SlideShare a Scribd company logo
Agilent Technologies Lifecycle Tracking Database
Table  of Contents Sponsor Background Agilent’s Existing System  Sponsor requirements of  Project  Key functions of our Product and the deliverables Project Tasks - Pert Chart Risk Analysis Contingency Plans Gantt Chart Product internals Test Plans Team Testing of Individual Modules Acceptance Test & Delivery date
Table of Contents (cont.) Service & Startup Guide User Interface & User Guide Demonstration of Product Obstacles  Outlook for Completion of Project Conclusion
Our Sponsor – Keith Price  Keith Price leads the quality team at Agilent’s Life Sciences and Chemical Analysis group (LSCA), with responsibilities for its quality management system, business process metrics system, and customer loyalty. He joined HP/Agilent in 1984 as an electronic engineer and then moved into a variety of quality consulting and management roles.  He holds a master’s degree in quality systems management from Napier University in Edinburgh, Scotland.
Our Sponsor – Michael McCaffrey   Trained as a chemist and worked for many years engaged in liquid crystal research and development. Economic, business and personal changes at the time caused me to reevaluate my career choices and I retrained in the computer science field. Michael McCaffrey have spent the last 20 years in a variety of process development, process improvement efforts - lifecycle creation, inspections implementations, measurement efforts, cost/estimation improvements, quality championing, etc.
Agilent’s Existing System Agilent does not have a system implemented Therefore we are using VMWARE, which will present portability
Sponsor Requirements of Project To design a webpage that can be accessed by the Life Sciences & Chemical Analysis team at Agilent Technologies (the webpage will allow them to log into their database) A webpage will actually query these items:  1. What Product 2. Which Phase it is in 3. The Product Name 4. Product Number 5. Version 6. Manager in Charge of Product 7. Whether it’s Hardware, Software, or Chemical 8. Product Description To develop a simple database to query products that are released and in development. We are to track different phases of each research and development product of Agilent Technologies: Life Sciences and Chemical Analysis Department with product release date and financial project.
Key Functions of Our Product & Deliverables   The functional aspects of this particular database will track hardware, software, and chemical analysis.  It will track phases and all deliverables of the department and project a simple website interface.
Key Functions of Our Product & Deliverables (cont.)
Key Functions of Our Product & Deliverables (cont.)
Key Functions of Our Product & Deliverables (cont.) Our deliverables are: Tracking Database -  We are implementing one database that tracks deliverables of each phase of every product life-cycle. It will need to be a form where information about the product and its status can be entered.  Web Page – Queries the following items What product Which phase it is in The product name Product Number Version Manager in charge of product Whether it’s Hardware, Software, or Chemicals Product Description
Project Tasks – PERT Chart Critical Points :  ID3 + ID4 + ID5 + ID8 + ID9 + ID10 + ID11, 13,  14 + ID18 + ID17 + ID19 + ID20 (5 + 6 + 33 + 4 + 15 + 8 + 36 + 1 + 28 + 16 + 1) = 153 days = Critical Point
  Risk Analysis: Probability and Impact Risk Factors 8 8 1 AWOL sponsor AWOL team member 10 1 1 1 Group tension 9 18 9 2 Failure to network through sponsor intranet 8 48 9 5 Project tool discrepancies 7 3 3 1 Meetings for project discussions and to-dos  6 15 5 3 The difficulty in contacting the team members of P4 5 15 5 3 The teams skill level on MySQL and PHP 4 5 5 1 Frequent changes by sponsor 3 15 5 3 Difficulties contacting sponsor 2 36 9 4 Technical specifications of project is to develop product tracking 1 Severity Impact Expectation Problem
