SlideShare a Scribd company logo
Ak. engg  profile   updated
We are a Steel fabrication based Company. Over the past ten years, A.K. Engineering Works, has worked hard to build its infrastructure
and system to handle a significant amount of business. Additionally company has configured a high technological equipment and has
experienced staffs and workers, who are well equipped to handle various kind of Steel Structure Projects.

Our clients trust us because…….

Steel Fabrication is our Core business and we offer the industry's most comprehensive and flexible service delivery model—on a large
scale—in today's business scenario.

In-depth knowledge of Steel Fabrication: Our technicians have insight knowledge of products, tools and methologies to provided better
solution to the client in order to complete project on time with quality work.

We work with a strong sense of transparency with all our employees and clients. To maintain transparency of operations with our clients
we regularly provide updates through Daily project report, detailed invoice annexure and copies of challans for statutory payments.




At A K ENGINEERING, We are the Second Generation in Fabrication & Erection process, we have Quality Management team who is
capable to sort out the puzzle of Fabrication management, apart from the management, our biggest asset is our team: We have
periodically upgraded our core team of welders, fitters, designers and operators, and its all come from the long way journey of Steel
Fabrication & Erection
At A K ENGINEERING, Quality has been consider the major part of any Steel Project. Our Team, Monitor quality Control from 2D model on
a paper to actual work done at project site. To achieve a Quality Assurance we have consider following Procedure.
A.   As an Fabrication and Erection company, A.K. Engineering Works, is totally committed to the safety of its
                                     employees and labours , as well as to prevent loss of human life, to protect against injury and to prevent
                                     damage / destruction to project, property, equipment and materials at its work sites.

                                B.   To achieve this we has established and implemented an effective Safety and Fire Prevention Program to
                                     create a safe working environment at site. Within the frame work of this Safety and Fire Prevention Program,
                                     we are committed strategy of creating Safety Awareness at all level of work.




i.     All individual working in our firm are above 18 years of age & well aware of the risk of working at
       the construction site.

ii.    The firm provides identity cards to all workers for each project

iii.   The firm provides Uniform, safety shoes, safety glasses for welding purpose, safety belts, hand gloves,
       and we ensure they are used at the site

iv.    The firm also provides fire extinguishers at the Work site

v.     All the equipment’s like rectifier welding machines, gas cutting machines, portable cranes are well
       maintained and checked before providing at the site

vi.    All safety precautions measures are taken if the worker is working on high rise towers

vii.   The hierarchy of controls for working at height, working at ground level, using scaffolds, platforms
       and ladders and safety netting.
Nos.                 Year                 Client                   Project                   Scope of Work         Cost

 A     Current Projects
 1     2012-2013            LODHA GROUP             LODHA LXURIA                Fabrication of M S Railing    55 lacs
 2     2012-2013            KALPATARU LTD           SYNERGY II - SANTACRUZ      FABRICATION of M S BEAM       102 lacs
 3     2012-2013            RAHEJA UNIVERSAL        RAHEJA EXCELSIOR            ROOFING WORK                  30 Lacs
 4     2009-2012            KAPSTONE CONSTRUCTION   RUSTOMJEE URBANIA - THANE   FABRICATION & ACP WORK        320 lacs
 5     2011-12              RNA CORP                RNA GRANDEUR                FABRICATION Work              10 lacs
 6     2010 – 2012          Bombay Dyeing           ICC Tower – Dadar           FABRICATION WORK              35 lacs
 7     2010-2012            MARTHON REALTY          MARATHON – FUTURE X         FABRICATION Work              54 lacs
 B     Projects Completed
 1     2010 – 2011          AVIGHNA INDIA LTD       ONE AVIGHNA                 FABRICATION WORK              10 Lacs
 2     2009-2011            RAHEJA UNIVERSAL        RAHEJA ATLANTIS             FABRICATION Work              148 Lacs
 3     2010-2011            RAHEJA UNIVERSAL        RAHEJA POLIS – AMBIVALI     Civil Work of Compound Wall   166 lacs

 4     2006-2010            RAHEJA UNIVERSAL        RAHEJA EXOTICA              FABRICATION Work              196 lacs
 5     2009-2010            KANAKIA GROUP           KANAKIA – METRO             FABRICATION Work              30 lacs
 6     2009-2010            KANAKIA GROUP           KANAKIA – BOOMERANG         FABRICATION Work              19 lacs
 7     2009-2010            KANAKIA GROUP           KANAKIA – Marriot           FABRICATION Work              22 lacs
 8     2009-2010            RAHEJA UNIVERSAL        RAHEJA LEGEND               FABRICATION Work              90 lacs


