Arena®
Tutorial
This Arena®
tutorial aims to provide a minimum but sufficient guide for a beginner to get
started with Arena®
. For more details, the reader is referred to the Arena user’s guide, which
can be found in Arena program (Help >Product Manuals>Arena User’s Guide).
1. Installation
You can download the student version of Arena software from the link below:
http://arenasimulation.com/downloadarena
To proceed with the download, you have to register your account with your valid email
address. Once registered, you can log into the download site and follow the download
instructions provided at that site. During the installation, customer information will be asked
to enter with the serial number. In that case, you have to enter STUDENT in the serial
number field as shown below.
2. Overall Features of Arena®
2.1 Arena Window Structure
You can run Arena from the Window Start menu and navigate to Program > Rockwell
Software > Arena. If a warning message will prompt, click OK to go on. The Arena will bring
you the new modeling environment as follows:
2
In the Arena window, you will face with the three regions where you’ll work for building a
simulation model.
1) Model Window (Flowchart view)
The flowchart view is a canvas to draw the process flow of entities using modules
from the project bar. It can also have the animation and other drawing elements
2) Model Window (Spreadsheet view)
The spreadsheet view displays the properties of selected module in the flowchart
view or the project bar.
3) Project bar
The project bar holds some panels that provide the various objects so as to help you
build the simulation model and reports
 Basic Process panel: holds modeling commands called modules that are
used to model your system.
 Reports panel: provides a road map to the results of a simulation run
 Navigate panel: allows to display different view of a model
The Arena also provides additional panels that provide various types of objects such
as advanced process, advanced transfer panels and so on. In order to use these panels,
you need to attach a panel located in Arena’s template folder by selecting a panel file
(ends with “tpo” extension) from File > Template Panel > Attach. In reverse, if you
don’t need it any more, you can detach from the project bar from File > Template
Panel > Detach.
2.2 Modules
In Arena, modules are basic building blocks (or objects) that consist of Arena models. There
are two types of modules: flowchart modules and data modules. All the modules can be found
in the project bar.
1) Flowchart Modules:
The flowchart modules are used to describe the flow of entities and placed in the
flowchart view of the model window.
In the Basic Process panel, you can find the following flowchart modules:
Name Description
Create Entities enter the simulation here.
Dispose Entities are removed from the simulation here.
Process
An activity, usually performed by one or more resources and requiring
some time to complete.
Decide A branch in entity flow. Only one branch is taken.
Batch Collect a number of entities before they can continue processing
Separate
Duplicate entities for concurrent or parallel processing, or separating a
previously established batch of entities
Assign
Change the value of some parameter (during the simulation), such as
the entity’s type or model variable.
Record Collect a statistic, such as an entity counter or cycle time.
3
2) Data Modules:
The data modules are used to define parameters associated with elements of the
model, such as resources, entities, queues and so on. The data module can be
accessed from the project bar by double-clicking a module and it will be shown on
the spreadsheet view of the model window.
In the Basic Process panel, you can find the following data modules:
Name Description
Entity
Define the various entity types and their initial picture values in a
simulation. Costing information is also defined for the entity.
Resource
Define the resources in the system including costing information
and resource availability.
Queue Define the queues in the system
Schedule
With the Resource module, define an operating schedule for a
resource or with the Create module, define an arrival schedule.
Set
Define various types of sets, including resource, counter, tally, and
entity type and entity picture.
Attribute
Define the entity’s attributes which consist of type, dimensions and
initial value.
Variable Define the variables used through the modules in the model.
3. Building Models with Arena
Throughout this section, the process of building an Arena model of a single server system
will be explained with the details.
3.1 Reference Model (Single Server System)
1) Entity: Job arrives every ta minutes (ta ~ Exp(5))
2) Active Resource: Machine
3) Passive Resource: Buffer (unlimited)
4) Activity: service time ts ~ triangular1(1, 3, 6)
3.2 Defining each Data Module
Before modeling the flow of the entity, the entities and resources are defined using Entity and
Resource data modules.
1) Entity module:
In Basic Process panel of the project bar, click the Entity module. Double-click the
spreadsheet view to define a new entity. Enter the entity type with “Job” and change
the initial picture to “Picture.Box” which will be used to animate the entity flow
during the simulation.
