RESEARCH TITLE :  APPLICATION OF WORK STUDY CONCEPTS IN APPAREL MANUFACTURING RESEARCH ASSOCIATES IQBAL AHMED – BS in Industrial Engineering NIRANJAN K. H – BS in Industrial Engineering Dr. Ambedkar Institute of Technology Bangalore University BALAJI B JAGANNATH Head Of Industrial Engineering Bombay Rayon Fashion Limited CONDUCTED AT BOMBAY RAYON FASHIONS LIMITED(UNIT-1)  BANGALORE
OBJECTIVE OF THE PROJECT WORK TO IMPLEMENT WORKSTUDY CHARTS TO OBTAIN MAXIMUM UTILIZATION OF THE RESOURCES(MAN, MACHINE AND MATERIALS) AND TO OPTIMIZE WORKPLACE BY CHANGING THE PLANT LAYOUT AND WORKSTATION, USING THE PROCESS CHARTS.
ROLE OF INDUSTRIAL ENGINEERING DEPARTMENT IN APPAREL INDUSTRY. Importance of Industrial Engineering (IE) tools that can be used to  improve upon the productivity  of their factories and thus  enhance the profits ! Very few companies have been operating with a full-fledged industrial engineering department and even those which boast of an Industrial Engineering Department (IED) in their factories are not allowing ample freedom and scope to function to its full capabilities. The role of IED is important for the garment industry for the following two reasons: It’s a highly labor-intensive industry.   Effective planning is emerging as one of the  key factors for the garment manufacturing  industry.
ABOUT THE COMPANY-BRFL:  is one of the leading garment manufacturer in India, currently operating with 7 units in Bangalore.
GARMENT MANUFACTURING – BLOCK DIAGRAM Fabric from stores Cutting section Sewing section Finishing section Finished garment to warehouse
TOPICS COVERED DURING THE PROJECT WORK   Plant Layout And Work Station Design Work Study Concepts
PLANT LAYOUT & WORKSTATION DESIGN
CUTTING SECTION
CUTTING SECTION – EXISTING LAYOUT
CUTTING SECTION – PROPOSED LAYOUT
CALCULATION – CUTTING SECTION FORMULA USED: PRODUCTION O/P  =  TOTAL TABLE  *  PRODUCTION PER DAY   LENGTH   CONSTANT -------------------------------------------------------------------------- EXISTING   PROPOSED No. of tables   4   6 Total Table length  22*2+10*1+17*1 20*4+17*1+10*1   = 71mts   = 107mts Production o/p    71 * 60   107 * 60 per day   = 4260   = 6420 % increase in production = 6420 -4260   -------------  *  100  =  33.64 %   6420
COMPARISION  B/W EXISTING & PROPOSED CUTTING SECTION LAYOUT EXISTING Lesser space utilization Operations not arranged in sequence. Bottle-necks occurs Production is less Too much of material movement & handling   PROPOSED Maximum space utilization Operations are arranged in sequence. Bottle-necks avoided Higher production achieved Minimized material movement & handling
SEWING SECTION LAYOUT
SEWING SECTION LINE
FINISHING SECTION LAYOUT
FINISHING SECTION – EXISTING LAYOUT
FINISHING SECTION – PROPOSED LAYOUT
FINISHED SECTION:   EXISTING LAYOUT V/S PROPOSED LAYOUT    EXISTING Operations are not arranged in sequence Intersection of material flow occurs Material movement is more Material handling is more PROPOSED Operations are arranged in sequence Intersection of material flow avoide d Material movement is minimized Material handling is minimized
WORKSTATION DESIGN The work station design affects the production rate, efficiency and the accuracy with which an operation can be performed. A work station not only needs space for the workers and the machine, there are plenty of other items which also need accommodation. Space requirements and a few more factors governing a good work station design are described below: Space requirements Consideration of the space required, for the movement of material handling equipments. Easy access to safety stops in case of emergency. Easy access to machine for inspection, lubrication, maintenance and repair. Convenience of making foundations and machine installations. Aisle space between one machine and the next. Appropriate ventilating, lighting and safety arrangements.
