SlideShare a Scribd company logo
Building Depth in Facilities
Chris Barron
Facilities Manager Faith Baptist
Church Youngsville, NC
Discussing the opportunities within our
teams to improve the overall function of
facilities work.
Today’s Training Plan
• Discuss a Process for Evaluating Facilities
– Assessment, Quantify, Adopt, Implement,
Control
• Diagram your current Facilities Ministries
– List current status, possible opportunities for
improvement / training and begin plan to
change
• Leave with list of possible improvements
– Begin the plan to improve facilities depth
Assessment
• What are my teams doing today?
– Spiritually – is it consistent with mission/vision
– Physically – can it be quantified / measured
• List them
– Contracts, job descriptions / title, teams, etc.
– What are you “not” doing?
• What could we be doing differently?
– Gaps, cross training, insource vs outsource
Assessment Examples
• Landscaper – 6 acres, $15K, $10K OoS
work, contract with no detail.
• Pest Control Spraying / watering plants
• Thermostats cost most Electrically
• Pastors asking Volunteers to serve in
kitchen untrained
• Largest financial liability for church
• What requires the most rework
Quantify
• Focus on Mission / Ministry Goals
– Member involvement
– Cross Functional Teams
– Employee satisfaction / Opportunity for
advancement
• Look for measurable outcomes
– Reduce sick time / reduce turn over rate
– Improve work order completion time / improve
customer satisfaction
– Reduce cost
Quantifiable Examples
• Cost of internalizing the landscaper -
storage shed, tools/equip, training, drivers
license just to go get the gas
• Cost of current carpet cleaning company
• Employee Efficiency (WO completion) -
Tool cart and radios
• Energy Usage Reduced -Weekly
Thermostat check, lockable thermostats
Adopt
• Change requires “Pre – Work”
– Write Training / Write Procedures / Write
Contracts, get them reviewed / approved
– Create Maps, checklist, calendar, schedule
• Sale the future change
– Prepare others for coming changes
– Budget
– Create incentive
Adoption Examples
• Wedding Coordinator
– Reduce time the FM has to manage events
• Carpet Extractions
– Equipment on hand always ready to use
– Reduce cost of contractor
– Improve quality of carpet overall
• Electrical Demand Reduction
– Improve Thermostat Settings
– HVAC start times / reduce cost
Hands on Training
• Ensure a part of Job Description
• Classroom (reading policies, etc.)
• Observe (watch others)
• Simulate (supervised )
• Perform (on your own, checked behind)
• Make Performance the new Norm
• Be able to Train others / replacement
Implement
• Hire / Change Job Description
– Employee Reviews / Goals / cross train
• Train
– Schedule / conduct training
– Follow-up / Ensure training working
– Make the change the new normal
– Tie to rewards / Allow team members to train
• Negotiate
– Look at all contracts and service level
agreements
Implementation Examples
• PM schedules / new CMMS
• Training – Vehicle Policy Improvement
• Maps - Landscaping on campus – write
PMs to match landscaping map
• Contract Re-negotiate / Implement Service
Level Agreements with measurements
• Procedure for Wedding Coordinator /
Kitchen Director Training
Initial PM Planning
• Map
• Inventory
• Investigate
• Count
• Inspect
PM Code
Example
Code Description
W2-F W2-F Thermostat HVAC Adjust
W3-G W3-G Mow, Trim, Blow
W4-TP W4-TP Garbage Pick-Up
W5-F W5-F Recycle Material Run
M1-G M1-G Weeding / Weed Kill
M2-TP M2-TP Cardboard Pick-Up
M3-V M3-V Inspect All Vehicles / Trailers / Plan (update) SA1-V
M4-F M4-F Flush floor drains
M5-F M5-F Elevator Fire Test
M6-F M6-F First Aid Kit Inventory / Restock
M7-F M7-F Fire Extinguishers / Ansul System Inspection
Q1-F Q1-F Pest / Insect Inspection / Spray
Q2-F Q2-F HVAC AHU's - Inspect, Filter change, Clean coil as necessar
Q3-TP Q3-TP Elevator Test (Schindler)
Q4-F Q4-F Exit Signs
Q5-F Q5-F Emergency Lighting Test (for Lithonia ELM4)
Q6-F Q6-F Paper Shredder Maintenance
Q7-C Q7-C Dry Erasers - Cleaning
SA1-C SA1-C Extract KT 1st Floor Carpets not Nursery
SA1-F SA1-F HVAC Semi-Annually
SA1-G SA1-G Lawn Re-Seed, Aerate, Fertilizer
SA1-K SA1-K Ice Maker Inspect / Clean
SA1-V SA1-V Vehicle / Trailer Oil Change / Inspect
SA2-C SA2-C Extract Nursery Carpets 3135,3145
SA2-K SA2-K Griddle Inspection/Clean
SA3-F SA3-F Inspect Storage Areas
SA3-G SA3-G Check for any safety/broken issues regarding children's play
SA3-K SA3-K Convection Oven Inspect / Clean
SA4-K SA4-K Coffee Systems De-Lime/Clean
PMP
Example
Manual PM Binder Example
Control
• Is it still working?
• Did the outcome we hoped for happen?
• Survey, Interview, buy-in, loose ends
• Sale the change
• Remember the People / Mission / Vision
Controlling Examples
• Electrical Utility Data – tied to Demand
charge and Usage Data affected by
Degree Days, and Thermostat
Programming.
• Annual Contract Review
• Employee Performance Reviews
• Large industries might us Loss Time
What’s on your worksheet?
• Real Depth in Facilities is in people
• Leadership and Controls you implement
including your example guide those people
and affect attitudes
• Remember Jesus Example – spend time,
have fellowships, write cards, love and set
the example.

