Caltrain Modernization Program Update

        Palo Alto City Council Rail Committee
                   August 10, 2012
Presentation Topics
 1.   State Legislature Update
 2.   Next Steps for the Peninsula
 3.   Blended System Planning Analysis Update
 4.   Discussion
State Legislature Update
Green Light for HSR & Blended System
•       Bay Area State Assembly and Senate support
    –     Elaine Alquist, D-San Jose
    –     Tom Ammiano, D- San Francisco
    –     Jim Beall, D-San Jose
    –     Nora Campos, D-San Jose
    –     Paul Fong, D-Mountain View
    –     Rich Gordon, D-Menlo Park
    –     Jerry Hill, D-San Mateo
    –     Mark Leno, D-San Francisco
    –     Fiona Ma, D-San Francisco
    –     Leland Yee, D-San Francisco
SB 1029
•       Appropriates $705 million for Caltrain Modernization
    –      $600 million from Prop 1A (HSR)
    –      $105 million from Prop 1A (Connectivity)

•       Funds available for:
    –      “blended system improvements consistent with the MOU” and
    –      “shall not be used to expand the system to a dedicated four-track system”

•       Bonds sold and allocated to project by State Controller
Next Steps for the Peninsula
Project Delivery Focus
• Early Investment (2019)
   – Define outreach/decision-making structure and process
   – Advanced Signal System
        Advance design from “Critical” to “Final”
   – Electrification & Electric Vehicles
        Update / Recirculate Caltrain EA/EIR
        Define project delivery approach/team

• Blended System (2029)
   – Complete current planning studies
   – Schedule for completing planning process
Blended System Planning Update
Blended System Planning Process
Capacity Analysis     Service Plan / Operations     Grade Crossing &
                           Considerations            Traffic Analysis



                        Service Plan Options


Infrastructure Need          Fleet Need              Revenue / Cost




                       Decision-Making Matrix



                      Blended System Alternatives



                        Design & Environmental
                                Review
Blended System
Service Plan/Operations Considerations Analysis
Purpose / Goals
 •   Consider service / operations variables
     not included in capacity analysis
 •   Requested by stakeholders
 •   Inform development of service plan
     options
Scope of Work
Passing Track Options
Options                                   Locations

4 Tracks – Northern                  Milepost 5 to 15.2
                                (Bayshore to Millbrae stations)

4 Tracks - Full Midline            Milepost 18.1 to 27.2
                           (Hayward Park to Redwood City stations)
4 Tracks - Short Midline           Milepost 18.1 to 24.2
                               (Hayward Park to Whipple Ave.)

4 Tracks - Southern                 Milepost 33.8 to 41.6
                              (San Antonio to Lawrence station)

3 Tracks                           Milepost 18.1 and 33.7
                              (Hayward Park to California Ave. )
Simulation Model Results
•      4 Track Options
                  Operational Performance Ranking
        High:                       Full Midline
        Medium:               Short Midline & Southern
        Low :                        Northern


•      3 Track Option
    –Model: high performance
    –Practice: further evaluation
Decision Matrix (work in progress)
                                              Considerations
Passing Track Options
                           Operations   E&C        ROW         Cost    City /
                                                                      County
4 Tracks - Northern


4 Tracks - Full Midline


4 Tracks - Short Midline

4 Tracks - Southern

3 Tracks
Blended System
Grade Crossing & Traffic Analysis
Study Purpose & Goals
•       40 at-grade crossings
•       Identify relationship between:
    –     Train service levels
    –     Gate down time
    –     Local traffic

•       Analyze future scenarios (2035):
    –     Impacts from Caltrain versus future growth
    –     Difference between service plan options

•       Improvement recommendations
Key Tasks and Status
Discussion

More Related Content

PDF
Countywide Transit Network Study: Introductory Public Meeting
PPTX
I-66 Inside the Beltway Framework Document
PPTX
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
PPT
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
PDF
Kanata-Stittsville LRT Planning & EA - Open House #2
PPTX
I-66 Beltway to Haymarket - VDOT
PDF
Countywide Transit Network Study: Public Meeting July 10, 2013
PPTX
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study
Countywide Transit Network Study: Introductory Public Meeting
I-66 Inside the Beltway Framework Document
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Kanata-Stittsville LRT Planning & EA - Open House #2
I-66 Beltway to Haymarket - VDOT
Countywide Transit Network Study: Public Meeting July 10, 2013
Fairfax County Parkway and Franconia-Springfield Parkway Corridor Study