WORKSTATION AT SEWING BATCH- EXISTING
WORKSTATION- Proposed/Implemented
COMPARISION OF EXISTING Vs PROPOSED  57 cm 18 minutes With out disturbing  Barrier does not exists  63 cm 20 minutes Disturbing the operator Restricted by the barrier to a limit Needle distance from center table edge Time required to manufacture one garment from one batch  Enter of performance card Movement of the operator towards the center table Proposed work station Existing work station  Description
COMPARISION OF EXISTING Vs PROPOSED  Calculation % Efficiency =  3168 – 2884   ×  100  =  9 %   3168 20 operations 18mins 3.33*20 = 66 garments/hr 66*8 = 528 garments/day 528*6 = 3168 garments/day 20 operations 20mins 3*20 = 60  garments/hr 60*8 = 480 garments/day 480*6= 2884 garments/day No. of operations /batch To manufacture 1 garment Hourly production per batch Daily production per batch Daily production from sewing section Proposed Existing Description
WORK STUDY
IMPORTANCE OF WORK STUDY Improving the planning of work. Improving Methods of production. Effective Worker Selection Processes. Improving Worker Effectiveness. Providing Workers with Adequate Training. Improving Worker Morale. Rewarding worker Morale. Improving worker attendance levels. Reducing worker labor turnover. Effective Communications.
IMPLEMENTING WORK STUDY CHARTS IN APPAREL MANUFACTURING Objective : To record the movements of man, machine & materials in a layout, study the distance covered, time involved, interaction between them, identify the area for improvement, and suggest a better way to overcome these problems.
WORK STUDY-   DEFINITION Work study is a generic term for those techniques, particularly method study& work measurement, which are used in the examination of human work in all its context, & which lead systematically to all the factors which affect the efficiency & economy of the situation being reviewed, in order to effect improvement.
METHOD STUDY WORK MEASUREMENT HIGHER PRODUCTIVITY WORK STUDY
PROCESS CHART SYMBOLS - OPERATION - STORAGE - DELAY - TRANSPORT - INSPECTION
OUT LINE PROCESS CHART: An out line process chart is a process chart giving an over all picture by recording in sequence only the main operation and inspection. Fabric inspecn sewing sec  final check cutting sec  finishing sec
Out line process chart: for apparel manufacturing Fabric insp  front prep  buttoning 1.5  1.25 Laying  front back attch  in line trim 0.15  1.0  0.6  Marking  checking  pressing 0.45  1.75 Cutting  part atch  final check  1.80  2.45  Panel check  final check  stain remove 2.0 Recut  msrmnt check  1.5  Sorting  prsnt check  1.5  tagging 0.65  1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 18
FLOW PROCESS CHART The flow process chart as a process chart setting out the frequency of the flow of a product or procedure by recording all event under review using the process chart symbols.  MAN TYPE MATERIAL TYPE EQUIPMENT TYPE
MAN TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS WHAT THE WORKER DOES
Flow Process Chart – Man type Feeding helper in Sewing Section. Click to Download File Flow Process Chart – Man Type Present Click to Download File Flow Process Chart – Man Type Proposed Improvement 4.08(8%) 51.5 55.58 Time (Min) 98 (41%) 136 235 Distance (Mtrs) 2 2 - - 1 13 10 - 2 1 15 12 - 2 - Operation Transport Delay Inspection Storage Savings Proposed Present Activity SUMMARY Subject Charted :  Feeding Helper in Sewing Section Activity:  Feeding of all parts and trims to assembly line Location:  Sewing Section – Unit – 1 - BRFL Charted by: IQBAL & NIRANJAN Approved by:  Date:5-03-07
MATERIAL TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS THE MOVEMENT OF MATERIALS, I.E. THE CHANGES THE MATERIAL UNDERGOES IN LOCATION. IN BUNDLE FORM , WAITING  FINISHED APPAREL  TO GET PICKED UP  WAITING TO GET DISPATCHED MATERIALS IN-PROCESS
Flow Process Chart – Material Type  Stitched  Garments In Finishing Section Click to Download File Flow Process Chart – Material Type Present Click to Download File Flow Process Chart – Material Type Proposed Improvement 1.9(35%) 3.4 5.3 Time (Mins) 94 (35%) 171 265 Distance (Mtrs) - - - - - 16 21 2 - 3 16 21 2 - 3 Operation Transport Delay Inspection Storage Savings Proposed Present Activity SUMMARY Subject Charted:  Stitched Garment in Finishing section  Activity: Buttoning, Inline Trimming, Pressing, Inspection & Dispatch Location:  Finishing Section – Unit – 1 – BRFL Charted by: IQBAL & NIRANJAN Approved by:  Date:05-03-07
EQUIPMENT TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS THE MANNER IN WHICH EQUIPMENT IS USED. STAIN REMOVER – WAITING    TO GET PICKED UP HAND KNIFE - UNDER WORKING
TWO- HANDED PROCESS CHART The two-handed process chart is a process chart in which activities of a workers hands(or limbs) are recorded in their relationship to the other.