More Related Content

DOC
William McCarten resume
PDF
David DiBiase Resume-2
PDF
Resume of Christian Kuhasz
DOC
Nino Balmes resume (1) (2)
DOCX
Robert Hill Inception to Completion
PPTX
Southwark Procurement Approach
PDF
David DiBiase Resume-2
DOC
Resume- Nauss, Paul M.
William McCarten resume
David DiBiase Resume-2
Resume of Christian Kuhasz
Nino Balmes resume (1) (2)
Robert Hill Inception to Completion
Southwark Procurement Approach
David DiBiase Resume-2
Resume- Nauss, Paul M.

What's hot (14)

DOC
Barron Stewart Resume
PDF
Nguyen Tan Thanh 040076000124 new
PDF
LeanSixSigmaProjectPresentation
DOCX
AR Improvement Plan 2.0 Draft
PPTX
Pres final rev1.pptx
DOC
WILLIAM MICHAEL BROWN R-1
DOC
Arun_Mangal_cv Feb 2015
PDF
150306 -- Reducing the Time of the Racing Engine Development Cycle at ECR Eng...
DOC
Chad Wagner Resume
DOCX
Resume
DOC
Necoles Resume
PDF
CV of Feri Noviardi (Mechanical)
PDF
Engineering Metrics Checklist for Commercial Buildings
DOCX
Robert Spargur Resume 1
Barron Stewart Resume
Nguyen Tan Thanh 040076000124 new
LeanSixSigmaProjectPresentation
AR Improvement Plan 2.0 Draft
Pres final rev1.pptx
WILLIAM MICHAEL BROWN R-1
Arun_Mangal_cv Feb 2015
150306 -- Reducing the Time of the Racing Engine Development Cycle at ECR Eng...
Chad Wagner Resume
Resume
Necoles Resume
CV of Feri Noviardi (Mechanical)
Engineering Metrics Checklist for Commercial Buildings
Robert Spargur Resume 1
Ad

Viewers also liked (6)

PPTX
SOPs - Improving Facilities Operations
PPTX
Blueprint Reading for Facility Managers
PPTX
Renting Your Facility to the Community
PPTX
Preventative Maintenance Facilities Managers
PPTX
Fire Protection Systems for Facilities Managers
PPT
The 4 degrees of separation between pain and pleasure
SOPs - Improving Facilities Operations
Blueprint Reading for Facility Managers
Renting Your Facility to the Community
Preventative Maintenance Facilities Managers
Fire Protection Systems for Facilities Managers
The 4 degrees of separation between pain and pleasure
Ad

Similar to Building Depth in Facilities Team (20)

