CALCULATION OF YIELDS,
PRODUCTION RECORD REVIEW,
CHANGE CONTROL
• CALCULATION OF YIELDS
• PRDUCTION RECORD REVIEW
• CHANGE CONTROL
CALCULATION OF YIELDS
• THEORETICAL YIELD: The amount of drug that is calculated by using
balanced equation.
• ACTUAL VALUE: The amount of drug that is obtained when reaction
takes place.
• PRACTICAL YIELD: It is the combination of both theoretical yield and
actual yield i.e.,
Practical yield = theoretical yield x 100
actual yield
Production record review
• All drug product production and control records including those for
packaging and labelling, shall be reviewed and approved by the quality
control unit to determine compliance with all established, approved
written procedures before a batch is released or distributed.
• Any unexplained discrepancy (including a percentage of theoretical yield
exceeding the maximum or minimum percentages established in master
production and control records) or the failure of a batch or any of its
components to meet any of its specifications shall be thoroughly
investigated, whether or not the batch has already been distributed.
• The investigation shall extend to other batches of the same drug product
and other drug products that may have been associated with the specific
failure or discrepancy. A written record of the investigation shall be made
and shall include the conclusions and follow up.
21 cfr 211.192 PRODUCTION
RECORD REVIEW
• The USP has established that the acceptable range of most compounded
preparations is typically +/- 10% ; however , it can be as great as +/-
20% (as with some proteins) or as tight as+/-5%(as with potent
analgesics).for some raw powders, potency is required to be within +/-
2%.
• In addition to 211.192 requires review and approval of all production
records prior to batch release /distribution and unexplained discrepancy
or the failure of a batch or any of its components to meet any of its
specifications shall be thoroughly investigated.
CHANGE CONTROL DEFINITION:
“ Change control is a formal system by which a qualified representative of
appropriate disciplines review proposed and actual changes that might
affect the validated status. The intent is to determine the need for action that
would ensure that the system is maintained in a validated state.”
Types of Change control
1 – Minor change is a change that has minimal potential to have an
adverse effect on identity, strength, quality, purity, or potency of the product as
they may relate to the safety or effectiveness of the product.
2 – Major change is a change that has a moderate potential to have an
adverse effect on the identity, strength, quality, purity, or potency of the
product as they may relate to the safety or effectiveness of the product.
3- Critical change is a change that has a substantial potential to have an
adverse effect on the identity, strength, quality, purity, or potency of a product
as they may relate to the safety or effectiveness of the product.
Levels of approval of Change control
• “Level -1 signifies level of approval required to approve a change”
Initiator department and the quality assurance department only
e.g. SOPs related to single department like operating procedure of
equipment’s, cleaning procedure of equipments, etc.
• “Level -2 signifies level of approval required to approve a change”
Initiator department and all other interlinked departments within the plant
e.g. Change in SOPs which are being followed at different departments
at plant level.
• “Level -3 signifies level of approval required to approve a change”
Initiator department and all other relevant departments (within plant or
outside the plant) including marketing, RA and Quality and Compliance,
etc.
e.g. Change Controls which include change in specifications /STPs / GTPs /
Artworks / License related issues / BMR / process change / Vendor change,
etc These type of changes may require company’s R.A. department to ask
for approval of regulatory agency(ies) that have impact on regulatory
dossiers submissions.
Procedure of Change Control
Fill the from
Initiator
department, date,
Name &
Designation
and proposed hangs
along with proper
justification and
assess the need
of training
Any personnel can propose a
change through “CHANGE
CONTROL FORM”
Head of initiator
department shall
assess the type of
change and
changes
required in the
interlinked
documents and
finally countersign
on the proposal.
Once the form has been signed by
the initiator’s department head /
designee,
the same shall be forwarded to QA.
QA personnel shall evaluate the
basic requirements of the change
control and assess whether change
control requires comments /
approval from Level 1/2/3.
QA personnel allocates a unique
number to the change control and
log the same number in the “Record
of Change Control”
Procedure of Change Control
Comments on
the
change control
can
be asked from
out stationed
departments
through
email/fax
After that QA personnel shall
circulate the change control for
approval to different
department Heads or designee.
All the Concern
Department
Heads/Designee shall
evaluate the change
control at their
respective ends and
give their comments
and submit back to
QA for further
action plan.
Head QA or Designee shall
approve or reject the change
controls based on the sound
scientific assessment.
After approval Head QA / designee, QA personnel
shall send the change intimation to all concerned
department heads / designee for planning the
implementation of the change control through
electronic means of communications.
After approval of change control, QA Personnel shall evaluate
the implementation of same and shall close the change control
only after all documents or any activity mentioned in the change
control is closed.
Steps of change control
• Documenting the change request
• Formal assessment of the change
• Proper Planning and timeline
• Final Impact assessment of the change
• Implementation of change
• Final assessment after Implementation
Steps of change control
• Documenting the change request: When any change is proposed, the
request form is filled and change is categorized in minor, major, critical
and recorded, along with informal assessments of the importance of that
change and the difficulty of implementing it.
• Formal assessment of the change: The justification for the change and
risks and benefits of making/not making the change are evaluated. If the
change request is accepted, a change control review team will be
assigned. If the change request is rejected, that fact is documented and
communicated to the Initiator.
Steps of change control
• Proper Planning and timeline: The review team responsible for the
change reviews approval or rejection, implementation and plans properly
for its implementation within timeline.
• Final Impact assessment of the change: The review team does correct
impact assessment of the change with respect to GMP. If the change is
found to have no impact on GMP and it is improving for the system, then
the review team requests approval and gives the timeline for
implementation.
• Implementation of change: The review team also verifies the
implementation status of the change after approval and the timeline of the
change implementation.
• Final assessment after implementation: If the initiator, review team and
QA are satisfied that the change was implemented satisfactorily, the
change request is closed.