What's hot (20)

PDF
Kanata LRT Planning and Environmental Assessment Study
PPT
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
PPTX
Silver Line Phase 1-Status Report: May 6, 2014
PDF
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
PPT
Juniper Lane Connectivity Study: August 1, 2018
PPT
Lorton Road and Silverbrook Road Intersection Improvement Study
PPTX
North Kings Highway (VA 241) Intersection Improvements Study
PPTX
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
PPT
Public workshops for Transit Options Amherst Buffalo
PDF
North Corridor Transit Project - December 16th Board Briefing
PPT
Soapstone Connector Public Information Meeting For Environmental Assessment
PPTX
Braddock Road Multimodal Study: Guinea Road to I-495
PDF
Scarborough Subway Extension - Phase 2 Presentation
PDF
Toronto Relief Line Public Meeting Presentation
PPTX
Briefing: Scarborough Transit Planning Update
PPT
Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...
PPTX
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
PDF
Scarborough Subway Extension - Terms of Reference
PPTX
Scarborough Subway Extension - Public Meeting Presentation - January/February...
PPTX
Roc swana va 03302017 v2
Kanata LRT Planning and Environmental Assessment Study
Fairfax County Parkway Trail at Dulles Toll Road EB Ramp Improvement Study
Silver Line Phase 1-Status Report: May 6, 2014
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
Juniper Lane Connectivity Study: August 1, 2018
Lorton Road and Silverbrook Road Intersection Improvement Study
North Kings Highway (VA 241) Intersection Improvements Study
Reston Network Analysis: Transportation Advisory Commission: July 19, 2016
Public workshops for Transit Options Amherst Buffalo
North Corridor Transit Project - December 16th Board Briefing
Soapstone Connector Public Information Meeting For Environmental Assessment
Braddock Road Multimodal Study: Guinea Road to I-495
Scarborough Subway Extension - Phase 2 Presentation
Toronto Relief Line Public Meeting Presentation
Briefing: Scarborough Transit Planning Update
Discussion of Converting Braddock Road from a Secondary to Primary Road-Feb. ...
Richmond Highway Bus Rapid Transit Public Meeting #1: April 17 & 18, 2018
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Roc swana va 03302017 v2
Ad

Viewers also liked (7)

PDF
Aeronáutica Andaluza N13
PDF
A400 m program update 2012
PDF
An Update on A400M Testing, May 2013
PDF
An Update on the A400M, May 2013
PDF
Programa del ciclo conferencias Del Bleriot al A-400M
PDF
A400 m flight_test
PDF
Las Partes de Avión
Aeronáutica Andaluza N13
A400 m program update 2012
An Update on A400M Testing, May 2013
An Update on the A400M, May 2013
Programa del ciclo conferencias Del Bleriot al A-400M
A400 m flight_test
Las Partes de Avión
Ad

Similar to Caltrain modernization program update 8 10-2012 (20)

PPTX
COTA NE AA Public Meeting Presentation
PDF
Caltrain/HSR Jan 2016 Local Policy Maker meeting agenda
PPT
12 16-13 caltrain strategic plan overview
PPTX
Managing California HSPR Programs-Caltrain, Bazeley
PDF
Nov 14 - Caltrain Modernization Cost and Schedule Update
PDF
Transbay presentation-2-14-13
PDF
Van Nuys Corridor Rapidway (Oct 2011 PowerPoint)
PPTX
Caltrain emu procurement sept 2014
PPTX
The State of Rail in Illinois
PDF
Caltrain Capacity Mountain View
PPTX
Caltrain_Equity_522
PDF
Vision plan spur 11.30 presentation - hires
PDF
Caltrain Capacity Palo Alto
PPTX
Peoria AA Public Meeting #1 - July 2012
PPT
Building a Better Metro: Possibilities for BRT
PDF
04 02-15 Caltrain Modernization Updates
PPT
Swearengen 7437
PDF
Bazeley_CHSRA 2012 Business Plan: Managing California's incremental Intercity...
PPT
Passenger Trains For Va Peninsula Csx 7 17 09
PPT
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
COTA NE AA Public Meeting Presentation
Caltrain/HSR Jan 2016 Local Policy Maker meeting agenda
12 16-13 caltrain strategic plan overview
Managing California HSPR Programs-Caltrain, Bazeley
Nov 14 - Caltrain Modernization Cost and Schedule Update
Transbay presentation-2-14-13
Van Nuys Corridor Rapidway (Oct 2011 PowerPoint)
Caltrain emu procurement sept 2014
The State of Rail in Illinois
Caltrain Capacity Mountain View
Caltrain_Equity_522
Vision plan spur 11.30 presentation - hires
Caltrain Capacity Palo Alto
Peoria AA Public Meeting #1 - July 2012
Building a Better Metro: Possibilities for BRT
04 02-15 Caltrain Modernization Updates
Swearengen 7437
Bazeley_CHSRA 2012 Business Plan: Managing California's incremental Intercity...
Passenger Trains For Va Peninsula Csx 7 17 09
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27

