SCHOOL OF ARCHITECTURE, BUILDING AND
DESIGN
BACHELOR OF QUANTITY SURVEYING
(HONOURS)
AUGUST INTAKE 2014
SEMESTER 1
[QSB 60104] MEASUREMENT 1
-Sr. Ang Fuey Lin
[BLD 60104] CONSTRUCTION TECHNOLOGY 1
-Pn. Azrina Md Yaakob
[BLD 62003] BUILDING MATERIALS
-Pn. Myzatul Aishah Kamarazaly
CONSTRUCTION SITE REPORT
INDIVIDUALASSIGNMENT
Thun Shao Xun – 0315919
TABLE OF CONTENT
No Title Pages
1. Cover page
2 Table of content
3. Introduction and objectives of the assignment
4. Content/ Technical observation
5. Photos and descriptions
6. Learning outcome / Conclusion
Introduction
This assignment is a combination of 3 different subject which are measurement,
building material and construction technology. One week before we visit to the construction
site, Ms Ang has told us that on the 21th of november 2014 there will be a construction site
visit. Ms Ang had announced to us that day there will be an assignment after we done our
site visit. The assignment must be done by 28th of november 2014. On that day we have to
wear long pants and long sleeve shirt with our sport shoe and if possible we should wear
safety boots to avoid any obligation happen in contruction site
Ms Ang had help us find a contruction site which is just located nearby to our
campus. The construction site is D La-Tour Developed by Penang-based DK-MY
Properties SDN BHD was located at the following address:
No.4, Jalan PPU 3, Taman Perindustrian Puchong Utama, 47100 Puchong, Selangor
Darul Ehsan.
We walk to there since it is near to our university. We took around 5 minute to reach
the front gate of the contruction site. We reach there sharp at 10 o'clock. Before we enter
to the construction site, the site manager ask us to wear our helmet and make sure we
must follow the instruction to avoid any acident happen in the construction site. Around
sharp at 10.05 am we went in the construction site to take a tour around by the site
manager. The site manager explained to us each of everything. The site manager also
told us that this project total is RM65 million which is a lump sum contract. We can also
can see a clearer picture on the site on how is the technologies look like and also the
material that using in the construction site. Beside that we also can take picture inside the
site to gain more information.
D'latour comprises of two 23-storey towers with 332 serviced suites in one and 629
SoHo duplexes in the other. It occupies three acres and has a total built-up area of 1.7
million sq. ft. Curving gracefully up into the Bandar Sunway skyline, it is built to master-
class quality and infused with the most demanding standards . Comprising two designer
towers( D'Latour SoHo and D'Latour Residence),D'Latour is set to become the next big
thing in terms of residential landmark in Bandar Sunway.
It one of the kind design features include:
•Vertical garden city concept
•Internal void area for better natural ventilation
•Elevated infinty swimming pool with waterfall feature
•Environmental friendly Sky Garden at various at various floors
•Roof Top Sky Hub
•Distinctive 'Welcome Home' lobby
The designer of D'Latour was the world-class architecture company RDA Harris Architects
Sdn Bhd which is responsible for the design of multiple award winning developments
around the world.
Objective
–To give us the chance to experience the working environment in the construction site as a
Quantity Surveyor in the future
–To understand the safety and precautions on the site of the construction.
–To visualize a clearer picture of the building, machine and material that used in
construction site.
–To gain more knowledge on the uses of the machinery on the construction site.
–To know how does the process build up the building.
Content
Once we reach to construction site, we can clearly see that the building is
surrounded by the vertical hoarding. The uses of the vertical hoarding is to prevent
unauthorized person to enter to the site. Besides that, we can clearly see that the panel
about rules and regulation that was placed on the hoarding to make sure that the people
who authorize to enter the construction site must always follow the rules if not any injure
that happen u must bear it yourself. A small guardhouse that have been constructed and
for the purpose of guarding the gate to avoid unauthorized person get into the site.
Before we enter to the site, the site manager told us the safety precaution. He also
roughly explained the company and the building itself the D La-Tour. The site manager