PDF
Using Siebel Clinical for Your Specific Job Function
PDF
Strategies for Continuous CTMS Improvement
PPT
Lean and 5 s
PPTX
Process flow and process chart
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PPT
Storyboard_SPS_Payroll
PPTX
Rsm GC PAT Advisory and Escert Trading ver 1
PPTX
Rsm gc pat advisory and escert trading ver 1
PPTX
7 board pri update 2-23-15 3 pm
PPT
technical audit in murugappa group - toward converting the audit from cost ...
PDF
Moving The OEE Needle -Tips for Surpassing 85%
PPT
Tpm+basics
PPT
Tpm+basics
PDF
Resume-Thomas Mathew
PDF
How to analyze your sap data and optimize your workforce
PPTX
FC VSM Presentation Future State Aug 5 -7 2013
PPT
ME Spencer Consulting Group
DOC
Latest_resume_10.9.14
PPTX
Shane Ireland - 1st Rotation
Using Siebel Clinical for Your Specific Job Function
Strategies for Continuous CTMS Improvement
Lean and 5 s
Process flow and process chart
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
Storyboard_SPS_Payroll
Rsm GC PAT Advisory and Escert Trading ver 1
Rsm gc pat advisory and escert trading ver 1
7 board pri update 2-23-15 3 pm
technical audit in murugappa group - toward converting the audit from cost ...
Moving The OEE Needle -Tips for Surpassing 85%
Tpm+basics
Tpm+basics
Resume-Thomas Mathew
How to analyze your sap data and optimize your workforce
FC VSM Presentation Future State Aug 5 -7 2013
ME Spencer Consulting Group
Latest_resume_10.9.14
Shane Ireland - 1st Rotation

More from Faith Youngsville, NC (10)

PPTX
Leadership Ownership.pptx
PPTX
the Pragmatic Manager - continuous improvement.pptx
PPTX
Effective Policy and Procedure Management.pptx
PDF
Leadership Carrots and Sticks
PPTX
NACFM CP Session 1 Green Church
PPTX
NACFM CP Session 1 Fire Protection Systems
PPSX
NACFM Preventative Maintenance for Facilities Managers
PPSX
Faith Baptist Church Passenger Van Training Slides
PPTX
FM as Event Planner (Room Set-up Design)
PPTX
Building Technology Discussion for Facilities Managers
Leadership Ownership.pptx
the Pragmatic Manager - continuous improvement.pptx
Effective Policy and Procedure Management.pptx
Leadership Carrots and Sticks
NACFM CP Session 1 Green Church
NACFM CP Session 1 Fire Protection Systems
NACFM Preventative Maintenance for Facilities Managers
Faith Baptist Church Passenger Van Training Slides
FM as Event Planner (Room Set-up Design)
Building Technology Discussion for Facilities Managers

Recently uploaded (20)

PDF
Understanding LA's Zero Waste Initiative
PDF
Choosing an Entrepreneurial Path Based on Your Personality.pdf
PDF
Legacy Application Modernisation Services.pdf
PDF
The Dark Web’s Front Door: Finding the Real Hidden Wiki
PDF
Optimize Freight, Fleet, and Fulfillment with Scalable Logistics Solutions.pdf
PDF
Smart Plumbing Solutions Every Property Owner and Developer Should Know
PDF
Why Infotrench Stands Out as the Best SEO Agency in Noida.pdf
PDF
Green minimalist professional Business Proposal Presentation.pdf
PDF
Profitable Farming Starts with AI in Agriculture | Rubixe
PDF
The Cost of Neglect How Skipping Fire Safety Maintenance Can Lead to Disaster...
PPTX
Unlocking-Business-Potential-Power-BI-Development-Services.pptx
PDF
Why Should Call Centers Use Inbound Call Tracking in 2025.pdf
PPTX
How After-School Art Classes Enhance Social Skills.pptx
PDF
Digital marketing strategy slides .pdf
PDF
Expert Medical Coding Services for Faster Reimbursements.pdf
PPT
8.1 Protein energy malnutrition paedatric.ppt
PPTX
Zulu Airline Systems – Innovative Airline Planning Solutions
PDF
Secure Your World with Acme Enterprises PDF Sharing.pdf
PPTX
Driving Accountability The Power of Business Responsibility and Sustainabilit...
PDF
Looking to Work Abroad_ Here’s Why Canada is a Great Option.pdf
Understanding LA's Zero Waste Initiative
Choosing an Entrepreneurial Path Based on Your Personality.pdf
Legacy Application Modernisation Services.pdf
The Dark Web’s Front Door: Finding the Real Hidden Wiki
Optimize Freight, Fleet, and Fulfillment with Scalable Logistics Solutions.pdf
Smart Plumbing Solutions Every Property Owner and Developer Should Know
Why Infotrench Stands Out as the Best SEO Agency in Noida.pdf
Green minimalist professional Business Proposal Presentation.pdf
Profitable Farming Starts with AI in Agriculture | Rubixe
The Cost of Neglect How Skipping Fire Safety Maintenance Can Lead to Disaster...
Unlocking-Business-Potential-Power-BI-Development-Services.pptx
Why Should Call Centers Use Inbound Call Tracking in 2025.pdf
How After-School Art Classes Enhance Social Skills.pptx
Digital marketing strategy slides .pdf
Expert Medical Coding Services for Faster Reimbursements.pdf
8.1 Protein energy malnutrition paedatric.ppt
Zulu Airline Systems – Innovative Airline Planning Solutions
Secure Your World with Acme Enterprises PDF Sharing.pdf
Driving Accountability The Power of Business Responsibility and Sustainabilit...
Looking to Work Abroad_ Here’s Why Canada is a Great Option.pdf

