CONTENT PAGE
2
PROJECT: DIGI Technology Operations Centre
LOCATION: Malaysia
ARCHITECT: T. R. Hamzah & Yeang Sdn. Bhd.
Picture 1: A perspective view of DIGI’s Technology Operations Centre.
Designed by the T. R. Hamzah & Yeang Sdn. Bhd., it first started its
construction in April 2009 and was completed in July 2010. The DiGi
Technology Operation Centre is located in Subang High Tech Park, Shah
Alam, Selangor. It stands at 23.5 metres in height, or 4-storeys tall, covering a
total gross area of 12, 468 sq. m. The building is a data centre equipped with
necessary facilities such as an administration office, reception lobby, telco
tower and a service management centre.
In the project’s brief, they stated that they had sought for a data centre based
on ‘IT data centre uptime institute’ Tier 3 platform, with a possible increase to
a Tier 4 security that includes substantial ecological features. The response to
the brief was a design that optimizes the data centre footprint, providing
effective drainage and waterproofing to protect sensitive equipment, reduce
solar heat gain into the centre and allows for effective security measures.
INTRODUCTION
3
Picture 2: Satellite view of DIGI Technology Operations Center
Coordinates: 3.067780, 101.569256
Aim: The DIGI Technology Operations Centre aims to reduce
the company’s carbon footprint by more than 40% while
achieving operational efficiencies through the
construction of this green building.
Certification: DIGI Technology Operations Centre has ben certified
Gold in the Green Building Index in Malaysia
Green Features: The passive green features implemented in building
includes:
• Extensive vertical green walls that filters and improves
the ambient indoor air quality and reduces solar heat
gain
4
Picture 3: The vegetated green walls of the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
Picture 4: The vegetated vertical green wall of the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
5
• Full-height Low-E curtain walls to provide maximum
daylight penetration and enables energy efficient
lighting systems
Drawing 1: The low-e curtain walls enclosing the building
Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
Diagram 1: Diagram showing the heat transfer through the low-e glass
Source: Lee, 2014
• Regular shuttle service is provided between the
building and the Batu Tiga KTM station
6
Picture 5: The nearest KTM station, Batu Tiga
Source : http://en.wikipedia.org/wiki/Batu_Tiga_Komuter_station
7
ORTHOGRAPHIC DRAWINGS
Drawing 2: Site Plan (nts)
Drawing 3: Level 2 floor plan of the DIGI Technology Operations Centre
8
Drawing 4: Roof Plan of Digi Technology Operations Centre
Drawing 5: North Western elevation of the building
9
Drawing 6: North Eastern elevation of the building
Drawing 7: Section cut of the building
Drawing 8: Section cut of the building
10
SITE PICTURES
( Copyright T.R. Hamzah & Yeang Sdn. Bhd. (2014) )
Picture 6: A perspective view of the DIGI Technology Operations Centre
11
Picture 7: Main entrance of the building
Picture 8: Reception area of the building
12
Figure 1: Average temperature of Kuala Lumpur, Malaysia
Diagram 2: Average Relative Humidity of Kuala Lumpur, Malaysia
Referring to Firgure 1, it can be seen that the temperatures vary throughout
the year. The first 6 months the temperature gradually decreases and
increases for the next 6 months. The average temperature for Malaysia is
28oC. Referring to Diagram 2, the northwestern side of Kuala Lumpur has the
highest level of humidity as compared to the other areas.
CLIMATE DATA
13
Diagram 3: A wind rose diagram for Kuala Lumpur, Malaysia
Diagram 4: A diagram showing the direction of the prevailing winds
Referring to Diagram 3, the highest frequency of wind comes from the East
and Southeast of Kuala Lumpur. The highest wind speed for both directions is
10 km/h. It can be seen the orientation of the building is angled to maximize
ventilation around the building.
WIND ANALYSIS
14
Diagram 5: A sun path diagram for Kuala Lumpur, Malaysia
Diagram 6: Optimum orientation of a building in Kuala Lumpur, Malaysia
Referring to Diagram 6, the optimum orientation of a building to prevent
overheating should be where the longest façade faces the North East,
indicated by the blue arrow.