MULTIPLE ACTIVITY CHART Is useful recording tool for situations where the work involves interactions of different subjects. One or more workers looking after different machines or a group of workers working on loading materials at one point.
MAN-MACHINE CHART FOR PLACKET TRIM & JOINT OPERATION Existing condition:  The operations, placket trim and placket joint were carried on by 2 different operators at different places for a single batch. Proposed condition:  A single operator to perform both the operations on two machines placed front & back of the operator , providing with a rotating chair.
MAN-MACHINE CHART FOR PLACKET TRIM & JOINT OPERATION 0 3 4 5 Idle Placket trim operation on m/c 1 Working 6 7 Working Placket joint operation on m/c 2 Idle 7.5 (placket joint machine) (trimming machine) (mins)    Machine 2 Operator 1 Machine 1 Time  Date: 06/04/2007 Approved by: Charted by: Iqbal and Niranjan Charted on:  Placket trim & Placket joint operations for a bundle of 10 pieces MAN MACHINE CHART : 2 M/C 1 OPERATOR
NUMBER OF OPERATORS WORKING ON SINGLE MACHINE
CONCLUSION WITH THE APPLICATION OF WORK STUDY CHARTS IN APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE ACHIEVED. THE COST INVOLVED IN USING THESE CHARTS ARE VERY MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT PERIOD OF TIME.
THANK  YOU -----------------

More Related Content

PPT
Method Study
PPTX
Work study
PPTX
Time study
PPTX
Line balancing
DOC
pre- determined time standard of work measurement
PPT
PPTX
Work measurement
Method Study
Work study
Time study
Line balancing
pre- determined time standard of work measurement
Work measurement

What's hot (20)

PPT
Work measurement
PPT
Method study
PPTX
Line balancing
DOCX
Method study
PPTX
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PPT
Work Study- Methods Study
PPTX
Production planning control ppt
PPTX
Lecture 2 process charts work study
PPTX
Time study
PPT
Line balancing
PDF
8. chapter 7 work study (time and motion study)
PPTX
Production & production system
PPT
Introduction to production planning and control
PPT
Production Planning and Control
PPTX
Group Layout (Manufacturing Management)
PPTX
Cellular manufacturing
PPT
Work Study: Method Study & Work Measurement
Work measurement
Method study
Line balancing
Method study
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
Work Study- Methods Study
Production planning control ppt
Lecture 2 process charts work study
Time study
Line balancing
8. chapter 7 work study (time and motion study)
Production & production system
Introduction to production planning and control
Production Planning and Control
Group Layout (Manufacturing Management)
Cellular manufacturing
Work Study: Method Study & Work Measurement
Ad

Viewers also liked (20)

PPTX
Garment Development Presentation
PDF
GST impact analysis - Textile & Apparels
PDF
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
PPT
Fashion Marketing Week 3
PDF
15020441094, garment manufacturing
PDF
Lean manufacturing tools for garment industry
PPT
Artistic apparel audit presentation ...
