Akurana Development Programme
Population of the Area
1971 2001 2011 2020
31,667 28,531 63,195 100,000
Total Land Extant – 32.39 Sq.km.
Density – 20 person per Hectare (P.S. Area)
90 person per Hectare (City Limits)
Identified main Problems
1. Over-flow of Piga Oya
2. No properParking Facility available
within the city
3. Malfunctioning of Existing Commercial
Building at City centre
4. Current problem regarding to availability of
Site of solid waste disposal.
1.Over-flow Of Piga Oya
• It is long time issue
• Frequently Flooding -at lease two times in a year
I. Encroachment of Piga Oya Reservation
• Nearly 75% of buildings are unauthorized
Causes 1
2.siltation
• Building Construction and soil erosion of upland
Causes 2
2.Clearing canal and canal bed improvement
PROPOSAL 1. Short Term Solution
•Already initiated
•Removal Soil deposit for Smooth water flow
1. Widening of stream (where can do )
Long Term Solution
Demarcation of National Disaster Management Organization
PROPOSAL 2.
2. PARKING PROBLEMS
A9 Road
1.Encroachment of Street line
Causes 1
3. Physical Character of the City
• The city located between hills and river
• Limitation of developable land
Causes 2
2. Available of Public Land is Very Limited
•Most of land has Private Ownership
Causes 2
• Development activity has Controlled
Ziya Hospital
D
S
Existing Parking
1.On- Street parking lots
PROPOSAL 1. Short Term Solution
• Providing parking spaces on one site of roads
Zia Hospital
MarketD
S
Proposed
On-Street Parking lots
PROPOSAL 2.
Long Term Solution
1. Identification of land for Off-Road Parking Spaces
• Considering rapid growth of the city parking will be major
problem of the area.
•It is crucial to identify land from near by the city for long hour parking :
shop owners and Banks etc.
Option I
Option II
1. Indoor Parking
Existing Situation
• Constructed during in 1980
• Most of shops are used for stores or closed
• Badly damaged
3. Malfunctioning of Existing Commercial
Building at City centre
Akurana Development Programm
Option I
PROPOSAL
Renovate of the Building
• Interior and Exterior renovation of the building
• Facade development
• Providing Parking in ground floor
Total Area - 20,000.Sq.ft
Estimated cost - Rs.150m
Number of floor – 4 floors with parking facilities
PROPOSAL
Option II
Proposed Commercial Complex
4. Current Issue: Solid Waste Disposal
•Collection: 9 trucks Per day
•Available site : Yalugama
The site has undergone landslide and damaged
near by village the on last rainy days.
Issues
PROPOSAL 1.
Short Term Solution
• Construct of a Retaining wall to the existing site
Estimated Cost – Rs. 1.0m
Long Term Solution
PROPOSAL 2.
• Promoting Compose production in domestic
• Regularize a system to deposal solid waste
• Fining
THANK YOU

More Related Content

PPTX
1. GDP and Country Development
PPT
Poverty Line Crises
PPT
Chapter 2 demand and supply
PPT
Chapter 1 Microeconomics Intro
DOCX
Pengenalan murid & alam belajar
PPTX
Bab 2 unsur perdagangan
PPTX
GEOGRAPHY YEAR 10: DEVELOPMENT. CONTRASTS IN DEVELOPMENT.
1. GDP and Country Development
Poverty Line Crises
Chapter 2 demand and supply
Chapter 1 Microeconomics Intro
Pengenalan murid & alam belajar
Bab 2 unsur perdagangan
GEOGRAPHY YEAR 10: DEVELOPMENT. CONTRASTS IN DEVELOPMENT.

