BIM & Coordination Work Process Presentation
BUILDING INFORMATION MODELING (BIM) WAS INTRODUCED
NEARLY TWELVE YEARS AGO TO DISTINGUISH THE INFORMATION RICH
ARCHITECTURAL 3D MODELING FROM THE TRADITIONAL 2D DRAWING. BIM IS
A BUILDING DESIGN METHODOLOGY CHARACTERIZED BY THE CREATION
AND USE OF COORDINATED, INTERNALLY CONSISTENT COMPUTABLE
INFORMATION ABOUT A BUILDING PROJECT IN DESIGN AND CONSTRUCTION.
• RELIABLE DIGITAL REPRESENTATION
• HIGH-QUALITY CONSTRUCTION DOCUMENT PRODUCTION
• CONSTRUCTION PLANNING
• PERFORMANCE PREDICTIONS
• COST ESTIMATES
WHAT IS BIM
ESSENTIAL PARAMETER IN BIM
“X”AXIS “Y”AXIS
“Z”AXIS
BIM PLATFORM USES THE THIRD
DIMENSION (ALONG “Z” AXIS) WHICH
ENHANCES OUR VISUALISATION IN 3D
AND EASES THE COORDINATION EFFORT
IN AUTOCAD TWO
DIMENSION ALONG “X” AXIS
AND “Z” AXIS ARE USED
CLIENT
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
DESIGN
BASIC INPUT
SCHEME/HAND SKETCH
PRESENTATION
3D MODEL
QUANTITY
CLASH
ANALYSIS
SECTIONS &
PLANS
GFC
DRAWING
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
 WALLS WITH THICKNESS AND HEIGHT, FIRE RATING IF REQUIRED
 ROOM DIMENSION WITH FUNCTIONAL NAMES
 CEILING TYPE, LEVEL
 VERTICAL CIRCULATION (STAIR,LIFT AND ESCALATOR) LOCATION
 EXTERIOR FAÇADE MATERIAL
 ACCESS OPENINGS IN WALL FOR DOORS,WINDOWS, LOUVER,
ROLLING SHUTTER
 WINDOW AND DOOR SCHEDULE
 SERVICE ROOMS(MECHANICAL, FIRE & PHE PUMP ROOM ) AND
SERVICE FLOORS WELL DEFINED AS PER MEP SERVICES
REQUIREMENT
 ARCITECTURAL INTENT FOR SERVICES AT CEILING LEVEL FOR
AREAS WITHOUT FALSE CEILING
 TYPE OF FIXTURES, FURNITURES
 PLANTER BODY,WATER BODIES (SPECIAL FEATURES) IF ANY
 ANY ADDITIONAL AESTHATIC REQUIREMENTS (BULK HEAD,
SKYLIGHT, COLUMN CLADDING, RAILING ETC)
 ROOF TYPE LEVELS, PARAPET HEIGHT
 FINISHING MATRIX
ARCHITECTURAL INPUT
 ARCHITECTURAL LAYOUT
 FLOOR THICK NESS & TOC.
 FOUNADTION DETAIL(ISOLATED, COMBINED, WALL FOOTING)
 COLUMN TYPE AND SIZE
 BEAM DESIGN INFORMATION(EXTRACTED FROM ANALYSIS
SOFTWARE)-
 STEPS INVOLVED:
• INNITIALLY BEAM SIZES TO BE PROVIDED
• BEAM SHOULD BE PLACED AS PER ARCHITECTURAL
LAYOUT
• SEND AGAIN TO DESGNER FOR FINAL ANALYSIS FOR
CHANGES IF ANY
 FINALLY MODEL HAS TO BE COMPLETED INCLUDING RAMP &
STAIR.
STRUCTURAL INPUT
 ARCHITECTURE & STRUCTURAL LAYOUT
 RCP LAYOUT
 EQUIPMENT CAPACITY AND LOCATION
 SHAFT LOCATION
 SCHEME AND ZONING INFORMATION
 VENDOR’S G.A. DRAWING
HVAC DESIGN INPUT
ARCHITECTURE LAYOUT SHOWING PLUMBING FIXTURE
LOCATION.