Contingency ALL P4 Sponsor will not receive product, and team member will be documented and rendered no credit from the group if adverse results comes from this absence 8 AWOL sponsor AWOL team member 10 Lily Only the directives and objectives of the project will be completely focused on and adhered to 1 Group tension 9 Will Finding alternative methods such as using same network as Agilent internal website to host product 18 Failure to network through sponsor intranet 8 Will Specific and correct requirements will be a part from implementation, or use different project tools 48 Project tool discrepancies 7 ALL P4 All team members should know and adhere to project requirements as documented 3 Meetings for project discussions and to-dos 6 Lily Use the communication tool that each member checks the most (i.e phone, email) 15 Difficulty contacting team members 5 ALL P4 Train each other on what the other person is doing, so we can all be on the same page 15 Skill level among team members 4 Khalida Meet and email daily to ensure the specifications of the project have not changed  3 Frequent changes by sponsor 3 Will Make weekly checkpoints 15 Difficulties contacting sponsor 2 Will Contact sponsor for daily meetings to clarify what is needed to build the database  36 Technical Specifications of project have not been provided by Sponsor  1 Responsible Person Contingency Plan Severity Problem #
Gantt Chart
Product Internal Software tools used to create product Agilent.
Test Plans Initial VMWARE implementation will be tested on Agilent Technologies servers. Connectivity will be configured by P4 Agilent student team.
Team Testing and Individual Modules TBA Staff/IT Admin Testing for Agilent staff Module 10 TBA Keith Price Testing for Agilent staff Module 9 11/13/2006 All Team Member Test Records Per Page Module 8 11/13/2006 All Team Member Test Advanced Search Module 7 11/13/2006 All Team Member Export Results Module 6 11/10/2006 All Team Member Test Printer-Friendly version Module 5 11/10/2006 All Team Member Test Search Value Module 4 11/10/2006 All Team Member Test Add Value Module 3 11/8/2006 Lily & Khalida Test website login and look at list Module 2 11/1/2006 Will Test website login and look at list Module 1 When Who Description
Acceptance Test and Delivery Date These are some of the test Cases that are necessary for both Agilent staff members and Student team members Create class presentation tables and values Create new tables FN#4 Adding a new field to all records in Table Create new authenticated users Create new database Create new table Function 4: Inserting a new Record Deleting a table Deleting a Chemical Deleting a Software Deleting a Hardware Function 3: Deleting a record from DB. Change Data Update Record Update new input record Update existing record Function2: Updating an existent Record Input Data Input data Chemical Input data Software Input data Hardware Function1: Data entry Testcase4 Testcase3 Testcase2 Testcase1
Service & Startup Guide By using WAMP (Windows, Apache server, MySQL, and PHP) the integration of the open source products were easier to use. To Start Apache Server after Windows load clicking (on the lower right corner) onto this display
Service & Startup Guide  cont. Select “Restart All Services” (This will restart the MySQL and Apache server for the website)
Service & Startup Guide  cont. To test if localhost is connecting (if server is up), click on the WAMP display on the lower right corner and select Localhost on the very top:
Service & Startup Guide  cont. Localhost should show this:
Service & Startup Guide  cont. By entering the Agilent project you will get into the login screen
User Interface and User Guide After retrieving the URL to get to the login screen user will see this login screen:
User Interface and User Guide  cont. Product_List Interface
User Interface and User Guide  cont. Product_Add Interface
User Interface and User Guide  cont. To Query Items Testing a Query
Demonstration of Product Demo by Will Liao
Obstacles Major obstacles we faced were from the Risk analysis: The team’s skill level severity was 15 which was considered moderate, and was a moderate issue. The difficulty in arranging team meetings, severity was at 15 moderate, but it was difficult in coordinating with sponsors the most.  Problems synergizing with sponsors. The contingency of group tension was met but there were some internal failures to meet deadlines on to-dos because of group tensions and lack of qualification.
Outlook of Completion of Product Product is complete as par to requirements. WebPage will query:  What product Which phase it is in The product name Product Number Version Manager in charge of product Whether it’s Hardware, Software, or Chemicals Product Description
Conclusion Sponsor Background Agilent’s Existing System  Sponsor requirements of  Project  Key functions of our Product and the deliverables Project Tasks - Pert Chart Risk Analysis Contingency Plans Gantt Chart Product internals Test Plans Team Testing of Individual Modules Acceptance Test & Delivery date
Conclusion cont. Service & Startup Guide User Interface & User Guide Demonstration of Product Obstacles  Outlook for Completion of Project Conclusion