then bring us into the construction site. In the construction site we can found that there are
a lot of thing that we does not seen before. Then we follow the site manager to enter to a
pathway that was constructed by timber with side netting that lead to the building.
In the building, the site manager start to explained that the foundation of the
construction site. Foundation of this building is micropile. Micropile is another type of pile
which is act as a supporting structure to transfer the load from the building to the ground.
As the name implies, micropile is small diameter piles constructed by the drilling process
and are often keyed into rock. There is various diameter of micropile can be found in the
market ranging from 100mm to 250mm. Of late, technological advancement in machinery
has made it possible for micropile of much greater diameters to be constructed. After
explained the site manager bring us to the basement.
Alongside we walked to the basement, we can see the reinforcement bar that pop
out from the slab. Those are post tensioning system that have been use for the whole
building. There is another thing we can assure this building is use post tensioning which
are there are no beam on top. We can only see there is only column that support the upper
floor slab. Telescopic props can be found everywhere inside the building. It is ideal to
support all kind of formwork to slabs, beams, walls and columns. Beside that the props
also act as safety purpose. Storage also can be found inside the building. The purpose of
the storage is to store cement, plaster, lime – dry store free from draughts which can bring
in moist air. Aggregates – clean firm base to ensure foreign matter is not included when
extracting material from the base of the stockpile. Bricks & blocks – to be stacked in stable
piles on a level & well-drained surface; covered with polythene sheets. Roof tiles – to be
stacked in pairs, head to tail, to give protection to the nibs.
In this building, scaffold can be found everywhere. There are two type of scaffold
which is independent and mobile access tower scaffolding. I can see that most of the
scaffold that for the external used is independent. While the internal use are mostly mobile
access tower. Independent scaffolds follow the same principal as putlog scaffolds but are
'free standing', putlogs are replaced with 5ft tubes and a row of standards and ledgers are
erected on the inside as well as the outside to provide support, in addition diagonal braces
are fitted between standards to give stability. The main reason to use independent
scaffold is because it does not rely on the building. Moreover it also easy to fix
up and easy to dismantle. For the mobile access tower is a gaining access to
buildings for maintenance and repair. Assembled from prefabricated
components. The reason that why mobile access tower is useful is because it
can move everywhere due to 4 castor have been install. Beside that it is stable
and rigid.
The three types of formwork that can be found around the site are wall,
column and slab formwork.
Beam Formwork- Beam formwork has prefabricated formwork sheeting parts (sheeting
bottom and side sheeting panels). Such individual parts are manufactured based on the beam
dimensions specified in the project. For prefabrication of the formwork sheeting parts, a
special preparation table must be manufactured on site.
Slab Formwork- It consist of sole plates, wedges, props, head tree, planks, batten and
ledgers. Slabs formwork rest on battens and joists. If props more than 8 it must provide
horizontal braces
Column Formwork- Similar to beam formworks, the sheeting of column formworks is
prefabricated according to the column dimensions from sheeting boards connected by cover
straps.The sheeting panels are placed in a foot rim which is anchored in the soil by steel
bolts.The foot rim consists of double-nailed boards. The foot rim must be exactly measured-
in because it is decisive for the exact location of the column. It has the same functions as the
thrust-board for foundation or beam formwork.When the sheeting panels have been inserted
in the foot rim, vertical arch timbers are placed to take up the forces from the cover straps of
the formwork sheeting.
There have three types of material formwork used in this building, which are timber, table
and steel formwork
Timber formwork
ADVANTAGE