DEPTH OF SUNKEN IN WET AREAS.
PIPE MATERIAL AS PER SPEC.
PIPE DIAMETER .
PIPE TYPES (WASTE, SOIL, RAIN WATER,IRRIGATION, WATER
SUPPLY)
PIPE SLOPE.
SUPPORT SPACING WHEREVER APPLICABLE.
FLOOR SCREED.
RAIN WATER PIPE LOCATION & HARVESTING TANK..
PIPING ARRANGEMENT INSIDE THE SHAFT.
LOCATION OF VALVES AND OTHER ACCESSORIES.
LOCATION OF HOT WATER EQUIPMENTS.
EXTERNAL ROUTING OF SANITARY, STORM & WATER SUPPLY
INPUT INCLUDING GULLY TRAP, MANHOLE & RAIN WATER
CHAMBER.
LAYOUT AND DETAILS OF WTP, STP, ETC.,
PHE DESIGN INPUT
 ARCHITECTURE & STRUCTURAL LAYOUT
 RCP LAYOUT
 LIGHTING LAYOUT-NUMBER OF FIXTURES, TYPE AND
ARRANGEMENT
 POWER LAYOUT-TYPE, QUANTITY AND ARRANGEMENT
 CABLE TRAY/BUS DUCT – SIZE AND ARRANGEMENT
 SUBSTATION LAYOUT – EQUIPMENT, DIMENSIONS,
ARRANGEMENT AND STATUOTORY CLEARANCE
 SCHEMATIC AND CABLE SCHEDULE.
ELECTRICAL DESIGN INPUT
 ARCHITECTURE , SHAFT LOCATION & STRUCTURAL LAYOUT
 RCP LAYOUT.
 CAR PARKING
 PIPE MATERIAL & GRADE AS PER DBR AND BOQ
 HYDRANT VALVE LOCATION AS PER RECOMMENDED INTERVAL
 PIPE TYPES (SPRINKLER, HYDRANT)
 COVERAGE OF SPRINKLER FOR CAR PARKING AND OFFICE AREA
 FIRE DETECTION AND PUBLIC ADRESSABLE SYSTEMS
 FIRE ALARM PANEL AND NUMBER OF LOOP.
 FIRE RESERVOIR.
 FIRE PUMP ROOM WITH PUMPING DETAILS AND CAPACITY.
FIRE DESIGN INPUT
BIM & Coordination Work Process Presentation
CLASH REPORT IN NAVIS WORKS
CLASH REPORT DOCUMENTS
THE STEPS INVOLVED:
1. THE STRUCTURE FOUNDATION MODEL SHOULD BE FREEZED
BEFORE START OF PHE MODEL
1. IN CASE OF ANY CLASH, CAN BE RESOLVED BY CHANGING THE
PIPE ROUTE, LOWERING THE PIPE DEPTH TO BELOW
FOUNDATION ELEMENT(HUME), SLEEVES CAN ALSO BE
PROVIDED AFTER DISCUSSION WITH THE STRUCTURAL
ENGINEER
TWO ELEMENTS ARE INVOLVED HERE :
STRUCTURE
PHE
STEPS INVOLVED:
THE RCP LAYOUT IS TO BE FREEZED
THE LOCATION OF THE FOLLOWING TO BE FIXED
1.LIGHTING FIXTURE LOCATION BY ELECTRICAL
2.DIFFUSER/GRILL LAYOUT BY HVAC
3.FIRE ALARM/SPRINKLER LAYOUT BY FIRE.