Building Depth in Facilities Team

  • 1. Building Depth in Facilities Chris Barron Facilities Manager Faith Baptist Church Youngsville, NC Discussing the opportunities within our teams to improve the overall function of facilities work.
  • 2. Today’s Training Plan • Discuss a Process for Evaluating Facilities – Assessment, Quantify, Adopt, Implement, Control • Diagram your current Facilities Ministries – List current status, possible opportunities for improvement / training and begin plan to change • Leave with list of possible improvements – Begin the plan to improve facilities depth
  • 3. Assessment • What are my teams doing today? – Spiritually – is it consistent with mission/vision – Physically – can it be quantified / measured • List them – Contracts, job descriptions / title, teams, etc. – What are you “not” doing? • What could we be doing differently? – Gaps, cross training, insource vs outsource
  • 4. Assessment Examples • Landscaper – 6 acres, $15K, $10K OoS work, contract with no detail. • Pest Control Spraying / watering plants • Thermostats cost most Electrically • Pastors asking Volunteers to serve in kitchen untrained • Largest financial liability for church • What requires the most rework
  • 5. Quantify • Focus on Mission / Ministry Goals – Member involvement – Cross Functional Teams – Employee satisfaction / Opportunity for advancement • Look for measurable outcomes – Reduce sick time / reduce turn over rate – Improve work order completion time / improve customer satisfaction – Reduce cost
  • 6. Quantifiable Examples • Cost of internalizing the landscaper - storage shed, tools/equip, training, drivers license just to go get the gas • Cost of current carpet cleaning company • Employee Efficiency (WO completion) - Tool cart and radios • Energy Usage Reduced -Weekly Thermostat check, lockable thermostats
  • 7. Adopt • Change requires “Pre – Work” – Write Training / Write Procedures / Write Contracts, get them reviewed / approved – Create Maps, checklist, calendar, schedule • Sale the future change – Prepare others for coming changes – Budget – Create incentive
  • 8. Adoption Examples • Wedding Coordinator – Reduce time the FM has to manage events • Carpet Extractions – Equipment on hand always ready to use – Reduce cost of contractor – Improve quality of carpet overall • Electrical Demand Reduction – Improve Thermostat Settings – HVAC start times / reduce cost
  • 9. Hands on Training • Ensure a part of Job Description • Classroom (reading policies, etc.) • Observe (watch others) • Simulate (supervised ) • Perform (on your own, checked behind) • Make Performance the new Norm • Be able to Train others / replacement
  • 10. Implement • Hire / Change Job Description – Employee Reviews / Goals / cross train • Train – Schedule / conduct training – Follow-up / Ensure training working – Make the change the new normal – Tie to rewards / Allow team members to train • Negotiate – Look at all contracts and service level agreements
  • 11. Implementation Examples • PM schedules / new CMMS • Training – Vehicle Policy Improvement • Maps - Landscaping on campus – write PMs to match landscaping map • Contract Re-negotiate / Implement Service Level Agreements with measurements • Procedure for Wedding Coordinator / Kitchen Director Training
  • 12. Initial PM Planning • Map • Inventory • Investigate • Count • Inspect
  • 13. PM Code Example Code Description W2-F W2-F Thermostat HVAC Adjust W3-G W3-G Mow, Trim, Blow W4-TP W4-TP Garbage Pick-Up W5-F W5-F Recycle Material Run M1-G M1-G Weeding / Weed Kill M2-TP M2-TP Cardboard Pick-Up M3-V M3-V Inspect All Vehicles / Trailers / Plan (update) SA1-V M4-F M4-F Flush floor drains M5-F M5-F Elevator Fire Test M6-F M6-F First Aid Kit Inventory / Restock M7-F M7-F Fire Extinguishers / Ansul System Inspection Q1-F Q1-F Pest / Insect Inspection / Spray Q2-F Q2-F HVAC AHU's - Inspect, Filter change, Clean coil as necessar Q3-TP Q3-TP Elevator Test (Schindler) Q4-F Q4-F Exit Signs Q5-F Q5-F Emergency Lighting Test (for Lithonia ELM4) Q6-F Q6-F Paper Shredder Maintenance Q7-C Q7-C Dry Erasers - Cleaning SA1-C SA1-C Extract KT 1st Floor Carpets not Nursery SA1-F SA1-F HVAC Semi-Annually SA1-G SA1-G Lawn Re-Seed, Aerate, Fertilizer SA1-K SA1-K Ice Maker Inspect / Clean SA1-V SA1-V Vehicle / Trailer Oil Change / Inspect SA2-C SA2-C Extract Nursery Carpets 3135,3145 SA2-K SA2-K Griddle Inspection/Clean SA3-F SA3-F Inspect Storage Areas SA3-G SA3-G Check for any safety/broken issues regarding children's play SA3-K SA3-K Convection Oven Inspect / Clean SA4-K SA4-K Coffee Systems De-Lime/Clean
  • 15. Manual PM Binder Example
  • 16. Control • Is it still working? • Did the outcome we hoped for happen? • Survey, Interview, buy-in, loose ends • Sale the change • Remember the People / Mission / Vision
  • 17. Controlling Examples • Electrical Utility Data – tied to Demand charge and Usage Data affected by Degree Days, and Thermostat Programming. • Annual Contract Review • Employee Performance Reviews • Large industries might us Loss Time
  • 18. What’s on your worksheet? • Real Depth in Facilities is in people • Leadership and Controls you implement including your example guide those people and affect attitudes • Remember Jesus Example – spend time, have fellowships, write cards, love and set the example.