 9     2008-2009            RAHEJA UNIVERSAL        RAHEJA EXOTICA              FABRICATION Work              40 lacs
 10    2008-2009            RAHEJA UNIVERSAL        RAHEJA WILLOWS              FABRICATION Work              48 Lacs
 11    2008-2009            RAHEJA UNIVERSAL        RAHEJA TITANIUM             FABRICATION Work              62 lacs
 12    2008-2009            RAHEJA UNIVERSAL        RAHEJA – TIPCO              FABRICATION Work              58 lacs
Ak. engg  profile   updated
Work Done   6th Floor – Fabricated Steel Beam
Ak. engg  profile   updated
Work Detail   Providing, Fabrication and Fixing M S
              Structural Member with ACP Sheet
Work Detail   Providing, Fabrication and Fixing M S
              Structural Member with ACP Sheet
Work Done        30th Floor Pergola Work
Cost of Project   285 Lacs
Client Name    RAHEJA UNIVERSAL LTD.
Project Name   RAHEJA ATLANTIS, Worli
Work Done   Staging at 17th Floor for erection of H Frame
Approximate Weight   95.50 M.Tons
Project Name     Raheja Atlantis, Worli
Detail of Work   Fabricated and Erected of M.S. Structure for A.C.P.
                 Sheet fitting.
Project Name     Raheja Atlantis, Worli
Detail of Work   By using ISA, ISMC, Base Plate & HILTI Anchor
                 Fastener
Project Name     Raheja Atlantis, Worli
Detail of Work   By using ISA, ISMC, Base Plate & HILTI Anchor
                 Fastener
Project Name     Raheja Atlantis, Worli
Detail of Work   By using ISA, ISMC, Base Plate & HILTI Anchor
                 Fastener
Project Name     Raheja Atlantis, Worli
Detail of Work   Steel Structure for Crown on Terrace about 430 Ft
                 above the ground level
Detail of Work   Steel Structure for Crown on Terrace about 430 Ft
                 above the ground level.
Project Name     Raheja Atlantis, Worli
Detail of Work   Steel Structure for Crown on Terrace about 430 Ft
                 above the ground level
Client Name    RAHEJA UNIVERSAL
               LTD.
Project Name   RAHEJA LEGEND, Worli
Project Name     Raheja – Legend - Worli
Detail of Work   Fabricated and Erected Triplex Flat Staircase about 20
                 M.Tos.
Project Name     Raheja – Legend - Worli
Detail of Work   Fabricated and Erected Service Platform in hollow
                 floor , Mezzanine Floor.
Project Name     Raheja – Legend - Worli
Detail of Work   Fabricated and Erected Service Platform in hollow
                 floor , Mezzanine Floor.
Project Name     KANAKIA – METRO - BORIVALI
Detail of Work   Fabricated and Erected M.S. Structure for A.C.P. Sheet
                 fitting @ Terrace
Ak. engg  profile   updated
Project Name     KANAKIA – METRO - BORIVALI
Detail of Work   Fabricated and Erected M.S. Structure for A.C.P. @
                 Terrace
Scope of Work   Lifting & shifting of material Manually, Fabrication and erection at
                position safely.
Material Used   M.S. hollow Pipe 300x150x6mm, Base Plate 20mm & HILTI Anchor
                Fastener.
Ak. engg  profile   updated
Work Detail   Fabrication and Fixing Column Jacketing
              with Anchor Fastener
Ak. engg  profile   updated
Project Name Raheja – Acropolis - Govandi
Detail    of Fabricated and Erected Circular Dome Structure
Work
Project Name     Raheja – Acropolis - Govandi
Detail of Work   Fabricated and Erected Circular Dome Structure
Project Name     Raheja – Acropolis - Govandi
Detail of Work   Fabricated and Erected Ornamental Gate and Grill.
Land line : 022 26525609
Mobile : 91 9867684550
Email     : project@akengg.com
          :ak.eng.works@gmail.com
Web       : www.akengg.com

Office Add :

104, Miranda House, Kole Kalyan,
Opp Christina Apt,
Kalina – Kurla - Road,
Santa Cruz West,
Mumbai - 400029