4
2) Resource module:
In Basic Process panel of the project bar, click the Resource module. Double-click
the spreadsheet view to define a new resource. Enter the name with “Machine”.
3.3 Constructing a Flowchart Model
In Arena, the flowchart represents the flow of entity in the system. In the single server system,
the entity, a job, 1) enters the system and waits in the queue. 2) The job will be processed by
the machine when the machine becomes idle. 3) The processed job will leave the system.
1) Create jobs
The starting point of the flowchart is always the Create module. Drag the Create
module from the Basic Process panel into the flowchart view of the model window.
2) Process jobs
Drag the Process module from the Basic Process panel into the flowchart view,
placing it to the right of the “Create 1” module. If the “Create 1” module is selected
before dragging, the connection will be automatically established from “Create 1” to
Process module. For this, check Object > Auto-Connect menu is activated.
If the connection is not made, click the Object > Connect menu or the Connect
toolbar button ( ) to draw a connection manually. Start the connection by clicking
the exit point (►) of the Create module, and then click the entry point (■) of the
Process module to complete the connection.
3) Dispose jobs
Select the “Process 1” module and Drag the Dispose module from the Basic Process
panel into the flowchart view, placing it to the right of the “Process 1” module.
5
3.4 Defining each Flowchart Module
1) Create Module
Double-click the “Create 1” module to open a dialog box so as to edit its properties.
(1) Type “Create a job” in the Name field.
(2) Select or type “Job” to name the entities in the Entity Type field.
(3) Type “5” in the Value field of the Time Between Arrivals section and select
“Minutes” in the Units field
(4) Click OK to close the dialog box.
2) Process Module
Next is the “Process 1” module. In this module, the behavior or flow of an entity at
buffer and machine will be defined. The newly created job waits at the buffer until the
resource (machine) becomes idle. If there is an idle resource, the entity seizes the
resource and holds for a time delay (representing resource’s processing of the entity),
and then it releases the resource for next processing of the entity.
Double-click the “Process 1” module to open a dialog box so as to edit its properties.
(1) Type “Process a Job” in the Name field.
(2) Select “Seize Delay Release” in the Action field of the Logic section.
Action field defines the behavior of an entity in this module.
- Seize Delay Release: the arriving entity seizes some number of units of a
resource, then is delayed for a time, and then releases the resource
- Delay: the arriving entity is simply delayed for some time and no resource is
required
- Seize Delay: seizes the resource and then is delayed, but does not release the
resource
- Delay Release: assuming that the resource is seized previously, the entity is
delayed and then the resource is released
(3) Click “Add...” button in the Resources filed of the Logic section to add a resource
for this module. The dialog box for Resources will be opened. Select “Machine”
in the Resource Name field. Click OK button to close the Resources dialog box.
Resources field defines the resources to be seized or released. It can be a
Resource or Set (a set of resources). The Quantity field indicates the number of
resources to be seized or released.
6
(4) To specify the time delay (service time) that follows the triangular distribution of
(1, 3, 6), select “Triangular” in the Delay Type field and type 1, 3 and 6 in
Minimum, Value (Most Likely), and Maximum fields, respectively. Also select
“Minutes” in the Units field.
The time delay for the Process module can be Constant, Normal, Triangular,
Uniform, and Expression.
3) Dispose Module
This module represents the ending point of the entity’s flow in the model. Nothing
special is mentioned here.
4. Running Simulation with Arena
4.1 Setting the run conditions
Prior to run the model, you need to specify the run conditions including project information
and the length of the simulation run. This is done in Run Setup dialog box from Run > Setup
menu.
1) Project Parameters
In Run Setup dialog box, select Project Parameters tab to specify the general project
information with Project Title, Analyst Name, and Project Description. You can also
specify for which categories you would like to collect statistics during the simulation
in the Statistics Collection field. Here, check the boxes of Queues, Entities, Processes,
and Resources of the Statistics Collection field.
7
2) Replication Parameters
In Run Setup dialog box, select Replication Parameters tab to specify how many
times the simulation runs and how long each simulation runs.
- Number of Replications: defines numbers of simulation runs to execute. Here,
type 1.