Editor's Notes

  • #2: Chris Barron Faith Baptist Church Facilities Manager Served in church in high school as leader in youth and church sound man. Served at Broadway theater as assistant technical director US Navy – Nuclear reactor operator in engineering Johnson Controls Facilities Management - calibrations - technical writer - analytical calibrations tech - call center, technical writers, document control supervisor - Six Sigma Black Belt Computer Store Manager Facilities Manager at Faith - IT, Vehicle, Grounds, SS, Sound, Maintenance, Kitchen, Events, etc.
  • #3: Story of first taking over at faith. - A single notepad had written sheet showing the current contracts and about what we paid them for the year. and the picture of the handover. Goal for Training Slide Depth – how do you define it? – individual employee abilities / knowledge level how they improve facilities Nature and design of contractors and contract relationships Team work / the synergy of cross functional teams, doing as a whole more than the individual Strength on the bench ability to overcome any new challenge thrown at Facilities
  • #4: Recognize, Define, phase six sigma What are you doing today. Ask yourself about the spiritual side – are we as a team doing things that make sense biblically? Example of Jesus – disciples, what did Jesus not do that was required for every day life? Does working with contractors help us do that better than training our in house staff? Does your job descriptions match up with the church goals / What are we not doing that we should be doing? Total budget, total work hours, total cost, what is being done on campus in similar ways or task that is not currently under your area of ministry. Can synergy be gained by joining work areas or cross training, etc. May include a programming list, or employee names, or job descriptions or list of contracts or list of task. List Facilities specific Areas: Business / Administration, Health and Safety, Fire Safety, Security, Maintenance Systems, Periodic Testing and Inspections, Operational, Business Continuity Planning, IT / IS / Computers / Technology, Landscaping, Audio / Video, Vehicles / Fleet Management, Insurance, Space Planning, Event Management List of programming / events / Ministry support areas: Sunday Morning, childcare, school, VBS, Dinners, Weddings, Fall Festival, Easter event, Christmas event, sports programming List of Contracts: Landscaping, custodial, fire extinguishers, elevator, smoke detectors, wheel chair lift, snow removal, side walk clearing / cleaning, gutters, pest control, HVAC, carpet cleaning, sprinkler system, vehicle maintenance, trash removal, recycling, painting, security, tree trimming, window cleaning, organ /piano tuning, room set-up, generator maintenance, dry cleaning, baptismal maintenance, watering plants, IT, IS, movers, even electric company riders (may affect how you use electricity – discuss demand response or back-up power generation), water credit for dumping condensate to sewer or using evaporative cooling, chemical company for water tower, List of Job Descriptions: Facility Helper, Facility Assistant, Sound Man, Kitchen Director, Wedding Coordinator, Facility Technician, Calendar Admin, Secretary, Child Care Director, Security Officer, Facility Director, Landscaper, Bus Driver
  • #5: List gaps, skills, attitudes Lack of spiritual focus on job / department not consistent with overall mission of organization, employees only focused on specific task – not team oriented, not reporting problems in other technical areas, finger pointing instead of asking how can I help / learn that task, not able to self perform routine task, customer always waiting for a deliverable. Better, quality, faster, not core business vs improves overall team Provide services on weekends without paying high overtime rates, Who - Look at business / operation  - Insourced Cross training, Cross functional, dual job description, Benefits of cross trainings: essentially changing a team members job description to include additional task. Improves the amount of the larger process an employee is included in, improves the buy in and inclusion of that team mate, provides for pay increase opportunities and knowledge advancement acquire new skills, demonstrates that the organization cares (non-monetary recognition), saves the company money by using existing workforce, helps protect from the loss caused by employee absence or turn over, efficiency of existing workers always better than initial new recruit. - Outsourced Contracts, license, government regulations, Review service level agreements, add additional language new contract review, put measures in place to provide deeper bench of support from contract labor. Examples: table chair set-up help from custodial company, paid child care from Day Care workers.