More Related Content

PPTX
Pharmaceutical Quality Management System
PPTX
calulation of yields, production record review,change control
PPTX
Six System Inspection Model.pptx
PPTX
Vendor qualification
PPTX
Validation utility system
PPTX
Good manufacturing practices (schedule m)
PPTX
cGMP Guidelines According to Schedule M
PPTX
Computer system validations
Pharmaceutical Quality Management System
calulation of yields, production record review,change control
Six System Inspection Model.pptx
Vendor qualification
Validation utility system
Good manufacturing practices (schedule m)
cGMP Guidelines According to Schedule M
Computer system validations

What's hot (20)

PDF
Qualification of tablet compression machine
PPTX
Qualification of laboratory equipments
PPTX
cGMP Guidelines according to USFDA
PPTX
Batch Review And Batch Release.pptx
PPTX
Ipqc and fpqc test for suppositories
PPTX
Qualification of tablet compression (machine) & Capsule filling machine
PPTX
Qualification of Analytical Equipments
PPTX
Auditing of quality assurance and maintenance of engineering department
PPTX
Auditing of capsule, sterile production and packaging
PPTX
CLEANING VALIDATION for M.pharm and industry person
PPTX
IPQC & FPQC creams, opthalmic & parentrals.pptx
PPTX
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
PPTX
QUALIFICATION OF HPLC , HPLC
PPTX
Manufacturing operation and controls
PPTX
Computerized system validation
PPTX
Qualification of Manufacturing Equipments.
PPTX
QUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTER
PPTX
BACPAC
Qualification of tablet compression machine
Qualification of laboratory equipments
cGMP Guidelines according to USFDA
Batch Review And Batch Release.pptx
Ipqc and fpqc test for suppositories
Qualification of tablet compression (machine) & Capsule filling machine
Qualification of Analytical Equipments
Auditing of quality assurance and maintenance of engineering department
Auditing of capsule, sterile production and packaging
CLEANING VALIDATION for M.pharm and industry person
IPQC & FPQC creams, opthalmic & parentrals.pptx
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
QUALIFICATION OF HPLC , HPLC
Manufacturing operation and controls
Computerized system validation
Qualification of Manufacturing Equipments.
QUALIFICATION OF TAP DENSITY TESTER & DISINTEGRATION TESTER
BACPAC
Ad

Similar to calulation of yields, production record review,change control (20)