- Replication Length: defines the length of a single replication in a specified
time unit. Here, type 8 and select Hours in its Time Units (directly to the right
of Replication Length)
- Base Time Unit: defines time units for reporting, status bar, simulation time
and animated plots. All time delays, replication length will be converted to
this base time unit. Here, select Hours.
4.2 Running a simulation
You can start the simulation run simply by clicking the Go ( ) button in the standard toolbar
or clicking the Run > Go menu. If you have a valid model, then Arena continues to run the
simulation. If your model is not valid, Arena lets you know that with error messages.
Once the simulation starts to run, some animation will be displayed as the simulation
progresses. As shown in the following figure, entities in a box shape (as specified in Entity
data module) move from one module to another. Below the each module, number of entities
created, in processing, and disposed are displayed. At the top of the Process module,
displayed is the status of the queue of the resource (number of waiting entities) with entity
pictures. In this figure, there are four entities in Process module, among them, one entity is
actually being processed by the resource and three entities are waiting at the queue.
8
If you don’t want to see the animation anymore during the simulation run, click the Fast
Forward ( ) button to run the simulation as fast as possible without animation update. Also
you can start the simulation run via the Run > Fast-Forward menu.
4.3 Reviewing the output reports
At the end of the simulation run, a message box will prompt to ask you whether you would
like to view the reports. Clicking Yes displays the reports as shown below.
In the Reports panel, you can see the list of reports provided by Arena. By clicking one of
them, you can see the corresponding report. The above figure shows the Category by
Replication report which provides the output results for each replication. As we specified in
Run Setup > Project Parameter, statistics are collected in four categories (Entity, Process,
Queue, and Resource) in addition to the system category (default statistics collected by
Arena).
The statistics provided in Arena’s reports can be classified into three types of statistics:
 Tally statistics: it refers to the statistics such as average, minimum, or maximum of a
series of numbers. For example, the average and maximum of the total time in the
system of entities are 0.1145 hour and 0.3123 hour, respectively.
 Time-persistent statistics: it refers the statistics such as time average, minimum, or
maximum of a plot of something during the simulation run. The time average is the
accumulated area under the plotted curve divided by the simulation length. For
example, one of time-persistent statistics is the average of the number of entities in
the queue at the machine that can be found in the Queue  Other  Number Waiting
of the report tree located to the left of the report. Also, the instantaneous utilization of
the resource (Resource  Usage  Instantaneous Utilization) is one of the time-
persistent statistics.
 Counter statistics: it refers to the statistics of accumulated sum of something. One of
the counter statistics is the number of entities that entered or left the system which
can be found in Entity  Other  Number In or Number Out of the report tree.
According to the figure above, ninety jobs entered the system and eighty-nine of them
left the system.

More Related Content

PDF
Đề tài: Kế toán vốn bằng tiền tại Công ty Xây dựng dân dụng
PPTX
Super 8 gas station model - Arena Simulation
DOCX
Hoàn thiện kế toán tiêu thụ và xác định kết quả tiêu thụtại Công ty TNHH thươ...
PDF
Luận văn: Kế toán vốn bằng tiền tại Công ty dịch vụ Kihin, HOT
PDF
Đề tài: Kế toán tài sản cố định tại công ty cổ phần Thế Kỷ Mới, HOT
DOC
CHUYÊN ĐỀ TỐT NGHIỆP: KẾ TOÁN TÀI SẢN CỐ ĐỊNH TẠI CÔNG TY CỔ PHẦN THANH TÂN
DOC
Báo cáo thực tập kế toán Hạch toán thành phẩm, tiêu thụ thành phẩm và xác địn...
PDF
Deone pranilfinalreport
Đề tài: Kế toán vốn bằng tiền tại Công ty Xây dựng dân dụng
Super 8 gas station model - Arena Simulation
Hoàn thiện kế toán tiêu thụ và xác định kết quả tiêu thụtại Công ty TNHH thươ...
Luận văn: Kế toán vốn bằng tiền tại Công ty dịch vụ Kihin, HOT
Đề tài: Kế toán tài sản cố định tại công ty cổ phần Thế Kỷ Mới, HOT
CHUYÊN ĐỀ TỐT NGHIỆP: KẾ TOÁN TÀI SẢN CỐ ĐỊNH TẠI CÔNG TY CỔ PHẦN THANH TÂN
Báo cáo thực tập kế toán Hạch toán thành phẩm, tiêu thụ thành phẩm và xác địn...