More Related Content

DOC
Test plan
PPTX
Team forge Test Management with TestLink
PDF
Agile testing: from Quality Assurance to Quality Assistance
PDF
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
PDF
PPT
1.basics of software testing
PDF
Qa case study
DOCX
Paper review
Test plan
Team forge Test Management with TestLink
Agile testing: from Quality Assurance to Quality Assistance
DEVELOP QUALITY CHARACTERISTICS BASED QUALITY EVALUATION PROCESS FOR READY TO...
1.basics of software testing
Qa case study
Paper review

What's hot (20)

PPTX
Test Plan Simplicity
PPTX
test plan
DOC
5WCSQ(CFP) - Quality Improvement by the Real-Time Detection of the Problems
PDF
Agile testing guide_2021
PDF
IRJET- Technique of Finding the Defect in Software Testing
PDF
IRJET - Gap Analysis for Safety Improvements in Chemical Handling
PDF
On Demand Feedback Analysis for Certification Process
PPT
3.static testing
DOCX
R!!! ria-gui-test plan 1.0
PPT
2.testing in the software life cycle
PDF
Introduction to Investigation And Utilizing Lean Test Metrics In Agile Softwa...
DOC
Manual testing interview question by INFOTECH
PPT
The Magic Of Application Lifecycle Management In Vs Public
PDF
What is Software Testing | Edureka
PDF
PPTX
FDA software compliance 2016
PPTX
Rals freedom project management methodologies training
DOCX
CV_SyedShoeb_2015
PDF
Mobile trends v3.0
PPTX
Graham et.al, 2008, Foundations of Software Testing ISTQB Certification. Chap...
Test Plan Simplicity
test plan
5WCSQ(CFP) - Quality Improvement by the Real-Time Detection of the Problems
Agile testing guide_2021
IRJET- Technique of Finding the Defect in Software Testing
IRJET - Gap Analysis for Safety Improvements in Chemical Handling
On Demand Feedback Analysis for Certification Process
3.static testing
R!!! ria-gui-test plan 1.0
2.testing in the software life cycle
Introduction to Investigation And Utilizing Lean Test Metrics In Agile Softwa...
Manual testing interview question by INFOTECH
The Magic Of Application Lifecycle Management In Vs Public
What is Software Testing | Edureka
FDA software compliance 2016
Rals freedom project management methodologies training
CV_SyedShoeb_2015
Mobile trends v3.0
Graham et.al, 2008, Foundations of Software Testing ISTQB Certification. Chap...
Ad

Similar to Agilent Technologies Demo (20)

PDF
Test Automation using UiPath Test Suite - Developer Circle Part-1.pdf
PPT
ISTQB / ISEB Foundation Exam Practice - 2
PPS
ISTQB Foundation - Chapter 2
PPT
ISTQB, ISEB Lecture Notes- 2
PDF
Software Development Lifecycle Presentation
PPT
16103271 software-testing-ppt
PPT
07 Outsource To India Independent Testing
PPTX
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
PPT
Gcs day1
PPTX
Software testing ppt
DOC
CV Coral
DOCX
DOCX
PDF
UiPath Test Automation using UiPath Test Suite series, part 1
PPT
ISTQBCH2.ppt
PPT
ISTQBCH2.ppt
PPTX
Performance Continuous Integration
PPTX
SQT-UNIT TESTING SOFTWARE DEVELOPMENT LIFECYCLE
PPTX
STLC & SDLC-ppt-1.pptx
PPTX
Defect Management Procedure Presentation
Test Automation using UiPath Test Suite - Developer Circle Part-1.pdf
ISTQB / ISEB Foundation Exam Practice - 2
ISTQB Foundation - Chapter 2
ISTQB, ISEB Lecture Notes- 2
Software Development Lifecycle Presentation
16103271 software-testing-ppt
07 Outsource To India Independent Testing
Welingkar_final project_ppt_IMPORTANCE & NEED FOR TESTING
Gcs day1
Software testing ppt
CV Coral
UiPath Test Automation using UiPath Test Suite series, part 1
ISTQBCH2.ppt
ISTQBCH2.ppt
Performance Continuous Integration
SQT-UNIT TESTING SOFTWARE DEVELOPMENT LIFECYCLE
STLC & SDLC-ppt-1.pptx
Defect Management Procedure Presentation
Ad

Recently uploaded (20)

PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
5 Stages of group development guide.pptx
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PPT
Chapter four Project-Preparation material
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
DOCX
Euro SEO Services 1st 3 General Updates.docx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Principles of Marketing, Industrial, Consumers,
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
Laughter Yoga Basic Learning Workshop Manual
Reconciliation AND MEMORANDUM RECONCILATION
ICG2025_ICG 6th steering committee 30-8-24.pptx
340036916-American-Literature-Literary-Period-Overview.ppt
Belch_12e_PPT_Ch18_Accessible_university.pptx
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Nidhal Samdaie CV - International Business Consultant
5 Stages of group development guide.pptx
Unit 1 Cost Accounting - Cost sheet
MSPs in 10 Words - Created by US MSP Network
DOC-20250806-WA0002._20250806_112011_0000.pdf
Chapter four Project-Preparation material
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Euro SEO Services 1st 3 General Updates.docx