•Timber is a popular formwork material.
•Concrete formwork can be made using only timber or combining timber with other
types of formwork material.
•Light weight, easy to fix and remove.
•Economical
DISADVANTAGE
•It is a traditional procurement process.
•It needs additional design and engineering time.
•Lack of experienced builders and erection crews for this formwork
Table formwork
ADVANTAGES
•Fast construction for large floor layouts.
•Fully assembled units can be maneuvered quickly into place.
•Using appropriate quality control, high quality surface finishes can be achieved.
•Reduced long-term workforce requirement on site.
•The need for infill areas and decking joints is minimized.
•Individual components of the formwork system can be precisely adjusted.
•Repetitive nature of the work makes it easier to plan construction activities.
DISADVANTAGES
•Cost of raw materials and cranes are expensive
Steel formwork
ADVANTAGE
•Has very high reuse rates
•Very smooth surfaces are possible
•Strong and can be stripped late
•Fast to install in simple walls and likes
DISADVANTAGE
•Thicker the surface greater the weight
•Steel dents easily
•Low versatility
•Release agents are demanded
Furthermore, the grade of concrete apply to this construction building is grade 40 concrete.
This type of concrete is used because it provides greater strength to the building. The
advantages of using grade 40 concrete are it has a relatively high compressive strength
and reduce in depth of slab, therefore it reduces cost. While the disadvantages of using
grade 40 are it is more expensive and it doesn’t retain the heat well. However in this
building, grade 15 is applicable to the column while concrete grade 25 is for the slab.
Regardless of the usage of concrete grade 40, another grade of reinforced concrete that I
would likely to recommend is concrete grade 30. The advantages of concrete grade 30 are
resistance to fire and cheaper than concrete grade 40. While the disadvantages of using
concrete grade 30 are lower compressive strength compare to grade 40 and it will easily
crack under heavy load.
Pictures and descriptions
Independent scaffolding with safety
net
Rules and regulations that can be
found at entrance
Temporary works – security (to
prevent unauthorized person
access to the site)
Column
Telescopic steel prop – it is use
to support the upper floor
Reinforcement bar and stirrups
Temporary work – Materials
storage
Tower crane – It is a common
fixture at any major
construction site
Temporary works –
accommodation for workers
Uninstall Reinforcement bar
that can be found around the
site
Reinforcement bar
Polymix – Fine mortar Base
(white)
Project information sign board
Sand brick
-Table formwork - A table form
is a large pre-assembled
formwork, often forming a
complete bay of suspended floor
slab.
Post tensioning
Starter bar
Group photo for group 2
Conclusion
After the construction site visit done by us, there are many valuable information and knowledge
gained by me. First of all, I have the chance to experience the life being a quantity surveyor.
Besides, I have learnt many things that I couldn’t learn from the lectures and textbooks. I now
understand better about how a construction site works after the visit.
I had seen many materials and tools used during the construction period. The process really
impressed me as I have never had the chance to see it that close. This will definitely help us to
recognize the materials better in the future.
Besides, I realized that communication between workers is very important. This is because every
single worker at the construction site is cooperating with each other in order to complete the task
given.
Furthermore, I had the chance to see how much safety has been emphasized in the construction site.
They require every single worker to wear their safety equipment on when they present in the
construction site. The safety rules need to be strictly followed by everyone present in the
construction site. Moreover, safety precaution signboard were seen everywhere especially at the
entrance. A safety officer was there to brief us about the safety rules before the visit began.
In conclusion, this visit is amazing for me as it has greatly increases my knowledge about
construction site. I am very thankful to have an opportunity to visit there in the first
semester. I wish that I could have more chances like this in the future later.
Construction Site Report
Construction Site Report