Deone pranilfinalreport

What's hot (20)

PPTX
Parallel port programming
PDF
Automation in Manufacturing (Unit-2) by Varun Pratap Singh
PPTX
PPTX
Project Presentation_fx7378_fy6055
PPTX
Automated storage and retrieval system
PDF
OS-Process Management
PPTX
Rủi ro và kiểm soát trong httt kế toán
PDF
Cellular manufacturing
DOCX
Đề tài: Kế toán doanh thu, chi phí tại công ty Xuất Nhập Khẩu Nhà Bè
DOC
Báo cáo tổ chức công tác kế toán
PPTX
Shop floor control and management in CIM
PDF
Luận văn: Kế toán tài sản cố định tại Công ty Thế Kỷ Mới, HAY
PDF
Kế toán tiêu thụ hàng hóa và xác định kết quả tiêu thụ tại công ty tnhh một t...
 
PPT
UC4 SCHEDULING
DOC
Hoàn thiện công tác kế toán thanh toán với người mua, người bán tại Công ty c...
PDF
KHÓA LUẬN KIỂM TOÁN: HOÀN THIỆN CÔNG TÁC KẾ TOÁN VỐN BẰNG TIỀN TẠI CÔNG TY T...
PPT
Chuong 1 Khái niệm kiểm toán
DOCX
Báo Cáo Thực Tập Tổng Hợp Kế Toán Tại Công Ty Xi Măng
DOC
Báo cáo thực tập về công ty TNHH Thương Mại và Dịch Vụ Đức Thịnh
PDF
Đề tài: Kế toán vốn bằng tiền tại Công ty vận tải thương mại TTC
Parallel port programming
Automation in Manufacturing (Unit-2) by Varun Pratap Singh
Project Presentation_fx7378_fy6055
Automated storage and retrieval system
OS-Process Management
Rủi ro và kiểm soát trong httt kế toán
Cellular manufacturing
Đề tài: Kế toán doanh thu, chi phí tại công ty Xuất Nhập Khẩu Nhà Bè
Báo cáo tổ chức công tác kế toán
Shop floor control and management in CIM
Luận văn: Kế toán tài sản cố định tại Công ty Thế Kỷ Mới, HAY
Kế toán tiêu thụ hàng hóa và xác định kết quả tiêu thụ tại công ty tnhh một t...
 
UC4 SCHEDULING
Hoàn thiện công tác kế toán thanh toán với người mua, người bán tại Công ty c...
KHÓA LUẬN KIỂM TOÁN: HOÀN THIỆN CÔNG TÁC KẾ TOÁN VỐN BẰNG TIỀN TẠI CÔNG TY T...
Chuong 1 Khái niệm kiểm toán
Báo Cáo Thực Tập Tổng Hợp Kế Toán Tại Công Ty Xi Măng
Báo cáo thực tập về công ty TNHH Thương Mại và Dịch Vụ Đức Thịnh
Đề tài: Kế toán vốn bằng tiền tại Công ty vận tải thương mại TTC
Ad

Similar to Arena tutorial (20)

PPT
arena_basics.ppt
PDF
Module05 arena
PPTX
BANA7030_DES_Detailed_Modeling.pptx Simulation
PDF
Guia de usuario arena
PPT
Chapter 07 Slides Simulations with Arena
PPTX
BANA7030_DES_Advanced_Modeling.pptx Simulation
PDF
4_5821003798000177081.pdf
PPT
Lecture 2.pptMOELING AND SIMULATION BS SOFTWARE ENGNEERING
PDF
grocery_store_model_1_help_file__1_.pptx.pdf
PPT
Lecture16_Process Analyzer and OPTQUEST.ppt
PPTX
Arena Presentation
PPT
Ch10
PPT
Prueba
PPT
Prueba
PPT
Prueba
PPS
Tutorial De Promodel
PDF
2_1_Fundamentals_Event_Mechanism_Chapter_2.pdf
PDF
2_1_Fundamentals_Event_Mechanism_Chapter_2.pdf
PPTX
Topic 3 - Measuring Simulation Performance.pptx
PPTX
Opnet final year project in jalandhar
arena_basics.ppt
Module05 arena
BANA7030_DES_Detailed_Modeling.pptx Simulation
Guia de usuario arena
Chapter 07 Slides Simulations with Arena
BANA7030_DES_Advanced_Modeling.pptx Simulation
4_5821003798000177081.pdf
Lecture 2.pptMOELING AND SIMULATION BS SOFTWARE ENGNEERING
grocery_store_model_1_help_file__1_.pptx.pdf
Lecture16_Process Analyzer and OPTQUEST.ppt
Arena Presentation
Ch10
Prueba
Prueba
Prueba
Tutorial De Promodel
2_1_Fundamentals_Event_Mechanism_Chapter_2.pdf
2_1_Fundamentals_Event_Mechanism_Chapter_2.pdf
Topic 3 - Measuring Simulation Performance.pptx
Opnet final year project in jalandhar
Ad

Recently uploaded (20)

PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
Well-logging-methods_new................