PPTX
Industrial engineering intro
PPT
Fashionmktingwk15 Review
PPTX
Application of information technology in gi k
PPTX
Presentation on Apparel Merchandising
PDF
21548667 t-shirt-operation-breakdown
PDF
Garment production systems
PPT
Lean Manufacturing and Principles
PPS
Case Study Sri Lanka Lean Wip Reduction
PPT
Tafe Fashion Marketing notes wk 9
PDF
Garment manufacturing process fabric to finished product
PPTX
Production Management by Sandra Carr
PPT
Supply Chain
PPTX
Garments process
Garment Development Presentation
GST impact analysis - Textile & Apparels
Industrial Engineering Guide to Job Interview Preparation (Book Cover)
Fashion Marketing Week 3
15020441094, garment manufacturing
Lean manufacturing tools for garment industry
Artistic apparel audit presentation ...
Industrial engineering intro
Fashionmktingwk15 Review
Application of information technology in gi k
Presentation on Apparel Merchandising
21548667 t-shirt-operation-breakdown
Garment production systems
Lean Manufacturing and Principles
Case Study Sri Lanka Lean Wip Reduction
Tafe Fashion Marketing notes wk 9
Garment manufacturing process fabric to finished product
Production Management by Sandra Carr
Supply Chain
Garments process
Ad

Similar to Application Of Workstudy (20)

PPTX
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
PDF
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
PDF
Application of value stream mapping tool to reduce wastes in bearing industry
PDF
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
PPT
Chapter5-Facility Layout_POM.ppt
PPTX
PLANT LAYOUT.pptx about plant layout that what is plant layout
PDF
Preliminary Study of an Assembling Plant
PDF
vignesh conference
DOC
PDF
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
PPTX
Ie microsoft office power point presentation
PPT
PDF
IRJET - Productivity Improvement by Time Study and Motion Study
PDF
Time Study and Method Study Application in Machining Plant for Improvement in...
PDF
A case study on productivity improvement of wearing insert and cutting ring
PPT
Production And Operation Materials
PPT
Production And Operation Materials
PDF
industrial engineering in sewing department
PPT
Line Balancing In Garments Industry
PPTX
Industrial engineeering pli
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
Application of value stream mapping tool to reduce wastes in bearing industry
Designing Facility Layout and Effective Material Handling for a Ceramic Insul...
Chapter5-Facility Layout_POM.ppt
PLANT LAYOUT.pptx about plant layout that what is plant layout
Preliminary Study of an Assembling Plant
vignesh conference
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
Ie microsoft office power point presentation
IRJET - Productivity Improvement by Time Study and Motion Study
Time Study and Method Study Application in Machining Plant for Improvement in...
A case study on productivity improvement of wearing insert and cutting ring
Production And Operation Materials
Production And Operation Materials
industrial engineering in sewing department
Line Balancing In Garments Industry
Industrial engineeering pli

Recently uploaded (20)

PPTX
Introduction to Managemeng Chapter 1..pptx
PDF
Corporate Finance Fundamentals - Course Presentation.pdf
PPTX
Introduction to Essence of Indian traditional knowledge.pptx
PDF
how_to_earn_50k_monthly_investment_guide.pdf
PDF
Circular Flow of Income by Dr. S. Malini
PPT
E commerce busin and some important issues
PPTX
Session 3. Time Value of Money.pptx_finance
PDF
Is Retirement Income a Three Dimensional (3-D) problem_ What is the differenc...
PDF
ECONOMICS AND ENTREPRENEURS LESSONSS AND
PDF
Spending, Allocation Choices, and Aging THROUGH Retirement. Are all of these ...
PPTX
Session 11-13. Working Capital Management and Cash Budget.pptx
PDF
illuminati Uganda brotherhood agent in Kampala call 0756664682,0782561496
PPTX
fastest_growing_sectors_in_india_2025.pptx
PPTX
Globalization-of-Religion. Contemporary World
PPTX
Antihypertensive_Drugs_Presentation_Poonam_Painkra.pptx
PPTX
What is next for the Fractional CFO - August 2025
PPTX
Introduction to Customs (June 2025) v1.pptx
PPTX
Basic Concepts of Economics.pvhjkl;vbjkl;ptx
PDF
Bladex Earnings Call Presentation 2Q2025
PDF
Understanding University Research Expenditures (1)_compressed.pdf
Introduction to Managemeng Chapter 1..pptx
Corporate Finance Fundamentals - Course Presentation.pdf
Introduction to Essence of Indian traditional knowledge.pptx
how_to_earn_50k_monthly_investment_guide.pdf
Circular Flow of Income by Dr. S. Malini
E commerce busin and some important issues
Session 3. Time Value of Money.pptx_finance
Is Retirement Income a Three Dimensional (3-D) problem_ What is the differenc...