Agilent Technologies Demo

  • 1. Agilent Technologies Lifecycle Tracking Database
  • 2. Table of Contents Sponsor Background Agilent’s Existing System Sponsor requirements of Project Key functions of our Product and the deliverables Project Tasks - Pert Chart Risk Analysis Contingency Plans Gantt Chart Product internals Test Plans Team Testing of Individual Modules Acceptance Test & Delivery date
  • 3. Table of Contents (cont.) Service & Startup Guide User Interface & User Guide Demonstration of Product Obstacles Outlook for Completion of Project Conclusion
  • 4. Our Sponsor – Keith Price Keith Price leads the quality team at Agilent’s Life Sciences and Chemical Analysis group (LSCA), with responsibilities for its quality management system, business process metrics system, and customer loyalty. He joined HP/Agilent in 1984 as an electronic engineer and then moved into a variety of quality consulting and management roles. He holds a master’s degree in quality systems management from Napier University in Edinburgh, Scotland.
  • 5. Our Sponsor – Michael McCaffrey Trained as a chemist and worked for many years engaged in liquid crystal research and development. Economic, business and personal changes at the time caused me to reevaluate my career choices and I retrained in the computer science field. Michael McCaffrey have spent the last 20 years in a variety of process development, process improvement efforts - lifecycle creation, inspections implementations, measurement efforts, cost/estimation improvements, quality championing, etc.
  • 6. Agilent’s Existing System Agilent does not have a system implemented Therefore we are using VMWARE, which will present portability
  • 7. Sponsor Requirements of Project To design a webpage that can be accessed by the Life Sciences & Chemical Analysis team at Agilent Technologies (the webpage will allow them to log into their database) A webpage will actually query these items: 1. What Product 2. Which Phase it is in 3. The Product Name 4. Product Number 5. Version 6. Manager in Charge of Product 7. Whether it’s Hardware, Software, or Chemical 8. Product Description To develop a simple database to query products that are released and in development. We are to track different phases of each research and development product of Agilent Technologies: Life Sciences and Chemical Analysis Department with product release date and financial project.
  • 8. Key Functions of Our Product & Deliverables The functional aspects of this particular database will track hardware, software, and chemical analysis. It will track phases and all deliverables of the department and project a simple website interface.
  • 9. Key Functions of Our Product & Deliverables (cont.)
  • 10. Key Functions of Our Product & Deliverables (cont.)
  • 11. Key Functions of Our Product & Deliverables (cont.) Our deliverables are: Tracking Database - We are implementing one database that tracks deliverables of each phase of every product life-cycle. It will need to be a form where information about the product and its status can be entered. Web Page – Queries the following items What product Which phase it is in The product name Product Number Version Manager in charge of product Whether it’s Hardware, Software, or Chemicals Product Description
  • 12. Project Tasks – PERT Chart Critical Points : ID3 + ID4 + ID5 + ID8 + ID9 + ID10 + ID11, 13, 14 + ID18 + ID17 + ID19 + ID20 (5 + 6 + 33 + 4 + 15 + 8 + 36 + 1 + 28 + 16 + 1) = 153 days = Critical Point
  • 13. Risk Analysis: Probability and Impact Risk Factors 8 8 1 AWOL sponsor AWOL team member 10 1 1 1 Group tension 9 18 9 2 Failure to network through sponsor intranet 8 48 9 5 Project tool discrepancies 7 3 3 1 Meetings for project discussions and to-dos 6 15 5 3 The difficulty in contacting the team members of P4 5 15 5 3 The teams skill level on MySQL and PHP 4 5 5 1 Frequent changes by sponsor 3 15 5 3 Difficulties contacting sponsor 2 36 9 4 Technical specifications of project is to develop product tracking 1 Severity Impact Expectation Problem
