BY Sir Hamisi Kisesa (Gumzo)
Email: kisesahamis@gmail.com Or
kisesahamis@arpf.or.tz
Website:www.arpf.or.tz
Mobile:+255717797536 Or
+255762655283
 Introduction
 Registration criteria
 Screening criteria
 Scoping criteria
 Compiling Term of References
 Organizing EIA study
 Undertaking full EIA study
 Environment Impact Statement (EIS)
 EAI review
 Environment Management and Monitoring
 Environment Auditing
 Decision making
 This presentation basing on assessing of any
proposed development activity/project under
EIA.
 The presentation also based much on
Tanzania country.
 Any proposed project development has great
influence on either positive or negative
impacts on the environment.
 Therefore, there is a need to evaluate such
project basis on the environmental effects.
 On assessing such proposed project the
assessor needs to evaluate by using
Environment impact assessment processes.
 The environment impact assessment work
under series of steps.
 Such steps are ;
 The project proponent should first officially
register in purpose to undertake development
activity.
 Remember, registration process differs from
country to country.
 In Tanzania, ENVIROMENT REGULATORY
BODY (ERBS) Responsible for registration of
proposed project.
 Screening determining what level of
environmental assessment exhibit.
 Determine the proposed project if require EIA
or not since not all project needs EIA.
 ON THIS PROCESS ;
 Identify project activities that may cause
potential significant impacts.
 Identify project capacity, project size, project
location ,etc
 Observe if it is community based or not.
 Observe the environmental characteristics on
that project.
 Then predict the impact.
 Also you need to identify if the project requre
full scale EIA or further environmental
analysis or not .
 Example of projects that require full Scale EIA
, infrastructure project, fishing practices,
waste management and disposal, large scale
industries activities etc.
 On screening proposed project develop a
check list type approach.
 Example ,
 USA check list criteria
 European union check list criteria
 World bank check list criteria
 African bank check list criteria
 European bank check list criteria
 If proposed project falling outside of the
developed checklist criteria would not
normally require further assessment.
 Consider,
LEVEL OF ENVIROMENT ASSESMENT OF KISESA
PROJECT COMPOSED WITH LEVEL OF EXPECTED
USING WORLD BANK CRITERIA.
LEVEL OF ENVIROMENT ASSESMENT OF KISESA
PROJECT COMPOSED WITH LEVEL OF EXPECTED
USING WORLD BANK CRITERIA.
Level of
assessment
actual Expected from
World bank
No of
state
ment
% of
statemen
t
No of
statem
ent
% of
stateme
nt
No of full EIA 7 27 17 65
No of initial
EIA
19 73 9 35
TOTAL 26 100 26 100
 Scoping focus EIA key issues for decision
making.
 Identify information needed like, study
boundaries( spatial, temporal or institutional
boundaries).
 State main problem and issues surround the
project.
 State positive and negative impacts of the
project.
 Example GUMZO FARMING IN ARUSHA ALONG
USA RIVER.
 Report how scoping was undertaking on this
project.
 Report how authorities and interested
affected parties involved on this project.
 Report how local or central government was
involved.
 Stakeholders concerns
 Examine the impacts and prepare the impact
assessment or alternatives
 TOR format depend on the local condition
and circumstances of the project.
 TOR may be prepared by developer, agency
or consultant requested by the developer or
donor like world bank.
 TOR should be systematic, tailored to the
specific context of the project.
 TOR should introduce the proponent, project
proposal and objective of the study
 TOR should introduce relevant studies
(background).
 TOR should introduce specific EIA
requirement like how to address, avoiding,
mitigate and managing impacts.
 TOR should shows range of stakeholders who
should involved in EIA process.
 TOR should indicate time for undertaking on
EIA process( timelines).
 It involves acquisition of relevant
environmental standards and guidelines,
laws, policies and institutional arrangement.
 Organizing EIA ensuring the team , time,
stakeholders , financial resources etc are
available and adequate.
 Attempts to predict which impacts will occurs
as a results of the project and their likely
significances
 It identify measures to mitigate or avoid the
impacts.
 It identify all impacts that should be
investigated in details.
 It considers alternative site for the project
and identify environmental implication on
each.
 It evaluate and asses impacts by determine
significance impacts at local, national and
international levels.
 It seeks to develop mitigation measures to
prevent or reduce impacts of the project and
these should be drawn together into
environmental management plan.
 Mitigation measures presented in form of
matrices and indicate the impacts before and
after different mitigation scenarios.
 Example, convert this into matrix format.
 Activity or project: Machinery construction.
 Potential Impact: fuels spills could damage
aquatic habitats.
 Mitigation measures: careful handling of fuel,
spill contingency plan.
 This involves the following:
 Executive summary
 Two or three pages written.
 Should be written in kiswahili and English for
Tanzania.
 Not use jargon and technical languages.
 Title of the project, location of the project, name of
the proponent, name of the organization preparing
the EIA project, brief environment description, names
of stakeholders plus their public involvement,
description of major significant impacts,
recommendation and compensation/ mitigation
measures and conclusion.
 Introduction Should identify type of project
proposed like, road, forest etc. and State its
location, size of coverage, outline proponents
and its background.
 Project description
 Project stakeholders and public involvement.
 Description of institutional and policy
 Assessment of environmental impact
 Environmental planning and design
 Impact mitigation planning and management
 Economic evaluation (environmental cost and
benefit of the project)
 Summary and recommendation
 appendices
 It asses quality of the EIA and its adequacy for
decision making.
 In Tanzania review agencies establish special
review panel drawn from different
organization and agencies like universities,
NGOs, consultation organizations, expertise
from government departments etc.
 It reviews sufficiency information if provided.
 It reviews sufficient attention to EIA process
like project design team.
 It reviews reliability of analysis and
interpretation like use of accepted
methodologies .
 It reviews utility of decision making like clear
description of the environmental
consequences, clear statement etc.
 It asses the effects of the project on the
natural and cultural environment.
 Environmental management plans that
prepared by developer used to bring together
mitigation and monitoring measures.
 It assure approval conditions and mitigation
measures have been carried out and testing
whether predictions were accurates.
 It review practices related to meeting
environmental requirements.
 It provide opportunity to re-thinks
environmental management practices as the
project progress through the project cycle by:
 Audit what environmental impacts were
predicted.
 Audit actual impacts that have been
monitored.
 Also audit where the results recorded?
 This takes throughout the EIA process and
many decision are made by proponent.
 During decision making it involves three main
points (decision maker, actions and
outcomes)
 Example
 Decision maker: EIA agency or regulator.
 Action: screening of the project.
 Outcomes: full EIA required, no EIA required
or preliminary EIA
FOR MORE COMPREHENSIVE SUMMARY
MATERIALS
FOLLOW AND SHARE
kisesahamis/slideshares