What's hot (9)

PDF
What are the social problems in Bangladesh? Discuss the media advocacy for s...
PDF
Indonesia Country Profile
PDF
tugasan-audit-keselamatan-jalan-raya-A171851.pdf
PPTX
Sistem Pengangkutan Pintar
PDF
Tugasan penenangan lalu lintas
PPTX
Economics problems and prospects of Bangladesh
PPTX
Allocation & Economic Systems
PPTX
Yoxsulluq
PPT
Understanding the Nigerian Economy and other Economic Issues that impact on P...
What are the social problems in Bangladesh? Discuss the media advocacy for s...
Indonesia Country Profile
tugasan-audit-keselamatan-jalan-raya-A171851.pdf
Sistem Pengangkutan Pintar
Tugasan penenangan lalu lintas
Economics problems and prospects of Bangladesh
Allocation & Economic Systems
Yoxsulluq
Understanding the Nigerian Economy and other Economic Issues that impact on P...
Ad

Similar to Akurana Development Programm (20)

PPTX
Oct 13 rosehill reservoir_preliminary_overview_
PPTX
Oct 13 rosehill reservoir_preliminary_overview_
PPTX
Road development projects.
PDF
Nehru place - Case Study
PPTX
The Inner City ucgs
PDF
Leonia Town hall Presentation on New Municipal Building - 20181128 v5
PDF
APR 23 10 LIVING WITH LID [Compatibility Mode]
PPTX
Cheonggyecheon canalCheonggyecheon canal south korea- Final (2).pptx south ko...
PDF
Green infrastructure foundation for climate resilience Mekong
PDF
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadway
PPTX
Public Input - City Streets Maintenance Plan for 2020
PDF
Green infrastructure as a foundation for climate resilience and sustainabilit...
PDF
Presentation anife
PPTX
Leaside & Laird Construction Liason Committee Meeting
PDF
20120201 061327 multi-use_trail_bid_award
PDF
Sharing Experiences of Flood Modelling Using MIKE 21
PPTX
9-10ebcctbrownfieldsseminarfinal-100914104154-phpapp01
PPTX
9 10ebcctbrownfieldsseminarfinal 100914104154 Phpapp01
PDF
PDF
WS3 Project Realities
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
Road development projects.
Nehru place - Case Study
The Inner City ucgs
Leonia Town hall Presentation on New Municipal Building - 20181128 v5
APR 23 10 LIVING WITH LID [Compatibility Mode]
Cheonggyecheon canalCheonggyecheon canal south korea- Final (2).pptx south ko...
Green infrastructure foundation for climate resilience Mekong
Alamo Heights CCM 01.14.19 Item #7 PPT Const Update 5500 Broadway
Public Input - City Streets Maintenance Plan for 2020
Green infrastructure as a foundation for climate resilience and sustainabilit...
Presentation anife
Leaside & Laird Construction Liason Committee Meeting
20120201 061327 multi-use_trail_bid_award
Sharing Experiences of Flood Modelling Using MIKE 21
9-10ebcctbrownfieldsseminarfinal-100914104154-phpapp01
9 10ebcctbrownfieldsseminarfinal 100914104154 Phpapp01
WS3 Project Realities
Ad

More from ishana shaheed (6)

PDF
Simple way to site planning.pptx
PPTX
New downtown,singapore
PPTX
New downtown,Singapore
PPTX
Geddes theory
PPTX
New downtown,singapore
PPTX
Eco2 Cities
Simple way to site planning.pptx
New downtown,singapore
New downtown,Singapore
Geddes theory
New downtown,singapore
Eco2 Cities

Recently uploaded (20)