ELEMENTS INVOLVED:-
ARCHITECTURE RCP
HVAC DIFFUSER
FIRE DETECTOR AND SPRINKLER
ELECTRICAL :LIGHTING FIXTURE
ELECTRICAL
ARCH-RCP
ELECTRICAL LIGHTING
LIGHTING + HVAC DIFFUSER/GRILL
DIFFUSER+LIGHTING+ SPRINKLER/FIRE ALARM
COORDINATED RCP TO ARCHITECT FOR REVIEW
(ASTHETIC/LOOK AND FILL)
COMMENTED RCP FROM ARCHITECT
HVAC FIRE
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
PHE PUMP ROOM PHE, HVAC, ELECTRICAL, ELV
TOILET AREA PHE, HVAC, ELECTRICAL, ELV
FIRE PUMP ROOM FIRE, HVAC, ELECTRICAL, ELV
OFFICE/ODC/CORRIDOR HVAC, PHE, FIRE, ELECTRICAL, ELV
TERRACE AREA HVAC, FIRE, PHE, ELECTRICAL, ELV
ELECTRICAL ROOM
SUB STATION
DG ROOM
HUB ROOM
BMS ROOM
SWITCH ROOM
UPS ROOM
DATA CENTER
PLAT ROOM/CHILLER PLANT/AHU ROOM HVAC, ELV
ELECTRICAL, HVAC, PHE, ELV
DAY-0 STAGE-0
A (MEP) DESIGN CAL CULATION AND REDINESS OF BASIC DRAWING INPUTS FOR THE ZONE BY THE ENGINEERS.
B (ARCH/STRUC) PREPARATION OF BASIC COORDINATED MODEL.
DAY-1 STAGE-1  
APPROX SPACE PLANNING AND BASIC ROUTING FOR INDIVIDUAL MEP DISCIPLINE BY THE ENGINEERS ON THE
ARCH. & STRUC. LAYOUT.
DAY-2
STAGE-2  
STRUCTURE & ARCHITECTURE MODEL REVIEW FOR ENABELING MEP DRAFTING PERSONS TO UDERSTAND THE
ZONE IN A 3D PLATFORM.
STAGE-3   INTER MEP DISCIPLINE COORDINATION MEETING TO FREEZ APPROX. PLAN AND ELEVATION.
DAY-3 STAGE-4   MEP DRAFTING AND MODEL DEVELOPMENT LAYOUT BASED ON INPUTS (STAGE-0 TO STAGE-3
DAY-3 & 4 STAGE-5
A CHECKING OF DRAWING BY ENGINEERS FOR TECHNICAL ADEQUECY (NOT CLASH DETECTION)
B MODEL UPDATION BY ARCH. & STRUC. AS PER MEP MODEL.
DAY-6 STAGE-6   MODEL REVIEW IN NAVIS BY ALL DISCIPLINE (MEP, STRUC, ARCH)
DAY-7 & 8 STAGE-7   CLASH COORDINATION AND RESOLVE AS PER STAGE-6
DAY-9 STAGE-8   ANNOTATION & SHEET CREATION
DAY-10 STAGE-9   QC & CORRCTION & GFC
• WALL CUT OUT LOCATION TO ARCHITECTURE.
• SLEEVE LOCATION FOR THE BEAM TO STRUC.
• DOG HOUSE LOCATION AND HEIGHT TO STRUC. & ARCH.
• LOUVERS SIZES & LOCATION TO ARCH.
• SHARE WALL OPENING TO STRUC.
• CORE CUT LOCATION & SIZE TO STRUC.
PHASE-I PHASE-II
PHASE-III
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
BIM & Coordination Work Process Presentation
THANK YOU

More Related Content

PDF
MEP BIM design
PDF
Building services planning manual 2007
PPTX
Revit Families
PPTX
Virtual Design and Construction
PDF
Building Services II Presentation Slides
PDF
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
PDF
Part 4 - HVAC & R Systems in Buildings.pdf
PDF
Introduction to BIM 360 Docs
MEP BIM design
Building services planning manual 2007
Revit Families
Virtual Design and Construction
Building Services II Presentation Slides
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
Part 4 - HVAC & R Systems in Buildings.pdf
Introduction to BIM 360 Docs

What's hot (20)

PDF
Revit Mep ppt.pdf
PPTX
mep bim ppt.pptx
PDF
BUILDING MEP SYSTEM
PPTX
Introduction to Building Information Modeling
PPTX
what is BIM
PPTX
Revit MEP Class.pptx
PPT
Bim Presentation
PDF
Bim implementation
PPTX
MEP- Building services
PPTX
Revit and Building Information Modeling (BIM) Presentation
PPTX
BIM (Building Information Modeling) for digital construction
PPTX
BIM awareness
PDF
The Bim Process Explained
PDF
BIM process adoption for integrated design and constuction
PPTX
What is BIM?