ECONOMICS AND ENTREPRENEURS LESSONSS AND
Spending, Allocation Choices, and Aging THROUGH Retirement. Are all of these ...
Session 11-13. Working Capital Management and Cash Budget.pptx
illuminati Uganda brotherhood agent in Kampala call 0756664682,0782561496
fastest_growing_sectors_in_india_2025.pptx
Globalization-of-Religion. Contemporary World
Antihypertensive_Drugs_Presentation_Poonam_Painkra.pptx
What is next for the Fractional CFO - August 2025
Introduction to Customs (June 2025) v1.pptx
Basic Concepts of Economics.pvhjkl;vbjkl;ptx
Bladex Earnings Call Presentation 2Q2025
Understanding University Research Expenditures (1)_compressed.pdf

Application Of Workstudy

  • 1. RESEARCH TITLE : APPLICATION OF WORK STUDY CONCEPTS IN APPAREL MANUFACTURING RESEARCH ASSOCIATES IQBAL AHMED – BS in Industrial Engineering NIRANJAN K. H – BS in Industrial Engineering Dr. Ambedkar Institute of Technology Bangalore University BALAJI B JAGANNATH Head Of Industrial Engineering Bombay Rayon Fashion Limited CONDUCTED AT BOMBAY RAYON FASHIONS LIMITED(UNIT-1) BANGALORE
  • 2. OBJECTIVE OF THE PROJECT WORK TO IMPLEMENT WORKSTUDY CHARTS TO OBTAIN MAXIMUM UTILIZATION OF THE RESOURCES(MAN, MACHINE AND MATERIALS) AND TO OPTIMIZE WORKPLACE BY CHANGING THE PLANT LAYOUT AND WORKSTATION, USING THE PROCESS CHARTS.
  • 3. ROLE OF INDUSTRIAL ENGINEERING DEPARTMENT IN APPAREL INDUSTRY. Importance of Industrial Engineering (IE) tools that can be used to improve upon the productivity of their factories and thus enhance the profits ! Very few companies have been operating with a full-fledged industrial engineering department and even those which boast of an Industrial Engineering Department (IED) in their factories are not allowing ample freedom and scope to function to its full capabilities. The role of IED is important for the garment industry for the following two reasons: It’s a highly labor-intensive industry. Effective planning is emerging as one of the key factors for the garment manufacturing industry.
  • 4. ABOUT THE COMPANY-BRFL: is one of the leading garment manufacturer in India, currently operating with 7 units in Bangalore.