PPT
Presentation on-change-control
PPTX
CCF PPT By Amit Gupta.pptx
PPTX
Change management system
PPTX
Regulatory aspect of pharmaceutical change control system
PPTX
Change control
PPT
Change control
PDF
Change control full pdf for assignment
PPTX
Change Control.pptx
PPTX
Change Control in Pharmaceutical Industry
PDF
B Phaem 7th sem Industrial Pharmacy 2 Change Control
PDF
b6d9292180b7acfb6cede93cf031347690ce.pdf
PPTX
Change control request
PPTX
CHANGE CONTROL
PPTX
Change control,SOP,PHARMA,R&D,QC,QA
PPTX
Mpharm pratik....pptx
PPTX
Mpharm pratik.pptx
PDF
Expiry date , calculation of yields, production record review, change control
PDF
Quality Management System in of pharma .pdf
PPTX
change control
PDF
Manufacturing operation and control
Presentation on-change-control
CCF PPT By Amit Gupta.pptx
Change management system
Regulatory aspect of pharmaceutical change control system
Change control
Change control
Change control full pdf for assignment
Change Control.pptx
Change Control in Pharmaceutical Industry
B Phaem 7th sem Industrial Pharmacy 2 Change Control
b6d9292180b7acfb6cede93cf031347690ce.pdf
Change control request
CHANGE CONTROL
Change control,SOP,PHARMA,R&D,QC,QA
Mpharm pratik....pptx
Mpharm pratik.pptx
Expiry date , calculation of yields, production record review, change control
Quality Management System in of pharma .pdf
change control
Manufacturing operation and control
Ad

More from srikrupa institute of pharmaceutical analysis (14)

DOCX
7.specification and test procedure
PDF
DNA FINGERPRINTING TECHNIQUE FOR IDENTIFICATION OF DRUGS OF NATURAL ORIGIN AN...
DOCX
PDF
PDF
PDF
special emphasis on Q series guidelines
PPTX
release of finished products
PDF
PDF
PPTX
Qualification of gc equipment
PPTX
Qualification of high performance liquid chromatography
7.specification and test procedure
DNA FINGERPRINTING TECHNIQUE FOR IDENTIFICATION OF DRUGS OF NATURAL ORIGIN AN...
special emphasis on Q series guidelines
release of finished products
Qualification of gc equipment
Qualification of high performance liquid chromatography

Recently uploaded (20)

PPTX
Open Quiz Monsoon Mind Game Prelims.pptx
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
TR - Agricultural Crops Production NC III.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
master seminar digital applications in india
PDF
Basic Mud Logging Guide for educational purpose
PPTX
Cell Structure & Organelles in detailed.
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
BÀI TẬP TEST BỔ TRỢ THEO TỪNG CHỦ ĐỀ CỦA TỪNG UNIT KÈM BÀI TẬP NGHE - TIẾNG A...
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
Open Quiz Monsoon Mind Game Prelims.pptx
Pharmacology of Heart Failure /Pharmacotherapy of CHF
2.FourierTransform-ShortQuestionswithAnswers.pdf
TR - Agricultural Crops Production NC III.pdf
human mycosis Human fungal infections are called human mycosis..pptx
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
master seminar digital applications in india
Basic Mud Logging Guide for educational purpose
Cell Structure & Organelles in detailed.
STATICS OF THE RIGID BODIES Hibbelers.pdf
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
O5-L3 Freight Transport Ops (International) V1.pdf
GDM (1) (1).pptx small presentation for students
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
BÀI TẬP TEST BỔ TRỢ THEO TỪNG CHỦ ĐỀ CỦA TỪNG UNIT KÈM BÀI TẬP NGHE - TIẾNG A...
Microbial diseases, their pathogenesis and prophylaxis
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table