PPT
Implementing Building Information Modelling in Construction
PPTX
Air Conditioning system and types
PPTX
BIM Presentation
PPTX
Building Information Modeling (BIM)
Revit Mep ppt.pdf
mep bim ppt.pptx
BUILDING MEP SYSTEM
Introduction to Building Information Modeling
what is BIM
Revit MEP Class.pptx
Bim Presentation
Bim implementation
MEP- Building services
Revit and Building Information Modeling (BIM) Presentation
BIM (Building Information Modeling) for digital construction
BIM awareness
The Bim Process Explained
BIM process adoption for integrated design and constuction
What is BIM?
Implementing Building Information Modelling in Construction
Air Conditioning system and types
BIM Presentation
Building Information Modeling (BIM)
Ad

Viewers also liked (20)

PDF
BIM COORDINATION PORTOFOLIOOO
PDF
Combined BIM & Design Coordination Workflow-r01
PDF
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
PDF
Haram complementary projects temporary feeding proposals
PDF
1 Generral Layout
PPTX
EMCI Presentation
PPTX
Pinnacle Infotech partaking at 2017 PCI Convention
PPTX
Presentasi Sistem Tata SuryaㅡSolar System Explanation
 
PDF
Bim Facades.Final
PDF
Au 09 Bi Mmeans Business.1.05.10
PDF
Flevy.com - Collaborative Process Mapping
PPS
Anthony N Dauginas
PPTX
Communication & Coordination on a Construction Project Through Building I...
PPTX
Reducing Risk with BIM
PPTX
Week 7 powerpoint reflected ceiling plans
PPTX
Trusted BIM: Accurate As-Builts for Project Coordination
PPT
Bim101 Aec
PPT
BIM and the drywall cover up - A case for division 9
PPTX
A Team Plumbing and Drainage Systems
BIM COORDINATION PORTOFOLIOOO
Combined BIM & Design Coordination Workflow-r01
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
Haram complementary projects temporary feeding proposals
1 Generral Layout
EMCI Presentation
Pinnacle Infotech partaking at 2017 PCI Convention
Presentasi Sistem Tata SuryaㅡSolar System Explanation
 
Bim Facades.Final
Au 09 Bi Mmeans Business.1.05.10
Flevy.com - Collaborative Process Mapping
Anthony N Dauginas
Communication & Coordination on a Construction Project Through Building I...
Reducing Risk with BIM
Week 7 powerpoint reflected ceiling plans
Trusted BIM: Accurate As-Builts for Project Coordination
Bim101 Aec
BIM and the drywall cover up - A case for division 9
A Team Plumbing and Drainage Systems
Ad

Similar to BIM & Coordination Work Process Presentation (20)

PDF
Building information modeling services new zealand
PPTX
Building Information Modeling Services New Zealand
PPTX
How to Design Mechanical Building Services
PPTX
Autodesk Revit MEP
PPT
Bim 2010 nmifma
PDF
Introduction OF NR BIM CONSULTANT
PDF
Introduction OF NR BIM CONSULTANT
PDF
Introduction of nr bim consultant
PPT
Architect Checklist
PDF
BIM_Presentation
PDF
Chemionix: Engineering Design & CAD Drafting Outsourcing Company
PDF
MEP Consultant
PDF
Clark Nexsen Architecture and Engineering
PPT
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
PDF
Awa teknik pvt. ltd- Profile
PDF
Awa teknik pvt. ltd.