More Related Content

PPTX
Eia - environmental impact assessment
PPTX
Introduction to Strategic Environmental Assessment
PPTX
IEE and screening in EIA
PPTX
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
PPTX
Environmental Management Systems
PPTX
Environment impact assessment.ppt
PPSX
Environmental Impact Assessment(EIA)
PPT
EIA-process
Eia - environmental impact assessment
Introduction to Strategic Environmental Assessment
IEE and screening in EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
Environmental Management Systems
Environment impact assessment.ppt
Environmental Impact Assessment(EIA)
EIA-process

What's hot (20)

PPTX
Strategic Environmental Assessment (SEA)
PPTX
Environmental Audit
PPT
PPTX
Environment auditing
PPTX
Environmental impact assessment
PPSX
16 cost benefit analysis of the environment
PPTX
Environmental impact assessment concept
PPT
Unit 7 eia and sd
PPTX
Environment management Tools : EIA & Environmetal Audit
PPTX
Environmental Impact Assessment and Environmental Audit- Unit III
PPTX
Environmental impact assessment 2020
PPT
Stream Order Lesson PowerPoint, River and Water Unit
PPTX
Environment impact Assessment (EIA) in Uganda
PPTX
Strategic Environmental Assessment Methodology
PPT
Environmental impact assessment (eia)
PPTX
Eia methodogies
PPTX
Environmental auditing ppt
PPS
Environmental audit
PPTX
Envirornment Impact Assessment
 
Strategic Environmental Assessment (SEA)
Environmental Audit
Environment auditing
Environmental impact assessment
16 cost benefit analysis of the environment
Environmental impact assessment concept
Unit 7 eia and sd
Environment management Tools : EIA & Environmetal Audit
Environmental Impact Assessment and Environmental Audit- Unit III
Environmental impact assessment 2020
Stream Order Lesson PowerPoint, River and Water Unit
Environment impact Assessment (EIA) in Uganda
Strategic Environmental Assessment Methodology
Environmental impact assessment (eia)
Eia methodogies
Environmental auditing ppt
Environmental audit
Envirornment Impact Assessment
 
Ad

Similar to Assessing proposed project development under EIA (20)

