Block wise risk evaluation 
Prepared By 
Jinu Philip
Risk 
• Risk is future uncertainty which is exposed to 
losing of invested value. 
• insurance is treatment of risk 
Risk evaluation 
Is assessing probability that how much will be 
danger create by that risk.
Why Risk Evaluation
Block wise risk evalution
10/14/2014
Block wise risk evaluation 
• It means 
If the is more then one building (and content) 
are insured under a single policy, block wise 
values shall be furnished in respect of Building, 
Plant & Machinery, Stocks and other contents.
A B
• At the beginning of a fire policy ,risk 
assessment take place by surveyors 
• In this 
Evaluation of perils are done for the purpose of 
fixing premium of the policy
Block wise risk evalution
Block wise risk evalution
Block wise risk evalution
• The above shown machines are there in block 
A and B. Now surveyors will check weather 
there machines expose to any danger or not. 
• If there they expose to danger then premium 
will be high
Cause of fire
Block wise risk evalution
Cause of fire
Cause of Damage
Cause of fire
Fire extinguishing 
• In block wise risk evaluation discounts are also 
given. 
If there is sprinklers system install there is 5% 
discount. 
• Hand appliances & Hydrant system – 5% 
• Hand appliance + Hydrant system & 
sprinklers/ fixed water spry system – 10%
Fire extinguishing
Thank You

More Related Content

PPTX
DRF - Pres Final
PPTX
Hernan Huwyler Corporate Compliance Contractual Risks
PPT
Software development slides
PPT
Windows Mobile
PPTX
Viral Loops: Making Self-Marketing Apps
PDF
Integrated Performance Evaluation System
PPTX
Historical evaluation of computer
PDF
Software Process Models
DRF - Pres Final
Hernan Huwyler Corporate Compliance Contractual Risks
Software development slides
Windows Mobile
Viral Loops: Making Self-Marketing Apps
Integrated Performance Evaluation System
Historical evaluation of computer
Software Process Models

Similar to Block wise risk evalution (20)

PPTX
Claims club, Exeter - September 2016
PPT
engineer's are responsible for safety
PDF
Knowledge Based System (Expert System) : Equipment Safety Control & Management
PPTX
Professional ethics-Unit4
PPTX
Safety and risk
PDF
Anna University PEE-GE6075_UnitIV_BM.pdf
PDF
SiteFM Interim Life Safety Measures Webinar
PPTX
Fire alarm ppt_presentation_to_suppliers_november_2015
PDF
Taking the Lead on Loss Control
PDF
Seminar 141120202109-conversion-gate02
PDF
Lession 4 Qualitative Risk Analysis .pdf
PPT
topic5 (2).ppt
PPTX
UNIT-4 Engineer responsibility.pptx
PPTX
Critical Hazard in Management system
PPTX
Commissioning of Industrial Projects - Cost Estimating Considerations
PPTX
Procedure for EIA.pptx
PPTX
Procedure for EIA.pptx
PPT
Acceptance sampling
PDF
Compliance Reporting with SiteFM (CMMS)
Claims club, Exeter - September 2016
engineer's are responsible for safety
Knowledge Based System (Expert System) : Equipment Safety Control & Management
Professional ethics-Unit4
Safety and risk
Anna University PEE-GE6075_UnitIV_BM.pdf
SiteFM Interim Life Safety Measures Webinar
Fire alarm ppt_presentation_to_suppliers_november_2015
Taking the Lead on Loss Control
Seminar 141120202109-conversion-gate02
Lession 4 Qualitative Risk Analysis .pdf
topic5 (2).ppt
UNIT-4 Engineer responsibility.pptx
Critical Hazard in Management system
Commissioning of Industrial Projects - Cost Estimating Considerations
Procedure for EIA.pptx
Procedure for EIA.pptx
Acceptance sampling
Compliance Reporting with SiteFM (CMMS)
Ad

Recently uploaded (20)

PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
IGGE1 Understanding the Self1234567891011
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Hazard Identification & Risk Assessment .pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
A powerpoint presentation on the Revised K-10 Science Shaping Paper
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Uderstanding digital marketing and marketing stratergie for engaging the digi...
IGGE1 Understanding the Self1234567891011
Weekly quiz Compilation Jan -July 25.pdf
Unit 4 Computer Architecture Multicore Processor.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx
My India Quiz Book_20210205121199924.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
History, Philosophy and sociology of education (1).pptx
Environmental Education MCQ BD2EE - Share Source.pdf
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
TNA_Presentation-1-Final(SAVE)) (1).pptx
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Hazard Identification & Risk Assessment .pdf
AI-driven educational solutions for real-life interventions in the Philippine...
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Ad

Block wise risk evalution

  • 1. Block wise risk evaluation Prepared By Jinu Philip
  • 2. Risk • Risk is future uncertainty which is exposed to losing of invested value. • insurance is treatment of risk Risk evaluation Is assessing probability that how much will be danger create by that risk.
  • 6. Block wise risk evaluation • It means If the is more then one building (and content) are insured under a single policy, block wise values shall be furnished in respect of Building, Plant & Machinery, Stocks and other contents.
  • 7. A B
  • 8. • At the beginning of a fire policy ,risk assessment take place by surveyors • In this Evaluation of perils are done for the purpose of fixing premium of the policy
  • 12. • The above shown machines are there in block A and B. Now surveyors will check weather there machines expose to any danger or not. • If there they expose to danger then premium will be high
  • 18. Fire extinguishing • In block wise risk evaluation discounts are also given. If there is sprinklers system install there is 5% discount. • Hand appliances & Hydrant system – 5% • Hand appliance + Hydrant system & sprinklers/ fixed water spry system – 10%