More from Adina Levin (20)

PDF
Project Delivery Workshop # 2 Slides.pdf
PDF
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
PDF
megaprojects, SPUR 2022.pdf
PDF
Southeast San Francisco New Caltrain Stations
PDF
Regional options for caltrain governance
PDF
SF resolution Caltrain sales tax
PDF
Senator Hill letter SB797 Caltrain
PDF
Caltrain tax legal opinion
PDF
West Bay Legislators support Caltrain ballot measure
PDF
San Jose Transit first policy nomination
PDF
More Homes Less Driving TransForm 2-6-20
PDF
More Homes Less Driving Sares Regis 2-6-20
PDF
More Homes Less Driving First Community Housing 2-6-20
PDF
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
PDF
Caltrain 20190822 (1) (1)
PDF
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
PDF
Dumbarton Crossbay
PDF
San Francisco Board of Supervisors Caltrain Governance Resolution
PDF
Connecting Communities Optimizing Highways Event April 18
PDF
Irfp 1819 07 dtx project delivery review services
Project Delivery Workshop # 2 Slides.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
megaprojects, SPUR 2022.pdf
Southeast San Francisco New Caltrain Stations
Regional options for caltrain governance
SF resolution Caltrain sales tax
Senator Hill letter SB797 Caltrain
Caltrain tax legal opinion
West Bay Legislators support Caltrain ballot measure
San Jose Transit first policy nomination
More Homes Less Driving TransForm 2-6-20
More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving First Community Housing 2-6-20
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Caltrain 20190822 (1) (1)
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
Dumbarton Crossbay
San Francisco Board of Supervisors Caltrain Governance Resolution
Connecting Communities Optimizing Highways Event April 18
Irfp 1819 07 dtx project delivery review services

Recently uploaded (20)

PDF
chopta tour package from delhi chopta tour
PPTX
Your Guide to the BBC Proms 2025: What to Expect
PDF
Delhi Agra Jaipur Tour Package 2025 – Travel with Rajasthan Tours India.pdf
PPTX
Telangana Culture and tradtion musicals .pptx
PPTX
Enjoy Peaceful Travel Even in Busy Places.pptx
PDF
International Kailash Mansarovar Yatra, Visa, Permits, and Package.pdf
PPTX
What Can You Discover If You Scrape Booking Sites for Monsoon Flash Sales Hou...
PDF
Explore Luxemburry.eu, the ancient of lands in Europe
PDF
How Expensive is Mansarovar Yatra cost from Mumbai.pdf
PDF
Delhi to Kashmir Tour Package at Best Price.pdf
PPSX
Detian Transnational Waterfall, Chongzuo, Guangxi, CN. (中國 廣西崇左市 德天跨國瀑布).ppsx
PPTX
Minimalist Business Slides XL by Slidesgo.pptx
PPTX
How Indian Culture Is Perceived Around the World,Infouncle.pptx
PDF
Mapping the Landscape of Hospitality and Tourism A Bibliometric Study 2000–20...
PDF
Why Everyone Misses These 7 Extraordinary Cities — And Why You Should Visit I...
PDF
Autumn in Pakistan. Hunza Autumn Tours.
PDF
CruiseXplore 2025 Brochure – Your Guide to the Best Cruise Holidays from the ...
PDF
Golden Triangle Tour A Complete Travel Guide.pdf
PDF
World Regional Geography 6th Edition Lydia Mihelic Pulsipher Download Test Ba...
PPTX
MALDIVES.pptx.pptx short power point to guide your explanation
chopta tour package from delhi chopta tour
Your Guide to the BBC Proms 2025: What to Expect
Delhi Agra Jaipur Tour Package 2025 – Travel with Rajasthan Tours India.pdf
Telangana Culture and tradtion musicals .pptx
Enjoy Peaceful Travel Even in Busy Places.pptx
International Kailash Mansarovar Yatra, Visa, Permits, and Package.pdf
What Can You Discover If You Scrape Booking Sites for Monsoon Flash Sales Hou...
Explore Luxemburry.eu, the ancient of lands in Europe
How Expensive is Mansarovar Yatra cost from Mumbai.pdf
Delhi to Kashmir Tour Package at Best Price.pdf
Detian Transnational Waterfall, Chongzuo, Guangxi, CN. (中國 廣西崇左市 德天跨國瀑布).ppsx
Minimalist Business Slides XL by Slidesgo.pptx
How Indian Culture Is Perceived Around the World,Infouncle.pptx
Mapping the Landscape of Hospitality and Tourism A Bibliometric Study 2000–20...
Why Everyone Misses These 7 Extraordinary Cities — And Why You Should Visit I...
Autumn in Pakistan. Hunza Autumn Tours.
CruiseXplore 2025 Brochure – Your Guide to the Best Cruise Holidays from the ...
Golden Triangle Tour A Complete Travel Guide.pdf
World Regional Geography 6th Edition Lydia Mihelic Pulsipher Download Test Ba...
MALDIVES.pptx.pptx short power point to guide your explanation

