dump planned by Lake Huron
PPT
Attachment a
PPT
Brant's water supply, aggregate & development risks
PPTX
Bradford Beck talk
PPT
Lanteigne on Darlington Nuclear Plant
PPT
Reason to rescind OMB decision
PPT
Alberta Water Council - CASA Outreach Presentation
PDF
Brantwaterpresentation 121002114120-phpapp02
PDF
Canada: Green Communities Guide
PDF
Rideau corridor landscape parks canada
PDF
Swim Drink Fish's submission on Preserving and Protecting our Environment for...
PPT
Water What Is Ailing Our Rivers And Lakes 1
PPTX
Fracking & Water Quality 101
Lanteigne line9hearing
Lanteigneline9hearing 120610184611-phpapp02
Brant's Water Risks
Arasubmissionlanteigneaggregaterisksgdpimpacts 120705153334-phpapp01
Lgu services amp
Ara submission lanteigne: aggregate risks & gdp impacts
Lanteigne re: nuclear waste dump planned by Lake Huron
Attachment a
Brant's water supply, aggregate & development risks
Bradford Beck talk
Lanteigne on Darlington Nuclear Plant
Reason to rescind OMB decision
Alberta Water Council - CASA Outreach Presentation
Brantwaterpresentation 121002114120-phpapp02
Canada: Green Communities Guide
Rideau corridor landscape parks canada
Swim Drink Fish's submission on Preserving and Protecting our Environment for...
Water What Is Ailing Our Rivers And Lakes 1
Fracking & Water Quality 101
Ad

More from Louisette Lanteigne (13)

PDF
Reasontorescind 130201005411-phpapp02
PDF
Nelsonquarrylanteigne 121011161032-phpapp01
PDF
Pipelinespillsprevention 130128015307-phpapp01
PDF
Raceway 121129160609-phpapp02
PDF
Waterlooregionsdrainedponds 120920170138-phpapp01
PDF
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
PDF
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
PDF
Farmsatrisk 130209015511-phpapp02
PDF
Enbridgeline9earthquakerisks 121123022811-phpapp01
PDF
Darlingtonlanteigne2015final 151103055554-lva1-app6891
PDF
Brantaggregate 120923133722-phpapp01
PDF
Attachmenta 130221133021-phpapp01
PDF
Aggregatecreation 131104112237-phpapp01
Reasontorescind 130201005411-phpapp02
Nelsonquarrylanteigne 121011161032-phpapp01
Pipelinespillsprevention 130128015307-phpapp01
Raceway 121129160609-phpapp02
Waterlooregionsdrainedponds 120920170138-phpapp01
Lanteignerenuclearwastelakehuron 120711130433-phpapp01
Lanteigneredarlingtonnuclearplant 121015183235-phpapp01
Farmsatrisk 130209015511-phpapp02
Enbridgeline9earthquakerisks 121123022811-phpapp01
Darlingtonlanteigne2015final 151103055554-lva1-app6891
Brantaggregate 120923133722-phpapp01
Attachmenta 130221133021-phpapp01
Aggregatecreation 131104112237-phpapp01

Recently uploaded (20)