PPTX
Lecture Notes Electrical Wiring System Components
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
bas. eng. economics group 4 presentation 1.pptx
PDF
PPT on Performance Review to get promotions
PPT
Mechanical Engineering MATERIALS Selection
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
Construction Project Organization Group 2.pptx
PPTX
Sustainable Sites - Green Building Construction
PPTX
UNIT 4 Total Quality Management .pptx
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
Well-logging-methods_new................
Lecture Notes Electrical Wiring System Components
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Internet of Things (IOT) - A guide to understanding
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Foundation to blockchain - A guide to Blockchain Tech
bas. eng. economics group 4 presentation 1.pptx
PPT on Performance Review to get promotions
Mechanical Engineering MATERIALS Selection
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Construction Project Organization Group 2.pptx
Sustainable Sites - Green Building Construction
UNIT 4 Total Quality Management .pptx
Embodied AI: Ushering in the Next Era of Intelligent Systems
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Mitigating Risks through Effective Management for Enhancing Organizational Pe...

Arena tutorial

  • 1. 1 Arena® Tutorial This Arena® tutorial aims to provide a minimum but sufficient guide for a beginner to get started with Arena® . For more details, the reader is referred to the Arena user’s guide, which can be found in Arena program (Help >Product Manuals>Arena User’s Guide). 1. Installation You can download the student version of Arena software from the link below: http://arenasimulation.com/downloadarena To proceed with the download, you have to register your account with your valid email address. Once registered, you can log into the download site and follow the download instructions provided at that site. During the installation, customer information will be asked to enter with the serial number. In that case, you have to enter STUDENT in the serial number field as shown below. 2. Overall Features of Arena® 2.1 Arena Window Structure You can run Arena from the Window Start menu and navigate to Program > Rockwell Software > Arena. If a warning message will prompt, click OK to go on. The Arena will bring you the new modeling environment as follows:
  • 2. 2 In the Arena window, you will face with the three regions where you’ll work for building a simulation model. 1) Model Window (Flowchart view) The flowchart view is a canvas to draw the process flow of entities using modules from the project bar. It can also have the animation and other drawing elements 2) Model Window (Spreadsheet view) The spreadsheet view displays the properties of selected module in the flowchart view or the project bar. 3) Project bar The project bar holds some panels that provide the various objects so as to help you build the simulation model and reports  Basic Process panel: holds modeling commands called modules that are used to model your system.  Reports panel: provides a road map to the results of a simulation run  Navigate panel: allows to display different view of a model The Arena also provides additional panels that provide various types of objects such as advanced process, advanced transfer panels and so on. In order to use these panels, you need to attach a panel located in Arena’s template folder by selecting a panel file (ends with “tpo” extension) from File > Template Panel > Attach. In reverse, if you don’t need it any more, you can detach from the project bar from File > Template Panel > Detach. 2.2 Modules In Arena, modules are basic building blocks (or objects) that consist of Arena models. There are two types of modules: flowchart modules and data modules. All the modules can be found in the project bar. 1) Flowchart Modules: The flowchart modules are used to describe the flow of entities and placed in the flowchart view of the model window. In the Basic Process panel, you can find the following flowchart modules: Name Description Create Entities enter the simulation here. Dispose Entities are removed from the simulation here. Process An activity, usually performed by one or more resources and requiring some time to complete. Decide A branch in entity flow. Only one branch is taken. Batch Collect a number of entities before they can continue processing Separate Duplicate entities for concurrent or parallel processing, or separating a previously established batch of entities Assign Change the value of some parameter (during the simulation), such as the entity’s type or model variable. Record Collect a statistic, such as an entity counter or cycle time.