PPTX
FIRE SAFETY SEMINAR SAMPLE FOR EVERYONE.pptx
PPTX
UN Environmental Inventory User Training 2021.pptx
PPTX
Environmental Ethics: issues and possible solutions
PPTX
Disposal Of Wastes.pptx according to community medicine
PDF
Effects of rice-husk biochar and aluminum sulfate application on rice grain q...
PDF
FMM Slides For OSH Management Requirement
PDF
Urban Hub 50: Spirits of Place - & the Souls' of Places
PDF
Insitu conservation seminar , national park ,enthobotanical significance
DOCX
D-360 ESG Series: Sustainable Hospitality Strategies for a Greener Future
PDF
The Role of Non-Legal Advocates in Fighting Social Injustice.pdf
PDF
Effect of salinity on biochimical and anatomical characteristics of sweet pep...
PPTX
sustainable-development in tech-ppt[1].pptx
PDF
The Truth Behind Vantara zoo in Jamnagar
PDF
Bai bao Minh chứng sk2-DBTrong-003757.pdf
PPTX
Plant_Cell_Presentation.pptx.com learning purpose
PPTX
structure and components of Environment.pptx
DOCX
Epoxy Coated Steel Bolted Tanks for Beverage Wastewater Storage Manages Liqui...
PDF
Blue Economy Development Framework for Indonesias Economic Transformation.pdf
PPTX
Envrironmental Ethics: issues and possible solution
DOCX
Double Membrane Roofs for Biogas Tanks Securely store produced biogas.docx
FIRE SAFETY SEMINAR SAMPLE FOR EVERYONE.pptx
UN Environmental Inventory User Training 2021.pptx
Environmental Ethics: issues and possible solutions
Disposal Of Wastes.pptx according to community medicine
Effects of rice-husk biochar and aluminum sulfate application on rice grain q...
FMM Slides For OSH Management Requirement
Urban Hub 50: Spirits of Place - & the Souls' of Places
Insitu conservation seminar , national park ,enthobotanical significance
D-360 ESG Series: Sustainable Hospitality Strategies for a Greener Future
The Role of Non-Legal Advocates in Fighting Social Injustice.pdf
Effect of salinity on biochimical and anatomical characteristics of sweet pep...
sustainable-development in tech-ppt[1].pptx
The Truth Behind Vantara zoo in Jamnagar
Bai bao Minh chứng sk2-DBTrong-003757.pdf
Plant_Cell_Presentation.pptx.com learning purpose
structure and components of Environment.pptx
Epoxy Coated Steel Bolted Tanks for Beverage Wastewater Storage Manages Liqui...
Blue Economy Development Framework for Indonesias Economic Transformation.pdf
Envrironmental Ethics: issues and possible solution
Double Membrane Roofs for Biogas Tanks Securely store produced biogas.docx

Akurana Development Programm

  • 2. Population of the Area 1971 2001 2011 2020 31,667 28,531 63,195 100,000 Total Land Extant – 32.39 Sq.km. Density – 20 person per Hectare (P.S. Area) 90 person per Hectare (City Limits)
  • 3. Identified main Problems 1. Over-flow of Piga Oya 2. No properParking Facility available within the city 3. Malfunctioning of Existing Commercial Building at City centre 4. Current problem regarding to availability of Site of solid waste disposal.
  • 4. 1.Over-flow Of Piga Oya • It is long time issue • Frequently Flooding -at lease two times in a year
  • 5. I. Encroachment of Piga Oya Reservation • Nearly 75% of buildings are unauthorized Causes 1
  • 6. 2.siltation • Building Construction and soil erosion of upland Causes 2
  • 7. 2.Clearing canal and canal bed improvement PROPOSAL 1. Short Term Solution •Already initiated •Removal Soil deposit for Smooth water flow
  • 8. 1. Widening of stream (where can do ) Long Term Solution Demarcation of National Disaster Management Organization PROPOSAL 2.
  • 10. 1.Encroachment of Street line Causes 1
  • 11. 3. Physical Character of the City • The city located between hills and river • Limitation of developable land Causes 2 2. Available of Public Land is Very Limited •Most of land has Private Ownership Causes 2 • Development activity has Controlled
  • 13. 1.On- Street parking lots PROPOSAL 1. Short Term Solution • Providing parking spaces on one site of roads
  • 15. PROPOSAL 2. Long Term Solution 1. Identification of land for Off-Road Parking Spaces • Considering rapid growth of the city parking will be major problem of the area. •It is crucial to identify land from near by the city for long hour parking : shop owners and Banks etc. Option I
  • 17. Existing Situation • Constructed during in 1980 • Most of shops are used for stores or closed • Badly damaged 3. Malfunctioning of Existing Commercial Building at City centre
  • 19. Option I PROPOSAL Renovate of the Building • Interior and Exterior renovation of the building • Facade development • Providing Parking in ground floor
  • 20. Total Area - 20,000.Sq.ft Estimated cost - Rs.150m Number of floor – 4 floors with parking facilities PROPOSAL Option II Proposed Commercial Complex
  • 21. 4. Current Issue: Solid Waste Disposal •Collection: 9 trucks Per day •Available site : Yalugama The site has undergone landslide and damaged near by village the on last rainy days. Issues
  • 22. PROPOSAL 1. Short Term Solution • Construct of a Retaining wall to the existing site Estimated Cost – Rs. 1.0m
  • 23. Long Term Solution PROPOSAL 2. • Promoting Compose production in domestic • Regularize a system to deposal solid waste • Fining