PPTX
structure and components of Environment.pptx
DOCX
Epoxy Coated Steel Bolted Tanks for Fish Farm Water Provides Reliable Water f...
DOCX
Epoxy Coated Steel Bolted Tanks for Beverage Wastewater Storage Manages Liqui...
DOCX
Epoxy Coated Steel Bolted Tanks for Agricultural Waste Biogas Digesters Turns...
DOCX
Epoxy Coated Steel Bolted Tanks for Dairy Farm Water Ensures Clean Water for ...
PDF
PET Hydrolysis (polyethylene terepthalate Hydrolysis)
PDF
Effective factors on adoption of intercropping and it’s role on development o...
DOCX
Epoxy Coated Steel Bolted Tanks for Farm Digesters Supports On-Farm Organic W...
PDF
Effect of anthropisation and revegetation efforts on soil bacterial community...
PPTX
NOISE-MITIGATION.-pptxnaksnsbaksjvdksbsksk
PPTX
UN Environmental Inventory User Training 2021.pptx
PDF
Urban Hub 50: Spirits of Place - & the Souls' of Places
PDF
Insitu conservation seminar , national park ,enthobotanical significance
PDF
School Leaders Revised Training Module, SCB.pdf
PDF
The Truth Behind Vantara zoo in Jamnagar
PPTX
Environmental Ethics: issues and possible solutions
PDF
Bai bao Minh chứng sk2-DBTrong-003757.pdf
PPTX
Topic Globalisation and Lifelines of National Economy (1).pptx
PPTX
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire
DOCX
Epoxy Coated Steel Bolted Tanks for Leachate Storage Securely Contain Landfil...
structure and components of Environment.pptx
Epoxy Coated Steel Bolted Tanks for Fish Farm Water Provides Reliable Water f...
Epoxy Coated Steel Bolted Tanks for Beverage Wastewater Storage Manages Liqui...
Epoxy Coated Steel Bolted Tanks for Agricultural Waste Biogas Digesters Turns...
Epoxy Coated Steel Bolted Tanks for Dairy Farm Water Ensures Clean Water for ...
PET Hydrolysis (polyethylene terepthalate Hydrolysis)
Effective factors on adoption of intercropping and it’s role on development o...
Epoxy Coated Steel Bolted Tanks for Farm Digesters Supports On-Farm Organic W...
Effect of anthropisation and revegetation efforts on soil bacterial community...
NOISE-MITIGATION.-pptxnaksnsbaksjvdksbsksk
UN Environmental Inventory User Training 2021.pptx
Urban Hub 50: Spirits of Place - & the Souls' of Places
Insitu conservation seminar , national park ,enthobotanical significance
School Leaders Revised Training Module, SCB.pdf
The Truth Behind Vantara zoo in Jamnagar
Environmental Ethics: issues and possible solutions
Bai bao Minh chứng sk2-DBTrong-003757.pdf
Topic Globalisation and Lifelines of National Economy (1).pptx
Biodiversity.udfnfndrijfreniufrnsiufnriufrenfuiernfuire
Epoxy Coated Steel Bolted Tanks for Leachate Storage Securely Contain Landfil...