More Related Content

PDF
site visit report (final)
DOCX
SITE REPORT (PAD FOOTING)
PDF
Building construction-report (1)
PDF
Site visit report qs semester 1
PPTX
Jkr Probe Test
DOCX
Site Visit Report
PDF
Building Construction 1: Project 1
PDF
Building Construction II Report
site visit report (final)
SITE REPORT (PAD FOOTING)
Building construction-report (1)
Site visit report qs semester 1
Jkr Probe Test
Site Visit Report
Building Construction 1: Project 1
Building Construction II Report

What's hot (20)

PDF
Building construction 1 group report
PDF
Construction site report
PDF
Site Visit Report CT BM M1
DOCX
bqs Site report
PPTX
Building Construction
DOCX
Site visit report
DOCX
Site visit report
PPTX
Spun pile
DOCX
Site visit report
DOCX
Civil engineering internship report
DOC
BQS Site Visit Report
PDF
Building construction ii report (1)
DOCX
Industrial Summer Training Report at Construction Site of CPWD
PPTX
Building Construction Details
DOCX
CT site visit report
DOCX
Site visit report
DOCX
final year civil engineering training report
DOCX
Road construction report
PPTX
road construction
PDF
Assignment 1 Site Visit Report
Building construction 1 group report
Construction site report
Site Visit Report CT BM M1
bqs Site report
Building Construction
Site visit report
Site visit report
Spun pile
Site visit report
Civil engineering internship report
BQS Site Visit Report
Building construction ii report (1)
Industrial Summer Training Report at Construction Site of CPWD
Building Construction Details
CT site visit report
Site visit report
final year civil engineering training report
Road construction report
road construction
Assignment 1 Site Visit Report
Ad

Viewers also liked (8)

PDF
Internship Report on Building Construction
PDF
Visit to a construction site
DOCX
Site visit report
DOCX
vishal res.1
PDF
Field Services - Pre-Construction Onsite Inspection Sample Report
DOCX
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...
DOCX
Site report
PDF
Super-Structural Construction Work of a Six Storied Residential Building
Internship Report on Building Construction
Visit to a construction site
Site visit report
vishal res.1
Field Services - Pre-Construction Onsite Inspection Sample Report
PRACTICUM REPORT ON Monitoring the Construction Process of Superstructure ...
Site report
Super-Structural Construction Work of a Six Storied Residential Building
Ad

Similar to Construction Site Report (20)

DOCX
Ctw site report(pg 1 to 8, 14)
DOCX
Site report
DOCX
Report
DOCX
Site report
DOCX
Site visitation
DOCX
Site report
DOC
Site report
DOCX
Site report
DOCX
MCB Final report
DOCX
Site report
DOCX
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
DOCX
Site report
DOCX
Assignment of Site Report
PPTX
BCON PJT 1
DOCX
Objective of site visit
DOCX
Measurement assignment site report
DOCX
PDF
Bachelor in quantity surveying 2
DOCX
Report
PDF
Site report
Ctw site report(pg 1 to 8, 14)
Site report
Report
Site report
Site visitation
Site report
Site report
Site report
MCB Final report
Site report
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Site report
Assignment of Site Report
BCON PJT 1
Objective of site visit
Measurement assignment site report
Bachelor in quantity surveying 2
Report
Site report

More from Shao Xun Sean Thun (20)

DOCX
Rumah charis-finalize
DOCX
Glass Lift report
PDF
Building and Facility report
PDF
Building services 2 assignment
DOC
Leading to 21st Century Report
PDF
Management Science assignment
DOCX
Traversing
DOCX
DOCX
BS ASSIGNMENT
ODT
Ct assignment
ODT
Ct assignment
ODT
Construction Technology Report
DOCX
CHARITY REPORT
DOCX
Research project
DOCX
RESEATCH ASSUGNMENT
DOCX
Mathematics Statistics Project
PPTX
PRESENTATION SLIDE
PPT
Muralartslideshowidjidj 140612135533-phpapp01
PPT
MURAL ART PRESENTATION REPORT
DOCX
RESEARCH REPORT
Rumah charis-finalize
Glass Lift report
Building and Facility report
Building services 2 assignment
Leading to 21st Century Report
Management Science assignment
Traversing
BS ASSIGNMENT
Ct assignment
Ct assignment
Construction Technology Report
CHARITY REPORT
Research project
RESEATCH ASSUGNMENT
Mathematics Statistics Project
PRESENTATION SLIDE
Muralartslideshowidjidj 140612135533-phpapp01
MURAL ART PRESENTATION REPORT
RESEARCH REPORT