  • 3. 3 2) Data Modules: The data modules are used to define parameters associated with elements of the model, such as resources, entities, queues and so on. The data module can be accessed from the project bar by double-clicking a module and it will be shown on the spreadsheet view of the model window. In the Basic Process panel, you can find the following data modules: Name Description Entity Define the various entity types and their initial picture values in a simulation. Costing information is also defined for the entity. Resource Define the resources in the system including costing information and resource availability. Queue Define the queues in the system Schedule With the Resource module, define an operating schedule for a resource or with the Create module, define an arrival schedule. Set Define various types of sets, including resource, counter, tally, and entity type and entity picture. Attribute Define the entity’s attributes which consist of type, dimensions and initial value. Variable Define the variables used through the modules in the model. 3. Building Models with Arena Throughout this section, the process of building an Arena model of a single server system will be explained with the details. 3.1 Reference Model (Single Server System) 1) Entity: Job arrives every ta minutes (ta ~ Exp(5)) 2) Active Resource: Machine 3) Passive Resource: Buffer (unlimited) 4) Activity: service time ts ~ triangular1(1, 3, 6) 3.2 Defining each Data Module Before modeling the flow of the entity, the entities and resources are defined using Entity and Resource data modules. 1) Entity module: In Basic Process panel of the project bar, click the Entity module. Double-click the spreadsheet view to define a new entity. Enter the entity type with “Job” and change the initial picture to “Picture.Box” which will be used to animate the entity flow during the simulation.
  • 4. 4 2) Resource module: In Basic Process panel of the project bar, click the Resource module. Double-click the spreadsheet view to define a new resource. Enter the name with “Machine”. 3.3 Constructing a Flowchart Model In Arena, the flowchart represents the flow of entity in the system. In the single server system, the entity, a job, 1) enters the system and waits in the queue. 2) The job will be processed by the machine when the machine becomes idle. 3) The processed job will leave the system. 1) Create jobs The starting point of the flowchart is always the Create module. Drag the Create module from the Basic Process panel into the flowchart view of the model window. 2) Process jobs Drag the Process module from the Basic Process panel into the flowchart view, placing it to the right of the “Create 1” module. If the “Create 1” module is selected before dragging, the connection will be automatically established from “Create 1” to Process module. For this, check Object > Auto-Connect menu is activated. If the connection is not made, click the Object > Connect menu or the Connect toolbar button ( ) to draw a connection manually. Start the connection by clicking the exit point (►) of the Create module, and then click the entry point (■) of the Process module to complete the connection. 3) Dispose jobs Select the “Process 1” module and Drag the Dispose module from the Basic Process panel into the flowchart view, placing it to the right of the “Process 1” module.
  • 5. 5 3.4 Defining each Flowchart Module 1) Create Module Double-click the “Create 1” module to open a dialog box so as to edit its properties. (1) Type “Create a job” in the Name field. (2) Select or type “Job” to name the entities in the Entity Type field. (3) Type “5” in the Value field of the Time Between Arrivals section and select “Minutes” in the Units field (4) Click OK to close the dialog box. 2) Process Module Next is the “Process 1” module. In this module, the behavior or flow of an entity at buffer and machine will be defined. The newly created job waits at the buffer until the resource (machine) becomes idle. If there is an idle resource, the entity seizes the resource and holds for a time delay (representing resource’s processing of the entity), and then it releases the resource for next processing of the entity. Double-click the “Process 1” module to open a dialog box so as to edit its properties. (1) Type “Process a Job” in the Name field. (2) Select “Seize Delay Release” in the Action field of the Logic section. Action field defines the behavior of an entity in this module. - Seize Delay Release: the arriving entity seizes some number of units of a resource, then is delayed for a time, and then releases the resource - Delay: the arriving entity is simply delayed for some time and no resource is required - Seize Delay: seizes the resource and then is delayed, but does not release the resource - Delay Release: assuming that the resource is seized previously, the entity is delayed and then the resource is released (3) Click “Add...” button in the Resources filed of the Logic section to add a resource for this module. The dialog box for Resources will be opened. Select “Machine” in the Resource Name field. Click OK button to close the Resources dialog box. Resources field defines the resources to be seized or released. It can be a Resource or Set (a set of resources). The Quantity field indicates the number of resources to be seized or released.