  • #6: Measure current processes with some accuracy. Remember to ignore many soft numbers or let them stay soft (productivity gain). Bundle savings, let contractors install for free (example of sample flooring coating). Be careful about claiming maintenance savings. (building operating management 2014 greg zimmerman) Decide on measurable outcomes / goals – Analyze measured data for possible improvements Measurable outcomes begin with action verbs, and are verifiable, or measurable. Cost reduction overall, employee satisfaction, reduction in customer complaints, increase in quality, You cannot improve what you do not measure (six sigma) Internalize contract, what would customer see / feel. Required change in budgeting…outside check vs. in-house payroll. Training: Ensures consistency Ensures safety Ensures Job description understood Reduces rework, mistakes Provides confidence / assurance Improve customer satisfaction Can demonstrate care to employee Cross training can have disadvantages and advantages: Cover vacation Cover Sick days Prevent boredom Create competition Develop greater ladder / opportunity for advancement Demonstrate leadership qualities and who is ready for promotion Allow reduction in outside contracts Improve casualty response (familiar with systems on site Improve customer satisfaction (on-site knowledge, quick response time, Provide cross area oversight or review (accountability, team building, Limit approach by considering: Stretching employees too thin Level of technical expertise Quality may suffer Employee chooses favorite work, other areas suffer https://www.fmbenchmarking.com/
  • #7: Example: - of our first landscaper – filed bankruptcy not long after we switched to a different contractor. - I began to push my tech too fast too soon. FMBenchmarking.com $1.50 to $3 sqft for maintenance $3 sqft for Utilities – moderate climate $1.25 sqft for custodial $ sqft for mortgage / insurance / taxes At Faith we run about $3 to $3.5 sqft on maintenance, custodial, utilities.
  • #8: Put procedures in place, plan for the transition PM calendar – procedures require signatures Design / Architect phase of six sigma Consider all the Leaning styles, visual, audible, tactile, repetitive Consider the ways to perform the training - Observe, Practice, simulate, discuss talk about more on another slide. Write the training, example vehicle binders, forms, handouts, quiz, power point, etc. Example: Switch from full time to on-call, vs volunteer labor for set-ups. Implement procedures that can be referenced. Create maps to help person check off list Create checklist for topics each job description needs to discuss, i.e. SDS (MSDS) Could be tied to pay raises / performance evaluation Qualification Cards – Navy example Break down the training into sections: Start with basics – always include and do not assume the employee knows what to do. Include the theory or reasons if known to seal the training and assist those who can apply the theory in the event the situation is slightly different next time.
  • #9: $600 single room with carpet extraction company each visit Electrical KWH reduction of $2800 first year, and $2100 in demand savings ($4900 or 12% reduction) Examples: - sound man training baptismal operation window cleaning kitchen helper, wedding coordinator security team carpet extraction vehicle maintenance checklist, vehicle driver training, fire extinguisher use, floor waxing fire extinguisher monthly, elevator monthly, pest control spray, termite inspection, HVAC monthly, quarterly, and semi-annual, simple electrical repair, GFCI testing, lawn care, network installation and testing, Air balance, ergonomics, thermostat operation, electrical demand reduction,