SUN ANALYSIS
15
1. VEGETATED GREEN WALL
a) Description
Diagram 9: Diagram showing the green wall surrounding the building
Picture 9: Picture showing the Southeastern façade with the green wall
PASSIVE GREEN DESIGN ANALYSIS
16
Drawing 10: A diagram showing the Northeastern façade with the green wall
Drawing 11: A diagram showing the Northwestern façade with the green wall
The green wall façade has a lot of biological advantages that it provides to the
building while functioning as a act living art installation. The northeast,
northwest and southeast façades, a large green wall is designed in a zigzag
manner across the building from the top to the bottom, creating a unique
attractive art installation, and at the same time protecting the entire building
with its biological advantages.
17
b) Thermal advantages
Diagram 7: A diagram showing the thermal and solar radiation pathways
Diagram 8: Temperature zoning within the building
The green wall surrounding the façades of the DIGI building causes thermal
reduction by trapping a layer of air within the plant mass. This reduces the
ambient temperature via evaporation shading. It also functions as a buffer
zone during hot weathers and cold weathers (e.g: rainy seasons). Not only is
the building protected from overheating, but also the surrounding air quality is
improved due to the green wall absorbing carbon dioxide and releasing
oxygen through photosynthesis. Referring to Diagram 8, heat has to be kept
18
away from the data centre to avoid damage to the equipment. This is done by
placing it in the centre of the building away from sources of heat.
c) Type of plant used
Picture 10: A close up of the green wall on the North Eastern façade
The DIGI Technology Operations Centre uses turf grass for the green wall
due to it having several advantages. Turf grass is larger, taller and they grow
in bulk making it easier to flourish. They also provide some sort of acoustic
insulation from the outside as well. The DIGI building is located in an industrial
area and due to it being an office building, acoustic insulation is necessary.
Evapotranspiration takes place thus reducing the heat entering the building,
regulating the interior temperatures and increasing the human comfort. The
turf grass also protects the building form ultraviolet rays as well (Bliss &
Everett, 2014).
19
d) Evapotranspiration
Diagram9: A diagram showing the effects of evapotranspiration
A wet object in this case turf grass will decrease in temperature due to
the effect of evaporation due to the molecular kinetics, where the faster
water molecules escape and become a part of the air. Since those that
escape has more energy than the average, the process decreases the
temperature of the water that escapes the object making the
environment cooler ( “How Does”, n.d.). The green wall is placed on
the north-east and north-west façade which, due to the building's
orientation, receives the most sunlight at 9am until 4pm, providing heat
to the turf grass, thus catalyzing the water molecules on the turf grass
to undergo evaporation, This in turn makes the environment around the
building cooler as the evaporated water molecules combine with the air
molecules. The designers take advantage of this process by placing
the ACMV’s, which take in fresh air close to the green walls. Not only
will the building ventilate cool air, it improves the indoor air quality as
well (Chua, et al., n.d.).
20
e) Acoustic Barrier
Diagram 10: A diagram stating the sources of noise in the area
Diagram 11: A diagram showing the reverberation of sound
Green walls also have an added benefit to the building occupants by
providing a form of acoustic insulation due to the plants ability to
absorb sound (“Green Wall Benefits”, 2010). The DiGi Technology
Operation Centre is located in an industrial area where large lorries
and trucks frequent. Therefore, sound insulation is needed. It can be
seen that the green walls have been placed strategically near the main
sources of noise, referring to Diagram 13.
21
2. BUILDING ORIENTATION
a) MS1525 Requirements
Diagram 12: Diagram showing the staircases and service rooms
In reference to the MS1525 (2007) requirements, the best orientation for
buildings in equatorial climates, have their long directional axis facing North-
South, minimizing the East-West orientation. It can be seen that the DIGI
Technology Operation Centre is angled in such a way that the longest façade
unfortunately have a East-West orientation. In order to reduce the solar heat
gain, service areas such as staircases and service ducts are located near the
external walls on the east-west façades. The rooftop also holds several
service rooms to further reduce the solar heat gain (Aun, 2009).
b) Induction of daylight
Diagram 13: North Eastern and North Western façade at 9am
22
Diagram 14: South Eastern and South Western façade at 4pm
Referring to the above diagrams, it can be seen that the Northeastern façade
receives the most sunlight at 9am until 4pm when it is shaded. The South
Eastern facade is shaded during the day until 4pm when it is fully exposed to
sunlight.
