REDEVELOPMENT OF
BHENDI BAZAAR,
MUMBAI
Presented By:
Simran Aggarwal
MURP-I (20-22)
FOA, SUPVA
OVERVIEW: ╸ Bhendi Bazaar is a market in South
Mumbai.
╸ The bazaar is popular for shopping
namely antique items, hardware items
etc.
╸ The area is set to be redeveloped with
the project being undertaken by Saifee
Burhani Upliftment Trust.
╸ Saifee Burhani Upliftment Trust is a not-
for-profit trust that was set up in 2009 to
undertake the redevelopment of one of
India's most vibrant but congested
localities.
2
3
OVERVIEW:
• Bhendi Bazaar is of 16.5 Acres which is divided in to 280 plots.
• It has more than 3500 residential tenants with 1250 shops which totals up to 245
total number of buildings.
• This bazaar is over 125 year old which is crumbling poor infrastructure with
congested streets.
NEED FOR
REDEVELOPMENT ╸ The bazaar is over 125-year-old, which is
crumbling under poor infrastructure.
╸ In the past 3 years more than 170 people
have died in 11 incident of building
collapse.
╸ Unsatisfactory living condition for the
tenants. (because of family expansion)
╸ Near to none public space for
recreational purpose.
╸ Illegal construction.
╸ The area lack basic utilities such as
sewage treatments and proper
ventilation.
Existing Scenario Of Bhendi Bazaar
4
INTENT &
CONTEXT ╸ The redevelopment of Bhendi
Bazaar is done to create more
commercial opportunities while
uplifting the quality of life of the
residents.
╸ The vision for the new era will be
achieved through building efficient
infrastructure with modern
amenities and promoting
sustainable living and creation of
green open spaces.
╸ This project aims to be the model
for future smart cities.
5
STAKEHOLDERS
╸ This redevelopment project indicates the lack of required
stakeholders engaged in project formulation.
╸ The project was okayed by Maharashtra Housing and Area
Development Authority and Bombay Municipal Corporation.
6
METHODOLOGY
╸ Started in 2009, original deadline was 2023.
╸ Phase-I:
╶ Sub clusters 1 and 3 completed and tenants from the
location have been shifted.
╸ Phase-2:
╶ Expected to be completed by 2025
7
METHODOLOGY ADOPTED
8
╸ For the execution of work, responsibilities are divided into
different departments and it is controlled by each other
which further helps to maintain the continuity of the work.
╶ Administration
╶ Execution Department
╶ Planning Department
╶ Billing Department
╶ Housing Board, Mumbai
╶ Site Safety Department
╶ Local Governing Body.
9
MASTER PLAN
10
CONNECTIVITY:
Existing Religious Structures & Reservation Buildings
Sub- Sector Development
11
CONNECTIVITY:
Wrap- Around Rehab Apartments
4-5 Acres of Podium Greens
Rehab Retails
3500: Podium Parkings
12
CONNECTIVITY:
3200 Rehab Apartments & 1900 Sale Apartments
13
REDEVELOPED: BHENDI BAZAAR
DURING:
╸ The high priest of the Dawoodi Bohra community. The Bohris
form about 85 per cent of the population of Bhendi Bazaar.
╸ Between 2010 and 2013 the trust built several transit homes.
Most of them near Mazgaon which is about 5 km from Bhendi
Bazaar.
╸ In April, 2011 some 100 families wer also moved to transit colony.
14
AFTER:
1
• Following the design of neighborhood as per the policy issued by Maharashtra
Government in 2009.
• 100- 150 of chauls has been replaced by 17 high storey residential buildings.
• Widest streets up to 20 meters.
• Maximum green areas and proper ventilation.
AFTER:
╸ The entire redevelopment is eco-friendly.
╸ The building rise progressively in height from south to north,
thus ensuring that every flat catches the breeze coming from
the sea.
╸ Out of 17 towers, 13 will be used to rehabilitate the current
residents and remaining 4 towers will be put on sale for 1200-
1600 residence.
╸ The ground floor will be commercial with underground parking,
and residential parking will be built on top.
16
AFTER:
╸ According to a 2012 regulation of the MRTP Act, residential
tenants are supposed to get 35% more area on their existing
total carpet area and commercial tenants are eligible for an
additional 20%.
17
SWOT Analysis
18
STRENGTHS
• Smart Transit:
Commercial Transit
Accomodation
• Sustainale Development
WEAKNESSES
• The saled towers
doesnot help in
generating economy.
• Economic Growth
• Social Gatherings
OPPORTUNITIES
• While construction, the
increase in pollution
percentage.
THREATS
Thankyou!
19

More Related Content

PPTX
RE developement of Bhindhi baazar
PPT
Bhendi Bazaar_mumbai 2010-08-19_Final
DOCX
Report on Redevelopment of Machhabhaudi Area, Dharan,Nepal
PDF
Urban Redevelopment
PPTX
Presentation on Redevelopment
PPT
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
PPTX
Urban Case study of Sector 3 Kurukshetra
PPTX
Noida Master Plan 2021
RE developement of Bhindhi baazar
Bhendi Bazaar_mumbai 2010-08-19_Final
Report on Redevelopment of Machhabhaudi Area, Dharan,Nepal
Urban Redevelopment
Presentation on Redevelopment
Draft Development Plan 2021 (Review) AUDA - D Thara, IAS
Urban Case study of Sector 3 Kurukshetra
Noida Master Plan 2021