PPTX
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT 2.pptx
PPTX
Auditing the extractive industry-the case of Ghana
PPTX
EIA PPT.pptx
PDF
EIA PPT.pdf
PPTX
Environmental Management_LEC04.pptx
DOCX
Environment impact assessment
PDF
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
PDF
environmentalimpactassessmenteia-210826024951.pdf
PPTX
Environmental impact assessment m5
DOCX
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
PPTX
Report on Environment impact assessment.
PPT
Contemporary issues in environmental impact assessment
PPT
Environmental impact assessment chapter-2.ppt
PPT
PPT
eia.ppt
PPTX
Environmental management
PDF
What is environmental impact assessment and its type_.pdf
PPTX
PRESENTATION ON ENIVERONMENTAL IMPACT ASSESSMENT (EIA).pptx
PDF
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
INTRODUCTION TO ENVIRONMENTAL IMPACT ASSESSMENT 2.pptx
Auditing the extractive industry-the case of Ghana
EIA PPT.pptx
EIA PPT.pdf
Environmental Management_LEC04.pptx
Environment impact assessment
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
environmentalimpactassessmenteia-210826024951.pdf
Environmental impact assessment m5
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
Report on Environment impact assessment.
Contemporary issues in environmental impact assessment
Environmental impact assessment chapter-2.ppt
eia.ppt
Environmental management
What is environmental impact assessment and its type_.pdf
PRESENTATION ON ENIVERONMENTAL IMPACT ASSESSMENT (EIA).pptx
Cloud-Based Environmental Impact Assessment Expert System – A Case Study of Fiji
Ad

Recently uploaded (20)

PDF
1_English_Language_Set_2.pdf probationary
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
Trump Administration's workforce development strategy
PDF
Hazard Identification & Risk Assessment .pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Lesson notes of climatology university.
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
advance database management system book.pdf
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
A systematic review of self-coping strategies used by university students to ...
1_English_Language_Set_2.pdf probationary
Weekly quiz Compilation Jan -July 25.pdf
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Trump Administration's workforce development strategy
Hazard Identification & Risk Assessment .pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
UNIT III MENTAL HEALTH NURSING ASSESSMENT
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Lesson notes of climatology university.
202450812 BayCHI UCSC-SV 20250812 v17.pptx
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
advance database management system book.pdf
Final Presentation General Medicine 03-08-2024.pptx
LDMMIA Reiki Yoga Finals Review Spring Summer
History, Philosophy and sociology of education (1).pptx
Paper A Mock Exam 9_ Attempt review.pdf.
A systematic review of self-coping strategies used by university students to ...