More Related Content

DOCX
Chandra Sekhar Reddy
DOCX
DOCX
Updated Resume May 2016 Neil Chadwick
PDF
DOC
Gurunathan resume
DOC
AK-BIODATA-Sep-2016
PDF
Rajib Ali CV (Final)
Chandra Sekhar Reddy
Updated Resume May 2016 Neil Chadwick
Gurunathan resume
AK-BIODATA-Sep-2016
Rajib Ali CV (Final)

What's hot (20)

DOCX
Farman Ali Rao
DOC
CV -BOSE
DOC
Mr. maherc.v Q.C_2
DOCX
Shane Pyke Resume
PDF
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
DOCX
CIVIL ENGINEER ,ssssssss
PDF
CV - CIVIL ENGINEER-KHODR Maen -
PDF
CV for Civil Engineer Zaid Abbas.
DOC
Resume Sivakumar SKTJ
DOCX
RAJESH RAMU CV
PDF
Ramy Emad C.V Project Engineer
PDF
KN Structural Engineers
DOC
01 CV 2016 Simon Barkley (1)
PDF
G.McMORRAN - CV
DOC
PDF
DOCX
Resume_George K Antony, GM
DOCX
CV-MEP-Ahmad Majdalawi
DOCX
CV_SHIBU.NS_19-01-2016
DOC
Zafarullah CV.doc-001
Farman Ali Rao
CV -BOSE
Mr. maherc.v Q.C_2
Shane Pyke Resume
L&T MMH IC Summer Internship Report (Coal Handling Plant in Chhabra, Rajasthan.)
CIVIL ENGINEER ,ssssssss
CV - CIVIL ENGINEER-KHODR Maen -
CV for Civil Engineer Zaid Abbas.
Resume Sivakumar SKTJ
RAJESH RAMU CV
Ramy Emad C.V Project Engineer
KN Structural Engineers
01 CV 2016 Simon Barkley (1)
G.McMORRAN - CV
Resume_George K Antony, GM
CV-MEP-Ahmad Majdalawi
CV_SHIBU.NS_19-01-2016
Zafarullah CV.doc-001
Ad

Viewers also liked (10)

PPTX
Mobile Device Security
PPTX
C & A Brokerage Services Presentation
PPTX
Employer Branding Presentation
PDF
Expert Advice on Resume Making & Interview Preparation
PDF
AC Drive VFD - Allen Bradley Powerflex 4M
PDF
PDF
HMI- Human Machine Interface
PDF
PLC Troubleshooting & Maintenance
PDF
Allen Bradley- Micrologix PLC Instructions
Mobile Device Security
C & A Brokerage Services Presentation
Employer Branding Presentation
Expert Advice on Resume Making & Interview Preparation
AC Drive VFD - Allen Bradley Powerflex 4M
HMI- Human Machine Interface
PLC Troubleshooting & Maintenance
Allen Bradley- Micrologix PLC Instructions
Ad

Similar to Ak. engg profile updated (20)

PPSX
Stone fixing services by pooja mining and marbles private limited
PPT
Park xpress presentation
PPT
Park xpress presentation
PPT
Acme Carpentry 09 V2
DOCX
A team company profile 2012 rev 4
PDF
NFS Company Profile for Glazzing Work in India
DOC
Tarek sai dcv[2]
PDF
Fbs Portfolio 2011 2012
DOCX
A team company profile 2012 rev 3
PDF
Bldg Maint Brochure
PPTX
Internship review
PDF
Fluid Portfolio Summer 2012
PDF
Cv Feb 2012
PDF
Greg labbe home performance verification
PDF
Adirtha steel furniture
PPTX
Presentation [AP14015]
PDF
Rockwool international annual-report-2011-en_scrollable
PPSX
GT13109700 - EPIC OF WASTE MANAGEMENT FACILITY AT
Stone fixing services by pooja mining and marbles private limited
Park xpress presentation
Park xpress presentation
Acme Carpentry 09 V2
A team company profile 2012 rev 4
NFS Company Profile for Glazzing Work in India
Tarek sai dcv[2]
Fbs Portfolio 2011 2012
A team company profile 2012 rev 3
Bldg Maint Brochure
Internship review
Fluid Portfolio Summer 2012
Cv Feb 2012
Greg labbe home performance verification
Adirtha steel furniture
Presentation [AP14015]
Rockwool international annual-report-2011-en_scrollable
GT13109700 - EPIC OF WASTE MANAGEMENT FACILITY AT