What's hot (20)

PPTX
Urban heritage conservation , India
PDF
Gandhinagar town planning and master plan study
PPTX
Theory of Settlement : Navi Mumbai
PDF
Kashmere gate isbt
PPT
Isbt kashmere gate 2
PPTX
Study of city evolution- temple town Madurai
PPTX
Urban studies case study townships
PPTX
Group housing case study
PPSX
Site analysis - Transit hub
PPTX
A Framework for campus planning - Case Study - India
PPTX
Settlement pattern of town (Varanasi)
PPTX
Navi mumbai development
PDF
Aranya Low Cost Housing
PPTX
Inter state bus terminal - Library Study & Case Study
PPTX
Bhubaneswar- Urban Planning
PPTX
Romi khosla
PDF
Dariba kalan in Chandni chowk - Study of urban services
PDF
Gandhinagar city case study
PPT
Aranya Community Housing
PPTX
Ancient town classifications
Urban heritage conservation , India
Gandhinagar town planning and master plan study
Theory of Settlement : Navi Mumbai
Kashmere gate isbt
Isbt kashmere gate 2
Study of city evolution- temple town Madurai
Urban studies case study townships
Group housing case study
Site analysis - Transit hub
A Framework for campus planning - Case Study - India
Settlement pattern of town (Varanasi)
Navi mumbai development
Aranya Low Cost Housing
Inter state bus terminal - Library Study & Case Study
Bhubaneswar- Urban Planning
Romi khosla
Dariba kalan in Chandni chowk - Study of urban services
Gandhinagar city case study
Aranya Community Housing
Ancient town classifications
Ad

Similar to Bhendi bazaar (20)

PPT
Pre-Launch The Rise By Lodha Group at Dombivali East Mumbai
PPTX
Sfurti - Findings from exploratory trip to india
PPS
The Rise by Lodha Marketed by NEW A1 ENTERPRISES
PPTX
Borivali market
PDF
Tankha design
PDF
APLI Mumbai - A Port Lands Initiative By Citizens To Re-Imagine Mumbai
PDF
Project bowstring : A perspective on revitalizing Janata Bazaar
PDF
05 ecostyle heights Integrated Marketing Communications IMC RoadMap
PPTX
Mumbai High South Redevelopment Phase Shaping the Future of Urban Living.pptx
PPTX
Mumbai High South Redevelopment Phase Shaping the Future of Urban Living.pptx
PDF
2018 Villanova Real Estate Challenge (2nd Place) - University of Southern Cal...
PDF
Socio Economic Determinants in Low Scale Mixed Use Developments
PDF
Cityheart
PDF
Project Central Park Presentation
PDF
Separate Pages
PDF
Industrial Training report Civil Engineering.
PDF
SUSTAINABLE SANDHAI.pdf
PDF
Rams Presentation of Mithila Apartments, Norton Road, Mandaveli.pdf
PDF
Shapoorji pallonji joyville sensorium hinjewadi, pune brochure
Pre-Launch The Rise By Lodha Group at Dombivali East Mumbai
Sfurti - Findings from exploratory trip to india
The Rise by Lodha Marketed by NEW A1 ENTERPRISES
Borivali market
Tankha design
APLI Mumbai - A Port Lands Initiative By Citizens To Re-Imagine Mumbai
Project bowstring : A perspective on revitalizing Janata Bazaar
05 ecostyle heights Integrated Marketing Communications IMC RoadMap
Mumbai High South Redevelopment Phase Shaping the Future of Urban Living.pptx
Mumbai High South Redevelopment Phase Shaping the Future of Urban Living.pptx
2018 Villanova Real Estate Challenge (2nd Place) - University of Southern Cal...
Socio Economic Determinants in Low Scale Mixed Use Developments
Cityheart
Project Central Park Presentation
Separate Pages
Industrial Training report Civil Engineering.
SUSTAINABLE SANDHAI.pdf
Rams Presentation of Mithila Apartments, Norton Road, Mandaveli.pdf
Shapoorji pallonji joyville sensorium hinjewadi, pune brochure
Ad

More from Simran Aggarwal (17)

PDF
Stockholm.pdf
PDF
PDF
Contract
PDF
Sustainable materials
PDF
Temporary stuctures
PDF
Housing mixed land use
PDF
Amanora housing
PDF
Zone of transition
PDF
Transportation environment
PDF
Regional imbalances RAJASTHAN
PDF
Cost benefit analysis
PDF
Private ownership
PDF
Affodable housing
PPTX
Reinforced Cement Concrete (RCC)
PPTX
Ferrocement
PDF
Green building
Stockholm.pdf
Contract
Sustainable materials
Temporary stuctures
Housing mixed land use
Amanora housing
Zone of transition
Transportation environment
Regional imbalances RAJASTHAN
Cost benefit analysis
Private ownership
Affodable housing
Reinforced Cement Concrete (RCC)
Ferrocement
Green building