Aggregateact 120611192330-phpapp02

  • 1. Waterloo Moraine,Growth Pressures & Gravel Risks By Louisette Lanteigne butterflybluelu@rogers.com
  • 2. Federal Challenges  Fish are cross jurisdictional = Federal Fisheries Act  Water is cross jurisdictional = No Water Act WHY NOT?
  • 3. Provincial Challenges  Provinces control aggregate and fossil fuel extraction.  Aggregates and fossil fuels = Provincial $  Provincial Ministry of Transportation is largest purchaser of aggregate materials for road repair.  The closer to the source, the cheaper.
  • 4. Water + Aggregates = Aquifers
  • 6. Waterloo Moraine's Complex Geology  Along coastal areas, geological composition is relatively consistent and “predictable”.  The Waterloo Moraine is located at the intersection of multiple glacial lobes.  The geology is very complex and less predictable.
  • 7. Cross Section of Waterloo Moraine
  • 8. Why protect the Waterloo Moraine?  This system of glacial formed aggregates gathers municipal water for our region and communities downstream.  It has been filtering, transporting, storing water and offsetting flood risk for 15,000 years for free!  The sediment distribution controls flow and flow rates to our fisheries, wells systems, the Grand River & Lake Erie.  Water volumes are need to dilute contamination issues and to keep wells running.  Grand River supports the same Gross National Revenue as Nova Scotia and contains 51% of Canada's fish species It is a Natural Heritage River.
  • 9. The Waterloo Moraine Yellow = 80% of the water
  • 14. Contamination Issues  Effluent: 29 waste water plants drain effluent into the Grand River  Animal wastes: 290,000 cows in the Grand River Watershed produce waste = five million people.  Leaky Landfills: The Greenbrook well contaminated by 1,4 dioxane, Middleton Wells in Cambridge at risk too. Waterloo's Landfill is leaking vinyl chloride.  Industrial waste: Elmira had contamination of NDMA (nitrosodimethylamine) from Unroyal/Chemtura. Elmira lost it's groundwater supply.  In Cambridge, North Star was sued for trichloroethylene (TCE) contamination.
  • 15. Opportunities to improve -Composting toilets can conserve water & reduce wastes in waterways. Wastes are reduced to 2% of it's mass in 5 years and end product safe for landscaping. -Biofuel recovery from sewage and farm wastes can replace gas from fracking to heat homes and run cars -creation of aggregate materials from sewage and farm wastes reduce dependency on gravel extraction for roads and construction materials -Biochemical in-situ remediation of contaminates including TCE is available. Natural enzymes “eat” toxins on site.
  • 16. Challenges in Protecting it  Provincial Growth Targets may exceed carrying capacity of the Grand River and deplete the moraine.  Gravel projects place the moraine and Grand River at risk.  Today's policies cannot be grandfathered so older plans approved years back don't have to comply to today's laws. They pose a risk.  We don't know how much water we have. Our knowledge of ground water volumes is limited to pre-development studies.  Some consulting firms make money re mediating the situations they create. There is money in destruction for them but heavy costs to taxpayers.
  • 17. Challenges cont.  The MNR does not recognize municipal policies so municipally protected lands (like the ESL) are still at risk for aggregate extraction.  The MOE reviewed our request for a Waterloo Moraine Act but the scope excluded socio- economic, health and long term sustainability issues as well as down stream impacts.
  • 18. Challenges cont. - The review lacked regard to the last five years worth of source water protection legislation. - The MOE report did not assess whether the ecological capacity of the moraines can realistically accommodate the projected growth in the region. - To protect the system, cross jurisdictional and Federal water policies are needed.
  • 19. Ontario Environmental Commissioner of Ontario 2009/2010 Annual Report  If the principles of watershed-based planning are applied, and the environmental and socio-economic context of the moraines are examined to assess the cumulative effects of development, the ECO believes that the current provincial policies do not adequately protect the ecological and hydrogeological integrity of moraines.  Watersheds should be a key unit within land use planning in which to frame decision-making.  
  • 20. ECO cont.    The population projections for Growth Plan communities were established before the future water and wastewater infrastructure was identified, and their associated costs and environment impacts, were assessed.  This clearly indicates that provincial policies, such as the Growth Plan, favor economic development over sustainable planning processes.
  • 21. ECO cont.     Not only does the Growth Plan fail to require that population allocations be adjusted for communities with watersheds close to or already at carrying capacity, it favors large-scale infrastructure projects to overcome natural limits.  Waterloo is proposing to address any future water shortages by constructing a pipe to Lake Erie to pump water in and out of the city. Not only do infrastructure projects like these override natural ecological carrying capacity, they are also extremely costly and energy intensive, and as a sewage and water systems, ("infrastructure") they are exempt from natural heritage protections in the PPS and Greenbelt Plan despite their potential for significant environmental effects.
  • 22. ECO's recommendation: The ECO recommends that the Ministry of Municipal Affairs and Housing amend the Provincial Policy Statement to require that long term ecological function and biodiversity of natural heritage systems are maintained. http://www.eco.on.ca
  • 23. Lake Erie Pipeline - Cost: $1.2 billion (2008) - no treatment or transportation costs estimates - Does not include cost to upgrade intake facilities. - Water delivered uphill - The Grand River would be “infrastructure” and lose heritage status.
  • 24. Lake Erie:Under Stress Toxic Algae Issues Growing “Dead Zone” Declining water volumes Contamination issues Climate Change Zebra Mussel blocks intake Invasive species Canadian and US water taking Bulk Water Shipments
  • 25. Toxic Blue Green Algae seen from space.
  • 26. International Joint Commission biennial report on the state of the Great Lakes Calling Lake Erie the "poster child" for eutrophication, the commission's U.S. co-chair, Lana Pollack, said much of the lake is back to being coated with slimy green algal blooms in the summer, as it was in the 1960s and early '70s. "They said, 'Well, we have this one fixed.' Well, we don't have this one fixed," she said. March 9, 2011 CBC NEWS http://www.cbc.ca/news/canada/windsor/story/2011/03/09/tech-ijc-great-lakes.html
  • 27. IJC: full report page 33 It is clear that human and ecosystem health in the Great Lakes basin cannot be protected without protecting ground-water resources. http://www.ijc.org/rel/news/2011/110308_e.htm
  • 28. TAKE ACTION! -Source Water Protection Act must include Quarries as a risk -Environmental Assessments for Quarries in Ontario
  • 29. Mandate test times and methods
  • 31. Protect the function of Aggregates Aggregates = Water Supplies