Picture 11: Natural daylight illuminates the reception area of the building
23
Picture 12: Natural daylight brightens up the office area
As seen in the above images, the interior spaces of the building are lit up with
natural daylighting especially the spaces in the Northeastern side during 9am
to 4pm, and the Southeastern spaces from 4pm onwards. The curtain wall at
Northeast façade allows sunlight to illuminate the main office areas during
working hours from 9am to 4pm, when the façade receives the maximum
daylight exposure.
c) Optimum Building Orientation
Diagram 15: Optimum building orientation for the DiGi Technology Operation Centre
The longer façade of the Digi Technology Operation Centre building is not
orientated towards the optimum direction, which is to the North East.
24
However, the building is perhaps to be orientated in such manner as the main
entrance as well as the main office area is situated there. This is as well to
avoid direct sunlight to penetrate in during morning and afternoon, which is
the time with the most sunlight.
As to compensate for the length of façade facing the optimum direction, the
North East side of the building has been installed with glazed glass with
curtain wall system which aid in the fully daylight penetration as well as an
efficient lighting scheme to the office area. Besides that, short overhang are
placed on this area for a better day lighting system.
Drawing 12: DiGi Technology Operations Centre façade with curtain walling
25
Aun, C. S. (Director) (2009). Green Building Index - MS1525. Applying
MS1525:2007 Code of Practice on Energy Efficiency and Use of Renewable
Energy for Non-Residential Buildings. Lecture conducted from Persatuan
Arkitek Malaysia, Kuala Lumpur.
Bliss, H., & Everett, W. (2014). What Is Turf Grass? Retrieved April 30, 2014, from
http://www.wisegeek.com/what-is-turf-grass.html
Chua, Z.Y., Chan, S.Q., Tan T., Ong, K., Hon, Y. M. Y., & Lim J. Z. ( n.d.)
[Presentation Board]. Digi technology operation centre.
Green Wall Benefits. (2010). Retrieved April 30, 2014, from
http://www.greenroofs.org/index.php/about/green-wall-benefits
Grondzik, W. T., Kowk, A. G., Stein, B., & Reynolds, J. S. (2010). Mechanical and
electrical equipment for buildings. Hoboken, N.J: Wiley.
Living Walls Improve Indoor Air Quality, Save Energy and Add Life to Your Home -
Green Home Gnome. (n.d.). Retrieved April 30, 2014, from
http://www.greenhomegnome.com/living-walls/
London's Famous Gherkin Building Goes Green - Literally | Inhabitat - Sustainable
Design Innovation, Eco Architecture, Green Building. (n.d.). Retrieved April 30,
2014, from http://inhabitat.com/gherkin-gets-a-green-roof/
REFERENCE LIST
26
Singal, S. (2014). AECCafe.com - ArchShowcase - DIGI Technology Operation
Centre in Shah Alam, Selangor, Malaysia by T.R. Hamzah & Yeang Sdn Bhd.
Retrieved April 28, 2014, from http://www10.aeccafe.com/blogs/arch-
showcase/2014/03/29/digi-technology-operation-centre-in-shah-alam-selangor-
malaysia-by-t-r-hamzah-yeang-sdn-bhd/?interstitial_displayed=Yes
TR Hamzah & Yeang Sdn. Bhd. (n.d.). Retrieved April 28, 2014, from
http://www.trhamzahyeang.com/project/large-buildings/Digi_01.html

More Related Content

PDF
BUILDING SCIENCE 1 PTM GEO 1
PDF
Lot 2C2 Building Science Report
PPTX
Council house 2 sustainable building example
PDF
BUOYANT FOUNDATION REPORT
PDF
Architecture Museum Malacca Dilapidation Report
PPTX
Air cleaning bricks
PPTX
Tokyo Sky Tree
PDF
INTEGRATION OF GREEN FACADES IN HIGHRISE COMMERCIAL BUILDINGS.pdf
BUILDING SCIENCE 1 PTM GEO 1
Lot 2C2 Building Science Report
Council house 2 sustainable building example
BUOYANT FOUNDATION REPORT
Architecture Museum Malacca Dilapidation Report
Air cleaning bricks
Tokyo Sky Tree
INTEGRATION OF GREEN FACADES IN HIGHRISE COMMERCIAL BUILDINGS.pdf

What's hot (20)

PDF
Building Services Case Study
PDF
Mesiniaga Tower.pdf
PDF
KOHINOOR SQUARE.pdf
PPTX
Vertical fins
PDF
PAM centre (building services)
PDF
High-rise case study in Seagram Building & John Hancock Center
PDF
Building services group report
PDF
B.tech Project 1 - Industrialised Building Systems
DOCX
Park Royal Building Science Report
PDF
Building science report [malaysia]
PDF
Building service
PPTX
Sangath
PPTX