Caltrain modernization program update 8 10-2012

  • 1. Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012
  • 2. Presentation Topics 1. State Legislature Update 2. Next Steps for the Peninsula 3. Blended System Planning Analysis Update 4. Discussion
  • 4. Green Light for HSR & Blended System • Bay Area State Assembly and Senate support – Elaine Alquist, D-San Jose – Tom Ammiano, D- San Francisco – Jim Beall, D-San Jose – Nora Campos, D-San Jose – Paul Fong, D-Mountain View – Rich Gordon, D-Menlo Park – Jerry Hill, D-San Mateo – Mark Leno, D-San Francisco – Fiona Ma, D-San Francisco – Leland Yee, D-San Francisco
  • 5. SB 1029 • Appropriates $705 million for Caltrain Modernization – $600 million from Prop 1A (HSR) – $105 million from Prop 1A (Connectivity) • Funds available for: – “blended system improvements consistent with the MOU” and – “shall not be used to expand the system to a dedicated four-track system” • Bonds sold and allocated to project by State Controller
  • 6. Next Steps for the Peninsula
  • 7. Project Delivery Focus • Early Investment (2019) – Define outreach/decision-making structure and process – Advanced Signal System  Advance design from “Critical” to “Final” – Electrification & Electric Vehicles  Update / Recirculate Caltrain EA/EIR  Define project delivery approach/team • Blended System (2029) – Complete current planning studies – Schedule for completing planning process
  • 9. Blended System Planning Process Capacity Analysis Service Plan / Operations Grade Crossing & Considerations Traffic Analysis Service Plan Options Infrastructure Need Fleet Need Revenue / Cost Decision-Making Matrix Blended System Alternatives Design & Environmental Review
  • 10. Blended System Service Plan/Operations Considerations Analysis
  • 11. Purpose / Goals • Consider service / operations variables not included in capacity analysis • Requested by stakeholders • Inform development of service plan options
  • 13. Passing Track Options Options Locations 4 Tracks – Northern Milepost 5 to 15.2 (Bayshore to Millbrae stations) 4 Tracks - Full Midline Milepost 18.1 to 27.2 (Hayward Park to Redwood City stations) 4 Tracks - Short Midline Milepost 18.1 to 24.2 (Hayward Park to Whipple Ave.) 4 Tracks - Southern Milepost 33.8 to 41.6 (San Antonio to Lawrence station) 3 Tracks Milepost 18.1 and 33.7 (Hayward Park to California Ave. )
  • 14. Simulation Model Results • 4 Track Options Operational Performance Ranking High: Full Midline Medium: Short Midline & Southern Low : Northern • 3 Track Option –Model: high performance –Practice: further evaluation
  • 15. Decision Matrix (work in progress) Considerations Passing Track Options Operations E&C ROW Cost City / County 4 Tracks - Northern 4 Tracks - Full Midline 4 Tracks - Short Midline 4 Tracks - Southern 3 Tracks
  • 16. Blended System Grade Crossing & Traffic Analysis
  • 17. Study Purpose & Goals • 40 at-grade crossings • Identify relationship between: – Train service levels – Gate down time – Local traffic • Analyze future scenarios (2035): – Impacts from Caltrain versus future growth – Difference between service plan options • Improvement recommendations
  • 18. Key Tasks and Status