  • 5. GARMENT MANUFACTURING – BLOCK DIAGRAM Fabric from stores Cutting section Sewing section Finishing section Finished garment to warehouse
  • 6. TOPICS COVERED DURING THE PROJECT WORK Plant Layout And Work Station Design Work Study Concepts
  • 7. PLANT LAYOUT & WORKSTATION DESIGN
  • 9. CUTTING SECTION – EXISTING LAYOUT
  • 10. CUTTING SECTION – PROPOSED LAYOUT
  • 11. CALCULATION – CUTTING SECTION FORMULA USED: PRODUCTION O/P = TOTAL TABLE * PRODUCTION PER DAY LENGTH CONSTANT -------------------------------------------------------------------------- EXISTING PROPOSED No. of tables 4 6 Total Table length 22*2+10*1+17*1 20*4+17*1+10*1 = 71mts = 107mts Production o/p 71 * 60 107 * 60 per day = 4260 = 6420 % increase in production = 6420 -4260 ------------- * 100 = 33.64 % 6420
  • 12. COMPARISION B/W EXISTING & PROPOSED CUTTING SECTION LAYOUT EXISTING Lesser space utilization Operations not arranged in sequence. Bottle-necks occurs Production is less Too much of material movement & handling PROPOSED Maximum space utilization Operations are arranged in sequence. Bottle-necks avoided Higher production achieved Minimized material movement & handling
  • 16. FINISHING SECTION – EXISTING LAYOUT
  • 17. FINISHING SECTION – PROPOSED LAYOUT
  • 18. FINISHED SECTION: EXISTING LAYOUT V/S PROPOSED LAYOUT EXISTING Operations are not arranged in sequence Intersection of material flow occurs Material movement is more Material handling is more PROPOSED Operations are arranged in sequence Intersection of material flow avoide d Material movement is minimized Material handling is minimized
  • 19. WORKSTATION DESIGN The work station design affects the production rate, efficiency and the accuracy with which an operation can be performed. A work station not only needs space for the workers and the machine, there are plenty of other items which also need accommodation. Space requirements and a few more factors governing a good work station design are described below: Space requirements Consideration of the space required, for the movement of material handling equipments. Easy access to safety stops in case of emergency. Easy access to machine for inspection, lubrication, maintenance and repair. Convenience of making foundations and machine installations. Aisle space between one machine and the next. Appropriate ventilating, lighting and safety arrangements.
  • 20. WORKSTATION AT SEWING BATCH- EXISTING
  • 22. COMPARISION OF EXISTING Vs PROPOSED 57 cm 18 minutes With out disturbing Barrier does not exists 63 cm 20 minutes Disturbing the operator Restricted by the barrier to a limit Needle distance from center table edge Time required to manufacture one garment from one batch Enter of performance card Movement of the operator towards the center table Proposed work station Existing work station Description
  • 23. COMPARISION OF EXISTING Vs PROPOSED Calculation % Efficiency = 3168 – 2884 × 100 = 9 % 3168 20 operations 18mins 3.33*20 = 66 garments/hr 66*8 = 528 garments/day 528*6 = 3168 garments/day 20 operations 20mins 3*20 = 60 garments/hr 60*8 = 480 garments/day 480*6= 2884 garments/day No. of operations /batch To manufacture 1 garment Hourly production per batch Daily production per batch Daily production from sewing section Proposed Existing Description
  • 25. IMPORTANCE OF WORK STUDY Improving the planning of work. Improving Methods of production. Effective Worker Selection Processes. Improving Worker Effectiveness. Providing Workers with Adequate Training. Improving Worker Morale. Rewarding worker Morale. Improving worker attendance levels. Reducing worker labor turnover. Effective Communications.
  • 26. IMPLEMENTING WORK STUDY CHARTS IN APPAREL MANUFACTURING Objective : To record the movements of man, machine & materials in a layout, study the distance covered, time involved, interaction between them, identify the area for improvement, and suggest a better way to overcome these problems.
  • 27. WORK STUDY- DEFINITION Work study is a generic term for those techniques, particularly method study& work measurement, which are used in the examination of human work in all its context, & which lead systematically to all the factors which affect the efficiency & economy of the situation being reviewed, in order to effect improvement.