PDF
Mechanical Portfolio & Statement -PARTIAL - 2016
PPTX
Mechanical Services Design Presentation.pptx
PPT
Role of Building Information Modelling in Construction
PDF
BIM for Interior Design
Building information modeling services new zealand
Building Information Modeling Services New Zealand
How to Design Mechanical Building Services
Autodesk Revit MEP
Bim 2010 nmifma
Introduction OF NR BIM CONSULTANT
Introduction OF NR BIM CONSULTANT
Introduction of nr bim consultant
Architect Checklist
BIM_Presentation
Chemionix: Engineering Design & CAD Drafting Outsourcing Company
MEP Consultant
Clark Nexsen Architecture and Engineering
Template-Process-Maps-V2-0-MS-Powerpoint-Format.ppt
Awa teknik pvt. ltd- Profile
Awa teknik pvt. ltd.
Mechanical Portfolio & Statement -PARTIAL - 2016
Mechanical Services Design Presentation.pptx
Role of Building Information Modelling in Construction
BIM for Interior Design

BIM & Coordination Work Process Presentation

  • 2. BUILDING INFORMATION MODELING (BIM) WAS INTRODUCED NEARLY TWELVE YEARS AGO TO DISTINGUISH THE INFORMATION RICH ARCHITECTURAL 3D MODELING FROM THE TRADITIONAL 2D DRAWING. BIM IS A BUILDING DESIGN METHODOLOGY CHARACTERIZED BY THE CREATION AND USE OF COORDINATED, INTERNALLY CONSISTENT COMPUTABLE INFORMATION ABOUT A BUILDING PROJECT IN DESIGN AND CONSTRUCTION. • RELIABLE DIGITAL REPRESENTATION • HIGH-QUALITY CONSTRUCTION DOCUMENT PRODUCTION • CONSTRUCTION PLANNING • PERFORMANCE PREDICTIONS • COST ESTIMATES WHAT IS BIM
  • 3. ESSENTIAL PARAMETER IN BIM “X”AXIS “Y”AXIS “Z”AXIS BIM PLATFORM USES THE THIRD DIMENSION (ALONG “Z” AXIS) WHICH ENHANCES OUR VISUALISATION IN 3D AND EASES THE COORDINATION EFFORT IN AUTOCAD TWO DIMENSION ALONG “X” AXIS AND “Z” AXIS ARE USED
  • 9. DESIGN BASIC INPUT SCHEME/HAND SKETCH PRESENTATION 3D MODEL QUANTITY CLASH ANALYSIS SECTIONS & PLANS GFC DRAWING
  • 19.  WALLS WITH THICKNESS AND HEIGHT, FIRE RATING IF REQUIRED  ROOM DIMENSION WITH FUNCTIONAL NAMES  CEILING TYPE, LEVEL  VERTICAL CIRCULATION (STAIR,LIFT AND ESCALATOR) LOCATION  EXTERIOR FAÇADE MATERIAL  ACCESS OPENINGS IN WALL FOR DOORS,WINDOWS, LOUVER, ROLLING SHUTTER  WINDOW AND DOOR SCHEDULE  SERVICE ROOMS(MECHANICAL, FIRE & PHE PUMP ROOM ) AND SERVICE FLOORS WELL DEFINED AS PER MEP SERVICES REQUIREMENT  ARCITECTURAL INTENT FOR SERVICES AT CEILING LEVEL FOR AREAS WITHOUT FALSE CEILING  TYPE OF FIXTURES, FURNITURES  PLANTER BODY,WATER BODIES (SPECIAL FEATURES) IF ANY  ANY ADDITIONAL AESTHATIC REQUIREMENTS (BULK HEAD, SKYLIGHT, COLUMN CLADDING, RAILING ETC)  ROOF TYPE LEVELS, PARAPET HEIGHT  FINISHING MATRIX ARCHITECTURAL INPUT