  • 14. Contingency ALL P4 Sponsor will not receive product, and team member will be documented and rendered no credit from the group if adverse results comes from this absence 8 AWOL sponsor AWOL team member 10 Lily Only the directives and objectives of the project will be completely focused on and adhered to 1 Group tension 9 Will Finding alternative methods such as using same network as Agilent internal website to host product 18 Failure to network through sponsor intranet 8 Will Specific and correct requirements will be a part from implementation, or use different project tools 48 Project tool discrepancies 7 ALL P4 All team members should know and adhere to project requirements as documented 3 Meetings for project discussions and to-dos 6 Lily Use the communication tool that each member checks the most (i.e phone, email) 15 Difficulty contacting team members 5 ALL P4 Train each other on what the other person is doing, so we can all be on the same page 15 Skill level among team members 4 Khalida Meet and email daily to ensure the specifications of the project have not changed 3 Frequent changes by sponsor 3 Will Make weekly checkpoints 15 Difficulties contacting sponsor 2 Will Contact sponsor for daily meetings to clarify what is needed to build the database 36 Technical Specifications of project have not been provided by Sponsor 1 Responsible Person Contingency Plan Severity Problem #
  • 16. Product Internal Software tools used to create product Agilent.
  • 17. Test Plans Initial VMWARE implementation will be tested on Agilent Technologies servers. Connectivity will be configured by P4 Agilent student team.
  • 18. Team Testing and Individual Modules TBA Staff/IT Admin Testing for Agilent staff Module 10 TBA Keith Price Testing for Agilent staff Module 9 11/13/2006 All Team Member Test Records Per Page Module 8 11/13/2006 All Team Member Test Advanced Search Module 7 11/13/2006 All Team Member Export Results Module 6 11/10/2006 All Team Member Test Printer-Friendly version Module 5 11/10/2006 All Team Member Test Search Value Module 4 11/10/2006 All Team Member Test Add Value Module 3 11/8/2006 Lily & Khalida Test website login and look at list Module 2 11/1/2006 Will Test website login and look at list Module 1 When Who Description
  • 19. Acceptance Test and Delivery Date These are some of the test Cases that are necessary for both Agilent staff members and Student team members Create class presentation tables and values Create new tables FN#4 Adding a new field to all records in Table Create new authenticated users Create new database Create new table Function 4: Inserting a new Record Deleting a table Deleting a Chemical Deleting a Software Deleting a Hardware Function 3: Deleting a record from DB. Change Data Update Record Update new input record Update existing record Function2: Updating an existent Record Input Data Input data Chemical Input data Software Input data Hardware Function1: Data entry Testcase4 Testcase3 Testcase2 Testcase1
  • 20. Service & Startup Guide By using WAMP (Windows, Apache server, MySQL, and PHP) the integration of the open source products were easier to use. To Start Apache Server after Windows load clicking (on the lower right corner) onto this display
  • 21. Service & Startup Guide cont. Select “Restart All Services” (This will restart the MySQL and Apache server for the website)
  • 22. Service & Startup Guide cont. To test if localhost is connecting (if server is up), click on the WAMP display on the lower right corner and select Localhost on the very top:
  • 23. Service & Startup Guide cont. Localhost should show this:
  • 24. Service & Startup Guide cont. By entering the Agilent project you will get into the login screen
  • 25. User Interface and User Guide After retrieving the URL to get to the login screen user will see this login screen:
  • 26. User Interface and User Guide cont. Product_List Interface
  • 27. User Interface and User Guide cont. Product_Add Interface
  • 28. User Interface and User Guide cont. To Query Items Testing a Query
  • 29. Demonstration of Product Demo by Will Liao
  • 30. Obstacles Major obstacles we faced were from the Risk analysis: The team’s skill level severity was 15 which was considered moderate, and was a moderate issue. The difficulty in arranging team meetings, severity was at 15 moderate, but it was difficult in coordinating with sponsors the most. Problems synergizing with sponsors. The contingency of group tension was met but there were some internal failures to meet deadlines on to-dos because of group tensions and lack of qualification.
  • 31. Outlook of Completion of Product Product is complete as par to requirements. WebPage will query: What product Which phase it is in The product name Product Number Version Manager in charge of product Whether it’s Hardware, Software, or Chemicals Product Description
  • 32. Conclusion Sponsor Background Agilent’s Existing System Sponsor requirements of Project Key functions of our Product and the deliverables Project Tasks - Pert Chart Risk Analysis Contingency Plans Gantt Chart Product internals Test Plans Team Testing of Individual Modules Acceptance Test & Delivery date
  • 33. Conclusion cont. Service & Startup Guide User Interface & User Guide Demonstration of Product Obstacles Outlook for Completion of Project Conclusion