  • 28. METHOD STUDY WORK MEASUREMENT HIGHER PRODUCTIVITY WORK STUDY
  • 29. PROCESS CHART SYMBOLS - OPERATION - STORAGE - DELAY - TRANSPORT - INSPECTION
  • 30. OUT LINE PROCESS CHART: An out line process chart is a process chart giving an over all picture by recording in sequence only the main operation and inspection. Fabric inspecn sewing sec final check cutting sec finishing sec
  • 31. Out line process chart: for apparel manufacturing Fabric insp front prep buttoning 1.5 1.25 Laying front back attch in line trim 0.15 1.0 0.6 Marking checking pressing 0.45 1.75 Cutting part atch final check 1.80 2.45 Panel check final check stain remove 2.0 Recut msrmnt check 1.5 Sorting prsnt check 1.5 tagging 0.65 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 18
  • 32. FLOW PROCESS CHART The flow process chart as a process chart setting out the frequency of the flow of a product or procedure by recording all event under review using the process chart symbols. MAN TYPE MATERIAL TYPE EQUIPMENT TYPE
  • 33. MAN TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS WHAT THE WORKER DOES
  • 34. Flow Process Chart – Man type Feeding helper in Sewing Section. Click to Download File Flow Process Chart – Man Type Present Click to Download File Flow Process Chart – Man Type Proposed Improvement 4.08(8%) 51.5 55.58 Time (Min) 98 (41%) 136 235 Distance (Mtrs) 2 2 - - 1 13 10 - 2 1 15 12 - 2 - Operation Transport Delay Inspection Storage Savings Proposed Present Activity SUMMARY Subject Charted : Feeding Helper in Sewing Section Activity: Feeding of all parts and trims to assembly line Location: Sewing Section – Unit – 1 - BRFL Charted by: IQBAL & NIRANJAN Approved by: Date:5-03-07
  • 35. MATERIAL TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS THE MOVEMENT OF MATERIALS, I.E. THE CHANGES THE MATERIAL UNDERGOES IN LOCATION. IN BUNDLE FORM , WAITING FINISHED APPAREL TO GET PICKED UP WAITING TO GET DISPATCHED MATERIALS IN-PROCESS
  • 36. Flow Process Chart – Material Type Stitched Garments In Finishing Section Click to Download File Flow Process Chart – Material Type Present Click to Download File Flow Process Chart – Material Type Proposed Improvement 1.9(35%) 3.4 5.3 Time (Mins) 94 (35%) 171 265 Distance (Mtrs) - - - - - 16 21 2 - 3 16 21 2 - 3 Operation Transport Delay Inspection Storage Savings Proposed Present Activity SUMMARY Subject Charted: Stitched Garment in Finishing section Activity: Buttoning, Inline Trimming, Pressing, Inspection & Dispatch Location: Finishing Section – Unit – 1 – BRFL Charted by: IQBAL & NIRANJAN Approved by: Date:05-03-07
  • 37. EQUIPMENT TYPE – FLOW PROCESS CHART A FLOW PROCESS CHART WHICH RECORDS THE MANNER IN WHICH EQUIPMENT IS USED. STAIN REMOVER – WAITING TO GET PICKED UP HAND KNIFE - UNDER WORKING
  • 38. TWO- HANDED PROCESS CHART The two-handed process chart is a process chart in which activities of a workers hands(or limbs) are recorded in their relationship to the other.
  • 39. MULTIPLE ACTIVITY CHART Is useful recording tool for situations where the work involves interactions of different subjects. One or more workers looking after different machines or a group of workers working on loading materials at one point.
  • 40. MAN-MACHINE CHART FOR PLACKET TRIM & JOINT OPERATION Existing condition: The operations, placket trim and placket joint were carried on by 2 different operators at different places for a single batch. Proposed condition: A single operator to perform both the operations on two machines placed front & back of the operator , providing with a rotating chair.
  • 41. MAN-MACHINE CHART FOR PLACKET TRIM & JOINT OPERATION 0 3 4 5 Idle Placket trim operation on m/c 1 Working 6 7 Working Placket joint operation on m/c 2 Idle 7.5 (placket joint machine) (trimming machine) (mins)    Machine 2 Operator 1 Machine 1 Time Date: 06/04/2007 Approved by: Charted by: Iqbal and Niranjan Charted on: Placket trim & Placket joint operations for a bundle of 10 pieces MAN MACHINE CHART : 2 M/C 1 OPERATOR
  • 42. NUMBER OF OPERATORS WORKING ON SINGLE MACHINE
  • 43. CONCLUSION WITH THE APPLICATION OF WORK STUDY CHARTS IN APPAREL MANUFACTURING, THE EFFECTIVE UTILIZATION OF RESOURCES ( MAN, MATERIAL & MACHINES) CAN BE ACHIEVED. THE COST INVOLVED IN USING THESE CHARTS ARE VERY MINIMUM AND A SOLUTION CAN BE DERIVED IN A SHORT PERIOD OF TIME.