Lift Location, Arrangement and Zoning System
PDF
Building services
PPTX
Case study- Mixed Use Building
PDF
Methods of Documentation and Measured Drawing
PPSX
JOHN HANCOCK CENTER
PPTX
Santiago calatrava
DOCX
Building service project2
PDF
Telekom Tower
Building Services Case Study
Mesiniaga Tower.pdf
KOHINOOR SQUARE.pdf
Vertical fins
PAM centre (building services)
High-rise case study in Seagram Building & John Hancock Center
Building services group report
B.tech Project 1 - Industrialised Building Systems
Park Royal Building Science Report
Building science report [malaysia]
Building service
Sangath
Lift Location, Arrangement and Zoning System
Building services
Case study- Mixed Use Building
Methods of Documentation and Measured Drawing
JOHN HANCOCK CENTER
Santiago calatrava
Building service project2
Telekom Tower
Ad

Similar to Building science report [malaysia] final (20)

PPT
PDF
Finalgeo part1
PPTX
Case study of the Living Planet Centre WWF
PDF
CASE STUDY.pdf
PDF
Setia International Centre Analysis Report
PPTX
The Edge Building.pptx hhdhgd hdhdhh dhhd
PDF
Finalgeo part2
PDF
BUILDING SCIENCE 1 PTM GEO 2
DOCX
Parkroyalfinalforsubmission 140717004033-phpapp02
PDF
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
PPTX
Mec 600 Sustainable Green Building
PDF
The eastgate centre, biomimicry architecture,
PDF
Manual of tropical housing-koenigsberger
PDF
Manual of tropical housing-koenigsberger
PDF
Manual of ropical housing - Otto H Koenigsberger
PPTX
TERI -BANGLORE_Case study
PDF
Architects, Technology and Energy Saving
PDF
PPTX
Teri, bangalore & solar passive techniques(rupesh)
PDF
Commercial complex futurex at parel south mumbai
Finalgeo part1
Case study of the Living Planet Centre WWF
CASE STUDY.pdf
Setia International Centre Analysis Report
The Edge Building.pptx hhdhgd hdhdhh dhhd
Finalgeo part2
BUILDING SCIENCE 1 PTM GEO 2
Parkroyalfinalforsubmission 140717004033-phpapp02
Bart Meehan: Sustainably Designed Buildings at the Australian National Univer...
Mec 600 Sustainable Green Building
The eastgate centre, biomimicry architecture,
Manual of tropical housing-koenigsberger
Manual of tropical housing-koenigsberger
Manual of ropical housing - Otto H Koenigsberger
TERI -BANGLORE_Case study
Architects, Technology and Energy Saving
Teri, bangalore & solar passive techniques(rupesh)
Commercial complex futurex at parel south mumbai
Ad

More from miranazrin (10)

DOCX
Semiology and archtecture synosis 2
DOCX
Life between buildings synopsis 1
DOCX
The eye of the skin architecture
DOCX
Critical regionalism
DOCX
Image of the city
DOCX
BUILDING STRUCTURE BRIDGE TRUSS
PPTX
CASE STUDY
PDF
Bcon report
PPTX
Building construction report
DOCX
Building science report [singapore] final
Semiology and archtecture synosis 2
Life between buildings synopsis 1
The eye of the skin architecture
Critical regionalism
Image of the city
BUILDING STRUCTURE BRIDGE TRUSS
CASE STUDY
Bcon report
Building construction report
Building science report [singapore] final

Recently uploaded (20)

PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
1_English_Language_Set_2.pdf probationary
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
PDF
Empowerment Technology for Senior High School Guide
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Computing-Curriculum for Schools in Ghana
PDF
My India Quiz Book_20210205121199924.pdf
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
1_English_Language_Set_2.pdf probationary
TNA_Presentation-1-Final(SAVE)) (1).pptx
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Introduction to pro and eukaryotes and differences.pptx
Indian roads congress 037 - 2012 Flexible pavement
MBA _Common_ 2nd year Syllabus _2021-22_.pdf
Empowerment Technology for Senior High School Guide
History, Philosophy and sociology of education (1).pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Computing-Curriculum for Schools in Ghana
My India Quiz Book_20210205121199924.pdf
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
FORM 1 BIOLOGY MIND MAPS and their schemes

Building science report [malaysia] final

  • 1. 1 INTRODUCTION PAGE 2 CLIMATE DATA PAGE 12 WIND ANALYSIS PAGE 13 SUN ANALYSIS PAGE 14 PASSIVE GREEN DESIGN ANALYSIS PAGE 15 REFERENCE LIST PAGE 25 CONTENT PAGE
