1. A technical due diligence report was conducted on the PT. xxxx coal project covering 1,223 hectares in East Kalimantan Province.
2. Exploration works included geological mapping, identification of 12 coal outcrops from 5 seams, and 23 exploration drill holes.
3. Based on limited data from drill holes and outcrops, coal seam models for seams A through E were generated through interpolation and extrapolation. However, additional data is needed to improve the geological models.
4. Based on the preliminary geological models and SR limits of 4-5, total coal resources were estimated between 23.4-31.3 million tonnes. However, the estimates have low confidence due