  • #10: Ensure a part of Job Description Classroom (reading policies, etc.) Observe (watch others) Practice (simulated, actual, supervised ) Perform (on your own, checked behind) Make Performance the new Norm Be able to Train others / replacement Remember Proficiency – some task will require repeat training or refresher training Example: Switch from full time to on-call, vs volunteer labor for set-ups. Implement procedures that can be referenced. Create maps to help person check off list Create checklist for topics each job description needs to discuss, i.e. SDS (MSDS) Could be tied to pay raises / performance evaluation Qualification Cards – Navy example Break down the training into sections: Start with basics – always include and do not assume the employee knows what to do. Include the theory or reasons if known to seal the training and assist those who can apply the theory in the event the situation is slightly different next time.
  • #11: Make the initial improvement in an area Time cards at call center with 5 dollar meal card Choose Trainer, tools, timing, improve phase   Limit your training environment to a place where the participants practice the desired outcome repeatedly in a training room. The definition of training is hands-on practice. Make improvement with goal in mind. May require change in contract, example of hiring custodian before other contract is up. Hiring landscape team member in winter for training time. Landscaper to map all plants on campus with recommended fertilizer and trimming schedule Fire Co. to map all smoke detectors and pull stations Quarterly training with all staff (not just facilities) Fire extinguisher Use of the defibrillator Van driver training Site wide Emergency response (fire, hurricane, flood, tornado, shooter, etc.) Computer / Internet security Office Safety Evacuation   New Equipment Training session Carpet extraction, manf. on the phone, everyone standing around equipment Classroom electrical theory, safety, then into field for hands on. Ladder safety New lawn mower Classroom, observe, hands on, shadow: with sound guys, then hands on, set-up and break down sound equipment, then hands on quality of sound, then phase in with sound team. Vehicle, start with classroom, then walk through, then behind the wheel.
  • #12: Current IT was a replacement from a guys who did not want to grow with the implementation of the virtual environment. The new guys contract needed a first year before we could add information Current work order system did not provide the data to compare to contract language on response time and work order priority. Asked the landscaper to add tree trimming and mulch, fertilizer and weed killing as part of annual contract instead of out of scope work. Combined kitchen hood, smoke, sprinkler, monitoring, back flow test, fire extinguishers, to a combined contract. Dropped the poor performing security contractor who was performing smoke test.
  • #13: No PMs so the tools needed to be created to improve the process or train people.
  • #14: Start with basic list Develop the list of steps or task Begin to put meat on the skeleton of the needed training or procedure.
  • #15: Put some life into the meat on the skeleton
  • #16: Putting a face on it, skin on the structure.
  • #17: Would the fault that I think I found cause the symptoms I have observed? Could the fault that I found have been caused by a fault I have not found yet? Could the fault I found caused another fault I have yet to find? When dealing with improvements change will slip back if not controlled. Control phase Talk to the employees who attended the training. Verify the effectiveness of the training to determine if participants have changed their work behaviors. Procedures, Owners, Validate cost savings Conduct ongoing needs assessments and embrace a proactive training stance. For years, corporate training reflected reactive, band-aid approaches to poor employee performance. Train employees before they begin the work, and they will perform better. If they do not receive training, and develop bad habits, it is counter-productive to offer training as a remedy. Feedback, re-check, re-measure, re-inspect, re-test, re-visit, remember. Communicate the change and impact to the customer – example of switch to IT provider, change in landscaper (clover in grass), Ensure that hard skills training is always a hands-on experience budgets and people there is always the un forseen un planned change or cost.
  • #18: Annual review of the vehicle training by Office Manager – 1 yr. copy of proof of insurance, 3 yr. new application.
  • #19: Institutionalize – Share Deploy to others, translate it. Re do. Your questions – What improvements opportunities have stood out to you today Second Closing – Drive point home with example Maybe the auditing tool in word for tech writers. Using interoffice mail system for tech writers, The key control process with new database and forms.