  • 20.  ARCHITECTURAL LAYOUT  FLOOR THICK NESS & TOC.  FOUNADTION DETAIL(ISOLATED, COMBINED, WALL FOOTING)  COLUMN TYPE AND SIZE  BEAM DESIGN INFORMATION(EXTRACTED FROM ANALYSIS SOFTWARE)-  STEPS INVOLVED: • INNITIALLY BEAM SIZES TO BE PROVIDED • BEAM SHOULD BE PLACED AS PER ARCHITECTURAL LAYOUT • SEND AGAIN TO DESGNER FOR FINAL ANALYSIS FOR CHANGES IF ANY  FINALLY MODEL HAS TO BE COMPLETED INCLUDING RAMP & STAIR. STRUCTURAL INPUT
  • 21.  ARCHITECTURE & STRUCTURAL LAYOUT  RCP LAYOUT  EQUIPMENT CAPACITY AND LOCATION  SHAFT LOCATION  SCHEME AND ZONING INFORMATION  VENDOR’S G.A. DRAWING HVAC DESIGN INPUT
  • 22. ARCHITECTURE LAYOUT SHOWING PLUMBING FIXTURE LOCATION. DEPTH OF SUNKEN IN WET AREAS. PIPE MATERIAL AS PER SPEC. PIPE DIAMETER . PIPE TYPES (WASTE, SOIL, RAIN WATER,IRRIGATION, WATER SUPPLY) PIPE SLOPE. SUPPORT SPACING WHEREVER APPLICABLE. FLOOR SCREED. RAIN WATER PIPE LOCATION & HARVESTING TANK.. PIPING ARRANGEMENT INSIDE THE SHAFT. LOCATION OF VALVES AND OTHER ACCESSORIES. LOCATION OF HOT WATER EQUIPMENTS. EXTERNAL ROUTING OF SANITARY, STORM & WATER SUPPLY INPUT INCLUDING GULLY TRAP, MANHOLE & RAIN WATER CHAMBER. LAYOUT AND DETAILS OF WTP, STP, ETC., PHE DESIGN INPUT
  • 23.  ARCHITECTURE & STRUCTURAL LAYOUT  RCP LAYOUT  LIGHTING LAYOUT-NUMBER OF FIXTURES, TYPE AND ARRANGEMENT  POWER LAYOUT-TYPE, QUANTITY AND ARRANGEMENT  CABLE TRAY/BUS DUCT – SIZE AND ARRANGEMENT  SUBSTATION LAYOUT – EQUIPMENT, DIMENSIONS, ARRANGEMENT AND STATUOTORY CLEARANCE  SCHEMATIC AND CABLE SCHEDULE. ELECTRICAL DESIGN INPUT
  • 24.  ARCHITECTURE , SHAFT LOCATION & STRUCTURAL LAYOUT  RCP LAYOUT.  CAR PARKING  PIPE MATERIAL & GRADE AS PER DBR AND BOQ  HYDRANT VALVE LOCATION AS PER RECOMMENDED INTERVAL  PIPE TYPES (SPRINKLER, HYDRANT)  COVERAGE OF SPRINKLER FOR CAR PARKING AND OFFICE AREA  FIRE DETECTION AND PUBLIC ADRESSABLE SYSTEMS  FIRE ALARM PANEL AND NUMBER OF LOOP.  FIRE RESERVOIR.  FIRE PUMP ROOM WITH PUMPING DETAILS AND CAPACITY. FIRE DESIGN INPUT
  • 26. CLASH REPORT IN NAVIS WORKS