Recently uploaded (20)

PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
RMMM.pdf make it easy to upload and study
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PPTX
master seminar digital applications in india
PDF
Computing-Curriculum for Schools in Ghana
2.FourierTransform-ShortQuestionswithAnswers.pdf
RMMM.pdf make it easy to upload and study
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Anesthesia in Laparoscopic Surgery in India
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
Chinmaya Tiranga quiz Grand Finale.pdf
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
O5-L3 Freight Transport Ops (International) V1.pdf
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
GDM (1) (1).pptx small presentation for students
Complications of Minimal Access Surgery at WLH
Final Presentation General Medicine 03-08-2024.pptx
STATICS OF THE RIGID BODIES Hibbelers.pdf
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
human mycosis Human fungal infections are called human mycosis..pptx
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
master seminar digital applications in india
Computing-Curriculum for Schools in Ghana

Construction Site Report

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) AUGUST INTAKE 2014 SEMESTER 1 [QSB 60104] MEASUREMENT 1 -Sr. Ang Fuey Lin [BLD 60104] CONSTRUCTION TECHNOLOGY 1 -Pn. Azrina Md Yaakob [BLD 62003] BUILDING MATERIALS -Pn. Myzatul Aishah Kamarazaly CONSTRUCTION SITE REPORT INDIVIDUALASSIGNMENT Thun Shao Xun – 0315919
  • 2. TABLE OF CONTENT No Title Pages 1. Cover page 2 Table of content 3. Introduction and objectives of the assignment 4. Content/ Technical observation 5. Photos and descriptions 6. Learning outcome / Conclusion
  • 3. Introduction This assignment is a combination of 3 different subject which are measurement, building material and construction technology. One week before we visit to the construction site, Ms Ang has told us that on the 21th of november 2014 there will be a construction site visit. Ms Ang had announced to us that day there will be an assignment after we done our site visit. The assignment must be done by 28th of november 2014. On that day we have to wear long pants and long sleeve shirt with our sport shoe and if possible we should wear safety boots to avoid any obligation happen in contruction site Ms Ang had help us find a contruction site which is just located nearby to our campus. The construction site is D La-Tour Developed by Penang-based DK-MY Properties SDN BHD was located at the following address: No.4, Jalan PPU 3, Taman Perindustrian Puchong Utama, 47100 Puchong, Selangor Darul Ehsan. We walk to there since it is near to our university. We took around 5 minute to reach the front gate of the contruction site. We reach there sharp at 10 o'clock. Before we enter to the construction site, the site manager ask us to wear our helmet and make sure we must follow the instruction to avoid any acident happen in the construction site. Around sharp at 10.05 am we went in the construction site to take a tour around by the site manager. The site manager explained to us each of everything. The site manager also told us that this project total is RM65 million which is a lump sum contract. We can also can see a clearer picture on the site on how is the technologies look like and also the material that using in the construction site. Beside that we also can take picture inside the site to gain more information. D'latour comprises of two 23-storey towers with 332 serviced suites in one and 629 SoHo duplexes in the other. It occupies three acres and has a total built-up area of 1.7 million sq. ft. Curving gracefully up into the Bandar Sunway skyline, it is built to master- class quality and infused with the most demanding standards . Comprising two designer towers( D'Latour SoHo and D'Latour Residence),D'Latour is set to become the next big thing in terms of residential landmark in Bandar Sunway. It one of the kind design features include: •Vertical garden city concept •Internal void area for better natural ventilation •Elevated infinty swimming pool with waterfall feature •Environmental friendly Sky Garden at various at various floors •Roof Top Sky Hub •Distinctive 'Welcome Home' lobby The designer of D'Latour was the world-class architecture company RDA Harris Architects Sdn Bhd which is responsible for the design of multiple award winning developments around the world.
  • 4. Objective –To give us the chance to experience the working environment in the construction site as a Quantity Surveyor in the future –To understand the safety and precautions on the site of the construction. –To visualize a clearer picture of the building, machine and material that used in construction site. –To gain more knowledge on the uses of the machinery on the construction site. –To know how does the process build up the building.