  • 2. 2 PROJECT: DIGI Technology Operations Centre LOCATION: Malaysia ARCHITECT: T. R. Hamzah & Yeang Sdn. Bhd. Picture 1: A perspective view of DIGI’s Technology Operations Centre. Designed by the T. R. Hamzah & Yeang Sdn. Bhd., it first started its construction in April 2009 and was completed in July 2010. The DiGi Technology Operation Centre is located in Subang High Tech Park, Shah Alam, Selangor. It stands at 23.5 metres in height, or 4-storeys tall, covering a total gross area of 12, 468 sq. m. The building is a data centre equipped with necessary facilities such as an administration office, reception lobby, telco tower and a service management centre. In the project’s brief, they stated that they had sought for a data centre based on ‘IT data centre uptime institute’ Tier 3 platform, with a possible increase to a Tier 4 security that includes substantial ecological features. The response to the brief was a design that optimizes the data centre footprint, providing effective drainage and waterproofing to protect sensitive equipment, reduce solar heat gain into the centre and allows for effective security measures. INTRODUCTION
  • 3. 3 Picture 2: Satellite view of DIGI Technology Operations Center Coordinates: 3.067780, 101.569256 Aim: The DIGI Technology Operations Centre aims to reduce the company’s carbon footprint by more than 40% while achieving operational efficiencies through the construction of this green building. Certification: DIGI Technology Operations Centre has ben certified Gold in the Green Building Index in Malaysia Green Features: The passive green features implemented in building includes: • Extensive vertical green walls that filters and improves the ambient indoor air quality and reduces solar heat gain
  • 4. 4 Picture 3: The vegetated green walls of the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd Picture 4: The vegetated vertical green wall of the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd
  • 5. 5 • Full-height Low-E curtain walls to provide maximum daylight penetration and enables energy efficient lighting systems Drawing 1: The low-e curtain walls enclosing the building Source : Image Courtesy © T.R. Hamzah & Yeang Sdn Bhd Diagram 1: Diagram showing the heat transfer through the low-e glass Source: Lee, 2014 • Regular shuttle service is provided between the building and the Batu Tiga KTM station
  • 6. 6 Picture 5: The nearest KTM station, Batu Tiga Source : http://en.wikipedia.org/wiki/Batu_Tiga_Komuter_station
  • 7. 7 ORTHOGRAPHIC DRAWINGS Drawing 2: Site Plan (nts) Drawing 3: Level 2 floor plan of the DIGI Technology Operations Centre
  • 8. 8 Drawing 4: Roof Plan of Digi Technology Operations Centre Drawing 5: North Western elevation of the building
  • 9. 9 Drawing 6: North Eastern elevation of the building Drawing 7: Section cut of the building Drawing 8: Section cut of the building
  • 10. 10 SITE PICTURES ( Copyright T.R. Hamzah & Yeang Sdn. Bhd. (2014) ) Picture 6: A perspective view of the DIGI Technology Operations Centre
  • 11. 11 Picture 7: Main entrance of the building Picture 8: Reception area of the building
  • 12. 12 Figure 1: Average temperature of Kuala Lumpur, Malaysia Diagram 2: Average Relative Humidity of Kuala Lumpur, Malaysia Referring to Firgure 1, it can be seen that the temperatures vary throughout the year. The first 6 months the temperature gradually decreases and increases for the next 6 months. The average temperature for Malaysia is 28oC. Referring to Diagram 2, the northwestern side of Kuala Lumpur has the highest level of humidity as compared to the other areas. CLIMATE DATA
  • 13. 13 Diagram 3: A wind rose diagram for Kuala Lumpur, Malaysia Diagram 4: A diagram showing the direction of the prevailing winds Referring to Diagram 3, the highest frequency of wind comes from the East and Southeast of Kuala Lumpur. The highest wind speed for both directions is 10 km/h. It can be seen the orientation of the building is angled to maximize ventilation around the building. WIND ANALYSIS
  • 14. 14 Diagram 5: A sun path diagram for Kuala Lumpur, Malaysia Diagram 6: Optimum orientation of a building in Kuala Lumpur, Malaysia Referring to Diagram 6, the optimum orientation of a building to prevent overheating should be where the longest façade faces the North East, indicated by the blue arrow. SUN ANALYSIS