Recently uploaded (20)

PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
IGGE1 Understanding the Self1234567891011
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
Empowerment Technology for Senior High School Guide
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
20th Century Theater, Methods, History.pptx
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Unit 4 Computer Architecture Multicore Processor.pptx
Chinmaya Tiranga quiz Grand Finale.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
IGGE1 Understanding the Self1234567891011
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
Virtual and Augmented Reality in Current Scenario
Empowerment Technology for Senior High School Guide
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Hazard Identification & Risk Assessment .pdf
20th Century Theater, Methods, History.pptx
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Environmental Education MCQ BD2EE - Share Source.pdf
My India Quiz Book_20210205121199924.pdf
Weekly quiz Compilation Jan -July 25.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx

Bhendi bazaar

  • 1. REDEVELOPMENT OF BHENDI BAZAAR, MUMBAI Presented By: Simran Aggarwal MURP-I (20-22) FOA, SUPVA
  • 2. OVERVIEW: ╸ Bhendi Bazaar is a market in South Mumbai. ╸ The bazaar is popular for shopping namely antique items, hardware items etc. ╸ The area is set to be redeveloped with the project being undertaken by Saifee Burhani Upliftment Trust. ╸ Saifee Burhani Upliftment Trust is a not- for-profit trust that was set up in 2009 to undertake the redevelopment of one of India's most vibrant but congested localities. 2
  • 3. 3 OVERVIEW: • Bhendi Bazaar is of 16.5 Acres which is divided in to 280 plots. • It has more than 3500 residential tenants with 1250 shops which totals up to 245 total number of buildings. • This bazaar is over 125 year old which is crumbling poor infrastructure with congested streets.
  • 4. NEED FOR REDEVELOPMENT ╸ The bazaar is over 125-year-old, which is crumbling under poor infrastructure. ╸ In the past 3 years more than 170 people have died in 11 incident of building collapse. ╸ Unsatisfactory living condition for the tenants. (because of family expansion) ╸ Near to none public space for recreational purpose. ╸ Illegal construction. ╸ The area lack basic utilities such as sewage treatments and proper ventilation. Existing Scenario Of Bhendi Bazaar 4
  • 5. INTENT & CONTEXT ╸ The redevelopment of Bhendi Bazaar is done to create more commercial opportunities while uplifting the quality of life of the residents. ╸ The vision for the new era will be achieved through building efficient infrastructure with modern amenities and promoting sustainable living and creation of green open spaces. ╸ This project aims to be the model for future smart cities. 5
  • 6. STAKEHOLDERS ╸ This redevelopment project indicates the lack of required stakeholders engaged in project formulation. ╸ The project was okayed by Maharashtra Housing and Area Development Authority and Bombay Municipal Corporation. 6
  • 7. METHODOLOGY ╸ Started in 2009, original deadline was 2023. ╸ Phase-I: ╶ Sub clusters 1 and 3 completed and tenants from the location have been shifted. ╸ Phase-2: ╶ Expected to be completed by 2025 7
  • 8. METHODOLOGY ADOPTED 8 ╸ For the execution of work, responsibilities are divided into different departments and it is controlled by each other which further helps to maintain the continuity of the work. ╶ Administration ╶ Execution Department ╶ Planning Department ╶ Billing Department ╶ Housing Board, Mumbai ╶ Site Safety Department ╶ Local Governing Body.
  • 10. 10 CONNECTIVITY: Existing Religious Structures & Reservation Buildings Sub- Sector Development
  • 11. 11 CONNECTIVITY: Wrap- Around Rehab Apartments 4-5 Acres of Podium Greens Rehab Retails 3500: Podium Parkings
  • 12. 12 CONNECTIVITY: 3200 Rehab Apartments & 1900 Sale Apartments
  • 14. DURING: ╸ The high priest of the Dawoodi Bohra community. The Bohris form about 85 per cent of the population of Bhendi Bazaar. ╸ Between 2010 and 2013 the trust built several transit homes. Most of them near Mazgaon which is about 5 km from Bhendi Bazaar. ╸ In April, 2011 some 100 families wer also moved to transit colony. 14
  • 15. AFTER: 1 • Following the design of neighborhood as per the policy issued by Maharashtra Government in 2009. • 100- 150 of chauls has been replaced by 17 high storey residential buildings. • Widest streets up to 20 meters. • Maximum green areas and proper ventilation.
  • 16. AFTER: ╸ The entire redevelopment is eco-friendly. ╸ The building rise progressively in height from south to north, thus ensuring that every flat catches the breeze coming from the sea. ╸ Out of 17 towers, 13 will be used to rehabilitate the current residents and remaining 4 towers will be put on sale for 1200- 1600 residence. ╸ The ground floor will be commercial with underground parking, and residential parking will be built on top. 16
  • 17. AFTER: ╸ According to a 2012 regulation of the MRTP Act, residential tenants are supposed to get 35% more area on their existing total carpet area and commercial tenants are eligible for an additional 20%. 17