  • 5. Content Once we reach to construction site, we can clearly see that the building is surrounded by the vertical hoarding. The uses of the vertical hoarding is to prevent unauthorized person to enter to the site. Besides that, we can clearly see that the panel about rules and regulation that was placed on the hoarding to make sure that the people who authorize to enter the construction site must always follow the rules if not any injure that happen u must bear it yourself. A small guardhouse that have been constructed and for the purpose of guarding the gate to avoid unauthorized person get into the site. Before we enter to the site, the site manager told us the safety precaution. He also roughly explained the company and the building itself the D La-Tour. The site manager then bring us into the construction site. In the construction site we can found that there are a lot of thing that we does not seen before. Then we follow the site manager to enter to a pathway that was constructed by timber with side netting that lead to the building. In the building, the site manager start to explained that the foundation of the construction site. Foundation of this building is micropile. Micropile is another type of pile which is act as a supporting structure to transfer the load from the building to the ground. As the name implies, micropile is small diameter piles constructed by the drilling process and are often keyed into rock. There is various diameter of micropile can be found in the market ranging from 100mm to 250mm. Of late, technological advancement in machinery has made it possible for micropile of much greater diameters to be constructed. After explained the site manager bring us to the basement. Alongside we walked to the basement, we can see the reinforcement bar that pop out from the slab. Those are post tensioning system that have been use for the whole building. There is another thing we can assure this building is use post tensioning which are there are no beam on top. We can only see there is only column that support the upper floor slab. Telescopic props can be found everywhere inside the building. It is ideal to support all kind of formwork to slabs, beams, walls and columns. Beside that the props also act as safety purpose. Storage also can be found inside the building. The purpose of the storage is to store cement, plaster, lime – dry store free from draughts which can bring in moist air. Aggregates – clean firm base to ensure foreign matter is not included when extracting material from the base of the stockpile. Bricks & blocks – to be stacked in stable piles on a level & well-drained surface; covered with polythene sheets. Roof tiles – to be stacked in pairs, head to tail, to give protection to the nibs. In this building, scaffold can be found everywhere. There are two type of scaffold which is independent and mobile access tower scaffolding. I can see that most of the scaffold that for the external used is independent. While the internal use are mostly mobile access tower. Independent scaffolds follow the same principal as putlog scaffolds but are 'free standing', putlogs are replaced with 5ft tubes and a row of standards and ledgers are erected on the inside as well as the outside to provide support, in addition diagonal braces are fitted between standards to give stability. The main reason to use independent scaffold is because it does not rely on the building. Moreover it also easy to fix up and easy to dismantle. For the mobile access tower is a gaining access to buildings for maintenance and repair. Assembled from prefabricated components. The reason that why mobile access tower is useful is because it can move everywhere due to 4 castor have been install. Beside that it is stable and rigid.
  • 6. The three types of formwork that can be found around the site are wall, column and slab formwork. Beam Formwork- Beam formwork has prefabricated formwork sheeting parts (sheeting bottom and side sheeting panels). Such individual parts are manufactured based on the beam dimensions specified in the project. For prefabrication of the formwork sheeting parts, a special preparation table must be manufactured on site. Slab Formwork- It consist of sole plates, wedges, props, head tree, planks, batten and ledgers. Slabs formwork rest on battens and joists. If props more than 8 it must provide horizontal braces Column Formwork- Similar to beam formworks, the sheeting of column formworks is prefabricated according to the column dimensions from sheeting boards connected by cover straps.The sheeting panels are placed in a foot rim which is anchored in the soil by steel bolts.The foot rim consists of double-nailed boards. The foot rim must be exactly measured- in because it is decisive for the exact location of the