  • 15. 15 1. VEGETATED GREEN WALL a) Description Diagram 9: Diagram showing the green wall surrounding the building Picture 9: Picture showing the Southeastern façade with the green wall PASSIVE GREEN DESIGN ANALYSIS
  • 16. 16 Drawing 10: A diagram showing the Northeastern façade with the green wall Drawing 11: A diagram showing the Northwestern façade with the green wall The green wall façade has a lot of biological advantages that it provides to the building while functioning as a act living art installation. The northeast, northwest and southeast façades, a large green wall is designed in a zigzag manner across the building from the top to the bottom, creating a unique attractive art installation, and at the same time protecting the entire building with its biological advantages.
  • 17. 17 b) Thermal advantages Diagram 7: A diagram showing the thermal and solar radiation pathways Diagram 8: Temperature zoning within the building The green wall surrounding the façades of the DIGI building causes thermal reduction by trapping a layer of air within the plant mass. This reduces the ambient temperature via evaporation shading. It also functions as a buffer zone during hot weathers and cold weathers (e.g: rainy seasons). Not only is the building protected from overheating, but also the surrounding air quality is improved due to the green wall absorbing carbon dioxide and releasing oxygen through photosynthesis. Referring to Diagram 8, heat has to be kept
  • 18. 18 away from the data centre to avoid damage to the equipment. This is done by placing it in the centre of the building away from sources of heat. c) Type of plant used Picture 10: A close up of the green wall on the North Eastern façade The DIGI Technology Operations Centre uses turf grass for the green wall due to it having several advantages. Turf grass is larger, taller and they grow in bulk making it easier to flourish. They also provide some sort of acoustic insulation from the outside as well. The DIGI building is located in an industrial area and due to it being an office building, acoustic insulation is necessary. Evapotranspiration takes place thus reducing the heat entering the building, regulating the interior temperatures and increasing the human comfort. The turf grass also protects the building form ultraviolet rays as well (Bliss & Everett, 2014).
  • 19. 19 d) Evapotranspiration Diagram9: A diagram showing the effects of evapotranspiration A wet object in this case turf grass will decrease in temperature due to the effect of evaporation due to the molecular kinetics, where the faster water molecules escape and become a part of the air. Since those that escape has more energy than the average, the process decreases the temperature of the water that escapes the object making the environment cooler ( “How Does”, n.d.). The green wall is placed on the north-east and north-west façade which, due to the building's orientation, receives the most sunlight at 9am until 4pm, providing heat to the turf grass, thus catalyzing the water molecules on the turf grass to undergo evaporation, This in turn makes the environment around the building cooler as the evaporated water molecules combine with the air molecules. The designers take advantage of this process by placing the ACMV’s, which take in fresh air close to the green walls. Not only will the building ventilate cool air, it improves the indoor air quality as well (Chua, et al., n.d.).
  • 20. 20 e) Acoustic Barrier Diagram 10: A diagram stating the sources of noise in the area Diagram 11: A diagram showing the reverberation of sound Green walls also have an added benefit to the building occupants by providing a form of acoustic insulation due to the plants ability to absorb sound (“Green Wall Benefits”, 2010). The DiGi Technology Operation Centre is located in an industrial area where large lorries and trucks frequent. Therefore, sound insulation is needed. It can be seen that the green walls have been placed strategically near the main sources of noise, referring to Diagram 13.