  • 28. THE STEPS INVOLVED: 1. THE STRUCTURE FOUNDATION MODEL SHOULD BE FREEZED BEFORE START OF PHE MODEL 1. IN CASE OF ANY CLASH, CAN BE RESOLVED BY CHANGING THE PIPE ROUTE, LOWERING THE PIPE DEPTH TO BELOW FOUNDATION ELEMENT(HUME), SLEEVES CAN ALSO BE PROVIDED AFTER DISCUSSION WITH THE STRUCTURAL ENGINEER TWO ELEMENTS ARE INVOLVED HERE : STRUCTURE PHE
  • 29. STEPS INVOLVED: THE RCP LAYOUT IS TO BE FREEZED THE LOCATION OF THE FOLLOWING TO BE FIXED 1.LIGHTING FIXTURE LOCATION BY ELECTRICAL 2.DIFFUSER/GRILL LAYOUT BY HVAC 3.FIRE ALARM/SPRINKLER LAYOUT BY FIRE. ELEMENTS INVOLVED:- ARCHITECTURE RCP HVAC DIFFUSER FIRE DETECTOR AND SPRINKLER ELECTRICAL :LIGHTING FIXTURE
  • 30. ELECTRICAL ARCH-RCP ELECTRICAL LIGHTING LIGHTING + HVAC DIFFUSER/GRILL DIFFUSER+LIGHTING+ SPRINKLER/FIRE ALARM COORDINATED RCP TO ARCHITECT FOR REVIEW (ASTHETIC/LOOK AND FILL) COMMENTED RCP FROM ARCHITECT HVAC FIRE
  • 33. PHE PUMP ROOM PHE, HVAC, ELECTRICAL, ELV TOILET AREA PHE, HVAC, ELECTRICAL, ELV FIRE PUMP ROOM FIRE, HVAC, ELECTRICAL, ELV OFFICE/ODC/CORRIDOR HVAC, PHE, FIRE, ELECTRICAL, ELV TERRACE AREA HVAC, FIRE, PHE, ELECTRICAL, ELV ELECTRICAL ROOM SUB STATION DG ROOM HUB ROOM BMS ROOM SWITCH ROOM UPS ROOM DATA CENTER PLAT ROOM/CHILLER PLANT/AHU ROOM HVAC, ELV ELECTRICAL, HVAC, PHE, ELV
  • 34. DAY-0 STAGE-0 A (MEP) DESIGN CAL CULATION AND REDINESS OF BASIC DRAWING INPUTS FOR THE ZONE BY THE ENGINEERS. B (ARCH/STRUC) PREPARATION OF BASIC COORDINATED MODEL. DAY-1 STAGE-1   APPROX SPACE PLANNING AND BASIC ROUTING FOR INDIVIDUAL MEP DISCIPLINE BY THE ENGINEERS ON THE ARCH. & STRUC. LAYOUT. DAY-2 STAGE-2   STRUCTURE & ARCHITECTURE MODEL REVIEW FOR ENABELING MEP DRAFTING PERSONS TO UDERSTAND THE ZONE IN A 3D PLATFORM. STAGE-3   INTER MEP DISCIPLINE COORDINATION MEETING TO FREEZ APPROX. PLAN AND ELEVATION. DAY-3 STAGE-4   MEP DRAFTING AND MODEL DEVELOPMENT LAYOUT BASED ON INPUTS (STAGE-0 TO STAGE-3 DAY-3 & 4 STAGE-5 A CHECKING OF DRAWING BY ENGINEERS FOR TECHNICAL ADEQUECY (NOT CLASH DETECTION) B MODEL UPDATION BY ARCH. & STRUC. AS PER MEP MODEL. DAY-6 STAGE-6   MODEL REVIEW IN NAVIS BY ALL DISCIPLINE (MEP, STRUC, ARCH) DAY-7 & 8 STAGE-7   CLASH COORDINATION AND RESOLVE AS PER STAGE-6 DAY-9 STAGE-8   ANNOTATION & SHEET CREATION DAY-10 STAGE-9   QC & CORRCTION & GFC
  • 35. • WALL CUT OUT LOCATION TO ARCHITECTURE. • SLEEVE LOCATION FOR THE BEAM TO STRUC. • DOG HOUSE LOCATION AND HEIGHT TO STRUC. & ARCH. • LOUVERS SIZES & LOCATION TO ARCH. • SHARE WALL OPENING TO STRUC. • CORE CUT LOCATION & SIZE TO STRUC.