column. It has the same functions as the thrust-board for foundation or beam formwork.When the sheeting panels have been inserted in the foot rim, vertical arch timbers are placed to take up the forces from the cover straps of the formwork sheeting. There have three types of material formwork used in this building, which are timber, table and steel formwork Timber formwork ADVANTAGE •Timber is a popular formwork material. •Concrete formwork can be made using only timber or combining timber with other types of formwork material. •Light weight, easy to fix and remove. •Economical DISADVANTAGE •It is a traditional procurement process. •It needs additional design and engineering time. •Lack of experienced builders and erection crews for this formwork Table formwork ADVANTAGES •Fast construction for large floor layouts. •Fully assembled units can be maneuvered quickly into place. •Using appropriate quality control, high quality surface finishes can be achieved. •Reduced long-term workforce requirement on site. •The need for infill areas and decking joints is minimized. •Individual components of the formwork system can be precisely adjusted. •Repetitive nature of the work makes it easier to plan construction activities. DISADVANTAGES •Cost of raw materials and cranes are expensive Steel formwork ADVANTAGE •Has very high reuse rates •Very smooth surfaces are possible
  • 7. •Strong and can be stripped late •Fast to install in simple walls and likes DISADVANTAGE •Thicker the surface greater the weight •Steel dents easily •Low versatility •Release agents are demanded Furthermore, the grade of concrete apply to this construction building is grade 40 concrete. This type of concrete is used because it provides greater strength to the building. The advantages of using grade 40 concrete are it has a relatively high compressive strength and reduce in depth of slab, therefore it reduces cost. While the disadvantages of using grade 40 are it is more expensive and it doesn’t retain the heat well. However in this building, grade 15 is applicable to the column while concrete grade 25 is for the slab. Regardless of the usage of concrete grade 40, another grade of reinforced concrete that I would likely to recommend is concrete grade 30. The advantages of concrete grade 30 are resistance to fire and cheaper than concrete grade 40. While the disadvantages of using concrete grade 30 are lower compressive strength compare to grade 40 and it will easily crack under heavy load.
  • 8. Pictures and descriptions Independent scaffolding with safety net Rules and regulations that can be found at entrance Temporary works – security (to prevent unauthorized person access to the site)
  • 9. Column Telescopic steel prop – it is use to support the upper floor Reinforcement bar and stirrups Temporary work – Materials storage
  • 10. Tower crane – It is a common fixture at any major construction site Temporary works – accommodation for workers Uninstall Reinforcement bar that can be found around the site Reinforcement bar
  • 11. Polymix – Fine mortar Base (white) Project information sign board Sand brick
  • 12. -Table formwork - A table form is a large pre-assembled formwork, often forming a complete bay of suspended floor slab. Post tensioning Starter bar
  • 13. Group photo for group 2 Conclusion After the construction site visit done by us, there are many valuable information and knowledge gained by me. First of all, I have the chance to experience the life being a quantity surveyor. Besides, I have learnt many things that I couldn’t learn from the lectures and textbooks. I now understand better about how a construction site works after the visit. I had seen many materials and tools used during the construction period. The process really impressed me as I have never had the chance to see it that close. This will definitely help us to recognize the materials better in the future. Besides, I realized that communication between workers is very important. This is because every single worker at the construction site is cooperating with each other in order to complete the task given. Furthermore, I had the chance to see how much safety has been emphasized in the construction site. They require every single worker to wear their safety equipment on when they present in the construction site. The safety rules need to be strictly followed by everyone present in the construction site. Moreover, safety precaution signboard were seen everywhere especially at the entrance. A safety officer was there to brief us about the safety rules before the visit began. In conclusion, this visit is amazing for me as it has greatly increases my knowledge about construction site. I am very thankful to have an opportunity to visit there in the first semester. I wish that I could have more chances like this in the future later.