  • 6. 6 (4) To specify the time delay (service time) that follows the triangular distribution of (1, 3, 6), select “Triangular” in the Delay Type field and type 1, 3 and 6 in Minimum, Value (Most Likely), and Maximum fields, respectively. Also select “Minutes” in the Units field. The time delay for the Process module can be Constant, Normal, Triangular, Uniform, and Expression. 3) Dispose Module This module represents the ending point of the entity’s flow in the model. Nothing special is mentioned here. 4. Running Simulation with Arena 4.1 Setting the run conditions Prior to run the model, you need to specify the run conditions including project information and the length of the simulation run. This is done in Run Setup dialog box from Run > Setup menu. 1) Project Parameters In Run Setup dialog box, select Project Parameters tab to specify the general project information with Project Title, Analyst Name, and Project Description. You can also specify for which categories you would like to collect statistics during the simulation in the Statistics Collection field. Here, check the boxes of Queues, Entities, Processes, and Resources of the Statistics Collection field.
  • 7. 7 2) Replication Parameters In Run Setup dialog box, select Replication Parameters tab to specify how many times the simulation runs and how long each simulation runs. - Number of Replications: defines numbers of simulation runs to execute. Here, type 1. - Replication Length: defines the length of a single replication in a specified time unit. Here, type 8 and select Hours in its Time Units (directly to the right of Replication Length) - Base Time Unit: defines time units for reporting, status bar, simulation time and animated plots. All time delays, replication length will be converted to this base time unit. Here, select Hours. 4.2 Running a simulation You can start the simulation run simply by clicking the Go ( ) button in the standard toolbar or clicking the Run > Go menu. If you have a valid model, then Arena continues to run the simulation. If your model is not valid, Arena lets you know that with error messages. Once the simulation starts to run, some animation will be displayed as the simulation progresses. As shown in the following figure, entities in a box shape (as specified in Entity data module) move from one module to another. Below the each module, number of entities created, in processing, and disposed are displayed. At the top of the Process module, displayed is the status of the queue of the resource (number of waiting entities) with entity pictures. In this figure, there are four entities in Process module, among them, one entity is actually being processed by the resource and three entities are waiting at the queue.
  • 8. 8 If you don’t want to see the animation anymore during the simulation run, click the Fast Forward ( ) button to run the simulation as fast as possible without animation update. Also you can start the simulation run via the Run > Fast-Forward menu. 4.3 Reviewing the output reports At the end of the simulation run, a message box will prompt to ask you whether you would like to view the reports. Clicking Yes displays the reports as shown below. In the Reports panel, you can see the list of reports provided by Arena. By clicking one of them, you can see the corresponding report. The above figure shows the Category by Replication report which provides the output results for each replication. As we specified in Run Setup > Project Parameter, statistics are collected in four categories (Entity, Process, Queue, and Resource) in addition to the system category (default statistics collected by Arena). The statistics provided in Arena’s reports can be classified into three types of statistics:  Tally statistics: it refers to the statistics such as average, minimum, or maximum of a series of numbers. For example, the average and maximum of the total time in the system of entities are 0.1145 hour and 0.3123 hour, respectively.  Time-persistent statistics: it refers the statistics such as time average, minimum, or maximum of a plot of something during the simulation run. The time average is the accumulated area under the plotted curve divided by the simulation length. For example, one of time-persistent statistics is the average of the number of entities in the queue at the machine that can be found in the Queue  Other  Number Waiting of the report tree located to the left of the report. Also, the instantaneous utilization of the resource (Resource  Usage  Instantaneous Utilization) is one of the time- persistent statistics.  Counter statistics: it refers to the statistics of accumulated sum of something. One of the counter statistics is the number of entities that entered or left the system which can be found in Entity  Other  Number In or Number Out of the report tree. According to the figure above, ninety jobs entered the system and eighty-nine of them left the system.