  • 21. 21 2. BUILDING ORIENTATION a) MS1525 Requirements Diagram 12: Diagram showing the staircases and service rooms In reference to the MS1525 (2007) requirements, the best orientation for buildings in equatorial climates, have their long directional axis facing North- South, minimizing the East-West orientation. It can be seen that the DIGI Technology Operation Centre is angled in such a way that the longest façade unfortunately have a East-West orientation. In order to reduce the solar heat gain, service areas such as staircases and service ducts are located near the external walls on the east-west façades. The rooftop also holds several service rooms to further reduce the solar heat gain (Aun, 2009). b) Induction of daylight Diagram 13: North Eastern and North Western façade at 9am
  • 22. 22 Diagram 14: South Eastern and South Western façade at 4pm Referring to the above diagrams, it can be seen that the Northeastern façade receives the most sunlight at 9am until 4pm when it is shaded. The South Eastern facade is shaded during the day until 4pm when it is fully exposed to sunlight. Picture 11: Natural daylight illuminates the reception area of the building
  • 23. 23 Picture 12: Natural daylight brightens up the office area As seen in the above images, the interior spaces of the building are lit up with natural daylighting especially the spaces in the Northeastern side during 9am to 4pm, and the Southeastern spaces from 4pm onwards. The curtain wall at Northeast façade allows sunlight to illuminate the main office areas during working hours from 9am to 4pm, when the façade receives the maximum daylight exposure. c) Optimum Building Orientation Diagram 15: Optimum building orientation for the DiGi Technology Operation Centre The longer façade of the Digi Technology Operation Centre building is not orientated towards the optimum direction, which is to the North East.
  • 24. 24 However, the building is perhaps to be orientated in such manner as the main entrance as well as the main office area is situated there. This is as well to avoid direct sunlight to penetrate in during morning and afternoon, which is the time with the most sunlight. As to compensate for the length of façade facing the optimum direction, the North East side of the building has been installed with glazed glass with curtain wall system which aid in the fully daylight penetration as well as an efficient lighting scheme to the office area. Besides that, short overhang are placed on this area for a better day lighting system. Drawing 12: DiGi Technology Operations Centre façade with curtain walling
  • 25. 25 Aun, C. S. (Director) (2009). Green Building Index - MS1525. Applying MS1525:2007 Code of Practice on Energy Efficiency and Use of Renewable Energy for Non-Residential Buildings. Lecture conducted from Persatuan Arkitek Malaysia, Kuala Lumpur. Bliss, H., & Everett, W. (2014). What Is Turf Grass? Retrieved April 30, 2014, from http://www.wisegeek.com/what-is-turf-grass.html Chua, Z.Y., Chan, S.Q., Tan T., Ong, K., Hon, Y. M. Y., & Lim J. Z. ( n.d.) [Presentation Board]. Digi technology operation centre. Green Wall Benefits. (2010). Retrieved April 30, 2014, from http://www.greenroofs.org/index.php/about/green-wall-benefits Grondzik, W. T., Kowk, A. G., Stein, B., & Reynolds, J. S. (2010). Mechanical and electrical equipment for buildings. Hoboken, N.J: Wiley. Living Walls Improve Indoor Air Quality, Save Energy and Add Life to Your Home - Green Home Gnome. (n.d.). Retrieved April 30, 2014, from http://www.greenhomegnome.com/living-walls/ London's Famous Gherkin Building Goes Green - Literally | Inhabitat - Sustainable Design Innovation, Eco Architecture, Green Building. (n.d.). Retrieved April 30, 2014, from http://inhabitat.com/gherkin-gets-a-green-roof/ REFERENCE LIST
  • 26. 26 Singal, S. (2014). AECCafe.com - ArchShowcase - DIGI Technology Operation Centre in Shah Alam, Selangor, Malaysia by T.R. Hamzah & Yeang Sdn Bhd. Retrieved April 28, 2014, from http://www10.aeccafe.com/blogs/arch- showcase/2014/03/29/digi-technology-operation-centre-in-shah-alam-selangor- malaysia-by-t-r-hamzah-yeang-sdn-bhd/?interstitial_displayed=Yes TR Hamzah & Yeang Sdn. Bhd. (n.d.). Retrieved April 28, 2014, from http://www.trhamzahyeang.com/project/large-buildings/Digi_01.html