calulation of yields, production record review,change control

  • 1. CALCULATION OF YIELDS, PRODUCTION RECORD REVIEW, CHANGE CONTROL • CALCULATION OF YIELDS • PRDUCTION RECORD REVIEW • CHANGE CONTROL
  • 2. CALCULATION OF YIELDS • THEORETICAL YIELD: The amount of drug that is calculated by using balanced equation. • ACTUAL VALUE: The amount of drug that is obtained when reaction takes place. • PRACTICAL YIELD: It is the combination of both theoretical yield and actual yield i.e., Practical yield = theoretical yield x 100 actual yield
  • 3. Production record review • All drug product production and control records including those for packaging and labelling, shall be reviewed and approved by the quality control unit to determine compliance with all established, approved written procedures before a batch is released or distributed. • Any unexplained discrepancy (including a percentage of theoretical yield exceeding the maximum or minimum percentages established in master production and control records) or the failure of a batch or any of its components to meet any of its specifications shall be thoroughly investigated, whether or not the batch has already been distributed. • The investigation shall extend to other batches of the same drug product and other drug products that may have been associated with the specific failure or discrepancy. A written record of the investigation shall be made and shall include the conclusions and follow up.
  • 4. 21 cfr 211.192 PRODUCTION RECORD REVIEW • The USP has established that the acceptable range of most compounded preparations is typically +/- 10% ; however , it can be as great as +/- 20% (as with some proteins) or as tight as+/-5%(as with potent analgesics).for some raw powders, potency is required to be within +/- 2%. • In addition to 211.192 requires review and approval of all production records prior to batch release /distribution and unexplained discrepancy or the failure of a batch or any of its components to meet any of its specifications shall be thoroughly investigated. CHANGE CONTROL DEFINITION: “ Change control is a formal system by which a qualified representative of appropriate disciplines review proposed and actual changes that might affect the validated status. The intent is to determine the need for action that would ensure that the system is maintained in a validated state.”
  • 5. Types of Change control 1 – Minor change is a change that has minimal potential to have an adverse effect on identity, strength, quality, purity, or potency of the product as they may relate to the safety or effectiveness of the product. 2 – Major change is a change that has a moderate potential to have an adverse effect on the identity, strength, quality, purity, or potency of the product as they may relate to the safety or effectiveness of the product. 3- Critical change is a change that has a substantial potential to have an adverse effect on the identity, strength, quality, purity, or potency of a product as they may relate to the safety or effectiveness of the product.
  • 6. Levels of approval of Change control • “Level -1 signifies level of approval required to approve a change” Initiator department and the quality assurance department only e.g. SOPs related to single department like operating procedure of equipment’s, cleaning procedure of equipments, etc. • “Level -2 signifies level of approval required to approve a change” Initiator department and all other interlinked departments within the plant e.g. Change in SOPs which are being followed at different departments at plant level.
  • 7. • “Level -3 signifies level of approval required to approve a change” Initiator department and all other relevant departments (within plant or outside the plant) including marketing, RA and Quality and Compliance, etc. e.g. Change Controls which include change in specifications /STPs / GTPs / Artworks / License related issues / BMR / process change / Vendor change, etc These type of changes may require company’s R.A. department to ask for approval of regulatory agency(ies) that have impact on regulatory dossiers submissions.
  • 8. Procedure of Change Control Fill the from Initiator department, date, Name & Designation and proposed hangs along with proper justification and assess the need of training Any personnel can propose a change through “CHANGE CONTROL FORM” Head of initiator department shall assess the type of change and changes required in the interlinked documents and finally countersign on the proposal. Once the form has been signed by the initiator’s department head / designee, the same shall be forwarded to QA. QA personnel shall evaluate the basic requirements of the change control and assess whether change control requires comments / approval from Level 1/2/3. QA personnel allocates a unique number to the change control and log the same number in the “Record of Change Control”
  • 9. Procedure of Change Control Comments on the change control can be asked from out stationed departments through email/fax After that QA personnel shall circulate the change control for approval to different department Heads or designee. All the Concern Department Heads/Designee shall evaluate the change control at their respective ends and give their comments and submit back to QA for further action plan. Head QA or Designee shall approve or reject the change controls based on the sound scientific assessment. After approval Head QA / designee, QA personnel shall send the change intimation to all concerned department heads / designee for planning the implementation of the change control through electronic means of communications. After approval of change control, QA Personnel shall evaluate the implementation of same and shall close the change control only after all documents or any activity mentioned in the change control is closed.
  • 10. Steps of change control • Documenting the change request • Formal assessment of the change • Proper Planning and timeline • Final Impact assessment of the change • Implementation of change • Final assessment after Implementation
  • 11. Steps of change control • Documenting the change request: When any change is proposed, the request form is filled and change is categorized in minor, major, critical and recorded, along with informal assessments of the importance of that change and the difficulty of implementing it. • Formal assessment of the change: The justification for the change and risks and benefits of making/not making the change are evaluated. If the change request is accepted, a change control review team will be assigned. If the change request is rejected, that fact is documented and communicated to the Initiator.
  • 12. Steps of change control • Proper Planning and timeline: The review team responsible for the change reviews approval or rejection, implementation and plans properly for its implementation within timeline. • Final Impact assessment of the change: The review team does correct impact assessment of the change with respect to GMP. If the change is found to have no impact on GMP and it is improving for the system, then the review team requests approval and gives the timeline for implementation. • Implementation of change: The review team also verifies the implementation status of the change after approval and the timeline of the change implementation. • Final assessment after implementation: If the initiator, review team and QA are satisfied that the change was implemented satisfactorily, the change request is closed.