Recently uploaded (20)

PPTX
chapter 2 entrepreneurship full lecture ppt
PPTX
Project Management_ SMART Projects Class.pptx
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
DOCX
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
DOCX
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
PDF
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
PDF
Keppel_Proposed Divestment of M1 Limited
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
ICv2 White Paper - Gen Con Trade Day 2025
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PDF
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
chapter 2 entrepreneurship full lecture ppt
Project Management_ SMART Projects Class.pptx
1911 Gold Corporate Presentation Aug 2025.pdf
Lecture 3344;;,,(,(((((((((((((((((((((((
Tortilla Mexican Grill 发射点犯得上发射点发生发射点犯得上发生
Center Enamel A Strategic Partner for the Modernization of Georgia's Chemical...
IITM - FINAL Option - 01 - 12.08.25.pptx
80 DE ÔN VÀO 10 NĂM 2023vhkkkjjhhhhjjjj
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
Keppel_Proposed Divestment of M1 Limited
Slide gioi thieu VietinBank Quy 2 - 2025
ICv2 White Paper - Gen Con Trade Day 2025
Slide gioi thieu VietinBank Quy 2 - 2025
Chapter 2 - AI chatbots and prompt engineering.pdf
ANALYZING THE OPPORTUNITIES OF DIGITAL MARKETING IN BANGLADESH TO PROVIDE AN ...
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications

Ak. engg profile updated

  • 2. We are a Steel fabrication based Company. Over the past ten years, A.K. Engineering Works, has worked hard to build its infrastructure and system to handle a significant amount of business. Additionally company has configured a high technological equipment and has experienced staffs and workers, who are well equipped to handle various kind of Steel Structure Projects. Our clients trust us because……. Steel Fabrication is our Core business and we offer the industry's most comprehensive and flexible service delivery model—on a large scale—in today's business scenario. In-depth knowledge of Steel Fabrication: Our technicians have insight knowledge of products, tools and methologies to provided better solution to the client in order to complete project on time with quality work. We work with a strong sense of transparency with all our employees and clients. To maintain transparency of operations with our clients we regularly provide updates through Daily project report, detailed invoice annexure and copies of challans for statutory payments. At A K ENGINEERING, We are the Second Generation in Fabrication & Erection process, we have Quality Management team who is capable to sort out the puzzle of Fabrication management, apart from the management, our biggest asset is our team: We have periodically upgraded our core team of welders, fitters, designers and operators, and its all come from the long way journey of Steel Fabrication & Erection
  • 3. At A K ENGINEERING, Quality has been consider the major part of any Steel Project. Our Team, Monitor quality Control from 2D model on a paper to actual work done at project site. To achieve a Quality Assurance we have consider following Procedure.
  • 4. A. As an Fabrication and Erection company, A.K. Engineering Works, is totally committed to the safety of its employees and labours , as well as to prevent loss of human life, to protect against injury and to prevent damage / destruction to project, property, equipment and materials at its work sites. B. To achieve this we has established and implemented an effective Safety and Fire Prevention Program to create a safe working environment at site. Within the frame work of this Safety and Fire Prevention Program, we are committed strategy of creating Safety Awareness at all level of work. i. All individual working in our firm are above 18 years of age & well aware of the risk of working at the construction site. ii. The firm provides identity cards to all workers for each project iii. The firm provides Uniform, safety shoes, safety glasses for welding purpose, safety belts, hand gloves, and we ensure they are used at the site iv. The firm also provides fire extinguishers at the Work site v. All the equipment’s like rectifier welding machines, gas cutting machines, portable cranes are well maintained and checked before providing at the site vi. All safety precautions measures are taken if the worker is working on high rise towers vii. The hierarchy of controls for working at height, working at ground level, using scaffolds, platforms and ladders and safety netting.
  • 5. Nos. Year Client Project Scope of Work Cost A Current Projects 1 2012-2013 LODHA GROUP LODHA LXURIA Fabrication of M S Railing 55 lacs 2 2012-2013 KALPATARU LTD SYNERGY II - SANTACRUZ FABRICATION of M S BEAM 102 lacs 3 2012-2013 RAHEJA UNIVERSAL RAHEJA EXCELSIOR ROOFING WORK 30 Lacs 4 2009-2012 KAPSTONE CONSTRUCTION RUSTOMJEE URBANIA - THANE FABRICATION & ACP WORK 320 lacs 5 2011-12 RNA CORP RNA GRANDEUR FABRICATION Work 10 lacs 6 2010 – 2012 Bombay Dyeing ICC Tower – Dadar FABRICATION WORK 35 lacs 7 2010-2012 MARTHON REALTY MARATHON – FUTURE X FABRICATION Work 54 lacs B Projects Completed 1 2010 – 2011 AVIGHNA INDIA LTD ONE AVIGHNA FABRICATION WORK 10 Lacs 2 2009-2011 RAHEJA UNIVERSAL RAHEJA ATLANTIS FABRICATION Work 148 Lacs 3 2010-2011 RAHEJA UNIVERSAL RAHEJA POLIS – AMBIVALI Civil Work of Compound Wall 166 lacs 4 2006-2010 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 196 lacs 5 2009-2010 KANAKIA GROUP KANAKIA – METRO FABRICATION Work 30 lacs 6 2009-2010 KANAKIA GROUP KANAKIA – BOOMERANG FABRICATION Work 19 lacs 7 2009-2010 KANAKIA GROUP KANAKIA – Marriot FABRICATION Work 22 lacs 8 2009-2010 RAHEJA UNIVERSAL RAHEJA LEGEND FABRICATION Work 90 lacs 9 2008-2009 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 40 lacs 10 2008-2009 RAHEJA UNIVERSAL RAHEJA WILLOWS FABRICATION Work 48 Lacs 11 2008-2009 RAHEJA UNIVERSAL RAHEJA TITANIUM FABRICATION Work 62 lacs 12 2008-2009 RAHEJA UNIVERSAL RAHEJA – TIPCO FABRICATION Work 58 lacs
  • 7. Work Done 6th Floor – Fabricated Steel Beam
  • 9. Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet
  • 10. Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet
  • 11. Work Done 30th Floor Pergola Work Cost of Project 285 Lacs
  • 12. Client Name RAHEJA UNIVERSAL LTD. Project Name RAHEJA ATLANTIS, Worli
  • 13. Work Done Staging at 17th Floor for erection of H Frame
  • 14. Approximate Weight 95.50 M.Tons
  • 15. Project Name Raheja Atlantis, Worli Detail of Work Fabricated and Erected of M.S. Structure for A.C.P. Sheet fitting.
  • 16. Project Name Raheja Atlantis, Worli Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
  • 17. Project Name Raheja Atlantis, Worli Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
  • 18. Project Name Raheja Atlantis, Worli Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener
  • 19. Project Name Raheja Atlantis, Worli Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level
  • 20. Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level.
  • 21. Project Name Raheja Atlantis, Worli Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level
  • 22. Client Name RAHEJA UNIVERSAL LTD. Project Name RAHEJA LEGEND, Worli
  • 23. Project Name Raheja – Legend - Worli Detail of Work Fabricated and Erected Triplex Flat Staircase about 20 M.Tos.
  • 24. Project Name Raheja – Legend - Worli Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.
  • 25. Project Name Raheja – Legend - Worli Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.
  • 26. Project Name KANAKIA – METRO - BORIVALI Detail of Work Fabricated and Erected M.S. Structure for A.C.P. Sheet fitting @ Terrace
  • 28. Project Name KANAKIA – METRO - BORIVALI Detail of Work Fabricated and Erected M.S. Structure for A.C.P. @ Terrace
  • 29. Scope of Work Lifting & shifting of material Manually, Fabrication and erection at position safely.
  • 30. Material Used M.S. hollow Pipe 300x150x6mm, Base Plate 20mm & HILTI Anchor Fastener.
  • 32. Work Detail Fabrication and Fixing Column Jacketing with Anchor Fastener
  • 34. Project Name Raheja – Acropolis - Govandi Detail of Fabricated and Erected Circular Dome Structure Work
  • 35. Project Name Raheja – Acropolis - Govandi Detail of Work Fabricated and Erected Circular Dome Structure
  • 36. Project Name Raheja – Acropolis - Govandi Detail of Work Fabricated and Erected Ornamental Gate and Grill.
  • 37. Land line : 022 26525609 Mobile : 91 9867684550 Email : project@akengg.com :ak.eng.works@gmail.com Web : www.akengg.com Office Add : 104, Miranda House, Kole Kalyan, Opp Christina Apt, Kalina – Kurla - Road, Santa Cruz West, Mumbai - 400029