Assessing proposed project development under EIA

  • 1. BY Sir Hamisi Kisesa (Gumzo) Email: kisesahamis@gmail.com Or kisesahamis@arpf.or.tz Website:www.arpf.or.tz Mobile:+255717797536 Or +255762655283
  • 2.  Introduction  Registration criteria  Screening criteria  Scoping criteria  Compiling Term of References  Organizing EIA study
  • 3.  Undertaking full EIA study  Environment Impact Statement (EIS)  EAI review  Environment Management and Monitoring  Environment Auditing  Decision making
  • 4.  This presentation basing on assessing of any proposed development activity/project under EIA.  The presentation also based much on Tanzania country.  Any proposed project development has great influence on either positive or negative impacts on the environment.  Therefore, there is a need to evaluate such project basis on the environmental effects.
  • 5.  On assessing such proposed project the assessor needs to evaluate by using Environment impact assessment processes.  The environment impact assessment work under series of steps.  Such steps are ;
  • 6.  The project proponent should first officially register in purpose to undertake development activity.  Remember, registration process differs from country to country.  In Tanzania, ENVIROMENT REGULATORY BODY (ERBS) Responsible for registration of proposed project.
  • 7.  Screening determining what level of environmental assessment exhibit.  Determine the proposed project if require EIA or not since not all project needs EIA.  ON THIS PROCESS ;  Identify project activities that may cause potential significant impacts.  Identify project capacity, project size, project location ,etc  Observe if it is community based or not.
  • 8.  Observe the environmental characteristics on that project.  Then predict the impact.  Also you need to identify if the project requre full scale EIA or further environmental analysis or not .  Example of projects that require full Scale EIA , infrastructure project, fishing practices, waste management and disposal, large scale industries activities etc.
  • 9.  On screening proposed project develop a check list type approach.  Example ,  USA check list criteria  European union check list criteria  World bank check list criteria  African bank check list criteria  European bank check list criteria
  • 10.  If proposed project falling outside of the developed checklist criteria would not normally require further assessment.  Consider, LEVEL OF ENVIROMENT ASSESMENT OF KISESA PROJECT COMPOSED WITH LEVEL OF EXPECTED USING WORLD BANK CRITERIA.
  • 11. LEVEL OF ENVIROMENT ASSESMENT OF KISESA PROJECT COMPOSED WITH LEVEL OF EXPECTED USING WORLD BANK CRITERIA. Level of assessment actual Expected from World bank No of state ment % of statemen t No of statem ent % of stateme nt No of full EIA 7 27 17 65 No of initial EIA 19 73 9 35 TOTAL 26 100 26 100
  • 12.  Scoping focus EIA key issues for decision making.  Identify information needed like, study boundaries( spatial, temporal or institutional boundaries).  State main problem and issues surround the project.  State positive and negative impacts of the project.
  • 13.  Example GUMZO FARMING IN ARUSHA ALONG USA RIVER.  Report how scoping was undertaking on this project.  Report how authorities and interested affected parties involved on this project.  Report how local or central government was involved.  Stakeholders concerns  Examine the impacts and prepare the impact assessment or alternatives
  • 14.  TOR format depend on the local condition and circumstances of the project.  TOR may be prepared by developer, agency or consultant requested by the developer or donor like world bank.  TOR should be systematic, tailored to the specific context of the project.
  • 15.  TOR should introduce the proponent, project proposal and objective of the study  TOR should introduce relevant studies (background).  TOR should introduce specific EIA requirement like how to address, avoiding, mitigate and managing impacts.  TOR should shows range of stakeholders who should involved in EIA process.  TOR should indicate time for undertaking on EIA process( timelines).
  • 16.  It involves acquisition of relevant environmental standards and guidelines, laws, policies and institutional arrangement.  Organizing EIA ensuring the team , time, stakeholders , financial resources etc are available and adequate.
  • 17.  Attempts to predict which impacts will occurs as a results of the project and their likely significances  It identify measures to mitigate or avoid the impacts.  It identify all impacts that should be investigated in details.  It considers alternative site for the project and identify environmental implication on each.
  • 18.  It evaluate and asses impacts by determine significance impacts at local, national and international levels.  It seeks to develop mitigation measures to prevent or reduce impacts of the project and these should be drawn together into environmental management plan.
  • 19.  Mitigation measures presented in form of matrices and indicate the impacts before and after different mitigation scenarios.  Example, convert this into matrix format.  Activity or project: Machinery construction.  Potential Impact: fuels spills could damage aquatic habitats.  Mitigation measures: careful handling of fuel, spill contingency plan.
  • 20.  This involves the following:  Executive summary  Two or three pages written.  Should be written in kiswahili and English for Tanzania.  Not use jargon and technical languages.  Title of the project, location of the project, name of the proponent, name of the organization preparing the EIA project, brief environment description, names of stakeholders plus their public involvement, description of major significant impacts, recommendation and compensation/ mitigation measures and conclusion.
  • 21.  Introduction Should identify type of project proposed like, road, forest etc. and State its location, size of coverage, outline proponents and its background.  Project description  Project stakeholders and public involvement.  Description of institutional and policy
  • 22.  Assessment of environmental impact  Environmental planning and design  Impact mitigation planning and management  Economic evaluation (environmental cost and benefit of the project)  Summary and recommendation  appendices
  • 23.  It asses quality of the EIA and its adequacy for decision making.  In Tanzania review agencies establish special review panel drawn from different organization and agencies like universities, NGOs, consultation organizations, expertise from government departments etc.
  • 24.  It reviews sufficiency information if provided.  It reviews sufficient attention to EIA process like project design team.  It reviews reliability of analysis and interpretation like use of accepted methodologies .  It reviews utility of decision making like clear description of the environmental consequences, clear statement etc.
  • 25.  It asses the effects of the project on the natural and cultural environment.  Environmental management plans that prepared by developer used to bring together mitigation and monitoring measures.  It assure approval conditions and mitigation measures have been carried out and testing whether predictions were accurates.
  • 26.  It review practices related to meeting environmental requirements.  It provide opportunity to re-thinks environmental management practices as the project progress through the project cycle by:  Audit what environmental impacts were predicted.  Audit actual impacts that have been monitored.  Also audit where the results recorded?
  • 27.  This takes throughout the EIA process and many decision are made by proponent.  During decision making it involves three main points (decision maker, actions and outcomes)  Example  Decision maker: EIA agency or regulator.  Action: screening of the project.  Outcomes: full EIA required, no EIA required or preliminary EIA
  • 28. FOR MORE COMPREHENSIVE SUMMARY MATERIALS FOLLOW AND SHARE kisesahamis/slideshares